SURVEY OF EXISTING INSTITUTE

JOBRA

CHITTAGONG UNIVERSITY

t
roo

AD
ATI RO

in
tra

AM
CHITTAGONG - RANG

le
utt
sh
FATEHBAD STATION

In Chittagong University he worked with such a form which was repeated in a staggered
progression to echo the mountains and the contour the site was on. Every oor had an open
terrace on one side and the mountains on the other. The buildings were gradually sliding on
columns towards the mountain creating a beautiful graphic and a visual system. Hence it
displayed a skillful juxtaposition of the aesthetic and perception of the structure in
consistency with the environment. His private indoor spaces always linked with the outdoor
landscape through a secondary space in between them. This semi enclosed space was not
only necessary for linking the outdoor with the indoor but was also an ideal solution for the
protection from sun and rain that a warm humid monsoon climate plead for.The robust
exposed brick walls with similar rectangular openings and staggered form provide the
buildings a sense of order and primordial power.

SECTION OF AUDITORIUM
Muzharul Islams analysis of the site was a unique understanding of the
earthen and sandy soil hills of Bangladesh. This kind of terrain made buildings
on the top or the slope of the hills almost impossible or if possible at formidable
cost. The harsh monsoon and heavy rainfall in that area demanded that the
natural water courses low lands and water bodies strictly maintained to avoid
any disruption of the ecological system.
Muzharul Islam studied these apparent restraints carefully. And then from
them derived an ingenious way of placing buildings and connecting them. The
buildings were all placed in the valleys or at the foot of the hills. This would set
the building against a wonderful set back of the hills themselves avoiding the
complexity and the ecological disturbance that would have taken place if the
building were set on the slops or the top of the hills. As one enters the buildings
one is situated in a close dialogue with the rising slops of the hills behind. This
magical space between the building and the slop of the hills that is created by
the close proximity of the slops and the buildings is truly his creation and gift to
the inhabitants of the campus.
Muzharul Islam was able to take the complex the site and decipher its hidden
code into a profound simple geometry. Muzharul Islam again chooses brick as
the main material because of our rich heritage of brick architecture and also
its color and texture would play beautifully with the lash green setting. He also
assumed that it would be a more maintenance free nish rather than plaster
and paint. All the buildings in the campus are designed in a clear modern
language, compositions of planes, solids and voids in sculptural geometric
order.

HUMANITIES DEPARTMENT

CSE BUILDING

CHITTAGONG UNIVERSITY MASTERPLAN


CENTRAL LIBRARY

academic zone

circulation

water dam

teachers quarter

stuffs quarter

students hall

scale 1:4000
AUDITORIUM

AUDITORIUM MASTERPLAN

CHITTAGONG UNIVERSITY
ARCHITECT : MAZHARUL ISLAM
ESTABLISHED IN 1966

Academics
central mosque
shahid abdur rob hall
social science faculty
shah jalal hall

AREA

business faculty

1244.73 acre

central library
language martyrs monument

pritilata hall
teachers quarter
biological science faculty

CHITTAGONG UNIVERSITY EXISTING CONDITION

Academic Faculties 7
Academic Departments 52
Research Centers 5
Affiliated Institutes 6
Affiliated Colleges 8
Academic staff 726
Admin. staff 1900
Students 22000

CENTRAL HALL

RESIDENCE HALL

Degrees Awarded
Undergrad
BA, MA, B.Ed, BSc, MSc,
MS, BBA, MBA, LLB, LLM, M.Ed, BSS,
MSS, M.B.B.S.
Postgrad M.Phil., Ph.D., M.D., M.P.H

Residence Hall
Types

10
Male:6, Female:3, Coed:1

Staff
Teaching Staff 726
Other Staff
Officer:296, 3rd Class
Staff:478, 4th Class Staff:1180
RESIDENCE HALL

LANGUAGE MARTYRS MONUMENT

CALIFORNIA INSTITUTE OF SCIENCE & TECHNOLOGY


ARCHITECT : BERHAM GOODHUE
ESTABLISHED IN 1891

SITE ANALYSIS - HISTORY DEVELOPMENT HISTORY ORGANIZES THE CAMPUS INTO FOUR DISTINCT BANDS OR ZONES
LOCATION
18 km away from DOWNTOWN LOS ANGELS

CONCEPT
design was influenced by SPANISH MISSION ARCHITECTURE

AREA
total area 124 acre comprising with ACADEMIC, RESIDENTIAL & LAB FACILITY

ACADEMIC FACILITY
6 DIVISIONS
Biology & Biological Engineering
Chemistry & Chemical Engineering
Engineering & Applied Science
Geological & Planetary Science
Humanities & Social Science
Physics, Mathematics & Astronomy

RECIDENTIAL FACILITY
4 houses, apartments, dormitories & single family houses

AERIAL VIEW OF THE CAMPUS

ARMS LABORATORY

BROAD CENTER

BECKMAN AUDITORIUM

AVERY HOUSE

RICKETTE HOUSE

BECKMAN INSTITUTE

WALKWAY

CALIFORNIA INSTITUTE OF SCIENCE & TECHNOLOGY

AVERY

PARKING

BROAD
CENTER

PARKING

MOORIE
BECKMAN
INSTITUTE

STUDENT SHOP
BECKMAN
AUDITORIUM

PARKING

BECKMAN BEHAVIORAL
BIOLOGY

POWEL

PARKING

KECK LAB

NOYES

STEELE
BAXTER

MEAD

WATSON

JORGENSEN

WINNETT

DABNEY
HALL

KIRCKHOFF BIOLOGY LAB

PARKING

CAF

SPALDING
CHURCH

STUDENT SHOP

PARKING

PARKING

RUDDOCK
PAGE

THOMAS

LOYD

MILLIKAN
LIBRARY
NO. MUDD

GUGGEMHEM

ROBINSON

ARMS
BRIDGE
(physics lab)

FIRESTONE

FLEMING
PARKING

KERMAN

DOWN LAURITSEN

SO. MUDD

FLEMING

DABNEY

BLACKER

EXISTING CONDITIONS - SURFACES


Analysis of surface conditions reveals that over 50% of the campus is impervious over 20% is planted in high maintenance lawn

CAHILL
CENTER
(astronomy
& astrophysics)

emergency telephone
parking
institutional building
shop facility
lab
auditorium
fire station
church
library
admin
dormitory
apartments
single family house
tennis court
recycling center
caf
green open field
gym
site for future projection

SITE ANALYSIS : GAZIPUR


PROPOSED INSTITUTE DESIGN
ARI

IWFM

The main objectives of the Institute are to carry out scientific research and investigation to ascertain the causes of
accidents on roads, railways and waterways in Bangladesh. The institute has also given the mandated function to
create awareness for safety issues at different stages of community across the country and share acquired
knowledge with the professionals at different levels to ensure safer transportation system.
he Institute of Flood Control and Drainage Research was established in 1974 and later renamed as the Institute of
Water and Flood Management (IWFM) in 2002. The Institute pursues research and capacity development in the field
of water and flood management that is vital for economic development and social prosperity of the country.

IAT

Institute of Appropriate Technology (IAT) is one of the oldest institutes of Bangladesh University of Engineering and
Technology.This institution was established to support development of national indigenous capability in selection,
generation and dissemination of technologies appropriate to the national development objectives of Bangladesh.

IICT

The purpose of the Institute is to provide a platform for teaching, learning and research in information and
communication technology (ICT) that will contribute to industrial and infrastructural development, economic growth
and social prosperity.

Gazipur - Joydebpur Highway

Secondary Road To The Site

Road In Front of The Site

BUET
The BUET-Japan Institute of Disaster Prevention and Urban Safety (BUET-JIDPUS) is a newly established
institution
of Bangladesh University of Engineering and Technology (BUET). The university syndicate gave formal
-JIDPUS
approval to this institute on July 1, 2011. BUET-JIDPUS was established to fulfill the urgent need for active research
and education support in the field of disaster prevention and urban safety in Bangladesh.

Dhaka - M
ymensing
Highway

testing field
peddy field
site
institutional area
residential area
shop
office
future residential area
mosque
less Integrated kaccha road
small pond

Small Pond

BARRI

Existing Two Tin Shaded Building

y
wa
h
ig

r H

ur -

ip
Gaz

pu
deb
Joy

Dhaka - Ga
zipur High
way

Deora - Joyd
ebpur Highw
ay

Poor Road Condition


Highway
Joydebpur - Tangail

Less Wide Road

- away from the city & crowd


- there are 2 institute around the site already
- openness
- fresh environment & less pollution

- the bazar is much distant from the site


- hospital facility is much distant from the site
- less road width
- scope of increasing the road width is low

- when the institute will be established the area


will be more developed
- the bazar will be developed
- the road will be improved

- after developing the area the load on the road


will be increased but the scope of increasing the
road width is low
- the developing residential area will be on the
back of the institute. that will create the
accessibility will be hampered.

EXISTING INSTITUTE SURVEY OF BUET

IAT& IWFM

ARI

Program for IAT (Institute of Appropriate Technology)


Space requirement for Teaching Facility
EXISTING CONDITION

Space

No of Room

Ground Floor Plan (IAT & IWFM)

Msc Classroom

No of Users

PROPOSED DESIGN
No of Room

30 per classroom

No of Users

30 per classroom

Phd Students Room

12

1 per room

Training room

50 per classroom

Discussion room

30 per classroom

Total Area

Space requirement for Lab Facility

Ground Floor Plan ( ARI )

No of Room

circulation 30.5%
(IAT & IWFM)
Program for ARI (Accident Research Institute)

Circulation

No of Users

1 person

Classroom
Research Incubator

PROPOSED DESIGN
No of Room

No of Users

30 per classroom

1 person

Total Area
1200 sqft
200 sqft

EXISTING CONDITION

Classrooms
Lab and Reserch

PROPOSED DESIGN

No of Room

No of Users

No of Room

No of Users

Total Area

6 person

6 person

1800 sqft

Driving Simulation Lab

4 person

4 person

500 sqft

100x60 sqft

20x30 sqft

Safety Equipment Lab

Crash Investigation Lab

2 person

4 person

1800 sqft

Computer Lab

30 person

30 person

2000 sqft

5 person

30 per classroom

Space requirement for Administration


EXISTING CONDITION

Teachers Room

Stuffs Room

No of Users

8 person

PROPOSED DESIGN
No of Room

No of Users

30

1 room for each

Total Area

25 person

Space requirement for Support Function

Space

EXISTING CONDITION
No of Room

Seminar Room

No of Users

PROPOSED DESIGN
No of Room

Service

400 sqft

150 person

Common Room
Library

Software Simulation Lab

5 person

Prototype Model Lab

Meeting Room

Vehicle Inspetion Lab (1 car)

Total Area

R&D LAb

15 per classroom

Director, Asst. Director And Section Officers will have individual office

Space requirement for Lab Facility


Space

No of Users

No of Room

Faculty and Administration


No of Room

PROPOSED DESIGN
No of Room

Computer Lab

Space

EXISTING CONDITION

Space

No of Users

Also require selected apparatus from EEE,CIVIL,CHEMICAL & Metallurgy dept

Space requirement for Teaching Facility

circulation 30.5% (ARI)

EXISTING CONDITION

Space

40 person

200 person

Total Area

50 Person

Garage

800 sqft

No of Users

30-40 sitting & 10 individual cubicles

2-3 Cars

provision of power room, generator room, storage, first aid room etc. is required
TOTAL 35000 sqft (approax.)

Space requirement for Administration


EXISTING CONDITION

Space

1st Floor Plan ( ARI )

PROPOSED DESIGN

No of Room

No of Users

No of Room

No of Users

Teachers Room

1 room for each

1 room for each

Stuffs Room

2 person

3 person

Total Area

Program for IWFM (Institute of Water & Flood Management)

Director will have individual office

Space requirement for Teaching Facility

1st Floor Plan (IAT)

Space requirement for Support Function

Space

EXISTING CONDITION
No of Room

No of Users

Space

PROPOSED DESIGN
No of Room

No of Users

Total Area
400 sqft

Reception & Waiting Room

10 person

10 person

Meeting Room

20 person

20 person

Seminar Room

200 person

200 person

Common Room

20 Person

20 Person

Library

20 sitting

20 sitting

Data Entry

3 person

3 person

200 sqft

Server Room

200 sqft

Garage

2-3 Cars

2-3 Cars

Msc Classroom

No of Users

10 per classroom

PROPOSED DESIGN
No of Room

No of Users

20 per classroom

Phd Students Room

1 per room

Pgd Classroom

5 per classroom

Total Area

Space requirement for Lab Facility


Space

TOTAL 15000 sqft (approax.)

EXISTING CONDITION
No of Room

provision of power room, generator room, storage, first aid room etc. is required

2nd Floor Plan ( ARI )

EXISTING CONDITION
No of Room

2nd Floor Plan (IWFM)

No of Users
20 pc

PROPOSED DESIGN
No of Room

No of Users

30+10 pc

Total Area

Computer & GIS Lab

Soil Testing Lab

Water Testing Lab

15x20 sqft

Hydraulic Flume

40x120 sqft

Flood Flow Channel

60x160 sqft

15x20 sqft

Hydraulic Flume & Flood Flow Channel are placed outside

Space requirement for Administration


Space

EXISTING CONDITION
No of Room

Teachers Room

10

Stuffs Room

No of Users

PROPOSED DESIGN
No of Room

8 person

No of Users

16

1 room for each

16 person

Total Area

Director, Asst. Director And Section Officers will have individual office

Space requirement for Support Function


Space

EXISTING CONDITION
No of Room

No of Users

Meeting Room
Seminar Room

3rd Floor Plan ( ARI )

PROPOSED DESIGN
No of Room

No of Users

40 person

200 person

Common Room

10 Person

50 Person

Project Room

5-6 Person

5-6 Person

Library
Garage

20-30 sitting

Total Area

20x30 sqft

20-30 sitting
1

2-3 Cars

provision of power room, generator room, storage, first aid room etc. is required
TOTAL 25000 sqft (approax.)

EXISTING INSTITUTE SURVEY OF BUET

IICT

BUET-JIDPUS

circulation 32.7%
BUET-JIDPUS

7th Floor Plan (IICT)

Ground Floor Plan (BUET-JIDPUS)

6th Floor Plan (IICT)


Program for BUET-JIDPUS

circulation 32.7%
(IICT)

BUET-Japan Institute of Disaster Prevention and Urban Safety

Program for BUET-IICT


Space requirement for Teaching Facility

BUET- Institute Of Information & Communication Technology

Space

Space requirement for Teaching Facility

Space

EXISTING CONDITION
No of Room

No of Users

No of Room

No of Users

30 per classroom

30 per classroom

Training Room

20 per classroom

40 per classroom

Total Area

EXISTING CONDITION
No of Room
5

No of Users

No of Room

No of Users

Classroom

30 per classroom

30 per classroom

Training room

50 per classroom

50 per classroom

PROPOSED DESIGN
No of Room

No of Users

30 pc provision

EXISTING CONDITION
No of Room

Total Area

No of Users

PROPOSED DESIGN
No of Room

Computer & Simulation Lab

Earthquake Engineering Lab

Geotechnical & Geophysical Lab

Non-Destructive Testing Lab

No of Users

2700 sqft

Earthquake Engineering Lab requires Triple height space, Control room, Gallery, Basement to facilitate Anchorage (5.5' high) and 20' high doorway

Data Entry

6 person

6 person

300 sqft

Geotechnical & Geophysical Lab requires High roof level needed, Storage space, Trainer's Station

5 person

5 person

1250 sqft

Non-Destructive Testing Lab requires Storage space, Trainer's Station

BIIS

2 person

2 person

150 sqft

Hardwware Room

5 person

5 person

150 sqft

Video Conference Room

5 person

5 person

5 person

10 person

Total Area

30 per classroom

Server Room

Strong Room

Total Area

Space requirement for Lab Facility


Space

Space requirement for Lab Facility

Computer Lab

PROPOSED DESIGN

No of Users

PROPOSED DESIGN

Classroom

Space

EXISTING CONDITION
No of Room

150 sqft
600 sqft

1st Floor Plan (BUET-JIDPUS)

Equipments details of Lab Facility


Earthquake Engineering Lab

BI-directional Reaction Wall, Unidirectional Shake Table, Horizontal Tray, Cooler, Crane

Geotechnical &
Geophysical Lab

Actuators, Portable Accelerometers, Micro-tremor equipment, Ground penetrable radar


equipment, Soil testing Apparatus, Cyclic tri-Axial Machine, Field Equipment

Space requirement for Administration


Space

Non-Destructive Testing Lab

EXISTING CONDITION
No of Room

Space requirement for Administration

PROPOSED DESIGN

No of Users

No of Room

No of Users

Teachers Room

25

1 room for each

30

1 room for each

Stuffs Room

15 person

25 person

Ferro Scanner, Ultrasonic NDT device, Cross-hole seismic equipment, UPV device etc.

Total Area
Space

EXISTING CONDITION
No of Room

Director, Asst. Director And Section Officers will have individual office

No of Users

PROPOSED DESIGN
No of Room

No of Users

Teachers Room

12

1 room for each

12

1 room for each

Stuffs Room

17 person

17 person

Total Area

Director, Asst. Director And Section Officers will have individual office

Space requirement for Support Function

Space

Space requirement for Support Function

EXISTING CONDITION
No of Room

No of Users

PROPOSED DESIGN
No of Room

No of Users

Space

Total Area

No of Users

PROPOSED DESIGN
No of Room

No of Users

Multipurpose Hall

Meeting Room

40 person

40 person

Meeting Room

40 person

40 person

Seminar Room

200 person

200 person

Seminar Room

200 person

200 person

Common Room

50 Person

50 Person

Common Room

50 Person

50 Person

30-40 sitting

Library

2-3 Cars

Garage

Library
Garage

EXISTING CONDITION
No of Room

30-40 sitting
1

Multipurpose Hall

provision of power room, generator room, storage, first aid room etc. is required

Total Area

30-40 sitting

30-40 sitting
1

2-3 Cars

provision of power room, generator room, storage, first aid room etc. is required

TOTAL 30000 sqft (approax.)