Check the installation


Installation
check list
10
Front covers
9
Front covers
Installation
Installing the
plinth
3
Plinth on the
floor
Plinth on the
wall
Plinth on the
pole
Installation
Installing
modules
6
Principle of
module
installation
Recommended
installation order
Installation
Installing
optional
sub-modules
5
Installing FPFD
Installing FTI
Installing FBBA
F
This guide can be used as quick reference for Flexi Multiradio BTS installation.
Flexi Multiradio BTS is a macro BTS site solution. It consists of one System Module with transmission
and RF Modules. It can be installed stacked on the floor, or mounted on the wall or on the pole.
This quick guide is for basic stand-alone installation only. For other installation options, see operating
documentation.
10
10
Ground
the BTS
Grounding
principle
4
Grounding
principle of
the BTS
Preparing
modules for
installation
Back cover
and cable
entries
Prepare the
installation
2
Powering up and
commissioning
the BTS
8
Power up and
commission BTS
Cabling
Cabling
Connecting
external power
feed
Antenna
cabling
Optical cabling
Transmission
cabling
FPFD cabling
FBBA cabling
1
Clearances
Check the site
Minimum
clearances
Flexi Multiradio 10 BTS
Quick Guide
The information in this document is subject to change without notice and describes only the
product defined in the introduction of this documentation. This document is not an official
customer document and Nokia Siemens Networks does not take responsibility for any errors or
omissions in this document. This document is intended for the use of Nokia Siemens Networks
customers only for the purposes of the agreement under which the document is submitted. No
part of this documentation may be used, reproduced, modified or transmitted in any form or
means without the prior written permission of Nokia Siemens Networks. The documentation has
been prepared to be used by professional and properly trained personnel, and the customer
assumes full responsibility when using it. Nokia Siemens Networks welcomes customer
comments as part of the process of continuous development and improvement of the
documentation.
The information or statements given in this documentation concerning the suitability, capacity or
performance of the mentioned hardware or software products are give and all liability
arising in connection with such hardware or software products shall be defined conclusively and
finally in a separate agreement between Nokia Siemens Networks and the customer.
IN NO EVENT WILL Nokia Siemens Networks BE LIABLE FOR ERRORS IN THIS
DOCUMENTATION OR FOR ANY DAMAGES, INCLUDING BUT NOT LIMITED TO SPECIAL,
DIRECT, INDIRECT, INCIDENTAL OR CONSEQUENTIAL OR ANY LOSSES SUCH AS BUT
NOT LIMITED TO LOSS OF PROFIT, REVENUE, BUSINESS INTERRUPTION, BUSINESS
OPPORTUNITY OR DATA, that might arise from the use of this document or the information in it.
THE CONTENTS OF THIS DOCUMENT ARE PROVIDED "AS IS". EXCEPT AS REQUIRED
BY APPLICABLE MANDATORY LAW, NO WARRANTIES OF ANY KIND, EITHER EXPRESS
OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF
MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE AND NON-INFRINGEMENT,
ARE MADE IN RELATION TO THE ACCURACY, RELIABILITY OR CONTENTS OF THIS
DOCUMENT. NOKIA SIEMENS NETWORKS RESERVES THE RIGHT TO REVISE THIS
DOCUMENT OR WITHDRAW IT AT ANY TIME WITHOUT PRIOR NOTICE.
This document and the product it describes are considered protected by copyrights and other
intellectual property rights according to the applicable laws.
The wave logo is a trademark of Nokia Siemens Networks Oy. Nokia is a registered trademark of
Nokia Corporation. Siemens is a registered trademark of Siemens AG.
Other product names mentioned in this document may be trademarks of their respective owners,
and they are mentioned for identification purposes only.
Copyright Nokia Siemens Networks 201 . All rights reserved.
n as is
3
120181 DN09 Issue 04, Approval date 2013-03-22
-2-
W Risk of eye damage caused by invisible laser beam. ARNING!
Danger of eye damage caused by invisible laser beam!
Make sure that the laser beam is switched off when optical cables are installed.
NOTICE:
Incorrect cables and seals may not provide secured weather protection. In outdoor
installations, including the outdoor cabinet, use only tested IP 5 class outdoor cables
with seals provided by Nokia Siemens Networks. This is also recommended for indoor
installations.
Electrostatic discharge (ESD) may damage the modules. Wear an ESD wrist strap or
use a corresponding method when handling the modules.
The plinth rear stopper is fragile. Do not attempt to lift the plinth using the rear stopper.
Installing and commissioning of BTS products must be performed by an expert
familiar with electronic devices, to avoid damage caused by improper handling.
6
WARNING! Risk of electric shock.
Before turning RF power on, RF ports should be terminated by nominal 50 load
(for example, feeder with antenna). However, if these conditions are not met,
the plastic caps that are delivered within the unused RF ports should remain in place.
The plastic caps isolate RF power from the environment, and thus provide
electric shock security in case RF power is accidentally on.
1 Contents of delivery
Delivery Contents Version Code
System Module delivery System Module with casing FSMF 472181A
FSMG 472295A
FSML 472424A
Cable tie 134 x 2.5 mm BLK [20 pcs.] 6401084
TX Screw M5X8 ISO14583 AISI316 2XWAX [2 pcs.] 6150279
ESD wrist strap L 1.8 m -2 m SNAP10 mm 6706632
DC terminal IP boot 825757A
Capacity Extension Module delivery FBBA Capacity Extension Sub -Module FBBA 472182A
QSFP cable assembly 995298
Power cable assembly 995297
Power Distribution Module delivery FPFD Power Distribution Sub -Module FPFD 472301A
Output cable IP seal [4 pcs.] 826174
TX Screw M5x12 ISO14583/3506-1 A2-70 WAX [3 pcs.] 6150283
FPFD -FSM Connection Card 985204
3 x 60W RF Module delivery RF Modules with casing FRBB 700 472417A
FRMA 800EU 472221A
FRMD 800EU 472625A
FRKA 1500 472111A
FRGF 2100 471483A
FRGP 2100 472100B
FRIE 1.7/2.1 471895A
FRHA 2600 471894A
RF Modules with optional casing FXCA 850 472142A
FXDA 900 472083A
FXDJ 900 472143A
FXEA 1800 472084A
FXFA 1900 472166A
FXFB 1900 472569A
Multibeam DC Cable 2 m [2 pcs.]
Multiomode fiber 2 m
Multimode SFP [2 pcs.]
3 x 80W RF Module delivery RF Modules with optional casing FRGT 2100 472442A
FXCB 850 472678A
FXDB 900 472573A
FXEB 1800 472501A
FXFC 1900 472679A
TD-LTE Radio Module delivery 8x10W RF Module FZHA 472313A
6x10W RF Module FZNC 472530A
4TX/4RX RRH FZNI 472652A
-3-
Deliveries are complete.
Equipment is not damaged.
Check list
Site meets the minimum clearances.
Check list
Back cover and cable entries
NOTE:
1. Thread the looped end of the
maintenance strap around the grill rib.
2. Route the end with the snap hook through
the exposed loop and tighten the loop.
3. Engage the snap hook to the casing
using the fixing points.
4. Install the back cover in the rear of the module.
5. Fix the back cover screws (Torx T25)
and tighten to 2.5 Nm.
6. Fix the cable entries
to the sides of the casing.
Use Flexi 3U Mounting Covers FMCF
with FSMx.
NOTE: DC seal always has to be covered
with IP Boot, even if FPFD is used.
Cable entries and back covers are installed.
Check list
Minimum clearances
min 100 mm
(3.9 in)
3
5
6
Clearances
2
Preparing modules for installation
3
4
2
2.5 Nm
1. Check the clearances around
the plinth.
2. Turn the rear stopper.
3. Place the plinth on the floor,
grounding points facing
forward.
4. Bolt on the floor with 4 bolts,
12 mm in diameter.
Installing the plinth
Plinth on the floor
4
Rear
stopper
Plinth
13.5 mm
(0.5 in)
(4 pcs)
3
6
0
m
m
(
1
4
.
1
i
n
)
75 mm
(3.0 in)
Facility wall
300 mm
(11.8 in)
4
17.
47 mm
( 5 in)
75 mm
(3.0 in)
4
5
5
m
m
(
7
i
n
)
1
.
9
min 75 mm
(3.0 in)
min 600 mm
( 23.6 in)
min 40 mm (1.6 in) measured
from back cover
(needed for fresh air)
min 80 mm (3.1 in)
measured from plinth
-4-
Plinth on the wall
TIP: It is recommended to install
the plinth with the front panel
facing right.
The dimensions are measured
from the fixing points.
185 mm
4
8
2
.
5
m
m
6
0
0
m
m
1
Installing the plinth (continued)
NOTE: use VMPB mounting kit when the
pole diameter is between
60 mm and
Remove or retract the rear stopper
to the inside in pole and wall instalations.
7
8
300 mm.
1. Fix the upper bracket on the pole
and attach the mounting screws.
2. Fix one half of the lower bracket on
the plinth.
3. Lift the plinth on the pole.
4. Tighten the mounting screws.
5. Fix the counterpart of the lower
bracket on the pole.
6.
. If a second plinth is required, install
it on the other side of the pole
mounting bracket.
. Ground the plinth. See section 4 for
instructions.
4
1. Mark screw locations using the
plinth as a template and drill holes.
2. Fix the mounting screws on the
wall and mount the plinth.
3. Tighten the upper mounting
screws.
4. Insert the lower mounting screws.
5. Tighten the lower mounting
screws.
6. Ground the plinth. See
section 4 for instructions.
3
2
4
5
Plinth on the pole (with VMPB mounting kit)
5
5
7
8
m
m
(
2
2
.
8
i
n
.
)
7
4
3
1
6
Secure al screws with thread
locking compound
l a
, for example
Loctite 243.
2
-5-
2
20 Nm
4
20 Nm
6
30 Nm
1
30 Nm
5
3
Installing the plinth (continued)
4
NOTE: use FPKA mounting kit when the
pole diameter is between
60 mm and 120
mounting
Tighten the mounting bracket screws
mm.
Ground the plinth. See section 4 for
instructions.
1. Fix the upper bracket on the pole
and attach the mounting screws.
2. Fix one half of the lower bracket on
the plinth.
3. Lift the plinth on the pole.
4. Tighten the mounting screws.
5. Fix the lower
bracket on the pole.
6. .
7.
8.
Secure all the screws with
thread locking compound.
NOTE: Do not install plinth
on the front face of FPKA.
Install it on left/right side
with FPKA fixing screws in front.
Plinth on the pole (with FPKA mounting kit)
-6-
Grounding principle
Antistatic wrist strap is used when handling modules.
Module core is inside the casing.
All modules are grounded.
Check list
External cable
entry
NOTE: Do not chain grounding cables.
Grounding principle of the BTS
5
Installing optional sub-modules 6
Installing Flexi Multiradio 10 BTS Power Distribution Sub-Module (FPFD)
4
1. Undo the screws holding the FSMx core in place.
2. Pull out the core.
3. Remove the FPFD dummy unit.
4
5
6 and IP plugs
7
. Remove the rubber plugs on the core and the FPFD.
. Insert the connection card to the slot on the FSMx core.
. Remove the DC screw terminal cover .
. Loosen the screw terminals.
1. Ground the plinth to the site main ground.
2. Connect the ESD wrist strap.
3. Install the first module.
4. Connect the grounding cable to the module front panel.
5. Route the grounding cable through the cable entry.
6. Connect the other end of the grounding cable to the plinth.
7. Repeat steps 3-6 for each module in your configuration.
8. Fix the excess cables to the cable support plates
with cable ties.
1
2
3
5
6
7
GSM/EDGE WCDMA LTE TD-LTE
5
4
Main
grounding
site *
1
*
6
2
Wrist strap
2
Wrist strap
4
5
5
Main
grounding
site *
1
*
6
-7-
Installing optional sub-modules (continued) 6
Installing Flexi Multiradio 10 BTS Power Distribution Sub- odule (FPFD) (continued) m
Power istribution is properly installed. D Sub-module
. Take
1 . Re the cable gland with the DC input cable
routed through .
1 . Insert the DC input cable to the screw terminal.
ighten to Nm .
1 . Tighten the cable gland.
1 . Re the DC screw terminal cover.
1 . Route the DC input cable between the FPFD and dummy
unit or F .
17. Re-insert the module core and fix the screws.
8
9 off tightening nuts of both cable glands and push
the DC input cables through them. If the cable diameter
is greater than 6 mm, remove the cable glands' inner ring.
NOTE: Cable glands have a seal that needs to be cut
when the used DC cable exceeds a certain diameter.
-install inner
it
4.0 (recommended)
: The max torque is 5.0 Nm. Do not overtighten.
-install
14
15 1
6
TIF If not enough space there for both cables,
route one of them on the right side of FTIF. If FTIF is not
installed, route cables through cut-outs in .
. Strip the DC input cable as needed.
. Align the FPFD with the guide pin on the FSMx core,
and push the FPFD in place.
. Fix the FPFD with 3 x M5x 2 screws. Tighten to 4.0 Nm.
dummy panel
0
1
T
2
REPEAT steps 10-12 for the outer cable gland.
3
NOTICE
Check list
5
Transmission ub-module is properly installed. S
Check list
7
Installing Flexi Multiradio 10 BTS optional Transmission Sub- odule (FT ) m IF
6
1. Undo the screws holding the FSMx core in place.
2. Pull out the core.
3. Remove the FTI dummy unit.
4. Remove the rubber plugs on the core and the FTI .
5. Insert the connection card to the slot on the FSMx core.
6. Align the FTI with the guide pin on the FSMx core and
push the FTI in place.
7. Fix the FTI with 4 x M5x25 screws. Tighten to 4.0 Nm.
8. Re-insert the module core and fix the screws.
F
F
F
F
F
16
(Not relevant for RL25TD)
16
9
10
12
13
11
14
15
3
4
4
-8-
Installing optional sub-modules (continued) 6
Installing Flexi Multiradio 10 BTS apacity Extension odules (FBB ) C m A Sub-
Check list
1. Line up the locating marks on the side of the module and
align the holes on the first module bottom with the fixing
studs on the plinth.
2. Push the module back until it stops.
3. Fix with two screws. In pole and wall installations, secure the
screws with thread locking compound.
4. Connect the grounding cable to the module and the plinth.
5. Insert the second module and repeat steps 1-4.
6. Repeat the steps above for each module in your
configuration.
Principle of module installation
NOTE: In pole and wall installations, attach the fixing plate
across the module casings and fix with six screws. Secure
the screws with thread locking compound.
See operating documentation for further information.
NOTE: When installing modules into a third-party cabinet,
module casings must always be used. Side trays or plates
are required under each module in a third-party cabinet.
See operating documentation for further information.
Installing modules
7
Capacity S Extension ub-module is properly installed.
1
2
3
4
5
1
3
4
6
1. Remove the side flange(s).
2. Remove the middle flange.
3. Pull out the dummy unit(s).
4. Insert the FBBA(s).
5. Fix the middle flange back in place.
Tighten the screws to 2. Nm.
6. Fix the side flange(s) back in place.
Tighten the screws to 2. Nm.
5
5
NOTE: When using only one FBBA,
install it in the left-hand side slot
and connect it to BB EXT1 port on FSMx core.
4
1
5
3
(Not relevant for RL40)
2
-9-
Recommended installation order
Modules are properly stacked.
Modules are level.
Modules are grounded.
Module fixing screws are secured with thread locking compound and tightened.
Check list
NOTE: Max. 5 modules for earthquake zone 4.
Max. 9 modules for earthquake zone 2.
RF Module
RF Module
System Module
RF Module
Power Module
(optional)
Plinth
Extension System
Module (optional)
Wall
NOTE:
Maximum 2 modules per plinth.
RF Module
System Module
Power Module
(optional)
RF Module
RF Module
Plinth
NOTE:
Maximum 2 modules
per plinth.
RF Module
System
Module
Power Module
(optional)
Plinth
RF Module
Plinth
Pole
RF Module
Installing modules (continued)
7
-10-
1. Route the DC power cable through the cable entry.
2. Remove the IP boot.
3. Loosen the screw terminals of the DC in port on the
FSMx front panel.
4. Strip the DC power cable and wrap tape around
the exposed wires in order not to break the IP boot.
5.
nsert the taped end of the DC power cable.
6. Remove the tape.
Remove the IP plug from the IP Boot and
i
7. Insert the DC power cable to the screw terminal.
Connecting external power feed
Cabling
8
3
7
8
4
5
6
1
Check list
Module core is inside the casing, and cable entries are installed.
Make sure that the DC connector IP boot is in place.
DC power cable is connected.
11
10
9
2
-11-
8. Tighten the screw terminals to .0 Nm.
9. Fix the IP boot in place and fix the screw.
Tighten to max. 2.0 Nm.
10. Install the cable entries.
11. Fix the cable entry screws.
12. Fix the DC power cable to the side of the module casing
with cable ties.
5
WARNING! Risk of power supply failure and, in rare
cases, of short circuit.
Check that the polarity is correct according to
the markings on the cable.
Optical cabling
NOTICE: Make sure that the optical
cable connectors have been cleaned.
Cabling (continued)
8
1. Remove the optical cable connector IP seals
in both System and RF Modules.
2. Remove the protective cap from the optical
transceiver and push it in the System Module.
3. Pull back the optical cable connector seal to
uncover the connector.
4. Remove the protective plug and clean the
connector with a swab or wipe alcohol.
5. Connect the cable to the System Module.
Make sure it clicks into place.
6. Push the connector seal firmly in place.
7. Route the cable between the System and
RF Modules.
8. Coil up the excess cable and fix it on the module
casing with cable ties.
9. Re RF Module
.
1 . Make sure that all the connector seals are
properly installed.
s with
peat steps 2-6 for each in the
configuration
0
TD-LTE
GSM/EDGE - WCDMA - LTE
1
2
3
5
6
Clean with swab or
wipe alcohol. s with
4
Left side
8
NOTICE: The optical cables are factory-bended to the left and, when connected, must always be routed to the
left from the connector. Bending them to the right by force will break the cables.
NOTICE: Do not bend optical cables beyond the minimum radius of 70 mm.
8
-12-
Transmission cabling
Cabling (continued)
8
There are three options for transmission: two integrated interfaces on the FSMx core and an optional transmission sub-module.
Connecting transmission
cable (EIF1 interface)
electrical Ethernet backhaul
1. Remove the IP seal from the EIF1 port on
the FSMx core front panel.
2. Route the transmission cable through the cable entry.
3. Pull back the connector seal to uncover the connector.
4. Connect the cable to the EIF1 port. Make sure it clicks
into place.
5. Push the cable connector seal firmly in place.
6. Coil up the excess cable and fix it on the module casing
with cable ties.
7. Make sure that the connector seal is properly installed.
Connecting transmission cable
(EIF2/RF/6 interface)
optical backhaul
1. Remove the IP seal from the EIF2/RF/6 port on the FSMx
core front panel.
2. Remove the protective cap from the optical
transceiver and push it in the EIF2/RF/6 port.
3. Route the transmission cable through the cable entry.
5. Remove the protective plug from the optical cable and clean
the connector with a swab or wipe alcohol.
6. Connect the cable to the EIF2/RF/6 port. Make sure it clicks
into place.
7. Push the cable connector seal firmly in place.
8. Coil up the excess cable and fix it on the module casing
with cable ties.
9. Make sure that the connector seal is properly installed.
backhaul
s with
4. Pull back the connector seal to uncover the connector.
Connecting Flexi Multiradio 10 BTS
optional Transmission Sub- odule (FT ) cabling m IF
(Not relev
1. Remove IP seals from the relevant transmission
sub-module ports.
2. If using the optical interfaces, insert
.
3. Route a transmission cable through the cable entry.
4. Pull back the connector seal covering the transmission
cable connector.
5. If using the optical interfaces, clean the optical cables with
a swab or wipe alcohol.
6. Connect the cable to the transmission sub-module.
7. Push the cable connector seal firmly in place.
8. Coil up the excess cable and fix it on the module casing
with cable ties.
9. Repeat steps 3-8 for all the transmission cables required
for your configuration.
10. Make sure that all the connector seals are properly
installed.
ant for RL25TD)
the backhaul optical
transceivers to the FTIF EIF1 and EIF2 ports
s with
1
2
5
4
Clean with swab or
wipe alcohol. s with
6
7
1
2 4
3
5
6
1
If using OPT Ifs:
2
3
6
4
7
8
3
-13-
Cabling (continued)
8
4. Push the antenna jumper cable to the cable entry.
5. Tighten the connector.
in the configuration. 6. Repeat for all the antenna cables
1. Remove the seal from the antenna connector in the
RF Module.
2. Push the antenna jumper cable to the
RF Module antenna connector.
3. Pierce the cable entry hole with a knife.
NOTE: In wall and pole installations, the recommended cable routing is through the lower cable entry.
4 5
3
2
1
1 2
3
4
Cable entries are not used
in cabinet installations
Antenna cabling
5
GSM/EDGE WCDMA LTE TD-LTE
_
+
7
6
1
2
3
4
5
7. Tighten the screw terminals to .0 Nm.
8. Fix the IP boot in place.
9. Repeat steps 2 to 8 as many times as necessary.
10. Reinsert the FSMx core and fix the screws.
3
1. Undo the screws holding the FSMx core in place and
pull it out slightly.
2. Loosen the screw terminals on the FPFD front pane .
3. Strip the DC output cable and wrap tape around the
exposed wires in order not to break the IP boot.
4. Insert the taped end of the cable to the IP boot.
5. Remove the tape.
l
6. Insert the cable to the screw terminal.
Connecting Flexi Multiradio 10 BTS Power Distribution Sub- odule (FPFD) cabling m
8
-14-
WARNING! Risk of power supply failure and, in rare
cases, of short circuit.
Check that the polarity is correct according to
the markings on the cable.
Cabling (continued)
8
1. Remove IP seals from the FBBA ports that you are
going to use.
2. Connect the power cable (995297_) from the DC out port
on the FSMx core to the DC in port on the FBBA front panel.
Make sure it clicks into place.
3. Push the connector seals firmly in place.
4. If using two FBBA sub-modules, chain the power cable from
the DC out port of the first FBBA to the DC in port of
the second FBBA.
5. Push the connector seals firmly in place.
6. Connect a (995298_) from the
BB EXT1 port on the FSMx core to the BB EXT
port on the FBBA front panel.
Make sure it clicks into place.
7. Push the connector seals firmly in place.
8. If using two FBBA sub-modules, connect a
cable (995298_) from the BB EXT2 port on the FSM
core to the BB EXT port of the second FBBA.
9. Push the connector seals firmly in place.
10. Make sure that all the connector seals are properly
installed.
n FBBA data cable
n FBBA data
x
11. Bend the cables upwards, ensuring they are within
the front cover inner dimensions. The maximum
bending radius is 40 mm (1.57 in).
All cables are connected according to the configuration.
Optical cable connectors have been cleaned.
BTS external cables or cables between the modules on separate plinths are routed via
cable entries.
Connector seals are
All cables are tied with cable ties or routed through cable clamps.
firmly in place.
All cables are bent correctly.
Check list
1
8
9
7
2
4
4
6
5
3
6
8
Connecting Flexi Multiradio 10 BTS Capacity Extension Sub- odule (FBBA) cabling m
(Not relevant for RL40)
11
-15-
Check list
Front covers
1. Thread the looped end
through the hole on
the front cover.
2. Route the end with
the snap hook through
the exposed loop
and tighten the loop.
3. Engage the hook to
the hole on the external
cable entry.
4. Install the front cover.
5. Tighten the screws
(Torx 25) to 2.5 Nm.
1. Power up the BTS and check the LEDs and fuses to ensure that all modules are powered.
2. Commission the BTS. See the document for further information. Commissioning Flexi Multiradio BTS
Module front panel covers are installed.
1
2
3
4
5
Powering up and commissioning the BTS 9
Front covers
10
-1 - 6
Perform these checks to make sure that the installation is complete:
Delivery is complete and undamaged.
Minimum clearances are met.
Plinth is installed according to the instructions.
Modules are installed according to the instructions.
Power supply cable is connected.
Cable entries are installed.
Antenna cables are connected according to the configuration.
Internal power cables are connected.
Optical fibre cable connectors are cleaned and connected.
Transmission cables are connected.
Relevant sub-modules are installed according to the instructions.
BTS external cables or cables between the modules on separate plinths are routed
via cable entries.
Cable connector seals are firmly in place.
Module front covers are installed.
Plinth is grounded.
Modules are grounded to the plinth.
BTS is switched on and all modules are ready for commissioning.
Site is clean and installation completed.
Unused connectors are covered with IP seals.
Cables are tied properly.
Installation check list
11
Correct type of backhaul optical transceivers are used.
-1 - 7