This document outlines specifications for mechanical works on a hospital project in Abu Dhabi, UAE. It details requirements for operation and maintenance manuals, including assembling maintenance instructions, wiring diagrams, performance curves, and shop drawings. It also requires submitting a testing and commissioning plan for review, notifying the engineer of witnessed tests, and protecting existing flooring during construction.
This document outlines specifications for mechanical works on a hospital project in Abu Dhabi, UAE. It details requirements for operation and maintenance manuals, including assembling maintenance instructions, wiring diagrams, performance curves, and shop drawings. It also requires submitting a testing and commissioning plan for review, notifying the engineer of witnessed tests, and protecting existing flooring during construction.
This document outlines specifications for mechanical works on a hospital project in Abu Dhabi, UAE. It details requirements for operation and maintenance manuals, including assembling maintenance instructions, wiring diagrams, performance curves, and shop drawings. It also requires submitting a testing and commissioning plan for review, notifying the engineer of witnessed tests, and protecting existing flooring during construction.
Burt Hill Project No. 10710.00 General Provisions Technical Specifications Tender Documents Book V Mechanical Works Date of Issue: 16 th February 2011
BURT , HILL Page 11 of 11
manufacturer's name, model number, service manual, and brief description of each piece of equipment and its basic operating features. j. Maintenance instructions describing routine maintenance and lubrication procedures and schedules, and simplified diagrams which illustrate the systems as installed. Instructions as described above shall be tailored for each specific system. k. Wiring and control diagrams for each piece of equipment, showing "as installed" conditions. l. Performance curves for pumps, fans and similar equipment. m. One (1) reviewed copy of each shop drawing submitted. n. O & M instruction manuals and as built drawings shall be submitted 3 months prior to the completion date (handover date) 1.19 SPECIAL TOOLS A. Provide the Owner's representative with two (2) sets of special tools required for operation and maintenance of equipment provided. 1.20 REVIEW BY ENGINEER A. 120 days from the award of the tender package, the MEP contractor shall submit for review to the owner and engineer, a testing and commissioning plan for all major pieces of equipment. The plan should cover all required labor and material required to commission each piece of equipment, any required assistance from other Contractors, the General Contractor, or the Owner. The plan should describe the proposed methodology to commission each piece of equipment, including detailed step by step procedures. Refer to Specification Section 15995, Commissioning Participation for additional instructions. B. Notify the Engineer at least 48 hours in advance of the date and time of tests specified to be witnessed by the Engineer. The Engineer reserves the right to demand repetition of any testing where he is unable to attend due to insufficient notice without additional cost to the Owner. 1.21 PROTECTION OF FLOORS A. Protect existing flooring from damage during the construction period. Provide plywood or similar material under equipment or materials stored on floors, and in areas where construction may damage the floor surfaces. Floor surfaces (including sealer) damaged during the construction shall be replaced at the cost of the Contractor at fault. END OF SECTION