SSAO OWS FOR MARLIM FIELD France, June 2008 Outline Outline 1. Petrobras Motivations 2. Scenariofor thePrototype 3. Challenges& Petrobras Actions 4. PrototypeDesign Premises Motivation: High watercuts Motivation: High watercuts 2007 2010 Water treatment Year Water 2015 Increasing production of water - Platforms topped-up Increasing cost of water treatment Increasing production of water - Platforms topped-up Increasing cost of water treatment Motivation: Environment Motivation: Environment Environment friendlysolution Environment friendlysolution Reservoir Subsea separation Surface separation and treatment Multiphase production Water discard Water discard Multiphase production . . . . . . Year of discovery: 1985 Year of start-up: 1991 Total oil production: Peak: 650,000 bpd, apr-2002 Currently: 410,000 bpd, jan-2007 Total water production: 295,000 bpd, jan-2007 Water depth: 500 m to 1,000 m Campos Basin N Scenario for the Prototype in Marlim Scenario for the Prototype in Marlim Host Platform Host Platform P37 FPSO Turret Process capacity Oil: 180,000 bpd Water: 120,000 bpd Gas: 3.1 million m3/d Water depth: 890 m Scenario Definition History Scenario Definition History P35 Scenario Basic Design 1 J une 2006 1 st evaluation Redesign API: 18 degree Emulsion: Higher stability 2nd evaluation Dec 2006 P37 Scenario API: 22 degree Emulsion: Lowstability Sand: up to 100 ppm Basic Design 2 march 2008 3 rd evaluation J un 2008 Prototype 2009/2010 Water depth: 870m Well: MRL-141 Well: MRL-102 PWRI - Marlim Field Pilot PWRI - Marlim Field Pilot LP Tests Prototype 2009/2010 HP Tests Detailed design Manufacturing Integration Tests Field Tests 2009/2010 J une 2008 Project Status Project Status BasicDesign for P37 aplicationready Testsat P35 / MRL 94 well interventionsongoing Contract discussionsongoing Waitingfor FMC Commercial propposal Technical andEconomical evaluationreadywaitingfor FMC negociating conditionsfor submittingto theDirectiveComittee Structuringfor theimplementationof thenext phase Scenario Scenario Marlim Field : Highwater productionandplatformstoppedup No dumpwell Highabsoluterevenue/highimpact for thetechnology P37 Platform: Oil API: 22 degrees(insteadof API 18 degrees) Lower emulsionstability(highstabilityfor lower APIs) AvailableroomontheTurret Fewer changingsto acomodate Availablepower (2,5 MWatt) Scenario Scenario Productionwell MRL 141: 70% watercut in december 2009 Total flowrate: 3500 m3/day ReinjectionWell MRL - 488 Highreservoir permeability: 7000 mD Possible injection above fracture propagation pressure Main Challenges for Marlim OWS Main Challenges for Marlim OWS Emulsion stability Reinjection Separation 10 ppm of solids 100 ppm of oil Up to 60% water in oil Pipe separator compact gravity separation Schmoo / Corrosion / Scale BR Actions to deal with the challenges BR Actions to deal with the challenges Separation Testsin Porsgrunn, Conceptual Studiesandin depthlab researchsonheavyoil separation QualificationProgrambefore/duringtheSSAO (Marlim OWS) implementation EmulsionStability Testingseveral chemicalsfor definitionof thedemulsifier to beinjectedonthegaslift linestream Reinjection TestsonP35: reinjectionof producedwater Schmoo/Corrosion/Scale Testingchemicalsfor dosedinjectionand/or batch injection Reinjection tests at P35 Reinjection tests at P35 Slop Tank Degasser TO Gravity separator Reservoir tank Injection Pump Filters Heat exchangers Production Wells MRL-94 Overboarding swivel Choke 90C 40C P35 tests Schmoo Schmoo Slop Tank Degasser TO Gravity separator Reservoir tank Injection Pump Filters Heat exchangers Production Wells MRL-94 Overboarding swivel Choke 90C 40C P35 tests Schmoo detected and sampled Design Premises for the Prototype on P37 Design Premises for the Prototype on P37 Production well Reinjection well Platform Oil: 22 o. API Chemical injection Total flow: 18,500 bpd Watercut @ start-up: 65% Production well MRL-141 Reinjection well MRL-93 Reinjection above fracturing pressure Expected minimum performance water removal: 70% OWS Oil in Water < 100ppm Produced Water and Re-injection Water Specifications Produced Water and Re-injection Water Specifications Well productionstream Maximumsandcontent: 100 ppm Freewater (demulsifier action) Seawater water injectionhaswashedupthereservoir Specificationsfor there-injectionwater system: Maximumsandcontent: 10 ppm Maximumoil content: 100 ppm Oil/gasandlowwater Oil-water line Gasline Multiphaseflow Simplified Process Flow Diagram Simplified Process Flow Diagram Reinjection well Oil/gas and low water to the platform Production inlet From the production well 1 2 3 4 5 6 Gas-liquid separation Water polishment Solids management system not depicted Reinjection Pump Liquid level chamber gravity oil-water separation Real time oil in water monitor Platform Process Flow Diagram / Process Design and Related Topics Process Flow Diagram / Process Design and Related Topics Conceptual FMC for Marlim Conceptual FMC for Marlim HxLxW: 8,4m x 29,5m x 8,5 m 298 toneladas Marlim Oil Water Subsea Separation Concept SSAO Marlim Oil Water Subsea Separation Concept SSAO Oil-water overall separation efficiency expectative > 70% Subsea Separation Station Subsea Separation Station Subsea Separation Station Subsea Separation Station Subsea Separation Station Subsea Separation Station System Artistic View System Artistic View Oil water subsea separator Multiphase line w/ low watercut Production Well Reinjection Well