CR DISTRIBUTION DEPARTMENT INSTRUCTION MANUAL

OFFSITE EXCAVATION CHECKLIST SUPPLEMENT NO. 1.805-2


OFFSITE EXCAVATION CHECKLIST
(THIS IS NOT A WORK PERMIT)

Saudi Aramco Representative Salih Al-Doghither Phone No. 01-2856478

Operating Foreman: Ahmed Al-Hanaidi Phone No. 01-285 6711

Contractor: Hadi Al-Hammam Establishment, BT # 6600020088
Work Title: T&I Activities for Road Crossing -2012
Contractor Represent: P.Arulselvam Phone No. 01-4986152
1. a) Work Location (Exact) : North Riyadh Terminal Unit
b) Total No of RC : 12 Road Crossing
b) Start Up Date : May 15, 2012.
c) Duration : 4 Months

2. Size & Depth of Excavation to be performed: The Depth is 7 M & the width is 6 M & 8 ML.

3. Purpose of Excavation: To perform T&I Inspection of Road Crossing pipe & Grit blast, Coating.

4. Precaution on Existing underground facilities (Electrical, Piping, etc.).

Underground Electrical Cables (HT) YES [ X ] NO [ ] (LT) YES [ X ] NO [ ]
Underground Telephone Cables YES [ X ] NO [ ]
Underground Piping YES [ X ] NO [ ]
The area has been surveyed & drawing checked: YES [ X ] NO [ ]
Copies of approved construction drawing / sketches attached:
Restrictions (Hand tools only etc.). :
Use only hand tools for excavation except the asphalt layer or concrete, contractor can use the cutter
machine and jackhammer for removing the layers then use hand tool for excavation.
CARE MUST BE MAINTAIN at all times during excavation process. All underground utilities if
any must be protected by covering /wrapping polyethylene sheet or split conduit where applicable.
Shoring must be installed when the excavation exceed more than 1.2 M depth.

______________________ ______________________
Mechanical Engineer Electrical Engineer

_________________________
NRTUs Foremen

==> Security Concurrence: (Head Division Signature) __________________________

==> Fire Concurrence: (Head Division Signature) __________________________

==> Communication Concurrence: (Head Division Signature) __________________________

Original Copy to be kept by Work Permit Issuer.
Carbon Copy to be kept by Work Permit Receiver.
5. Completion Sign off- Operating
(Head Division):_______________________________________________________________