Вы находитесь на странице: 1из 7

(

200092)

: 238m
60 10 18195~ 24100m

22 000m2 ,

, ,
, ,
:

A STUDY ON MONITORING OF UP- DOWN CONSTRUCTION


FOR DEEP EXCAVATION ENGINEERING
Dai Biaobing Fan Qingguo Zhao Xihong
( Department of Geotechnical Engineering, Tongji University Shanghai 200092)
Abstract : In a 238m high and 60- storey super- tall building with 10- storey podium, excavation depth of 18195~ 24100m
and an area of 22 000m2 in Shanghai, based on the theoretical concept and experience, it has been analyzed that a great
deal of monitoring results for horizontal displacements, heave in pit bottom, differential displacements between diaphragm
wall and adjacent mid- post pile and between mid- post piles, earth pressure and stress in diaphragm wall for special deep and
big ex cavation, and five characteristics of stress and displacement for up- down construction method differing with normal
construction method have also been obtained. Some suggestions on improving the design of up- down construction method for
deep excavation engineering are presented, which may be a reference for other similar projects.
Keywords : up- down construction
deep excavation eng ineering
horizontal displacement
displacement

earth pressure

heave

differential

stress in diaphragm wall

, 20 80
,
,
, , , , 58
, 283m, 6 , 3 , ,
2
11 664m , 17150m,
22168m, 15130m, 17110m,
,
[1]
,

60 ,
, , ,
,

,
,
,

,
,

, 2133
~ 3138m ,
, ,
0138~ 112m 3- 2 ,
3- 2 ,
,
11135m
1
60 238m -
, 10
, - 16175m; 4100
~ 6125m, 210m; 18195
~ 24100m <850 ,
72150m, 48m, - 2 ;
* ,

54 Industrial Construction Vol135, No19, 2005

: 1971 1

: 2005- 03- 28

2005 35 9

800mm 1 000mm
, 32 m 4

, 22 000m
1

1
P

UP

cP

( kN#m- 3 )

(b)

kPa

P( cm#s- 1 )

11 92

01 84

181 3

20

1715

31 86

171 4

13

1715

112~ 38m

81 81 @ 10- 5
21 33 @ 10- 5

81 61

161 6

14

11

81 63 @ 10- 6
71 07 @ 10- 6

1- 1

1- 2

61 17

171 5

15

1615

81 46 @ 10- 6
11 16 @ 10- 5

71 07

171 8

15

2015

31 38

191 5

45

1615

11 05 @ 10- 5

61 88

19

3115

31 26 @ 10

11 28 @ 10- 5

211

- 4

4m

, ,
215m, 10m
; ,
; 40m
;
40m 6 ;
30m 12
,
, ,
, , ,
2
: y B0
y 2 y B1 y
3 y B2 y 4 y
B3 y 5 y B4 (
) y

CX1~ CX30 ; H1~ H30


HC1~ HC30

; G1~ G6 ; P1
~ P6 ; SW1~ SW12 ;
TCX1~ TCX3 ; J1~ J8
2

,
, ,
600m ABC
D
, 42 ,
, 2
A CX21~ CX27, 7 ;
B CX14~ CX20, 7 ;
C CX1~ CX9CX28CX29
CX30, 12 ;
D CX10~ CX13CX31~

) ) ) ,

CX42, 16
55

, 42

- 3m~ 5m,

42 ,
, A CX21
, 3
,

, 4 5
4

1- 8 5 ; 2- 8 13 ; 3- 9 11 ; 4- 9 24 ;

5- 10 17 ; 6- 11 15 ; 7- 12 14 ; 8- 12 28 ;

3 5 , ,

9- 4 19 ; 10- 5 6 ; 11- 5 10 ; 12- 7 5

3 CX21

5 ,
A B , 52mm,
0129% , C
D , 21mm,
0112% A
B ,
, 512m,
- 11m~ 5m, ;
, SMW , 12m,

1P2
,
2 3
[ 2]


3 ,
,
0124% ~ 0136% , 0114% ,

2
P

m2

mm

90

14~ 17

3 600

33

283

171 5~ 221 7

11 660

21

4 600

3715

22

58

151 3~ 171 5

212

27

911 5

101 5

20m

20m ( 1815m)

1P3 A B 52mm ,
2P3,

( 1916m)
( 30m) ,

015%

311

, 18m ,

15m ,

90mm, ,

A B C D

30mm,

200

56

2005 35 9

, A

, A , B0

B 1
B2
B3 B4

,
( ) :

B4

( ) U( 015~ 110) % D ( 1)

, 6 7

, D
( 1)
, ,
,

[ 3]

2) ( )
20 80

( ) , ,
716m, ( ) 20mm ,
( ) :
( ) U( 0115~ 0125) % D ( 2)
6

, 0115% D , D=

B 4 ( 04 07 04 )
( )

mm

18145 m, 2717mm, 25mm,

3) ( )

, , ,

,
, 20 90
: U
U
[ 4]


,
7

B 4 ( 04 07 11 )
( )

mm

6 7 :
, B4 ( 2004 07
04 ) ( 2004 07 11 ) ,
615mm ,
, ,
, 615mm

312

,
20 70 ( )
1) ( )
20 70 4
) ) ) ,

,
,

[ 3]

,
,
, -
,
, 1P3,
:
( ) U
1P3 @ 0115% D = 0105% D
( )
9mm, 615mm ,
,
Mindlin
,
,
57

4
411

, ,
, ; ,

, 20mm
LP400( L ) ,
, , ,
,

8 A

,
,
,

412

8 A
, 9 A 3 A

3 , B4
317mm 411mm, B4

9 A

( ,
3

B0

B 1

B2

mm
B3

B 4

( 10 21 ) ( 11 4 ) ( 12 7 ) ( 12 16) ( 2 22 ) ( 3 7 ) ( 5 2 ) ( 5 9 ) ( 7 4 ) ( 7 11 )

315

314

31 0

21 2

21 1

211

217

21 6

31 7

41 1

H L47

418

817

91 4

91 5

81 6

816

1110

101 0

171 0

151 9

H23 L4

715

314

61 9

81 0

71 0

517

913

71 3

81 2

61 3

: H ( H26+ H27) P2

) , H L47 1710 mm

1519mm; ,

612 mm,
20mm

512

6 ,

19 50 ( 1857)

5
10
15
20
25m6
,

,
,

511

, ,
, ,
,
[3]
30m ,
58

, 10
10 , ,
, ,

2005 35 9

3 m ( 140MPa) ,
,
,
,
10MPa ,
15 m,
17MPa
3 ,
5
10
15
20
25 m
, 12
1- 2004- 6- 20( p a ) ; 2- 2003- 10- 6( p 0 ) ;
3- ; 4- ; 5-
10

1- 10 8 ; 2- 11 2 ; 3- 11 15 ; 4- 12 2 ;
5- 1 7 ; 6- 2 23 ; 7- 3 10 ; 8- 2 11 ;
9- 4 23 ; 10- 5 25 ; 11- 6 15 ; 12- 8 3
1- ( ) ;

2- ( ) ;

3- T4 ( ) ; 4- T5 ( ) ;
5- T4 ( ) ; 6- T5 ( )
11

12

12 , ,
, 1 300kPa,
,

1 ,
50%

,
,
, ,


: ; ,

, ,

/ 0

, ,

, ,

[ 1]

, 11,

, ,
, ,
:

, ,
, ; ,
,

1) ,

, , , ,

2) ,

, 35 ,
, 1215m, 30~ 40MPa
) ) ) ,

, ,
( 63 )
59

, ,

9 ,

, ,

,
8 ,

,
,
, :
Q c
,
,
1- E c = 600MPa;
4- E c = 5 000MPa;
8

213

2- E c = 1 800MPa;
5- E c = 9 000MPa;

3- E c = 3 000MPa;
6- E c = 12 000MPa

Q c ,
,
, , ,
, ,

1 Dan Brown.
Foundat ions

Effect of Construction on Axial Capacity of Drilled


in

Piedmont

Soils.

Journal

of

Geot echni cal

and

Geoenvironment Engineering. 2002, 128( 12) : 967~ 973


2 Ming-Fang Chang, Hong Zhu. Construct ion Effect on Load Transf er along
Bored Pile. Journal of Geotechnical and Geoenvironment Engineering,
2004, 130( 4) : 426~ 437
1- R = 21 4m; 2- R= 118m; 3- R = 1. 2m; 4- R = 0. 7m
9

9
9 ,
3 000MPa, Q c ,
, 9, 600~ 1 800MPa Q c

3 OcNeill M W. Side Resistance in Piles and Drilled Shaft s. Journal of


Geotechnical and Geoenvironmental Engineering, 2001, 127 ( 1) : 3~ 16
4 , , , . .
, 2001, 23( 5) : 547~ 551
5 , . .
, 2002, 23( 6) : 85~ 94
6

, , .

. , 2002, 35( 3) : 77~ 81

( 59 )
3) :
U
U ,

4) , ,
,
, ,

1 , . ) ) )
. : , 2002
2 , , .
. : , :
2000
3 ,

, , . .

: , 2005
4 , , , .
. : , 1996

) ) )

63

Вам также может понравиться