NAME OF WORK:-
PKN
CANAL DATA
1
0.6805 cumec
Discharge
0.6805 cumec
:1
F.S.D.
2.00
2.00
Free Board
0.50
0.50
mm F bars@
140
Bed slope
10
mm F bars@
90
C.B.L.
256.58 m
256.58 m
16
mm F bars@
220
F.S.L.
258.58 m
258.58
Bed width
270
TBL 758.58
5000
2x 16 mm F top anchor bar
3.00
5.00
270
vertical :1
10
mm F bars@
F.B.
500
FSD
2000
180
F.S.L. 258.58
3000
1 in
1 in
3000
16
200
Hench
10
M.W.D.
10 Span
2.50
2.50
8.00
8000 mm
11 Concrete
Mscbc
20
7
12 Steel
sst
Inside
150
13 Water
mm F bars@
6 x Bars F
mm F bars@ 110
mm F bars@ 130
300
20
1.00
CBL 256.58
sst
wt
720
200
190
200
9800 kg/m3
Main Vertical
10
mm F @
90
mm c/c
Disty.
mm F @
140
mm c/c
Main
16
mm F @
110
mm c/c
Disty.
mm F @
130
mm c/c
Main bottom
20
mm f
Top anchor
16
mm Nos.
Nos.
mm F @
300
mm c/c
270
mm
or
0.27
mtr
300
mm
or
0.30
mtr
pk_nandwana@yahoo,co,in
Nos.
PKN
FOR QUEDUCT
0.6805
cumec
5.00
m
vertical
2.00
m
0.50
m
3000
256.58
m
258.58
m
2.50
m
8.00
m
50
mm
40
mm
CANAL DATA
0.6805
cumec
3.00
m
1 :1
2.00
m
0.50
m
3000 1in
256.58
m
258.58
m
2.50
m
Discharge
Bed width
water Side slope
F.S.D.
Free Board
Bed slope
C.B.L.
F.S.L.
M.W.D.
Span (Proposed)
Nominal Cover
Effective cover
For HYSD Bars
for water side force
= 150 N/mm2
7
=
N/mm2
= 13
m*c
=
k=
1 Design Constants:-
sst =
scbc =
m
m*c+sst
1
j=1-k/3 =
0.5
R=1/2xc x j x k
=
sst =
scbc =
m
x
for out side force
= 190 N/mm2
7
=
N/mm2
= 13
m*c
=
k=
m*c+sst
1
j=1-k/3 =
R=1/2xc x j x k
= 0.5
Concrete M- 20
wt. of concrete = 25000 N/m3
wt of water = 9800 N/mm2
for water side force
13
x 7
13 x
7
+
0.378 /
3
7
x 0.87 x
150
0.378
= 0.378
0.378
= 0.874
= 1.155
J
R
=
=
0.874
1.155
= 0.324
0.324
= 0.892
= 1.011
J
R
=
=
0.892
1.011
8.00 m
270 mm say
8.00 m
270
=
=
25521 N-m
149
mm
25520833
n-mm
mm
Steel required
Ast =
BMx1000
sst x j x D
using 10 mm bars =
Hence Provided
spacing =A/Ast
10 mm bars
=
@
=
25521 x 1000
= 867 mm2
150 x 0.892 x 220
3.14 x 10 x 10
3.14xdia2
A
=
=
= 78.5 mm2
4 x
100
4
78.50 x 1000 / 866.94 =
91 mm
1.45 m from base
90 mm c/c half the bars will be curtailed at
0.1 (
27
10 )
0.3
=
0.25 %
10
45
-
using
spacing =A/Ast
Hence Provided
8
679
2
A
0.25
270
100
WL2
8
= 106752 s st =
Since tension face is out side
BM
Effective depth required
=
=
Rxb
Provided Effective depth
250 mm
x 1000
679 mm2
50.2 mm2
339 mm2
= 3.14xdia2
= 3.14 x
8
4 x100
4
=
50.24 x 1000 / 339.43 =
148 mm
mm bars @ 140 mm c/c Each face
mm bars
250 mm say
2.50
30115
190
76638
1.011
cover
76638
250
mm
0.25
5.27
8
x
x
=
5.00 m
30750 x
=
mm
=
30625
2.5
3
5.27
=
=
24500 N
6250 N
30750 N
=
+
30625
0.3
2
= 30115 N-m
= 106752 N-m
Steel required
76637.50 x 1000
= 1809 mm2
190 x 0.89 x 250
3.14 x 16 x 16
3.14xdia2
using 16mm bars =
A
=
=
= 201 mm2
4 x
100
4
spacing =A/Ast =
201 x 1000 / 1809 = 111.1 mm
mm
bars
Hence Provided
16
@
110 mm c/c
30115
1000
x
Area of steel required at end (Near support) =
=
919 mm2
150 x 0.874 x 250
This is
< than half the steel provided at the center of span,However,
half the bars from the center of the span may be bent up at L/2 meter from supports.
Let us check whether this bending of half bars satisfies the enchorage and devlopments envisaged in
equation M1/V + Lo > Ld
1
1000 x
201
Where M1=
x
x 190 x 0.892 x 250
Ast x sst x j x d=
110
2
'6
=
38.71 x 10
N-mm
30750 x 5.27
V = shear force at the ends
=
= 81026 N
2
ls
ls
Lo =
x'
- 3 F + 16 F =
x'
+ 13 F
2
2
Where L s = Length of support
50
= 270 mm and x' = side cover =
mm
Ast = BMx100/sstxjxD=
M1
V
pk_nandwana@yahoo.co.in
+ Lo
38.71 x 10'6
81026
270
2
50
13
16
= 771 mm
F sst =
4 t bd
46.88 x
771 >
x
150
See table
Concrete
F
= 46.88 F
3.4
4
x
0.8
M 20
=
16 = 750 mm
or
750
Thus the requirement is satisfied
minimum steel to be provided for
0.1 (
300
- 100 )
=
0.3
=
0.24 %
distribution
100
450
Area of distribution steel
0.24
x 300 x 1000
=
0.24 % of x section area =
= 729 mm2
required
100
729
Steel of Each face
=
= 364 mm2
2
mm bars
using 8
A
= 3.14xdia2
= 3.14 x
8
x 8
= 50.2 mm2
4
4
spacing =A/Ast =
50.24 x 1000 / 364.29 = 138 cm
mm bars @ 130 cm c/c Each face
Hence Provided
8
Ld
190
N/mm2
WL2
8
= 30750 x
= 2.50 x
93750 x
8.00
8
0.324
5
/
2 = 76875 kg-m
0.27 x 25000 = 16875 kg-m
Total Load
= 93750 kg-m
8.00
= 750000 Kg-m
k=
J = 0.892
750000 x 1000
BM
=
= 1657 mm
Rxb
1.011 x 270
2.50 + 0.25 = 2.75 or 2750 mm
80
2750 mm - (2 x cover =
)= 2670 mm
R = 1.011
750000.0 x 1000
= 1657 mm2
190 x 0.892 x 2670
using 20 mm bars
A
= 3.14xdia2
= 3.14 x 20 x 20
= 314 mm2
4 x100
4
Nomber of Bars = Ast/A = 1657 /
314 = 5.28
say
=
6 No.
Hence Provided
bars of
20
mm F at Bottom
6
6
x
314
% of steel provided =
x
100 = 0.26 %
270 x 2670
total load x span
93750 x 8.0
Shear force
=
=
= 375000 kg.
2
2
Shear stress
shea force
375000.0
=
=
=
0.52 N/mm2
Beam Ht. x Beam Dt.
270
x 2670
Permissible shear stress for 0.26 % steel provided t c =
0.21 N/mm2 (See Table 3.1)
TV
Tc Hence shear reinforcement required
Shear reinforcenment required if
>
V c = shear resistance of concrete =
t c.b.d = 0.21 x 2670 x 270 = 151389
N
Vs = V - Vc =
375000
151389 = 223611 N
sst .d.Asv
Spacing of strirrups is
190
x 2670
Sv
Asv
=
=
= 2.27 Asv
Vs
given by
223611
While maximum permissible
2.175 x
fy
x
Asy
2.175 x 415 x Asv
<
<
< 3.34 Asv
spacing of shear stirip is
B
270
Sv
Hence
=
3.34 Asv
Hence using 8 mm dia
2 Legged stirrups A =
100.5 mm2
Sv
=
3.34 x 100.5 =
336 mm
subject to a max. = 300 mm
legged
shear
stirrus
Hence provideed
@ 300 mm c/c
8 mm Dia
2
Provide 2 x 12 mm F hoilding bars at the top.
Ast = BMx100/sstxjxD=
pk_nandwana@yahoo.co.in
NAME OF WORK:-
270
PKN
TBL 758.58
5000
2x 16 mm F top anchor bar
270
F.B.
500
FSD
2000
10 mm F bars@ 180
F.S.L. 258.58
8 mm 2 ledge stirrups@
300
8 mm F bars@ 140
10 mm F bars@ 90
16 mm F bars@ 220
16 mm F bars@ 110
8 mm F bars@ 130
200
10 mm F bars@ 300
6 x Bars F
CBL 256.58
20
1.00
720
300
200
pk_nandwana@yahoo.co.in
200
Tensile stress
2
N/mm
M-10
M-15
M-20
M-25
M-30
M-35
M-40
1.2
2.0
2.8
3.2
3.6
4.0
4.4
Grade of concrete
M
M
M
M
M
M
M
M
M
10
15
20
25
30
35
40
45
50
Kg/m
300
500
700
850
1000
1150
1300
1450
1600
(N/mm2)
2.5
4.0
5.0
6.0
8.0
9.0
10.0
11.0
12.0
Kg/m
250
400
500
600
800
900
1000
1100
1200
(N/mm2) in kg/m
--0.6
60
0.8
80
0.9
90
1.0
100
1.1
110
1.2
120
1.3
130
1.4
140
Grade of concrete
Modular ratio m
M-15
19
(18.67)
M-20
13
(13.33)
M-25
11
(10.98)
M-30
9
(9.33)
M-35
8
(8.11)
M-40
7
(7.18)
M-15
M-20
M-25
M-30
M-35
M-40
Modular Ratio
scbc N/mm2
18.67
5
13.33
7
10.98
8.5
9.33
10
8.11
11.5
7.18
13
93.33
93.33
93.33
93.33
93.33
93.33
0.4
0.4
0.4
0.4
0.4
0.4
0.867
0.867
0.867
0.867
0.867
0.867
0.867
1.214
1.474
1.734
1.994
2.254
m scbc
kc
jc
(a) sst = 140
N/mm2 (Fe 250) Rc
Pc (%)
(b) sst = 190
N/mm2
(c ) sst = 230
N/mm2 (Fe 415)
0.714
1.214
1.429
1.643
1.857
kc
0.329
0.329
0.329
0.329
0.329
0.329
jc
0.89
0.732
0.89
0.89
0.89
0.89
0.89
Rc
1.025
1.244
1.464
1.684
1.903
Pc (%)
0.433
0.606
0.736
0.866
0.997
1.127
kc
0.289
0.289
0.289
0.289
0.289
0.289
jc
0.904
0.904
0.904
0.904
0.904
0.904
Rc
0.653
0.914
1.11
1.306
1.502
1.698
Pc (%)
0.314
0.44
0.534
0.628
0.722
0.816
Shear stress tc
100As
M-20
bd
0.15
0.18
0.16
0.18
0.17
0.18
0.18
0.19
0.19
0.19
0.2
0.19
0.21
0.2
0.22
0.2
0.23
0.2
0.24
0.21
0.25
0.21
0.26
0.21
0.27
0.22
0.28
0.22
0.29
0.22
0.3
0.23
0.31
0.23
0.32
0.24
0.33
0.24
0.34
0.24
0.35
0.25
0.36
0.25
0.37
0.25
0.38
0.26
0.39
0.26
0.4
0.26
0.41
0.27
0.42
0.27
0.43
0.27
0.44
0.28
0.45
0.28
0.46
0.28
0.47
0.29
0.48
0.29
0.49
0.29
0.5
0.30
0.51
0.30
0.52
0.30
0.53
0.30
0.54
0.30
0.55
0.31
0.56
0.31
0.57
0.31
0.58
0.31
0.59
0.31
0.6
0.32
0.61
0.32
0.62
0.32
0.63
0.32
0.64
0.32
0.33
0.65
0.33
0.66
Reiforcement %
100As
M-20
bd
0.18
0.15
0.19
0.18
0.2
0.21
0.21
0.24
0.22
0.27
0.23
0.3
0.24
0.32
0.25
0.35
0.26
0.38
0.27
0.41
0.28
0.44
0.29
0.47
0.30
0.5
0.31
0.55
0.32
0.6
0.33
0.65
0.34
0.7
0.35
0.75
0.36
0.82
0.37
0.88
0.38
0.94
0.39
1.00
0.4
1.08
0.41
1.16
0.42
1.25
0.43
1.33
0.44
1.41
0.45
1.50
0.46
1.63
0.46
1.64
0.47
1.75
0.48
1.88
0.49
2.00
0.50
2.13
0.51
2.25
0.67
0.68
0.69
0.7
0.71
0.72
0.73
0.74
0.75
0.76
0.77
0.78
0.79
0.8
0.81
0.82
0.83
0.84
0.85
0.86
0.87
0.88
0.89
0.9
0.91
0.92
0.93
0.94
0.95
0.96
0.97
0.98
0.99
1.00
1.01
1.02
1.03
1.04
1.05
1.06
1.07
1.08
1.09
1.10
1.11
1.12
1.13
1.14
1.15
1.16
1.17
1.18
1.19
1.20
1.21
1.22
0.33
0.33
0.33
0.34
0.34
0.34
0.34
0.34
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.36
0.36
0.36
0.36
0.36
0.36
0.37
0.37
0.37
0.37
0.37
0.37
0.38
0.38
0.38
0.38
0.38
0.38
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.41
0.41
0.41
0.41
0.41
0.41
0.41
1.23
1.24
1.25
1.26
1.27
1.28
1.29
1.30
1.31
1.32
1.33
1.34
1.35
1.36
1.37
1.38
1.39
1.40
1.41
1.42
1.43
1.44
1.45
1.46
1.47
1.48
1.49
1.50
1.51
1.52
1.53
1.54
1.55
1.56
1.57
1.58
1.59
1.60
1.61
1.62
1.63
1.64
1.65
1.66
1.67
1.68
1.69
1.70
1.71
1.72
1.73
1.74
1.75
1.76
1.77
1.78
0.41
0.41
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.43
0.43
0.43
0.43
0.43
0.43
0.43
0.43
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.47
0.47
0.47
0.47
1.79
1.80
1.81
1.82
1.83
1.84
1.85
1.86
1.87
1.88
1.89
1.90
1.91
1.92
1.93
1.94
1.95
1.96
1.97
1.98
1.99
2.00
2.01
2.02
2.03
2.04
2.05
2.06
2.07
2.08
2.09
2.10
2.11
2.12
2.13
2.14
2.15
2.16
2.17
2.18
2.19
2.20
2.21
2.22
2.23
2.24
2.25
2.26
2.27
2.28
2.29
2.30
2.31
2.32
2.33
2.34
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
2.35
2.36
2.37
2.38
2.39
2.40
2.41
2.42
2.43
2.44
2.45
2.46
2.47
2.48
2.49
2.50
2.51
2.52
2.53
2.54
2.55
2.56
2.57
2.58
2.59
2.60
2.61
2.62
2.63
2.64
2.65
2.66
2.67
2.68
2.69
2.70
2.71
2.72
2.73
2.74
2.75
2.76
2.77
2.78
2.79
2.80
2.81
2.82
2.83
2.84
2.85
2.86
2.87
2.88
2.89
2.90
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
2.91
2.92
2.93
2.94
2.95
2.96
2.97
2.98
2.99
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
3.08
3.09
3.10
3.11
3.12
3.13
3.14
3.15
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
tc N/mm2
M-35
M-40
0.2
0.2
0.23
0.23
0.31
0.32
0.37
0.38
0.42
0.42
0.45
0.46
0.49
0.49
0.52
0.52
0.54
0.55
0.56
0.57
0.58
0.60
0.60
0.62
0.62
0.63
300 or more
1.00
275
1.05
250
1.10
225
1.15
200
1.20
175
1.25
M-15
1.6
tc.max
M-20
1.8
M-25
1.9
M-30
2.2
M-35
2.3
M-40
2.5
Table 3.4. Permissible Bond stress Table tbd in concrete (IS : 456-2000)
Grade of concrete M10
-tbd (N / mm2)
15
0.6
20
0.8
25
0.9
30
1
35
1.1
40
1.2
tbd
H.Y.S.D. Bars
(N / mm2)
kd = Ld F
0.96
60
M 20
0.8
44
1.28
45
M 25
0.9
39
1.44
40
M 30
35
1.6
36
M 35
1.1
32
1.76
33
M 40
1.2
29
1.92
30
M 45
1.3
27
2.08
28
M 50
1.4
25
2.24
26
150 or less
1.30
50
1.4