Академический Документы
Профессиональный Документы
Культура Документы
Water flows out of a constant height reservoir, over a spillway, across a concrete apron, and into a trapezoidal river.
This program calculates the distance, measured from the toe of the spillway, required for the hydraulic jump to occur.
Blue cells are user inputs, green cells are program outputs.
Channel & River Design Parameters
B
S0
20 ft
0.0001 ft/ft
n
z
0.022 ft 1/3
1.5
3276 cfs
43.0 ft
Run
Load
Example
Clear
Operational Parameters
river cross section
Q
y0
Spillway Calculations
y1
Fr1
y2
3.24 ft
4.9567
21.13 ft
Tailwater Calculations
yT
FrT
y1T
19.90 ft
0.3252
3.57 ft
Lj
45.60 ft
transition to
supercritical flow
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
x
ft
0.00
2.30
4.59
6.88
9.17
11.46
13.75
16.03
18.32
20.60
22.88
25.16
27.44
29.72
31.99
34.26
36.53
38.80
41.07
43.33
45.60
y
ft
3.24
3.25
3.27
3.29
3.30
3.32
3.34
3.35
3.37
3.39
3.40
3.42
3.44
3.45
3.47
3.49
3.50
3.52
3.54
3.55
3.57
A
ft 2
64.74
65.07
65.40
65.73
66.06
66.40
66.73
67.06
67.39
67.72
68.06
68.39
68.72
69.05
69.38
69.71
70.05
70.38
70.71
71.04
71.37
P
ft
26.47
26.51
26.54
26.57
26.61
26.64
26.67
26.71
26.74
26.77
26.81
26.84
26.87
26.91
26.94
26.97
27.00
27.04
27.07
27.10
27.14
R
ft
2.445
2.455
2.464
2.474
2.483
2.492
2.502
2.511
2.520
2.530
2.539
2.548
2.557
2.566
2.576
2.585
2.594
2.603
2.612
2.621
2.630
Vavg
ft/s
50.60
50.35
50.09
49.84
49.59
49.34
49.09
48.85
48.61
48.37
48.14
47.90
47.67
47.44
47.22
46.99
46.77
46.55
46.33
46.11
45.90
Sf
ft/ft
0.1704
0.1678
0.1652
0.1627
0.1603
0.1579
0.1556
0.1533
0.1510
0.1488
0.1466
0.1445
0.1424
0.1404
0.1384
0.1364
0.1345
0.1326
0.1308
0.1290
0.1272
Fr
toe
y0
4.9567
4.9188
4.8815
4.8446
4.8081
4.7721
4.7366
4.7015
4.6668
4.6326
4.5987
4.5653
4.5323
4.4997
4.4675
4.4356
4.4041
4.3730
4.3423
4.3119
4.2819
y1
Lj
x
y1T
yT
energy
dissipation
tailwater
Node