Вы находитесь на странице: 1из 2

Tuesday, August 26, 2014

Ref. #:26082014-01
Mr. Arif
Electrical Manager
UES
Multan Road Lahore
Offer for DSE Load Share & Synchronizing System for 3 x Generators & 1 Mains.
Dear Mr. Arif,
Reference your discussions with Mr. Zahid Tehseen regarding DSE Load Share & Synch
System between 3 x Generators & 1 x Mains (WAPDA), we are pleased to offer as under:
Sr.#
1

Description

Make

Qty

Package Price
(Rs.)

DSE Synchronization & Load


Share System suitable for 3 x
Generators & 1 x Mains (Wapda)
Comprising with followings:
Powder Coated Floor Mounted
Control Panel with Inside Control
Wiring.
DSE Synch & Load Share Module
DSE AMF/ATS Module
Made In
DSE Battery Charger.
04
England/UK
Dry Batteries.
Power relays.
Cartage Fuses.
Emergency Stop.
Selector Switches.
Key Locks.
Terminal Blocks.
Commissioning & Configuration of
above Offered System at Site.
Supply & Services for Breakers
STD
02
Motorization
Net Payable Project Cost (Rs.)

1,600,000

240,000
1,840,000

Terms & Conditions:


Payment: 70% Advance, 20% on delivery & 10% after successful commissioning.
Tax: Above Prices are without all taxes i.e. 17% GST, 8% WH Tax & 4.5% Income Tax etc.
Delivery: Within 4 to 6 weeks after receipt of advance payment.
Warranty: 3 Months system operational warranty.
System Training: Necessary System Operation Training to the Operators at site.
Validity: 15 days.
System Features:
1. Automatic or Manual starting & stopping of Generators.
2. Peak Lopping / Peak Shaving Import/Export Feature.
8-A/2 Gulberg lll Near Hussain Chowk Lahore 54660 Pakistan
Tel: +92-42- 35760910, 35760911, 35760912 Fax: +92-42-35754944
E-mail: Support@pyramidautomation.com
www.pyramidautomation.com

3. Automatic Synchronization and equal load sharing between 3xGenerators according


to ratings.
4. Comprehensive metering & instrumentation LCD display of Generators.
5. Comprehensive metering & instrumentation LCD display of Mains.
6. Soft Transfer of load between Mains & Generators.
7. Manual voltage/frequency adjustment.
8. Automatic hours run balancing.
9. Dead bus sensing.
10. Bus failure detection.
11. Direct governor and AVR control.
12. Volts and frequency matching.
13. KW and kV Ar load sharing.
14. Event log (250).
15. Engine protection.

Scope of Work:
Our scope of work would be limited to following:

Supply of DSE Load Share & Synch System at Site.


Interfacing of Generators AVRs & Speed Control with DSE Controllers.
System Configuration & Commissioning at site.
Submission of Commissioning Report software configuration files of the DSE
controllers & Operational Manual.

Exclusions & Clarifications:


1. Our scope of work is limited to the supply, installation & commissioning of the above
offered system at site, any other equipment accessories required for the completion of
the system will be provided by the customer.
2. Our offer is subject to the understanding that Speed Controller (Electronic Governors)
and AVR fitted on the entire generators are compatible with DSE controllers and
suitable for parallel operation.
3. The installation of all CTs/PTs along with sensing cables up to DSE controllers will
be done by the customer.
Important Note:
Our engineering & commissioning work will start when following tasks have been done:
1. All Generators are commissioned and tested independently at 50Hz.
2. All Engine safeties of the Generators i.e. Oil Pressure, High coolant Temperature etc.
are operative.
Looking forward to hear from you and if you require any further information or clarification,
please feel free to contact us at any time.
Best Regards,

Muzna Wahid
Support Engineer
8-A/2 Gulberg lll Near Hussain Chowk Lahore 54660 Pakistan
Tel: +92-42- 35760910, 35760911, 35760912 Fax: +92-42-35754944
E-mail: Support@pyramidautomation.com
www.pyramidautomation.com

Вам также может понравиться