SOLAR PV QUOTA YEAR 2015


QUOTA
(MW)

APPLICATION
METHODOLOGY

Solar PV Non individual (<425 kW)

20

e-FiT Online System with


Balloting (efit.seda.gov.my)

Solar PV Non individual (> 425 kW up


to and including 1MW)

32

Manual Submission with


*balloting

CATEGORIES

*Should

there be multiple applications having the same merit points,


decision will be based on balloting results (proposed balloting to be
conducted together with solar PV category up to 425kW application)
3

PROPOSED TIMELINE (QUOTA RELEASE)


Solar PV Non Individual 425 kW
Bil

Item

Date*

Announcement to Flush out data

Mon, 20 Oct 2014

Flush Out Data (Draft Application)

Wed, 12th Nov 2014

Profile (Creation & Update)

Mon, 17 Nov 2014 Thurs, 26


Feb 2015, 2.00pm

Draft Application Creation

17 Nov 2014 - 26 Feb 2015

Draft Application To Be 100% Completed

Thurs, 26 Feb 2015, 2.00pm

Balloting

Mon, 9th March 2015

*Note: Proposed dates will only be finalized once FiT rate schedules are gazetted
4

PROPOSED TIMELINE (QUOTA RELEASE)


Solar PV Non Individual > 425kW upto and including 1 MW
Bil

Item

Date*

Flush Out Data (Draft Application)

Wed, 12th Nov 2014

Profile (Creation & Update)

Mon, 17 Nov 2014 Thurs, 29 Jan


2015

Manual Submission @ SEDA HQ, 26 Jan 2015 (Mon) 29 Jan 2015


Putrajaya
(Thurs)

Verification Merit Points

3rd Feb 2015 (Tues) 27 Feb 2015


(Fri)

Balloting (in the event there is a tie to


Mon, 9th March 2015
the merit points)

*Note: Proposed dates will only be finalized once FiT rate schedules are gazetted
5

SOLAR PV MANUAL APPLICATION


(> 425 KW UP TO AND INCLUDING 1 MW)

PROPOSED MERIT POINTS


1) Service Providers Track Record
Criteria

No. of Points

180 kw but < 3 projects

180 kw & 3 projects

1MW 3 projects

1MW = 2projects

1 MW = 2 projects AND 180 kW 2 projects

180 kW > 3 projects AND 1 MW 1 project

< 180kw <3 projects

SP Sabah

/
/

/
/

7
7

PROPOSED MERIT POINTS (SERVICE PROVIDER)


i.

Criteria as proof:
LOA showing installation & design awarded to the SP
(Company and not to the individual/shareholders/directors);
The LOA must be a CTC

ii. No change in SP allowed after obtaining quota


(post approvals).
iii. If application satisfies item # 3, 5 or 6 above and
uses an SP from Sabah, the application will
receive a maximum of 2 points only.
8
8

PROPOSED MERIT POINTS


2) Project Site
Criteria

No. of Points
0

Ground mounted

Mounted on roof

Secondary use of panel (BIPV , etc.)

/
/
/

9
9

PROPOSED MERIT POINTS (PROJECT SITE)


i.

Criteria as proof:

TBA for BIPV


Secondary use shall include for education
and R&D purposes if installed in a University
or registered research institution only.

10
10

PROPOSED MERIT POINTS


3) Project Site Status
Criteria

No. of Points
0

Letter of Intent (LOI) only from the Land Owner

A valid lease for the full 21 years tenure (with


LHDN stamping)

Long term lease ( 50 years)

Self-owned (Land title = Eligible Producer)

Owned by Shareholders** 51%

Owned by Shareholders** 51%

Owned by Shareholders** 10%

/
/

*All documents to be CTC


** Shareholders here refers to the applications profile submission in the e-FiT system.

11

PROPOSED MERIT POINTS


4) Project Finance
Criteria
1
2
2.1

Letter of Intent (LOI) or nothing


*Financing
Term sheet

Valid 6 months from date of submission

Self-finance Overdraft /credit facility


self-finance - 2 months statement
- parent company with board resolution

Self-finance - shareholder 51%

Latest 2 months statement

No. of Points
0
/

* If using financing, applicants should show balance funds in the SPV accounts (i.e. the
applicants name itself for the equity portion).

12

PROPOSED MERIT POINTS


5. Plant Distance to the Connection Point
Criteria

No. of Points
0

Distance > 1km

500m < Distance 1km

Distance 500 m

/
/
/

13

PROPOSED MERIT POINTS


Proposed Additional Conditions to be imposed
1) Applicants with existing projects that have not
reached FiTCD by 26 Jan 2015 will not be
eligible to apply; ear marked:
By FiAH
By location
By shareholder

2) Only one (1) application allowed per property


for each quota opening.

14

Thank you

SEDA Malaysia,
Galeria PjH, Level 9
Jalan P4W, Persiaran Perdana,
Presint 4, 62100 Putrajaya, Malaysia.

Phone : +603-8870 5800


Email: F1tteam@seda.gov.my
15
Web: www.seda.gov.my

Вам также может понравиться