PLANNERSTOWER(LEVEL18),13/A,BIPONONC/A,BIRUTTAMC.R.DATTAROAD
(SONARGAONROAD),DHAKA1000,BANGLADESH,TEL:880296146614.
Managing Director
FFBL
Karachi, Pakistan.
Thanking you.
Yours Sincerely,
INDEX
SECTION 1 : Building Description
01-02
03
03
04
05
06
07
07
08-09
10
11
ENCLOSURES:
Proposal Drawing
Design
Calculations
REF NO.
REV NO.
DATE
PAGE
Q1403-072
00
14-Octomber-2014
1 of 10
Span (m)
Length (m)
Clear Height (m)
No. of Interior Columns
Roof Slope
Bay Spacing (m)
Type of End Frames
Wind Bracing
90.00
C\C of Steel Column
240.00
C\C of Steel Column
30.00
00
1:10
30 @ 8.00 C/C of Steel Col.
Steel Main Frame
In Roof and wall
Wall Conditions
1
2
3
4
Secondary Members
1
Endwalls
Left
Right
Endwall Type
By Pass
By Pass
REF NO.
REV NO.
DATE
PAGE
Q1403-072
00
14-Octomber-2014
2 of 10
TRIMS
At Eave
At Gable
Door
No.
1
Hot Dip, 55% Aluminium & 45% Zinc, Aluzinc alloy Coated Steel Sheet
0.70 mm thick. to roof.
Pre-painted Hot Dip, 55% Aluminium & 45% Zinc, Aluzinc Alloy Coated
Steel Sheet 0.70 mm thk. including 25 microne polyester protective colour
paint to wall (Color to be as per Sarker Standard Panel Chart)
Description
Double Sliding
door
Type
Over
Hanging
Location at
As Per Drawing
Sky Light
No.
Description
Size
1
Glass Fiber material, 0.82 m width x 3 m length
Type : Frosted Glass
Size
8.0 m X 8.0 m
Location at
Roof area
Quantity
14.00
Quantity
120 Nos.
REF NO.
REV NO.
DATE
PAGE
Q1403-072
00
14-Octomber-2014
3 of 10
Span (m)
Length (m)
Clear Height (m)
No. of Interior Columns
Roof Slope
Bay Spacing (m)
Type of End Frames
Wind Bracing
30.00
C\C of Steel Column
42.00
C\C of Steel Column
12.00
00
1:10
6 @ 7.00 C/C of Steel Col.
Steel Main Frame
In Roof and wall
Wall Conditions
1
2
3
4
Secondary Members
1
Endwalls
Left
Right
Endwall Type
By Pass
By Pass
REF NO.
REV NO.
DATE
PAGE
Q1403-072
00
14-Octomber-2014
4 of 10
TRIMS
At Eave
At Gable
Door
No.
1
Hot Dip, 55% Aluminium & 45% Zinc, Aluzinc alloy Coated Steel Sheet
0.70 mm thick. to roof.
Pre-painted Hot Dip, 55% Aluminium & 45% Zinc, Aluzinc Alloy Coated
Steel Sheet 0.70 mm thk. including 25 microne polyester protective colour
paint to wall (Color to be as per Sarker Standard Panel Chart)
Description
Double Sliding
door
Sky Light
No.
Description
1
Glass Fiber material,
Type : Frosted Glass
Type
Over
Hanging
Location at
As Per Drawing
Size
0.82 m width x 3 m
length
Size
6.00 m X 8.0 m
Location at
Roof area
Quantity
4.0
Quantity
24 Nos.
REF NO.
REV NO.
DATE
PAGE
Q1403-072
00
14-Octomber-2014
5 of 10
Span (m)
Length (m)
Clear Height (m)
No. of Interior Columns
Roof Slope
Bay Spacing (m)
Type of End Frames
Wind Bracing
40.00
C\C of Steel Column
128.00
C\C of Steel Column
17.00
00
1:10
17 @ 7.529 C/C of Steel Col.
Steel Main Frame
In Roof and wall
Wall Conditions
1
2
3
4
Secondary Members
1
Endwalls
Left
Right
Endwall Type
By Pass
By Pass
REF NO.
REV NO.
DATE
PAGE
Q1403-072
00
14-Octomber-2014
6 of 10
TRIMS
At Eave
At Gable
Door
No.
1
Hot Dip, 55% Aluminium & 45% Zinc, Aluzinc alloy Coated Steel Sheet
0.70 mm thick. to roof.
Pre-painted Hot Dip, 55% Aluminium & 45% Zinc, Aluzinc Alloy Coated
Steel Sheet 0.70 mm thk. including 25 microne polyester protective colour
paint to wall (Color to be as per Sarker Standard Panel Chart)
Description
Double Sliding
door
Type
Over
Hanging
Sky Light
No.
Description
1
Glass Fiber material,
Type : Frosted Glass
Location at
As Per Drawing
Size
0.82 m width x 3 m
length
Size
6.0 m X 8.0 m
Location at
Roof area
Quantity
10
Quantity
68 Nos.
REF NO.
REV NO.
DATE
PAGE
Q1403-072
00
14-Octomber-2014
7 of 10
Span (m)
Length (m)
Clear Height (m)
No. of Interior Columns
Roof Slope
Bay Spacing (m)
Type of End Frames
Wind Bracing
18.00
C\C of Steel Column
35.00
C\C of Steel Column
12.00
00
1:10
5 @ 7.00 C/C of Steel Col.
Steel Main Frame
In Roof and wall
Wall Conditions
1
2
3
4
Secondary Members
1
Endwalls
Left
Right
Endwall Type
By Pass
By Pass
REF NO.
REV NO.
DATE
PAGE
Q1403-072
00
14-Octomber-2014
8 of 10
TRIMS
At Eave
At Gable
Hot Dip, 55% Aluminium & 45% Zinc, Aluzinc alloy Coated Steel Sheet
0.70 mm thick. to roof.
Pre-painted Hot Dip, 55% Aluminium & 45% Zinc, Aluzinc Alloy Coated
Steel Sheet 0.70 mm thk. including 25 microne polyester protective colour
paint to wall (Color to be as per Sarker Standard Panel Chart)
Design, Fabrication and supply of Pre-Fabricated steel structure withstand the wind
and other imposed load factors.
REF NO.
REV NO.
DATE
PAGE
Q1403-072
00
14-Octomber-2014
9 of 10
0.57
0.57
150
Wind Exposure
Exposure- A
Earthquake Zone
Zone 02
Earthquake Coefficient
0.20
270
n/a
n/a
REF NO.
REV NO.
DATE
PAGE
Q1403-072
00
14-Octomber-2014
10 of 10
REF NO.
REV NO.
DATE
PAGE
Q1403-072
00
14-Octomber-2014
11 of 10
No. Components
1
2
3
4
6
7
8
Specifications
REF NO.
REV NO.
DATE
PAGE
Q1403-072
00
14-Octomber-2014
12 of 10
High Strength connection bolts for connection of all primary and secondary
members.
Signed contract
REF NO.
REV NO.
DATE
PAGE
Q1403-072
00
14-Octomber-2014
13 of 10
Covered Area
(Sft)
Building Price,
(USD)
233569.00
Sub Total A
Total Price
USD.
USD.
In Word (USD):
B. Additional Price
No.
01
02
03
Description
Door ( 8.0 M X 6.0 M ) (double Sliding)
Sky Light (3 M Length x 1 M width)
Epoxy Paint
Quantity
Price (USD.)
14.00
120 Nos
Red Steel
Sub Total B
USD
REF NO.
REV NO.
DATE
PAGE
Q1403-072
00
14-Octomber-2014
14 of 10
Covered Area
(Sft)
Building Price,
(USD)
13796.00
Sub Total A
Total Price
USD.
USD.
In Word (USD):
only.
B. Additional Price
No.
01
02
03
Description
Door ( 6.0 M X 8.0 M ) (double Sliding)
Sky Light (3 M Length x 1 M width)
Epoxy Paint
Quantity
Price (USD.)
04
24 Nos
Red Steel
Sub Total B
USD
REF NO.
REV NO.
DATE
PAGE
Q1403-072
00
14-Octomber-2014
15 of 10
Building Price,
(USD)
Sub Total A
Total Price
USD.
USD.
In Word (USD):
B. Additional Price
No.
01
02
03
Description
Door ( 8.0 M X 6.0 M ) (double Sliding)
Sky Light (3 M Length x 1 M width)
Epoxy paint
Quantity
Price (USD.)
10 Nos
68 Nos
Red Steel
Sub Total B
USD
REF NO.
REV NO.
DATE
PAGE
Q1403-072
00
14-Octomber-2014
16 of 10
Building Price,
(USD)
Sub Total A
Total Price
USD.
USD.
In Word (USD):
B. Additional Price
Description
Epoxy paint
Quantity
Price (USD.)
Red Steel
Sub Total B
USD
REF NO.
REV NO.
DATE
PAGE
Q1403-072
00
14-Octomber-2014
17 of 10
Weight Breadown
Red Steel (Column, Rafter, Sub Beam, Brackets & Stoppers, Purlin
stay angle, Sheeting angle, Anchor Bolt, Cable bracing,
Nut Bolt, Fastener)
Roof Purlin & Wall Girts
Roof Sheet & Wall Sheet
Mezzanine Decking Sheet
Capping, Trims etc.
Total
Total 40 feet containers
WEIGHT (MT) 5%
3006.01
261.58
382.28
00.00
17.17
3667.04
183
WEIGHT (MT) 5%
Red Steel (Column, Rafter, Sub Beam, Brackets & Stoppers, Purlin
stay angle, Sheeting angle, Anchor Bolt, Cable bracing,
Nut Bolt, Fastener)
Roof Purlin & Wall Girts
16.39
26.51
00.00
2.24
103.20
5
58.06
C. (STGS Hall)
ITEMS
WEIGHT (MT) 5%
Red Steel (Column, Rafter, Sub Beam, Brackets & Stoppers, Purlin
stay angle, Sheeting angle, Anchor Bolt, Cable bracing,
Nut Bolt, Fastener)
359.23
58.52
100.15
00.00
6.34
524.24
26
REF NO.
REV NO.
DATE
PAGE
Q1403-072
00
14-Octomber-2014
18 of 10
WEIGHT (MT) 5%
Red Steel (Column, Rafter, Sub Beam, Brackets & Stoppers, Purlin
stay angle, Sheeting angle, Anchor Bolt, Cable bracing,
Nut Bolt, Fastener)
49.86
5.73
6.56
00.00
1.52
63.67
3
Country
China/ Japan
China/ Japan
China/ Japan
China
China
China
Bangladesh
REF NO.
REV NO.
DATE
PAGE
Q1403-072
00
14-Octomber-2014
19 of 10
Summary Page
Building Name
Coal Storage
Building
Lime Stone
Building
Net Weight
Building Area
Basic Building
price CFR
Chittagong($)
Total Building
Price With
Accessories
Numbers of 40 feet
containers
183
103.00 MT
13796.00 SFT
127324.00
STGS Building
524.00 MT
55655.00 SFT
647821.00
779164.00
26
Coal Unloading
Shed
64.00 MT
6953.00
78405.00
89547.00
Total
160989.00
217
-
REFERENCE PROJECT:
REF NO.
REV NO.
DATE
PAGE
Q1403-072
00
14-Octomber-2014
20 of 10
Redsteel
needed
Sheeting
needed
Hobigonj,Shylet
685.00MT
185.00
Mt
46490
Narayanngonj
250.00MT
60.0MT
FFAKIRAPPEARSLTD
2,31,780.00
Narayanngonj
700MT
130.0MT
RATULKnitwearLtd
50,00.00
Saver,Dhaka
250MT
65.00MT
I.U.SHEFASHION
1,20,000.00
Pabna
680MT
135.00
MT
DIMONDCEMENTCLINKER
SHED,CHITTAGONG
1,00,000.00
Gazipur
700.00MT
250.00
MT
AircraftHanger
75,000.00
Dhaka
500.00MT
120.00
MT
BKSPINDOORSTADIUM
1,20,000.00
Saver,Dhaka
700.00MT
135.00
MT
BRITISHAMERICAN
TOBACCOHEADOFFICE
70,000.00
Dhaka
200.00MT
AKIJCERAMIC
93,000.00
MYMENSINGH
500
Projectname
Area(Sft)
RAKCERAMICS
2,31,469.00
VAIVAISPININIG
Projectlocation
50.00MT
105.00
MT
REF NO.
REV NO.
DATE
PAGE
Q1403-072
00
14-Octomber-2014
21 of 10
Month:
Year: 2014
BETWEEN
FFBL ON THE ONE HAND located in Lahore-Pakistan and represented by Mr.
.. duly authorized to enter into this contract.
AND
Sarker Steel Ltd, ON THE OTHER HAND, located at Planners Tower (Level-18), 13/A,
Bipanon C/A, Bir Uttam C.R Datta Road (Sonargaon Road), Banglamotor, Dhaka 1000,
Bangladesh, Tel: 8802-9614661~4, Fax: 8802-9614660, Email: buildts@hotmail.com,
Factory: Balitha, Dhamrai, Dhaka, and represented by Mr. Md. Zakir Hossain Sarker duly
authorized to enter into this contract.
NOW THEREFORE the parties agree as follows:
CONTRACT SCOPE: The supply of Sarker Steels building(s) as described in the contract
documents.
CONTRACT DOCUMENTS: The following documents constitute the contract documents:
1. Sarker Steels Proposal No. Q1403-072 Rev.No.00 Date October - 17 - 2014
2. Sarker Steels Standard Terms & Conditions of Sale.
3. Sarker Steels Standard Product Specifications.
CONTRACT PRICE: USD
IN WITNESS HEREOF, the authorized parties hereto have executed this Contract.
FOR
FOR
: FFBL
Name
Name
Title
: Managing Director
Title
: Managing Director
Signature
Signature :
Date
Date
Company Stamp:
Company Stamp:
SarkerSteelLimited
SeduleOfDeliveryOfMaterail
ClientName:FaujiFertilizerBinKashem
Q1403072
Activities
Agreement&Document
FebricationDrawing
ReturnofApprovalDrawing
Production
Shipment
Mnth1
Month2
month3
Month4
Month05
Month6
month7
Month8
Month9