LBE/SLBE Participation

CCIG DEVELOPER
Project Name: OAKLAND ARMY BASE - MASTER PLAN
Project No.:

NA

Discipline

Prime & Subs

Location

Cert.
Status

LBE

SLBE

VSLBE/LPG
*double
counted value

Total
LBE/SLBE %

Total
Dollars

Ethn.

PRIME

CCIG Developer

Oakland

CB

76,425.62

76,425.62

76,425.62

Program Mgt

Architectural Dimensions

Oakland

CB

1,477,144.02

1,477,144.02

1,477,144.02

Health & Safety

Innovative and Creative Environmental Solutions

Oakland

UB

2,800.00

NL

Computer Modeling

Udinsky Architecture

Not Listed

UB

60,000.00

AP

Program Management

Turner Construction

Oakland

CB

314,022.89

314,022.89

314,022.89

Estimating Services
Deconstruction
Analysis

Leland Saylor

Oakland

CB

26,400.00

26,400.00

26,400.00

KJB Management Services

Oakland

CB

14,000.00

14,000.00

14,000.00

Community Outreach
Capacity Study Admin
Svcs

A2 Ventures

Oakland

CB

37,828.14

37,828.14

37,828.14

AA

Roth Staffing Companies

Not Listed

UB

4,806.30

NL

Video Project

YLE LLC

Not Listed

UB

8,400.00

NL

99,425.34

AA

644,356.55

NL

129,914.29
32,950.00

NL
O

Scheduleing

Acumen Building Enterprise

Oakland

CB

Land Planning

Ruggeri-Jensen-Azar Land Planning

Not Listed

UB

Not Listed
Oakland

UB
CB

Not Listed

UB

571,781.44

NL

Surveying
Aerial Surveying
Geotechnical
Engienering

Golden Pacific Surveys


Tetra Tech Aerial Surveying
Berlogar Stevens & Associates

99,425.34

32,950.00

99,425.34

32,950.00

Analytical Testing

Cerco Analytical Testing Subconsultant

Not Listed

UB

4,267.00

NL

Lab Testing

Cooper Lab Testing Testing Subconsultant

Not Listed

UB

3,920.00

NL

Testing Subconsultant

Environmental Data Resources

Not Listed

UB

145.00

NL

Drilling Subconsultant

H.S.I. Engineering

Not Listed

UB

8,030.00

NL

Drilling Subconsultant

Gregg Drilling

Not Listed

UB

42,960.00

NL

Drilling Subconsultant

Pitcher Drilling

Not Listed

UB

104,164.44

NL

Drilling Subconsultant

Lankelma Drilling Subconsultant

Not Listed

UB

16,886.74

NL

Drilling Subconsultant

Emploration Geoservices

Not Listed

UB

25,710.58

NL

Utility Location

C. Cruz Subsurface

Not Listed

UB

9,434.26

NL

Utility Location

Subtronics

Not Listed

UB

14,175.00

NL

Oakland

UB

311,388.01

Electrical Planning

AECOM Transportation

For Tracking Only


MBE

60,000.00

99,425.34

LBE/SLBE Participation
CCIG DEVELOPER
Project Name: OAKLAND ARMY BASE - MASTER PLAN
Project No.:

NA

Discipline

Power Survey
Environmental
Remediation
Environmental

Prime & Subs

Location

LBE

Oakland

CB

62,643.23

Northgate Environmental Management


Verdant Solutions, Inc.

Oakland
Oakland

CB
CB

27,304.00

Rail Design

HDR Engineering Rail Design

Not Listed

UB

Rail Design

Industrial Railways Company

Oakland

CB

Landcscape Architect

PGA Design Landscape Architecture

Oakland

CB

Engineering

BKF Engineers

Oakland

CB

Oakland

Structural Engineering

Morrow Meadows

Cert.
Status

Biggs Cardosa

SLBE

VSLBE/LPG
*double
counted value

Total
LBE/SLBE %

Total
Dollars

Ethn.

62,643.23

62,643.23

27,304.00
287.50

27,304.00
287.50

C
H

318,106.51

NL

114,596.99

114,596.99

58,160.75

58,160.75

519,856.00

519,856.00

519,856.00

CB

37,046.12

37,046.12

37,046.12

282,127.65

282,127.65

282,127.65

113,635.25

NL

217,255.33

101,131.00

NL

47,040.00

47,040.00

AA

$3,444,513.58

$5,940,525.95

Wharf Design

Jacobs Engineering

Oakland

CB

Health & Safety

Innovative and Creative

Not Listed

UB

Consultant

Top Grade Construction Consultant

Oakland

CB

Legal

Law Office of Marc Stice

Not Listed

UB

Audit

Williams Adley Audit

Oakland

CB

Project Totals

287.50

114,596.99
58,160.75

217,255.33

47,040.00
$1,634,202.21
27.51%

Requirements:
The 50% requirement can be satisifed by a combination of 25% LBE and 25% SLBE. The SLBE requirement is waived for
Oakland certified prime consultants. An VSLBE's participation is double counted toward meeting the requirement.

217,255.33

$1,810,023.87
30.47%

$287.50
0.01%

57.99%

For Tracking Only


MBE

SLBE 25%

VSLBE

TOTAL
LBE/SLBE 50%

TOTAL

3.48%
AA = African American
A = Asian
C = Caucasian
H = Hispanic

Legend

LBE = Local Business Enterprise

UB = Uncertified Business

NA = Native American

SLBE = Small Local Business Enterprise

CB = Certified Business

O = Other

Total LBE/SLBE = All Certified Local and Small Local Businesses

MBE = Minority Business Enterprise

NL = Not Listed

NPLBE = NonProfit Local Business Enterprise

WBE = Women Business Enterprise

NPSLBE = NonProfit Small Local Business Enterprise

The following firms were listed in both LBE and SLBE categories. Firms may be counted in one category only.

47,040.00
$206,752.84

100.00%
Ethnicity

LBE 25% or 50%

287.50

WBE

37,828.14

WBE

58,160.75

$95,988.89
1.62%

LBE/SLBE Participation
CCIG
Project Name: Oakland Army Base Bridge Phase
Project No.:
Discipline

NA
Prime & Subs

Engineer's Estimate
Location

Cert.

Under/Over Engineers Estimate:


LBE

SLBE

Status

PRIME
Program
Lead & Asbestos
Survey
Labs Pavement
Testing
Equipment
Emuissions
Subconsultant
Subconsultant
Subconsultant
Program
Management

Oakland
Oakland

CB
CB

American Compliance Service

Not Listed

UB

Consolidated Engineering Labs

Oakland

CB

35,850.00

Kleinfelder Geotechnical Oakland


Environ Construction Not Listed
AECOM
Oakland
AECOM - John Barna
Oakland

CB
UB
UB
UB

Turner Construction

CB

CCIG Developer
Architectural Dimensions

Oakland

VSLBE
*double counted
value

999,860.59
2,901,502.65

Total

Total

LBE/SLBE

Amounts

999,860.59
2,901,502.65

Ethn.

999,860.59
2,901,502.65

O
C

43,000.00

NL

35,850.00

35,850.00

146,000.00

146,000.00

146,000.00
5,000.00
12,336.81
74,818.33

C
NL
C
C

250,310.95

250,310.95

250,310.95

32,986.39

32,986.39

48,513.12

48,513.12

32,986.39
21,693.42
10,160.00
48,513.12
1,229,839.42
125,701.00

AA
NL
NL
AA
NL
NL
NL
NL
NL
NL
NL

Community Outreach
A2 Ventures Oakland
Video Project
YLE LLC Not Listed
Utility Location
Subtronics Not Listed
Scheduling
Acumen Building Enterprise
Oakland
Land Planning
Ruggeri-Jensen-Azar
Not Listed
Surveying
Golden Pacific Surveys Not Listed
Geotechnical
Engineering
Berlogar Stevens & Associates
Not Listed
Testing
Cerco Analytical Not Listed
Testing
Cooper Lab Testing Not Listed
Testing
Environmental Data Resources Not Listed
Drilling
HIS Engineering Not Listed
Drilling
Gregg Drilling Not Listed
Drilling
Pitcher Drilling Not Listed
Drilling
Lankeima Not Listed
Drilling
Emploration Geoservices Not Listed

CB
UB
UB
CB
UB
UB
UB
UB
UB
UB
UB
UB
UB
UB
UB

649,924.12
14,285.00
3,920.00
145.00
8,030.00
59,235.00
173,504.63
14,830.50
40,835.61

Subsurface Locators
C Cruz
Utility Location
Subtronics
Power Survey
Morrow Meadows
Environmental
Remediation
Northgate Environmental
Environmental
Remediation
Verdant Solutions, Inc.
Rail Design
HDR Engineering

Not Listed
Not Listed
Oakland

UB
UB
CB

1,052,297.52

1,052,297.52

9,434.26
21,855.00
1,052,297.52

Oakland

CB

540,097.25

540,097.25

505,097.25

Oakland
Not Listed

CB
UB

35,000.00

35,000.00
532,983.90

H
NL

35,000.00

For Tracking Only


MBE

48,513.12

35,000.00

LBE/SLBE Participation
CCIG
Project Name: Oakland Army Base Bridge Phase
Project No.:
Discipline

NA

Engineer's Estimate

Prime & Subs

Location

Cert.

Under/Over Engineers Estimate:


LBE

SLBE

Status

Landscape
Architecture
Civil Engineering
Structural
Engineering
Subconsultant
Hydrographic Survey
Biologist
Traffic Consultant
Health & Safety
Subconsultant
Consultant
Subconsultant
Subconsultant
Subconsultant
Subconsultant
Subconsultant
Subconsultant
Subconsultant
Legal
Subconsultant
Subconsultant
Subconsultant
Subconsultant
Subconsultant
Subconsultant

PGA Design
BKF Engineers

Oakland
Oakland

VSLBE
*double counted
value

CB
CB

1,806,492.18

Biggs Cardosa Oakland


DRS Marine Not Listed

CB
UB

895,700.00
0.00

Sea Surveyor Not Listed


HT Harvey Biologist Not Listed
Kittelson & Associates Oakland
Innovative and Creative EnvironmentalNot
Solutions
Listed
Liftech
Oakland
Top Grade Construction
Oakland
Goodfellow Top Grade
Oakland
TTGF JV *
Oakland
Digital Concrete Not Listed
ROJE
Oakland
Corbin Construction Oakland
MBC Construction Oakland
Robbin & Associates Not Listed
Law Office of Marc Stice Legal
Not Listed
Stice & Block
Not Listed
Rent-A-CFO
Not Listed
44 Energy Technologies
Not Listed
Gray Bowen
Not Listed
Project Film & TV
Not Listed
Williams Adley
Oakland

UB
UB
CB
UB
CB
CB
UB
CB
UB
CB
CB
CB
UB
UB
UB
UB
UB
UB
UB
CB

0.00
0.00
156,955.00 CCIG did not have listed

Project Totals
Requirements:
TheRequirements:
50% requirement can be satisifed by a combination of 25% LBE and 25% SLBE. The SLBE
requirement
waived for is
Oakland
certified
consultants.
An VSLBE's
participation
isfirm can
The 20% is
requirements
a combination
of prime
10% LBE
and 10% SLBE
participation.
An SLBE
double
counted100%
toward
meeting
the requirement.
be counted
towards
achieving
20% requirements.

120,530.25

Total

Total

LBE/SLBE

Amounts

120,530.25
1,806,492.18

120,530.25
1,806,492.18

C
O

895,700.00

895,700.00
0.00

C
NL
NL
NL
H
NL
O
C
C
C
NL
AP
AA
AA
C
C
NL
NL
NL
NL
NL
AA

24,999.00
10,000.00

1,570,916.78
49,000.00
24,999.00
10,000.00

140,794.00

8,000.00
80,870.00
156,955.00
110,910.00
2,435.00
49,511.14
91,099.76
1,221,174.14
0.00
1,570,916.78
49,000.00
24,999.00
10,000.00
35,062.50
199,937.50
192,750.00
69,000.00
75,154.00
36,839.00
140,794.00

$69,999.00
0.875%

$11,480,338.89
71.72%

$16,007,080.72
100.00%

156,955.00

2,435.00
49,511.14

2,435.00
49,511.14

610,587.07

610,587.07
1,570,916.78
49,000.00

140,794.00
$5,546,236.11
34.65%

$5,864,103.78
36.63%

For Tracking Only


MBE

Ethn.

156,955.00

1,570,916.78
49,000.00
24,999.00

140,794.00
$2,026,177.90
12.658%

Ethnicity

LBE 25% OR 50%

SLBE 25%

VSLBE

TOTAL LBE/SLBE 50%

TOTAL

AA = African American
A = Asian
C = Caucasian
H = Hispanic

Legend

LBE = Local Business Enterprise

UB = Uncertified Business

NA = Native American

SLBE = Small Local Business Enterprise

CB = Certified Business

O = Other

Total LBE/SLBE = All Certified Local and Small Local Businesses

MBE = Minority Business Enterprise

NL = Not Listed

NPLBE = NonProfit Local Business Enterprise

WBE = Women Business Enterprise

NPSLBE = NonProfit Small Local Business Enterprise

LBE/SLBE Participation
CCIG
Project Name: Oakland Army Base Bridge Phase
Project No.:
Discipline

NA
Prime & Subs

Engineer's Estimate
Location

Cert.
Status

Under/Over Engineers Estimate:


LBE

SLBE

VSLBE
*double counted
value

Total

Total

LBE/SLBE

Amounts

*TTGF JV - participation credit is based on the LBE percentage of owenership in the Joint Venture.

The following firms were listed in both LBE and SLBE categories. Firms maybe counted in one category only, and that is the category they carry with their certification.
CCIG Developer
Please note the following discrepancy: For Liftech - LBE side showed 2,435 and the slbe side showed 845,881.47
Architectural Dimensions
A2 Ventures
Acumen Building Etnerprise
Verdant Solutions, Inc.
PGA Design Landscape Architecutre
Liftech
Corbin Construction
MBC Construction
Robbin & Associates
Williams Adley

Ethn.

For Tracking Only


MBE

WBE

32,986.39

1,052,297.52
505,097.25

WBE

120,530.25

$1,710,911.41
10.688%

WBE

##########

LBE/SLBE PARTICIPATION
Bidder 1
Project Name:

Oakland Army Base

Project No.:

Discipline

Engineers Est:

Prime & Subs

Location

Cert.
Status

Under/Over Engineers Estimate:

LBE

SLBE

VSLBE *double
counted value

LPG *double
counted value

Total LBE/SLBE

L/SLBE Trucking

Total Trucking

Non Specialty Bid


Amount

For Tracking Only


Total Dollars

Ethn.

1.0
3.0
9.1
10.0

11.0
12.0
13.0
14.0
16.0
17.0
21.0
23.0
2.0
1.0
5.0
14.1
1.2
3.0
3.0
3.0
3.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
11.0
11.0
11.0
11.0
11.0
13.0
13.0
13.0
13.0
13.0
9.1
9.1
9.1
14.0
14.0
14.0

Oakland
Oakland
Oakland
Oakland
Oakland
Saratoga

CB
CB
CB
CB
CB
UB

53,465,325.00
380,050.00
977,000.00
1,066,700.00
2,038,000.00

53,465,325.00
380,050.00
977,000.00
1,066,700.00
2,038,000.00

53,465,325.00
380,050.00
977,000
1,066,700
2,038,000.00

53,465,325.00
380,050.00
977,000.00
1,066,700.00
2,038,000.00

C
C
C
C
C

Sweeping

Turner/Goodfellow Top
Grade/Flatiron JV
Innovative Construction Solutions
Gallagher & Burk
Good Fellow-TopGrade/Flatiron JV
Gallagher & Burk
Cleansweep

West Burma Paving & Rail


Grading

Gallagher & Burk

Oakland

CB

2,693,500.00

2,693,500.00

2,693,500

2,693,500.00

East Burma Paving


Wake Paving
Dry Utilities
Street Lights
Traffic Signals
Railroad Crossings
Surveying
Demolition
Earthwork
Wet Utilities
Gas
Dynamic Compaction Test
Trucking
Trucking
Trucking
Site Demolition
SD Structures
Maritime St. Demolition
Pavement Fabric (maritime)
Cement Treatment (Maritime)
Temporary Striping (Maritime)
Trucking (Partial) (Maritime)
Trucking (Partial) (Maritime)
Trucking (Partial) (Maritime)
AC Material (Maritime)
AC Material (West Burma)
Demolition (W. Burma)
Trucking (Partial) W. Burma
Trucking (Partial) W. Burma
Trucking (Partial) W. Burma
AC Material
Trucking (Partial) (Wake)
Trucking (Partial) (Wake)
Site demolition (Wake)
Trucking (Partial) (Wake)
Excavation (W. Burma Detour)

Good Fellow-TopGrade/Flatiron JV Oakland


CB
Gallagher & Burk
Oakland
CB
Morrow Meadows
Oakland
CB
Morrow Meadows
Oakland
CB
Aeko Consulting
Oakland
CB
Industrial Railways Company
Pinole
UB
Aliquot Associates
Oakland
CB
Alarcon Bohm
Oakland
CB
Good Fellow-TopGrade/Flatiron JV Oakland
CB
Mountain Cascade
Livermore
UB
Talus Construction
San Ramon
UB
Densification, Inc.
Paeonian SpringsUB
Monroe Trucking
Oakland
CB
CJC Trucking
Oakland
CB
Sudden Sam's Trucking
Oakland
CB
DeKay Demolition & Clearing
Oakland
CB
Beliveau Engineering Contractors, Inc.Oakland
CB
DeKay Demolition & Clearing
Oakland
CB
Pacific Northwest Oil
Stockton
UB
Griffin Oil
Pleasanton
UB
Chrisp Company
Fremont
UB
CJC Trucking
Oakland
CB
Monroe Trucking
Oakland
CB
Sudden Sam's Trucking
Oakland
CB
Gallagher & Burk, Inc.
Oakland
CB
Gallagher & Burk, Inc.
Oakland
CB
DeKay Demolition & Clearing
Oakland
CB
CJC Trucking
Oakland
CB
Monroes Trucking
Oakland
CB
Sudden Sam's Trucking
Oakland
CB
Gallagher & Burk, Inc.
Oakland
CB
CJC Trucking
Oakland
CB
Monroes Trucking
Oakland
CB
DeKay Demolition & Clearing
Oakland
CB
Sudden Sam's Trucking
Oakland
CB
Focon Construction
Oakland
CB

1,030,660.00
280,000.00
7,526,237.00
1,289,805.00

1,030,660.00
280,000.00
7,526,237.00
1,289,805.00
1,501,914.00

1,030,660.00
280,000
7,526,237
1,289,805
1,501,914
2,181,386
538,395
3,702,158
14,377,666
22,847,580
1,320,465
85,000
25,000
25,000
25,000
268,000

1,030,660.00
280,000.00
7,526,237.00
1,289,805.00
1,501,914.00
2,181,386.00
538,395.00
3,702,158.00
14,377,666.00
22,847,580.00
1,320,465.00
85,000.00
25,000.00
25,000.00
25,000.00
268,000.00

C
C
C
C
AA
NL
C
C
C
NL
NL
NL
AA
AA
AA
C

85,000
95,000
70,000
107,000
65,000.00
65,000.00
65,000.00
1,650,000.00
850,000.00
56,500.00
50,000.00
50,000.00
50,000.00
75,000.00
6,000.00
6,000.00
17,000.00
6,000.00
1,000,000.00

85,000.00
95,000.00
70,000.00
107,000.00
65,000.00
65,000.00
65,000.00
1,650,000.00
850,000.00
56,500.00
50,000.00
50,000.00
50,000.00
75,000.00
6,000.00
6,000.00
17,000.00
6,000.00
1,000,000.00

C
NL
NL
NL
AA
AA
AA
C
C
C
AA
AA
AA
C
AA
AA
C
AA
AA

Demolition & Clearing W. Burma)


AC Material
Electrical Purchasing
Gas
High Voltage

DeKay Demolition & Clearing


Gallagher & Burk
Gills Electric
Talus Construction
Hotline Construction

197,000.00
800,000.00
1,204,238.00
3,007,562.00
1,454,137.00

197,000.00
800,000.00
1,204,238.00
3,007,562.00
1,454,137.00

H
C
C
NL
C

PRIME
Material Handling
Site Demolition
West Burma Detour
Maritime Detour & Paving

Oakland
Oakland
Oakland
San Ramon
Brentwood

CB
CB
CB
UB
UB

1,501,914.00
538,395.00

538,395.00
3,702,158.00
14,377,666.00

3,702,158.00
14,377,666.00

25,000.00
25,000.00
25,000.00
268,000.00
635,000.00
85,000.00

65,000.00
65,000.00
65,000.00
1,650,000.00
850,000.00
56,500.00
50,000.00
50,000.00
50,000.00
75,000.00
6,000.00
6,000.00
17,000.00
6,000.00

197,000.00
800,000.00
1,204,238.00

53,465,325
96,762,525

25,000.00
25,000.00
25,000.00
268,000.00
635,000.00
85,000.00

25,000.00
25,000.00
25,000.00

65,000.00
65,000.00
65,000.00
1,650,000.00
850,000.00
56,500.00
50,000.00
50,000.00
50,000.00
75,000.00
6,000.00
6,000.00
17,000.00
6,000.00

65,000.00
65,000.00
65,000.00

65,000.00
65,000.00
65,000.00

50,000.00
50,000.00
50,000.00

50,000.00
50,000.00
50,000.00

6,000.00

6,000.00

6,000.00

6,000.00

197,000.00
800,000.00
1,204,238.00

25,000.00
25,000.00
25,000.00

MBE

WBE

7,526,237.00
1,289,805.00
1,501,914.00

25,000.00
25,000.00
25,000.00

65,000.00
65,000.00
65,000.00

50,000.00
50,000.00
50,000.00
6,000.00
6,000.00
6,000.00
1,000,000.00
197,000.00

LBE/SLBE PARTICIPATION
Bidder 1
Project Name:

Oakland Army Base

Project No.:

Discipline

Engineers Est:

Prime & Subs

Location

Cert.
Status

Under/Over Engineers Estimate:

LBE

SLBE

VSLBE *double
counted value

LPG *double
counted value

Total LBE/SLBE

L/SLBE Trucking

Total Trucking

Non Specialty Bid


Amount

For Tracking Only


Total Dollars

Ethn.

14.0
99.0
9.1
9.1
9.1
16.0
16.0
16.0
16.0
14.0
14.0
14.0
10.0
10.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
1.2
5.0
1.0
???
2.5
3.0
10.0
1.2
1.2
1.2
1.2
11.0
10.0
13.0

Trucking
Utility Abandonment
Hydroseeding
Fencing
Striping & Signage
Conduit Installation
Conduit & Wire Supply
Traffic Signal Supplier
Trucking Services
Electrical (Partial)
Electrical (Misc)
Joint Trench Work
Traffic Safety

TBD
Top Grade/Flatiron
Selby's Soil
North American Fence
Chrisp Company
Ray's Electric
Alameda Electric
Liam Services
Williams Trucking
Dal Technologies
Ray's Electric
Fonseca McElroy Grinding Co.
Farwest
TBD
D Line Constructors
Gallagher & Burk
Marshall Trucking
Central Concrete Supply
Right Away Ready Mix, Inc.
North American Fence
Tap Master
Dillard Environmental
Bayline Cutting & Coring
D-Line Contractors

MC Drain Rock Material


MC Drain Lines, Back Fill
Asphalt Material
Trucking
Concrete Materials
Concrete Materials
Fencing Materials
Underground Utility Work
Haz Mat
Saw Cutting
ICS Concrete Crushing
String/Pipe Layout
TBD
Material Crushing
Alarcon Bohm Special Projects
Site demolition
Gerco Construction
Structural Concrete
Beliveau Engineering
Wicking
Good Fellow-TopGrade/Flatiron JV
Wick Drains
HB Wick Drains
Wick Drains
Advanced Pipeline
Wick Drains
PLS Surveys
Cellular Lightweight Concrete
Cell Crete Corp
Cellular Lightweight conrete
Cell Crete Corp
Cellular Lightweight Concrete (W) Cell Crete Corp

Requirements:

TBD
New Castle
Oakland
Fremont
Oakland
Alameda
Livermore
Oakland
Oakland
Oakland

UB
CB
UB
CB
UB
UB
CB
CB
CB

Lodi

UB

Oakland
Oakland
Oakland
Oakland
Oakland
Oakland

CB
CB
CB
UB
CB
CB

Byron

UB

Oakland

CB

TBD
Oakland
Auburn
Oakland

Oakland
Kiowa
Byron
Oakland
Hayward
Hayward
Hayward
Project Totals

39,035.00

39,035.00

929,485.00

929,485.00

10,200.00
1,725,547.00
451,115.00

10,200.00
1,725,547.00
451,115.00

2,000,000.00
480,000.00
1,000,000.00
150,000.00

CB
UB

102,500.00

102,500.00

915312

915312

4,111,313.00

25,000.00

CB
UB
UB
UB

1,000,000.00

10,200.00

1,000,000.00

150,000.00
60,000.00

60,000.00

CB
UB
CB

2,000,000.00
480,000.00
1,000,000.00

10,200.00

0.00
420,000.00
1,750.00
39,035.00
20,000.00
929,485.00
41,300.00
396,915.00
10,200.00
1,725,547.00
451,115.00

0.00
420,000.00
1,750.00
39,035.00
20,000.00
929,485.00
41,300.00
396,915.00
10,200.00
1,725,547.00
451,115.00

C
C
C
C
C
C
NL:
AA
AA
C

4,500.00
0.00
2,000,000.00
480,000.00
1,000,000.00
450,000.00
150,000.00
60,000.00

4,500.00
0.00
2,000,000.00
480,000.00
1,000,000.00
450,000.00
150,000.00
60,000.00

H
C
AA
NL
C
C

0.00

0.00

102,500.00
0.00
915,312.00
7,600.00

4,111,313.00
4,650,000.00

C
C

25,000.00

25,000.00

C
NL

$1,442,200.00 ############ ############

25,000.00
3,300,000.00
60,000.00
200,000.00
$150,227,850.00

5,903,812

2,205,000

109,142,655

65.21%

8.06%

8.56%

3.20%

85.02%

100.00%

100.00%

100.00%

10,200.00
1,725,547.00

2,000,000.00
1,000,000.00

102,500.00
H
0.00
915,312.00 C
7,600.00 NL

0.00

11,109,192

102,500.00

25000.00

NL
$7,975,161.00

$8,841,042.00

5.31%

5.89%

100.00%
Ethnicity

Requirements:
The 50% requirement can be satisifed by a combination of 25% LBE and 25% SLBE. The SLBE
requirement is waived for Oakland certified prime consultants. A VSLBE's participation is double
counted
toward meeting the requirement.
Legend

AA = African American

LBE 25 or 50%

SLBE25%

VSLBE(*2)

LPG (*2)

TOTAL
LBE/SLBE/VSLBE/LPG

50% LBE/SLBE TRUCKING

AI = Asian Indian
AP = Asian Pacific
C = Caucasian

LBE = Local Business Enterprise

UB = Uncertified Business

UB = Uncertified Business

H = Hispanic

SLBE = Small Local Business Enterprise

CB = Certified Business

CB = Certified Business

NA = Native American

Total LBE/SLBE = All Certified Local and Small Local Businesses

MBE = Minority Business MBE


Enterprise
= Minority Business Enterprise

O = Other

NPLBE = NonProfit Local Business Enterprise

WBE = Women Business Enterprise


WBE = Women Business Enterprise

NL = Not Listed

NPSLBE = NonProfit Small Local Business Enterprise

WBE

4,111,313.00

89,924,651

MBE

MO = Multiple Ownership

Attachment B

MASTER PLAN, BRIDGING, AND HORIZONTAL INFRASTRUCTURE CONSTRUCTION CONTRACTS


Project
Total
Contracting
Total
Goal
Contracting Current Delta
City Ordinance No. 13101 Policy Goals
Combined L/SLBE
50%
80.0%
30.0%
Local Business Enterprise (LBE)
25%
60.7%
35.7%
25%
19.2%
-5.8%
Small Local Business Enterprise (SLBE)
Very Small Local Business Enterprise (SLBE) *
7.5%
Local Business Enterprise of Locally Produced Goods (LBE-LPG) *
2.8%
50%
100.0%
50.0%
Local Trucking
HORIZONTAL INFRASTRUCTURE CONSTRUCTION CONTRACTS
Project

City Ordinance No. 13101 Policy Goals


Combined L/SLBE
Local Business Enterprise (LBE)
Small Local Business Enterprise (SLBE)
Very Small Local Business Enterprise (SLBE) *
Local Business Enterprise of Locally Produced Goods (LBE-LPG) *
Local Trucking

Total
Contracting
Total
Goal
Contracting Current Delta
50%
85.0%
35.0%
25%
65.2%
40.2%
25%
16.6%
-8.4%
8.6%
3.2%
50%
100.0%
50.0%

MASTER PLAN AND BRIDGING PHASES


Project

City Ordinance No. 13101 Policy Goals


Combined L/SLBE
Local Business Enterprise (LBE)
Small Local Business Enterprise (SLBE)
Very Small Local Business Enterprise (SLBE) *

Total
Contracting
Total
Goal
Contracting Current Delta
50%
68.3%
18.3%
25%
32.7%
7.7%
25%
35.6%
10.6%
0.6%
-