btg C& I Defects


Area
Defects
TG
HPBP all CVs cable routing through conduit.
BOP
Hotwell transmitter one from each side is not in service.
BOP
Mismatching of Main steam & RH temperatures.
STG mechanical
Moog Servo valves failure & calibration & Availability of Spare Servo valve.
TG
All defects/Modification noted in protocol during function test & individual checking of Turbine system to be attended.
TG
Turbine trip logic signals fail safe to be implemented
TG
Time synch on MKVI system
TG
MW signal to be triple redundant.
TG
Tightness checking of all turbine & generator temperatures.
TG
Vibration sensor tightness & x channel of brg no -8 showing less.
TG
cable dressing of MKVIe system.
TG
Turbine trip alarm is not in MKVI alarm list.
TG
CRV b side QCNRV not operating.
Tg
IV2 Fast Closing signal to be normalized by replacing the card as old channel was burnt.
Tg
relocation of in accessible JB at Turbine enclosure area
BOP
All HPH & LPH level Tx calibration & interlock checking is pending.
TG
Reorientation of required control valve position like HSPV
TG
Relocation of Instrument Rack-P1MAA10GZ027.
BOP
LPBP attempteration water flow reading mismatch.
TG been used.)
VMS System- Differential Expansion Card to be replaced with suitable for complementary probes. (At present spare channels of suitable card has
MKVI
MK-VI-All Cable earth shields to be connected in the earth bus Panel end ensuring earthing at one end.
MKVI
All extra cable bunches should be removed unit1-ST3 (Mark VI)
The rated pressure discharge of lube oil main pumps is 6kg/cm2 but pressure showing on local guage is 8kg/cm2
Condenser shell-B vacuum pressure guage is showing negative pressure about -0.2KSC
Condenser clean up line to condensate MOV is showing wrong feed back.
Vacuum breaker level indicator is not installed.
LP bypass spray water flow is not coming in DCS.(At spray CV 40% open position)
MOT low level switch is malfunctioning.
LPBP HPU Local temperature guage damaged.
MOT oil level in DCS is showing 'low' where as in local it is at operating level.
CCW discharge header flow transmitter(P1PGB04CF001) is shwoing wrong value
LP clean up line MOV not operating
HPH-6 bypass isolating equalisation valve(P1LAB50AA014)is not operating from remote.
Condenser shell-B specific gravity is showing wrong value in DCS.
The CV in CCW cooling line to generator H2 cooler is opening 8% at 100% command.
Generator end upper temperature RTD is faulty.
ESOP is in stop condition at local but in DCS it showing as standby.When ESOP is put in AUTO from local it gets started.
Condensate hotwell excess return line to consensate storage tank CV(P1LCA52AA081) is not taking any command.
SSAFV(Gland sealing system) valve position scaling placed in reverese.
For SSFV(Gland sealing system) scale making is improper.
In Gland sealing system graphics auxiliary steam system temperature to be provided.

TG
BOP
BOP
BOP
BOP
TG
BOP
TG
BOP
BOP
BOP
BOP
BOP
TG
TG
BOP
TG
TG
TG

Charge
Elec
Elec, Comm
Comm, Elec
Mech, Comm
Comm, Design
Design, Comm
Elec, Comm
Design
Elec, Comm
Elec, Comm
Elec
Design, Comm
Comm
Comm
Design, Elec
Elec, Comm
Design, Elec
Elec
Elec, Comm
Design, Elec
Elec
Elec
Comm
Comm
Comm
Comm
Comm
Comm
Comm
Comm
Comm
Comm
Comm
Comm
Comm
Comm
Comm
Comm
Elec
Elec
Design

Вам также может понравиться