Академический Документы
Профессиональный Документы
Культура Документы
BSNL
01/09/2010
Page | 1
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
2.
Reservation ............................................................................................................................................................. 64
1.
2.
3.
4.
5.
6.
3.
1.
2.
3.
4.
5.
6.
MM-MB1B-TP-Transfer Posting of Input Material for Subcontracting Vendor End Mvt-541 ......................... 115
7.
Page | 2
1.
2.
3.
4.
5.
5.
1.
2.
3.
6.
1.
7.
1.
2.
3.
4.
5.
6.
7.
8.
8.
1.
2.
9.
1.
Page | 3
FLOWCHART
Page | 4
1. Goods Receipt
1.
Overview
In Case of Stock Transfer Order Goods Receipt will be done against Outbound Delivery
Activity
Goods Receipt against Outbound Delivery
In the Screen Goods Receipt Outbound Delivery enter the following Entry:
Field Name
Executable Action
Reference Document
Movement Type
Description
Enter the Executable
Action as Goods Receipt
Select Outbound
Delivery as Reference
Document
Use Movement Type -101
R/O/
C
R
R
Page | 5
Comments
Select Good
Receipt
Select Outbound
Delivery
Enter the Outbound
Delivery Number
Page | 6
Check on Item OK
Page | 7
Page | 8
Overview
Deliveries of Direct Charge-Revenue category material is required to be received from Vendors as a part of external
procurement.
BUSINESS PROCESS PROCEDURE OVERVIEW
Direct Charge-Revenue material is required to be received from Vendors against Purchase Order placed
by the company. A goods movement is entered into the system referencing others accordingly goods
receipt material document is posted. Appropriate general ledger accounts-Company Stock Accounts are
also posted. On receipt there shall not be Stock in the system as the material of the Direct Charge
category shall be treated as Consumed.
Field Values/Comments
PO number
After Pressing Execute Button-Following Fields are required to be maintainedDocument Date (MM/DD/YY)
Movement Type
Delivery Note
Bill of Lading
Notes
Output Results
The output is a material document
which can contain accounting, profit
center, and other financial postings.
Comments
Each time an inventory movement is posted a Material document is created
by the system. If the movement has a financial impact an Accounting
document is also created.
Page | 9
Procedural Steps
On screen Goods Receipt for Purchase Order: Initial Screen, enter information in the
fields as specified in the below table:
Select Purchase
order
Select goods receipt
Description
Default is current system
date
R/O/
C
R
Page | 10
Comments
Todays date
defaults in
Movement
type
Quantity
In
Delivery
Note
No of
Containers
No user input
Todays date
defaults in
Not Required
Auto
Movement
type is 101for
goods receipt
against PO
Auto
Automatically from PO
O
O
Number of Containers
Received
Auto
from
PO
Storage
location
Storage location
Goods
Recipient
Unloading
Point
Text
In the
Information related to PO
Page | 11
If the plant is
left blank, it
will be
picked up
from the
purchase
order.
shall appear.
In the
Account
Assignme
nt Tab
G/L Account
Press the tab to view the same
Cost Center field shall be
appeared. Values shall be
automatically picked from
Account Assignment.
Finally Check on the Item OK button to ensure selecting the Item.
Note1. Before Saving the document, Click on the Check Button to check the completeness of the document.
2. System shall give the message Document is OK
3. Now Save the transaction
Result: Document posted. (Material document number shall be generated and also accounting document shall
also be generated in the background. On display, in Doc. Information; accounting document can be seen.
Page | 12
Overview
Deliveries of Non Valuated material is required to be received from Vendors as a part of external procurement.
BUSINESS PROCESS PROCEDURE OVERVIEW
Non Valuated material is required to be received from Vendors against Purchase Order placed by the
company. A goods movement is entered into the system referencing Purchase Order accordingly goods
receipt material document is posted. Appropriate general ledger accounts-Company Stock Accounts/
Consumption Accounts as applicable are also posted.
Field Values/Comments
PO number
Movement Type
Delivery Note
Bill of Lading
Notes
Page | 13
Via Menus
Via Transaction Code
On screen Goods Receipt for Purchase Order: Initial Screen, enter information in the
fields as specified in the below table:
Select GR purchase
order
Page | 14
Field
Name
Description
R/O/
C
Comments
Document
Date
Todays date
defaults in
Posting
Date
No user input
Todays date
defaults in
Delivery
Note
Bill of
lading
Enter LR No.
Notes
Movement
type
Auto
Auto
Automatically from PO
Material
Material Code/number
Page | 15
Movement
type is
101for goods
receipt
against PO
Description
R/O/
C
Comments
Quantity received
Quantity
In
Delivery
Note
No of
Containers
Number of Containers
Received
Plant number.
Auto
from
PO
Storage
location
Goods
Recipient
Unloading
Point
Text
Storage location
In the
Purchase
Order
TAB
In the
Partner
Tab
Information related to PO
shall appear.
In the
Where
Tab
Plant
Page | 16
If the plant is
left blank, it
will be
picked up
from the
purchase
order.
Page | 17
Overview
Deliveries of Project Stock Capital material is required to be received from Vendors as a part of external
procurement.
BUSINESS PROCESS PROCEDURE OVERVIEW
Project Capital material is required to be received from Vendors against Purchase Order placed by the
company. A goods movement is entered into the system referencing others accordingly goods receipt
material document is posted. Appropriate general ledger accounts-Company Stock Accounts are also
posted. On receipt of the Project Capital Material,
Field Values/Comments
PO number
After Pressing Execute Button-Following Fields are required to be maintainedDocument Date (MM/DD/YY)
Movement Type
Delivery Note
Bill of Lading
Notes
Excise Invoice
Page | 18
Via Menus
Via Transaction Code
On screen Goods Receipt for Purchase Order: Initial Screen, enter information in the
fields as specified in the below table:
Page | 19
Field
Name
Document
Date
Posting
Date
Delivery
Note
Bill of
lading
Notes
Excise
Invoice
Movement
type
In the
Material
TAB
Material
In the
Quantity
Tab
Description
R/O/
C
R
Comments
Todays date
defaults in
Todays date
defaults in
Not Required
Auto
matic
ally
Material Code/number
Auto
Automatically from PO
R
R
O
Excise Group
63 defaults
in
Movement
type is 101
with Stock
Type Q for
goods receipt
against PO
for Project
Capital.
Page | 20
Field
Name
Quantity
Quantity
In
Delivery
Note
No of
Containers
Description
Quantity received
R/O/
C
R
Number of Containers
Received
Plant number.
Auto
from
PO
Storage
location
Storage location
Goods
Recipient
Unloading
Point
Text
In the
Purchase
Order
TAB
In the
Partner
Tab
Information related to PO
shall appear.
In the
Where
Tab
Plant
Comments
Page | 21
If the plant is
left blank, it
will be
picked up
from the
purchase
order.
Before Saving the document, Click on the Check Button to check the completeness of the
document.
Note-System shall give the message Document is OK
Page | 22
Overview
Deliveries of Valuated material are required to be received from Vendors as a part of external procurement.
BUSINESS PROCESS PROCEDURE OVERVIEW
Valuated stock material is required to be received from Vendors against Purchase Order placed by the
company. A goods movement is entered into the system referencing Purchase Order accordingly goods
receipt material document is posted. Appropriate general ledger accounts-Company Stock Accounts are
also posted.
Field Values/Comments
PO number
Movement Type
Delivery Note
Bill of Lading
Notes
Page | 23
Via Menus
Via Transaction Code
On screen Goods Receipt for Purchase Order: Initial Screen, enter information in the
fields as specified in the below table:
Movement
type101
Select GR purchase
order.
Page | 24
Movement
type
Description
Default is current system
date
Default is current system
date
Delivery Note numberVendor Invoice Number.
Number of the bill of lading
issued by the sender.
Document header text.
Contains explanations or
notes which apply to the
document as a whole.
Goods movement type.Automatically if GR is
against PO
R/O/
C
R
Comments
Todays date
defaults in
Todays date
defaults in
Not Required
Auto
Movement
type is 101for
goods receipt
against PO
Auto
Automatically from PO
R
R
O
O
Material Code/number
In quantity tab
Quantity
Quantity received
Quantity
In
Delivery
Note
No of
Containers
Number of Containers
Received
Auto
from
PO
Plant number.
Page | 25
If the plant is
left blank, it
will be
picked up
Storage location
Goods
Recipient
Unloading
Point
Text
In the
Purchase
Order
TAB
In the
Partner
Tab
Information related to PO
shall appear.
Before Saving the document, Click on the Check Button to check the completeness of the
document.
Note-System shall give the message Document is OK
Page | 26
Overview
Deliveries of Direct Charge-Capital material is required to be received from Vendors as a part of external
procurement.
BUSINESS PROCESS PROCEDURE OVERVIEW
Capital material is required to be received from Vendors against Purchase Order placed by the company.
A goods movement is entered into the system referencing others accordingly goods receipt material
document is posted. Appropriate general ledger accounts-Company Stock Accounts are also posted. On
receipt there shall not be Stock in the system as the material of the Direct Charge category shall be treated
as Capitalized.
Field Values/Comments
PO number
After Pressing Execute Button-Following Fields are required to be maintainedDocument Date (MM/DD/YY)
Movement Type
Delivery Note
Bill of Lading
Notes
Excise Invoice
Output Results
The output is a material document
which can contain accounting
documents.
Comments
This document number can be used for further processing.
Page | 27
Procedural Steps
Via Menus
Via Transaction Code
On screen Goods Receipt for Purchase Order: Initial Screen, enter information in the
fields as specified in the below table:
Page | 28
Movement
type101
Select GR purchase
order.
Field
Name
Document
Date
Posting
Date
Delivery
Note
Bill of
lading
Notes
Description
Excise
Invoice
Movement
type
R/O/
C
R
Comments
Todays date
defaults in
Todays date
defaults in
Not Required
Auto
R
R
O
Page | 29
Excise Group
63 defaults
in
Movement
type is 101for
goods receipt
Material Code/number
Field
Name
Description
Auto
R/O/
C
Automatically from PO
User Action and Values
Comments
Quantity received
Quantity
In
Delivery
Note
No of
Containers
Number of Containers
Received
Plant number.
Auto
from
PO
Storage
location
Storage location
Goods
Recipient
Unloading
Point
Text
In the
Purchase
Order
TAB
Information related to PO
shall appear.
Page | 30
If the plant is
left blank, it
will be
picked up
from the
purchase
order.
In the
Account
Assignme
nt Tab
Before Saving the document, Click on the Check Button to check the completeness of the
document.
Note- System shall give the message Document is OK
Page | 31
Overview
Deliveries of Project Stock Capital material is required to be received from Vendors as a part of external
procurement.
BUSINESS PROCESS PROCEDURE OVERVIEW
Project Capital material is required to be received from Vendors against Purchase Order placed by the
company. A goods movement is entered into the system referencing others accordingly goods receipt
material document is posted. Appropriate general ledger accounts-Company Stock Accounts are also
posted. On receipt of the Project Capital Material, project stock will be increased.
Field Values/Comments
PO number
After Pressing Execute Button-Following Fields are required to be maintainedDocument Date (MM/DD/YY)
Movement Type
Delivery Note
Bill of Lading
Notes
Excise Invoice
Page | 32
Procedural Steps
Via Menus
Via Transaction Code
On screen Goods Receipt for Purchase Order: Initial Screen, enter information in the
fields as specified in the below table:
Movement type101Q
Select GRPurchase
order
Page | 33
Excise
Invoice
Movement
type
In the
Material
TAB
Material
Description
R/O/
C
R
Comments
Todays date
defaults in
Todays date
defaults in
Not Required
Auto
matic
ally
Material Code/number
Auto
Automatically from PO
R
R
O
Excise Group
63 defaults
in
Movement
type is 101
with Stock
Type Q for
goods receipt
against PO
for Project
Capital.
Page | 34
Field
Description
Name
In the quantity tab
Quantity
Quantity received
Quantity
In
Delivery
Note
No of
Containers
R/O/
C
R
Number of Containers
Received
Auto
from
PO
Storage
location
Storage location
Goods
Recipient
Unloading
Point
Text
In the
Purchase
Order
TAB
In the
Partner
Tab
Information related to PO
shall appear.
Comments
Page | 35
If the plant is
left blank, it
will be
picked up
from the
purchase
order.
Before Saving the document, Click on the Check Button to check the completeness of the
document.
System shall give the message Document is OK
Page | 36
Overview
Deliveries of subcontracting material are required to be received from Vendors as a part of subcontracting
procurement.
BUSINESS PROCESS PROCEDURE OVERVIEW
Subcontracting material is required to be received from Vendors against Purchase Order placed by the
company. A goods movement is entered into the system referencing others accordingly goods receipt
material document is posted. During the Receipt of the subcontracting material, Inputted material as sent
to vendor for subcontracting automatically gets credited / reconciled.
Field Values/Comments
PO number
After Pressing Execute Button-Following Fields are required to be maintainedDocument Date (MM/DD/YY)
Movement Type
Delivery Note
Bill of Lading
Notes
Excise Invoice
Page | 37
Via Menus
Via Transaction Code
On screen Goods Receipt for Purchase Order: Initial Screen, enter information in the
fields as specified in the below table:
Enter the
recipient name
Page | 38
Description
Excise
Invoice
Movement
type
Quantity
In
Delivery
Note
No of
Containers
R/O/
C
R
Comments
Todays date
defaults in
Todays date
defaults in
Not Required
Auto
Auto
Automatically from PO
R
R
O
Number of Containers
Received
In the
Where
Page | 39
Excise Group
63 defaults
in
Movement
type is 101for
goods receipt
against PO
Plant number.
Auto
from
PO
Storage
location
Storage location
Goods
Recipient
Unloading
Point
Text
In the
Purchase
Order
TAB
In the
Partner
Tab
Information related to PO
shall appear.
If the plant is
left blank, it
will be
picked up
from the
purchase
order.
Before Saving the document, Click on the Check Button to check the completeness of the
document.
System shall give the message Document is OK
Page | 40
Overview
Deliveries of Direct Charge-Revenue material is required to be received from Vendors as a part of external
procurement.
BUSINESS PROCESS PROCEDURE OVERVIEW
Direct Charge material is required to be received from Vendors against Purchase Order placed by the
company. A goods movement is entered into the system referencing others accordingly goods receipt
material document is posted. On receipt there shall not be Stock in the system as the material of the
Direct Charge category shall be treated as Consumed.
Field Values/Comments
PO number
After Pressing Execute Button-Following Fields are required to be maintainedDocument Date (MM/DD/YY)
Movement Type
Delivery Note
Bill of Lading
Notes
Output Results
The output is a material document
which can contain accounting
documents.
Comments
Page | 41
Procedural Steps
Via Menus
Via Transaction Code
On screen Goods Receipt for Purchase Order: Initial Screen, enter information in the
fields as specified in the below table:
Page | 42
Field
Name
Document
Date
Posting
Date
Delivery
Note
Bill of
lading
Notes
Movement
type
Description
Default is current system
date
Default is current system
date
Delivery Note numberVendor Invoice Number.
Number of the bill of lading
issued by the sender.
Document header text.
Contains explanations or
notes which apply to the
document as a whole.
Goods movement type
automatically from PO
R/O/
C
R
Comments
Todays date
defaults in
Todays date
defaults in
Not Required
Auto
Movement
type is 101for
goods receipt
against PO
Auto
Automatically from PO
R
R
O
O
Field
Name
Quantity
Quantity
In
Delivery
Note
No of
Containers
Description
Quantity received
R/O/
C
R
Number of Containers
Received
In the
Where
Tab
Page | 43
Comments
Plant number.
Auto
from
PO
Storage
location
Storage location
Goods
Recipient
Unloading
Point
Text
In the
Purchase
Order
TAB
In the
Partner
Tab
Information related to PO
shall appear.
If the plant is
left blank, it
will be
picked up
from the
purchase
order.
In the
Account
Assignme
nt Tab
G/L Account
Press the tab to view the same
Cost Center field shall be
appeared. Values shall be
automatically picked from
Account Assignment.
Finally Check on the Item OK button to ensure selecting the Item.
Before Saving the document, Click on the Check Button to check the completeness of the
document.
Page | 44
Click on Check,
before saving
Page | 45
The Rejected materials posted to blocked stock in a Storage Location have to be cleared and returned to
Vendors as soon as possible as the blocked stock are the valuated stock of the plant and dont reflect in
PO open quantity. Purchase department and Stores should periodically (max weekly) review the blocked
stock and take action to return them back to vendors.
Output - Results
The output is a material document.
Field Values/Comments
Date that the document is entered.
Date that the document is posted.
Movement type to be used.
The plant of manufacture.
Location from which material will be issued.
Material to be issued to the manufacturing order.
Quantity of material to be issued.
Unit of measure for material to be issued.
Purchase Order Number
Reason for Movement
Vendor Number to which the goods need to be issued.
Comments
Each time an inventory movement is posted a Material document
is created by the system. If the movement has a financial impact
an Accounting document is also created.
Page | 46
Procedural Steps
Choose Return Delivery from the Drop-Down Menu and we will get Return Delivery
Material Document Screen...
On screen Return Delivery Material Document, fill in the following fields:
Select Return Delivery
Page | 47
Description
Defines type of movement to
be performed by the
transaction
Current /System Date
Defau
lt
R
Doc
Header
Text
Purchase
Order
Sloc
Enter PO number
Storage location
Plant
Plant location.
Material
Quantity
Material to be issued
Quantity of material to be
issued
Type of Stock-Blocked
where rejected material is
lying
R
R
R
Stock
Type
Reason
for
Moveme
nt
Text
R/O/
C
View
Page | 48
Comments
Page | 49
Field Value/Comments
Details the type of message to print.
Output - Results
Comments
Procedural Steps
MB90
Page | 50
On screen out put for goods movement, enter information in the fields as specified in
the table below:
Enter material
document number
Page | 51
Page | 52
Press Enter
Page | 53
Page | 54
Challan Number
Required
Challan Year
Required
Output - Results
Subcontracting Challan Print Output
Comments
Procedure Steps
Via Menus
Via Transaction Code
On screen Goods Receipt Purchase Order, type the values as per table below.
Page | 55
Description
Enter the Purchase Order
Number
R/O/C
R
Comments
As soon as you press Enter system will show the complete Subcontracting PO Data
By Default you will find the material which will come
You will come to know the input material consumed by clicking on the
First enter the quantity of the Material which is coming then click on the tab
automatically show you the quantity of Input Material in correct ratio.
Page | 56
Page | 57
Now we have to refer the Subcontracting Challan (on which we send the input material to subcontractor) during
Goods Receipt. Excise tab will come by default if following prerequisites are fulfilled:
1. Chapter ID/ Excise Tariff Code is maintained in the Material Master in the Foreign Trade Import view for the
input material
2. Material is declared for Subcontracting in the Material Master in the Foreign Trade Import view
3. Output material is defined for the input material in the Material Master in the foreign Trade Import View
4. Plant Excise data, Excise Group, Series Group is maintained
Page | 58
Page | 59
Page | 60
Page | 61
Page | 62
Page | 63
2. Reservation
1.
Overview
In case of any material is required by the users, a reservation will be created by the user in the system if stock is
available in the store.
SAP supports manual and automatic reservations. Manual reservations are entered directly by the
user.
Check the availability of materials through stock overview screen at the time of creating
reservations. However, the system also conducts a dynamic availability check at the time of
reservation creation and correspondingly issues a warning message in case of unavailability of stock
for desired date.
In the material master record, total stock and unrestricted-use stock of the material remain
unchanged. Reserved stock is increased by the reserved quantity.
Field Value/Comments
Base Date
Movement Type
Plant
Page | 64
Material of requirement.
Quantity
Storage Location
Qty required.
Cost Centre
Requisitioner
Header Text
Output Results
Creation of a reservation
Creation of a reservation.
Comments
Procedural Steps
Via Menus
MB21
Page | 65
Field Name
Base Date
Description
Date for which the goods
movement is planned
Goods movement
R/O/C
R
Plant
Plant number
Reservation
Movement
Type
Reference
G/L
account
Comments
Page | 66
(Note: Some of the data on this screen depends upon the movement type that was specified on the initial
screen).
Page | 67
Description
Material number
R/O/C
R
Quantity
Material quantity
UnE
Plant
SLoc
Plant number
The storage location where
the material is currently
stored.
Indicator: Goods movement
for reservation allowed Indicator specifying that
movements are allowed in
respect of the reservation
item.
If the user wants to
prevent a goods
movement in respect of
this reservation item, the
user must deselect the
field.
If the user wants to allow
a goods movement in
respect of this reservation
item, select the field.
C
R
Comments
Pull down table
access.
The quantity is
automatically
converted to
stock-keeping
units.
Pull down table
access. The
system will use
the default unit
of
measure (entry)
if this field is
left blank.
Pull down table
access.
Overview
In case of any material is required by the users, a reservation will be created by the user in the system if stock is
available in the store.
SAP supports manual and automatic reservations. Manual reservations are entered directly by the
user.
Check the availability of materials through stock overview screen at the time of creating
reservations. However, the system also conducts a dynamic availability check at the time of
reservation creation and correspondingly issues a warning message in case of unavailability of stock
for desired date.
In the material master record, total stock and unrestricted-use stock of the material remain
unchanged. Reserved stock is increased by the reserved quantity.
Field Value/Comments
Base Date
Movement Type
913
Plant
Material
Material of requirement.
Quantity
Storage Location
Qty required.
Issuing storage location.
Page | 69
Output - Results
Creation of a reservation
Creation of a reservation.
Comments
Procedural Steps
Via Menus
MB21
Page | 70
Field Name
Base Date
Movement
Type
Plant
Description
Date for which the goods
movement is planned
Goods movement
R/O/C
R
Plant number
Comments
Reservation
Press <Enter>
On screen Create Reservation: New Items, enter the below information:
Page | 71
(Note: Some of the data on this screen depends upon the movement type that was specified on the initial screen).
Field Name
Material
Description
Material number
R/O/C
R
Quantity
Material quantity
UnE
Plant
SLoc
Plant number
The storage location where
the material is currently
stored.
Indicator: Goods movement
for reservation allowed Indicator specifying that
movements are allowed in
C
R
Page | 72
Comments
Pull down table
access.
The quantity is
automatically
converted to
stock-keeping
units.
Pull down table
access. The
system will use
the default unit
of
measure (entry)
if this field is
left blank.
Pull down table
access.
Page | 73
Overview
In case of any material is required by the users, a reservation will be created by the user in the system if stock is
available in the store.
SAP supports manual and automatic reservations. Manual reservations are entered directly by the
user.
Check the availability of materials through stock overview screen at the time of creating
reservations. However, the system also conducts a dynamic availability check at the time of
reservation creation and correspondingly issues a warning message in case of unavailability of stock
for desired date.
In the material master record, total stock and unrestricted-use stock of the material remain
unchanged. Reserved stock is increased by the reserved quantity.
Field Value/Comments
Base Date
Movement Type
915
Plant
Material
Material of requirement.
Quantity
Storage Location
Qty required.
Issuing storage location.
Page | 74
Output - Results
Creation of a reservation
Creation of a reservation.
Comments
Procedural Steps
Via Menus
MB21
Page | 75
Field Name
Base Date
Description
Date for which the goods
movement is planned
Goods movement
R/O/C
R
Plant
Plant number
Reservation
Movement
Type
Comments
Press <Enter>
On screen Create Reservation: New Items, enter the below information:
Page | 76
(Note: Some of the data on this screen depends upon the movement type that was specified on the initial screen).
Field Name
Material
Description
Material number
R/O/C
R
Quantity
Material quantity
UnE
Plant
SLoc
Plant number
The storage location where
the material is currently
stored.
Indicator: Goods movement
for reservation allowed Indicator specifying that
movements are allowed in
respect of the reservation
item.
If the user wants to
C
R
Page | 77
Comments
Pull down table
access.
The quantity is
automatically
converted to
stock-keeping
units.
Pull down table
access. The
system will use
the default unit
of
measure (entry)
if this field is
left blank.
Pull down table
access.
Page | 78
MM-MB22-Change Reservations
Overview
User wishes to change a reservation.
This process describes the method to change a reservation within the R/3 system
Field Value/Comments
Reservation number
Output - Results
Change the reservation
Comments
Procedural Steps
Page | 79
MB22
Field Name
Reservation
Description
Reservation number
R/O/C
R
Comments
Press <Enter>
On screen Change Reservation #####: Collective Processing, enter the below
information:
Page | 80
Page | 81
Page | 82
MM-MB23-Display Reservations
Overview
User wishes to display a reservation.
Business Process Procedure Overview
This process describes the method to display a reservation within the R/3 system.
The exact process for displaying a reservation will be slightly different depending upon which goods
movement is being designated.
This process describes the method to display a reservation within the R/3 system.
Output - Results
Display the reservation
Field Value/Comments
Enter the reservation number that you want to display.
Comments
Only display can be possible.
Procedural Steps
Via Menus
Description
Reservation number
R/O/C
R
Comments
Press <Enter>
On screen Display Reservation XXXXXXXXXXX: Overview, the user may view the
information contained within the reservation.
Page | 84
Page | 85
Overview
Requirement for printout of reservation document
Business Process Description Overview
This document describes the procedure for getting the printout of the reservation document.
Field Value/Comments
Enter the reservation record number for which printout is
required.
Press <EXECUTE>
Output - Results
The output displays the document.
Comments
Procedural Steps
ZMMF_RES
On screen Program for reservation print out: enter the user desired Reservation
number:
Page | 86
Enter the
Reservation number
button.
Page | 87
3. Transfer Posting
1.
Overview
Material needs to be transferred from one storage Location to another in one step.
1.
2.
3.
4.
5.
For certain materials, we need to do transfer from one storage location to another.
This movement is called as Transfer Posting Storage Location to Storage Location in SAP.
This transfer posting can take place in two ways.
One is single step transfer posting and the other one is knows as two step Transfer posting.
For Storage Location with in a Plant, it is decided to carry out single step transfer posting
through reservation with in Plant Storage Location transfer.
6. The Storage location which requires the material will create the Reservation for the required
Materials with Movement Type 311.
7. The issuing Storage Location to do transfer posting with reference to this reservation.
NOTE: The movement types above also allow the material to move from one location to another within
the same plant. The receiving location defaults to the sending location, but may be over-ridden as
necessary.
Movement Type
Plant
Plant number
Receiving Location
Material
Material number
Quantity
Storage location
Page | 88
Procedural Steps
Via Menus
Select Transfer Posting from the drop-down menu and on Screen Transfer Posting
reservation, enter information in the fields as specified in the below table:
Page | 89
Selection Reference-
Field Name
To
Reservation
Description
Reservation number
R/O/C
O
Document
Date
Posting
Date
Material
Identifier of an external
Page | 90
Comments
The system
checks whether
the posting date
entered is
allowed by
means of the
posting period
permitted.
Defaults for
documents
items
Movement
type
document
Document header text.
Contains explanations or
notes which apply to the
document as a whole.
Section Heading
Plant
Plant number
Storage
location
number if available
Enter any necessary notes for
this transfer document
Press <Enter>
Enter information in the fields as specified in the below table for the recipient:
Please note, the fields that appear and those that are required are completely dependent upon the movement
type selected by the user.
Field Name
Recipient
Description
Recipient for whom the
material or the service is
destined.
R/O/C
O
Page | 91
Comments
Material
Material number
Quantity
Material quantity
UnE
Sloc
Defaults to
same location
type as sending
location.
Pull down table
access.
The quantity is
automatically
converted to
stock-keeping
units.
Pull down table
access. The
system will use
the default unit
of
measure (entry)
if this field is
left blank.
Pull down table
access.
Multiple materials may be handled with the same goods movement screen.
Pressing ENTER locks the material for this transaction but allows for any quantity changes prior to saving the goods
movement.
You can also raise the stock transfer reservation at the recipient storage location then
stock transfer with reference to reservation can be posted as shown below,
Page | 92
1. Select transfer
posting.
4. Enter quantity.
5. Enter storage
location.
Enter only material quantity and storage location from which the material is to be
transfer.
Page | 93
Overview
Material needs to be transferred from Revenue Stock to Project Stock in one step to meet the requirement of
material against Project.
Business Process Description Overview
1. For certain materials, we need to do transfer from Revenue Stock to Project Stock in one step to
meet the requirement of material against Project.
2. This movement is called as Transfer Posting Plant to Plant in SAP. It is decided to carry out single
step transfer posting through from Revenue Stock to Project Stock.
3. The issuing Plant/Storage Location to do transfer posting with Movement Type 415+Q.
Movement Type
Plant
Plant number
Receiving Sloc
Material
Page | 94
Storage location
WBS Element
Procedural Steps
Via Menus
MIGO
Select Transfer Posting from the drop-down menu and on Screen Transfer Posting
Others, enter information in the fields as specified in the below table:
Page | 95
Selection Reference-
Field Name
To
Reservation
Description
Reservation number
R/O/C
o
Document
Date
Posting
Date
Material
slip
Doc.
header text
Identifier of an external
document
Document header text.
Contains explanations or
Page | 96
Comments
The system
checks whether
the posting date
entered is
allowed by
means of the
posting period
permitted.
Defaults for
documents
items
Movement
type
Plant
Plant number
Storage
location
415Q
Press <Enter>
Enter information in the fields as specified in the below table:
Please note, the fields that appear and those that are required are completely dependent upon the movement
type selected by the user.
Field Name
Recipient
Recv. Sloc
Description
Recipient for whom the
material or the service is
destined.
Receiving Plant/Storage
location where material will
reside after transfer.
R/O/C
O
Page | 97
Comments
Defaults to
same location
type as sending
location.
Material number
Quantity
Material quantity
UnE
Sloc
WBS
Element
Multiple materials may be handled with the same goods movement screen.
Pressing ENTER locks the material for this transaction but allows for any quantity changes prior to saving the goods
movement.
Page | 98
Overview
Material needs to be transferred from Project Stock to Revenue Stock in one step as per requirement.
3. The issuing Plant/Storage Location to do transfer posting with Movement Type 411+ Q.
Movement Type
Plant
Plant number
Receiving Sloc
Material
Quantity
Storage location
Page | 99
1. If the user enter the issuing Plant and Storage Location in the Enter Transfer Posting: Initial Screen and the
data is carried through to the detail line items.
2. It is sometimes necessary to reverse a transfer order due to user error. For example, an incorrect quantity is
entered or the wrong material was chosen. Within SAP, there are two different ways to reverse a goods
movement. One is done via a movement type. Another is done through a material document.
3. Reversing goods movements using movement types are the same as the initial movement types +1. For
example, a reversal of a transfer between Plants, 412 movement type is the reversal of movement type 411
Path-To reverse a transfer by material document follow the menu path: Logistics > Material Management >
Inventory Management > Material Document > Cancel/Reverse. The material document is needed for this
transaction.
Procedural Steps
Via Menus
MIGO
Select Transfer Posting from the drop-down menu and on Screen Transfer Posting
Others, enter information in the fields as specified in the below table:
Page | 100
Movement type
411Q
Description
Reservation number
R/O/C
o
Document
Date
Posting
Date
Material
slip
Doc.
Identifier of an external
document
Document header text.
Page | 101
Comments
The system
checks whether
the posting date
entered is
allowed by
means of the
posting period
permitted.
Defaults for
documents
items
Movement
type
Contains explanations or
notes which apply to the
document as a whole.
Section Heading
Plant
Plant number
Storage
location
Press <Enter>
Enter information in the fields as specified in the below table:
Please note, the fields that appear and those that are required are completely dependent upon the movement type
selected by the user.
Field Name
Recipient
Recv. Sloc
Description
Recipient for whom the
material or the service is
destined.
Receiving Plant/Storage
location where material will
R/O/C
O
Page | 102
Comments
Defaults to
same location
Material number
Quantity
Material quantity
UnE
Sloc
WBS
Element
type as sending
location.
Pull down table
access.
The quantity is
automatically
converted to
stock-keeping
units.
Pull down table
access. The
system will use
the default unit
of
measure (entry)
if this field is
left blank.
Pull down table
access.
Multiple materials may be handled with the same goods movement screen.
Pressing ENTER locks the material for this transaction but allows for any quantity changes prior to saving the goods
movement.
Page | 103
Overview
Material needs to be transferred from Revenue Stock to Project Stock in one step to meet the requirement of
material against Project.
3. The issuing Plant/Storage Location to do transfer posting with Movement Type 415.
Movement Type
Plant
Plant number
Receiving Sloc
Material
Quantity
Page | 104
WBS Element
If the user enter the issuing Plant and Storage Location in the Enter Transfer Posting: Initial Screen and the data is
carried through to the detail line items.
It is sometimes necessary to reverse a transfer order due to user error. For example, an incorrect quantity is entered or
the wrong material was chosen. Within SAP, there are two different ways to reverse a goods movement. One is done
via a movement type. Another is done through a material document.
Reversing goods movements using movement types are the same as the initial movement types +1. For example, a
reversal of a transfer between Plants, 416 movement type is the reversal of movement type 415
To reverse a transfer by material document follow the menu path: Logistics > Material Management > Inventory
Management > Material Document > Cancel/Reverse. The material document is needed for this transaction.
Procedural Steps
Via Menus
MIGO
Select Transfer Posting from the drop-down menu and on Screen Transfer Posting
Others, enter information in the fields as specified in the below table:
Page | 105
Movement type
415
Description
Reservation number
R/O/C
o
Document
Date
Posting
Date
Material
slip
Doc.
Identifier of an external
document
Document header text.
Page | 106
Comments
The system
checks whether
the posting date
entered is
allowed by
means of the
posting period
permitted.
Defaults
for
documents
items
Movement
type
Plant
Contains explanations or
notes which apply to the
document as a whole.
Section Heading
Plant number
Press <Enter>
Field Name
Recipient
Description
Recipient for whom the
material or the service is
destined.
R/O/C
O
Page | 107
Comments
Receiving Plant/Storage
location where material will
reside after transfer.
Material
Material number
Quantity
Material quantity
UnE
Sloc
WBS
Element
Defaults to
same location
type as sending
location.
Pull down table
access.
The quantity is
automatically
converted to
stock-keeping
units.
Pull down table
access. The
system will use
the default unit
of
measure (entry)
if this field is
left blank.
Pull down table
access.
Multiple materials may be handled with the same goods movement screen.
Pressing ENTER locks the material for this transaction but allows for any quantity changes prior to saving the goods
movement.
Page | 108
Overview
Material needs to be transferred from one storage Location to another in two steps.
NOTE: The movement types above also allow the material to move from one location to another within
the same plant. The receiving location defaults to the sending location, but may be over-ridden as
necessary.
The issuing Storage Location to do transfer posting with movement type 913 for removing the stock.
Input - Required Fields
Document Date (MM/DD/YY)
Rservation no.
Posting Date (MM/DD/YY)
Movement Type
Plant
Plant number
Receiving Location
Material
Material number
Quantity
Storage location
Page | 109
The receiving Storage Location to do transfer posting with movement type 915 for placement of stocks
Input - Required Fields
Document Date (MM/DD/YY)
Material Document Number
Posting Date (MM/DD/YY)
Movement Type
Plant
Plant number
Receiving Location
Material
Material number
Quantity
Storage location
Procedural Steps
Via Menus
Page | 110
Select Transfer Posting from the drop-down menu and on Screen Transfer Posting -reservation, enter information
in the fields as specified in the below table:
1.Select Transfer posting
3. Select Movement
Type 913
2. Select reservation as
reference and enter
reservation number
4. Data from reservation
will get automatically fetch
up here.
Selection Reference-
Field Name
Document
Date
Posting
Date
Description
Default is current system date
R/O/C
R
Page | 111
Comments
The system
checks whether
Movement
type
Plant
Reservation number
Identifier of an external
document
Document header text.
Contains explanations or
notes which apply to the
document as a whole.
Goods movement type
Plant number
Press <Enter>
Page | 112
Field Name
Recipient
Description
Recipient for whom the
material or the service is
destined.
Storage location where
material will reside after
transfer.
R/O/C
O
Material
Material number
Quantity
Material quantity
UnE
Sloc
Recv. Sloc
Comments
Defaults to
same location
type as sending
location.
Pull down table
access.
The quantity is
automatically
converted to
stock-keeping
units.
Pull down table
access. The
system will use
the default unit
of
measure (entry)
if this field is
left blank.
Pull down table
access.
Multiple materials may be handled with the same goods movement screen.
Pressing ENTER locks the material for this transaction but allows for any quantity changes prior to saving the goods
movement.
Page | 113
Enter the data as the same as mentioned for issuing storage location only movement
type will be 915.
Page | 114
Overview:
Required
Storage Location
Required
Output - Results
Material Document Generated
Comments
Transfer posting of material done at subcontractor end
Procedure Steps
Via Menus
Page | 115
Field Name
Movement Type
Description
Enter Movement type
for Transfer Posting
R/O/C
R
Plant
Enter Plant
Storage Location
Comments
Page | 116
Field Name
Purchase Order
Number
Description
Enter PO Number you are
referring for subcontracting
R/O/C
R
Comments
Page | 117
As soon as you
press
Save button you will get
Page
| 118
material document number. With the help of this
number you will generate Subcontracting Challan
Page | 119
Overview
A STO (stock transfer note) Issue note needs to be printed
Business Process Procedure Overview
This procedure details how to print a STO Issue note created in R/3 by T code MB90
Message Data
Field Value/Comments
Output - Results
Comments
Procedural Steps
MB90
Page | 120
On screen out put for goods movement, enter information in the fields as specified in
the table below:
Page | 121
Page | 122
Click print
Press Enter/print
STO Issue notes will be as below.
Page | 123
Page | 124
4. Goods Issue
1.
Overview
When a manual goods issue is required to issue material to project from the project stock
Output - Results
The output is a material document
which can contain accounting, profit
center, and other financial postings.
Field Values/Comments
Date that the document is entered.
Date that the document is posted.
Movement type to be used.(281Q)
The plant of manufacture.
Location from which material will be issued.
Material to be issued to the manufacturing order.
Quantity of material to be issued.
Unit of measure for material to be issued.
Enter the reservation number from the network release.
Comments
Each time an inventory movement is posted a Material document is created
by the system.
If the movement has a financial impact an Accounting document is
also created.
Page | 125
Procedural Steps
Via Menus
Via Transaction Code
Page | 126
Enter Reservation
number
Please note, the fields that appear and those that are required are completely dependent upon the movement
type selected by the user.
Page | 127
Select Item OK
Page | 128
Page | 129
CHECK the
document and
POST it.
Page | 130
Overview
Returning the partial quantity of a material which was issued against the reservation
BUSINESS PROCESS PROCEDURE OVERVIEW
Incase when a goods is to return to store which was issued against the reservation. It might be issued to
Project, cost center, production order etc.
It is sometimes necessary to reverse a goods issue due to lesser requirements by the user.
If a material was issued to the project or cost center against the reservation but now requirement is less
and it requires returning to the store.
Field Values/Comments
Return Delivery
A document number by which material has been issued.
Movement type
Output - Results
The output is a material document
which can contain accounting, profit
center, and other financial postings.
Comments
Each time an inventory movement is posted a Material document is created
by the system. If the movement has a financial impact an Accounting
document is also created.
Procedural Steps
Page | 131
MIGO
Select MATERIAL
DOCUMENT
Page | 132
Please note, the fields that appear and those that are required are completely dependent upon the movement
type and reservation number selected by the user.
Page | 133
Page | 134
Overview
When a Goods Issue is required to be reversed from project
Field Values/Comments
Document type
Reference document
Document number
Movement Type
Return delivery
R02 Material Document.
Document number by which material was issued
System will automatically pick the movement type 282-Q
Output - Results
The output is a material document
which can contain accounting, profit
center, and other financial postings.
Comments
Each time an inventory movement is posted a Material document is created
by the system. If the movement has a financial impact an Accounting
document is also created.
Procedural Steps
Via Menus
Via Transaction Code
Page | 135
Page | 136
Please note, the fields that appear and those that are required are completely dependent upon the document
number selected by the user.
Page | 137
Overview
When a goods is required to be issue for own consumption by transaction code MB1A
BUSINESS PROCESS PROCEDURE OVERVIEW
In this case Goods Issue or Goods Withdrawal is required for own consumption. Some examples of goods
issue requirements are as follows:
1. Material is required to deliver to the production line.
2. The process of consuming the inventory from the warehouse to cost center,
3. Material is required for consumables like cotton waste, hand gloves, etc.
Output - Results
The output is a material document
which can contain accounting, profit
center, and other financial postings.
Field Values/Comments
Date that the document is entered.
Date that the document is posted.
Movement type to be used.
The plant of manufacture.
Location from which material will be issued.
Material to be issued to the manufacturing order.
Quantity of material to be issued.
Unit of measure for material to be issued.
Reservation number, a unique number.
Comments
Each time an inventory movement is posted a Material document is created
by
The system. If the movement has a financial impact an
Accounting document is also created.
Procedural Steps
Page | 138
Via Menus
MB1A
Page | 139
On screen Enter Goods Issue: New Items: fill in the following fields:
Enter the header level data 1. Quantity, 2. Cost center,
Please note, the fields that appear and those that are required are completely dependent upon the movement
type selected by the user.
Page | 140
Field
Name
Movement
type
G/L
account
Business
Area
Cost
center
Recipient
Description
Defines type of movement to
be performed by the
transaction
Identifies G/L account in
chart of accounts
R/O/
C
View
Enter if required
Identifies destination of
material
Material to be issued
Quantity of material to be
issued
O
R
R
Sloc
Plant
Plant location.
Text
Descriptive text
Material
Quantity
UnE
Comments
Shall
automatically
pick from
Reservation, if
issued against
Reservation.
For a Reservation, on the screen Enter Goods Issue: Initial Screen: press the To
Reservation button.
Page | 141
Field Name
Reservation
R/O/C
R
Cost Center
Description
Number which identifies
a material reservation or
dependent requirement
Number of the storage
location from which the
material will be
withdrawn
Material number of the
order, if order number is
not known
Cost Center
Order
SLoc
Material
Page | 142
Comments
WBS Element
Network
Asset
Receiving Plant
Receiving Sloc.
Sales Order
Plant
Requirements
Date
task order
Work Breakdown
Structure element
Network number for
account assignment
Main fixed asset number
The receiving plant or
internal unit that will
receive the material
Receiving Storage
Location
Sales Order number
Plant for the order
Date for the order
reservations to be
executed
Enter if appropriate
Enter if appropriate
O
O
Enter if appropriate
Enter if appropriate
Enter if appropriate
O
O
O
Enter if appropriate
Enter if appropriate
Enter if appropriate
Press Enter.
Page | 143
Page | 144
Overview
A Goods Issue note needs to be printed
Business Process Procedure Overview
This procedure details how to print a GI note created in R/3 by T code MB90
Message Data
Field Value/Comments
Output Results
Comments
Procedural Steps
MB90
Page | 145
On screen out put for goods movement, enter information in the fields as specified in
the table below:
Page | 146
Click EXECUTE
Page | 147
Press Enter
GI note will be as below.
Page | 148
Page | 149
Overview
A material document needs to be changed.
BUSINESS PROCESS PROCEDURE OVERVIEW
When you do any receipts, Issue or stock transfers a material and a accounting document is get created.
You can change only unloading point and enter a information text using this transaction.(MB02)
Field Values/Comments
If the number is known, enter it. If not, conduct a match-code
search for it.
Output - Results
A Change Material Document
Overview Screen
Comments
You can use the magnifying glass to view the details and change
the Unloading point and texts.
Procedural Steps
Via Menus
Page | 150
On screen Change Material Document: Initial Screen, enter information in the fields as
specified in the below table:
Field
Name
Material
Document
Material
Document
Year
Description
Alphanumeric key that
uniquely identifies the
material document.
Calendar year of the material
document
R/O/
C
R
Comments
Page | 151
Enter unloading
point
Enter a text here
Field
Name
Unloading
point
Text
Description
Point at which the material
will be unloaded
Explanatory text
R/O/
C
O
Page | 152
Comments
Overview
(Print) .
Field Value/Comments
GR note/GI note/Excise note etc.
Printout/Fax/Mail etc.
Output - Results
Processed Output for Material
Document
Comments
Page | 153
MB90
Page | 154
Enter material
document number
Field Name
Output Type
Description
Specifies the kind of
output to be produced.
Transmission
Medium
Sort Order
Message transmission
medium
Sort order for output from
goods movements
Expansion Levels of
batch where used list
Material doc. year
Processing
Mode
Material
Document Year
Material
Document
Number of material
document
R/O/C
R
O
R
Page | 155
Comments
Page | 156
Page | 157
Overview
Field Value/Comments
Plant
Storage location
Output Results
Material slow moving non moving
obsolete report
Comments
Page | 158
Transaction Code
ZMMP_SMO01
On screen Material slow Moving Non Moving Obsolete creation, enter the below
information:
Page | 159
Field Name
Plant
Description
Enter the plant no.
R/O/C
M
Storage
Location
Comments
On screen Material slow Moving Non Moving Obsolete creation, Press Execute:
Page | 160
As soon as User press Execute button, system will Display Material slow Moving Non Moving Obsolete report.
Page | 161
6. Outbound Delivery
1.
Overview
Outbound Delivery will be created if a material is required to transfer from One Plant to Another Plant within BSNL
with reference to Stock transfer Purchase Order(Refer STO manual).
Transaction Code
VL10B
VL02N
VL03N
Activity
Create Outbound Delivery with reference to Stock Transfer PO
Change Outbound Delivery/ Post Goods Issue
Display Outbound Delivery
2. Execute
1. Enter the
purchasing document
no.
Page | 162
3. Select background
Select the line item and click on background to create outbound delivery
Page | 163
4. Display the
outbound delivery
Transaction Code
VL02N
Activity
Change Outbound Delivery
Field Name
Outbound Delivery
Number
Description
Enter the Desired Outbound
Delivery Number
R/O/C
R
Storage Location
Quantity
Page | 164
Comments
In the Screen STO Cross Company XXXXXXXX Change Overview if you press Post
Goods Issue tab system will remove the stock from your end and it will show at vendors
end.
Page | 165
Transaction Code
VL03N
Activity
Display Outbound Delivery
Page | 166
Field Name
Outbound Delivery
Number
Description
Enter the Desired Outbound
Delivery Number
R/O/C
R
Click on accounting
document
Page | 167
Comments
Page | 168
Page | 169
Overview
Store Person need to send Returnable Gate Pass when a material goes out from the company on returnable basis.
Field Value/Comments
Output - Results
Comments
Page | 170
Field Name
Movement
Type
Plant
Storage
Location
Description
Enter Movement type for Transfer
Posting of material at Vendor End
Enter Plant Code from which
material is being Stock Transferred
to Vendor
Enter Storage Location
R/O/C
M
Comments
Page | 171
Field Name
Material
Code
Quantity
Description
Enter Material Code which will go
outside
Enter the quantity of material
which is going outside
R/O/C
M
Comments
Page | 172
As soon as you press Save Button, system will generate Material Document Number.
Note- With reference to this Material Document you will create RGP Number
Page | 173
Transaction Code
ZMMP_RGP01 - Create
ZMMP_RGP02 - Change
ZMMP_RGP03 - Display
Page | 174
Description
R/O/C
Planned
Return
Date
Amount
Header
Text
Item Text
Material
Document
Doc. Year
Vendor
M
M
M
Page | 175
Commen
ts
RGP number
As soon as User presses Save button, system will generate RGP Number.
Page | 176
Movement type
942
Field Name
Movement
Type
Plant
Storage
Location
Description
Enter Movement type for Transfer
Posting of material from Vendor
End
Enter Plant Code in which material
is being Stock Transferred from
Vendor
Enter Storage Location
R/O/C
M
Comments
Page | 177
Field Name
Material
Code
Quantity
Description
Enter Material Code which will
come inside the company
Enter the quantity of material
which is coming inside
R/O/C
M
Comments
Page | 178
As soon as you press save button system will generate material document number with reference to this material
documents you will create return RGP number
Page | 179
ZMMP_RGPRET01 - Create
ZMMP_RGPRET02 - Change
ZMMP_RGPRET03 - Display
Field Name
Reference
RGP
Number
Document
Year
Reference
Material
Document
Description
Enter RGP number using which
you sent the material outside
R/O/C
M
Page | 180
Comments
Return material
document number.
As soon as you press Save button system will generate Return RGP number
Page | 181
Overview
Store Person need to send Returnable Gate Pass when a material goes out from the company on returnable basis.
Field Value/Comments
Output - Results
Comments
Procedural Steps
Field Name
Movement
Type
Plant
Storage
Location
Description
Enter Movement type for Transfer
Posting of material at Vendor End
Enter Plant Code from which
material is being Stock Transferred
to Vendor
Enter Storage Location
R/O/C
M
Comments
Page | 183
Field Name
Material
Code
Quantity
Description
Enter Material Code which will go
outside
Enter the quantity of material
which is going outside
R/O/C
M
Comments
Page | 184
As soon as you press Save Button, system will generate Material Document Number.
Note- With reference to this Material Document you will create RGP Number
Page | 185
Transaction Code
ZMMP_RGP01 - Create
ZMMP_RGP02 - Change
ZMMP_RGP03 - Display
Page | 186
Description
R/O/C
Planned
Return
Date
Amount
Header
Text
Item Text
Material
Document
Doc. Year
Vendor
M
M
M
Page | 187
Commen
ts
RGP number
As soon as User presses Save button, system will generate RGP Number.
Page | 188
Movement type
942
Field Name
Movement
Type
Plant
Storage
Location
Description
Enter Movement type for Transfer
Posting of material from Vendor
End
Enter Plant Code in which material
is being Stock Transferred from
Vendor
Enter Storage Location
R/O/C
M
Comments
Page | 189
Field Name
Material
Code
Quantity
Description
Enter Material Code which will
come inside the company
Enter the quantity of material
which is coming inside
R/O/C
M
Comments
Page | 190
As soon as you press save button system will generate material document number with reference to this material
documents you will create return RGP number
Page | 191
ZMMP_RGPRET01 Create
ZMMP_RGPRET02 Change
ZMMP_RGPRET03 Display
Field Name
Reference
RGP
Number
Document
Year
Reference
Material
Document
Description
Enter RGP number using which
you sent the material outside
R/O/C
M
Page | 192
Comments
Return material
document number.
As soon as you press Save button system will generate Return RGP number
Page | 193
Overview
Materials which will go outside the company and which are expected to return back will be sent on Returnable Gate
Pass. Once you have created RGP then it may be required to change Planned Return Date, Amount, Item Text and
Header Text.
Prerequisite:
1.
2.
3.
Business Process:
Materials which will go outside first their Returnable Gate Pass number will be generated
and then if required changes will be done
Sr.
Activity
N
o.
1
Enter RGP Number and RGP year
T Code
ZMMP_RG
P02
Remarks
Procedural Steps
In the Screen Returnable Gate Pass Out enter the following Data:
Field Name
RGP
Number
Description
Enter RGP Number
R/O/C
R
RGP Year
Page | 194
Comments
After entering the RGP number and year, press Enter and make required changes.
Page | 195
button.
Page | 196
Overview
Materials which will go outside the company and which are expected to return back will be sent on Returnable Gate
Pass. Once you have created RGP then it may be required to display RGP at any point of time
Prerequisite:
1. Returnable Gate Pass Number should be known
2. Returnable Gate Pass Year should be known
Business Process:
1. Materials which will go outside first their Returnable Gate Pass number will be generated and
at any time of time it may be required to display
Sr.
Activity
N
o.
1
Enter RGP Number and RGP year
T Code
ZMMP_RGP03
Remarks
Procedural Steps
In the Screen Returnable Gate Pass Out enter the following Data:
Field Name
RGP
Number
Description
Enter RGP Number
R/O/C
R
RGP Year
Page | 197
Comments
Page | 198
Overview
Materials which will go outside the company and which are expected to return back will be sent on Returnable Gate
Pass
Prerequisite:
1. Returnable Gate Pass Number should be known
2. Returnable Gate Pass Year should be known
Business Process:
Materials which will go outside first their Returnable Gate Pass number will be generated and then
print output of RGP will go along with materials.
Sr.
Activity
N
o.
1
Enter RGP Number and RGP year
T Code
ZMMF_RG
P
Remarks
Procedural Steps
In the Screen Returnable Gate Pass Generation enter the following Data:
Field Name
RGP
Number
Description
Enter RGP Number
R/O/C
R
RGP Year
Page | 199
Comments
Page | 200
Page | 201
Overview
Store Person need to send Returnable Gate Pass when a material goes out from the company and when
material will come back then Return of Returnable Gate Pass will be generated against RGP number
Field Value/Comments
Enter the RGP number on which material was sent
Output Results
Return RGP Number created
Comments
Procedural Steps
Transaction Code
ZMMP_RGPRET01 - Create
ZMMP_RGPRET02 - Change
ZMMP_RGPRET03 - Display
Page | 202
Field Name
Reference
RGP
Document
No.
RGP
Document
Year
Reference
Material
Document
Number
RGP
Return
Date
Description
Enter the RGP number on which
material was sent to Vendor
R/O/C
R
Page | 203
Comments
On screen Returnable Gate Pass-Return, Press Save: As soon as User presses Save
button, system will generate Return RGP Number
Page | 204
Overview
Store Person need to send Returnable Gate Pass when a material goes out from the company and when
material will come back then Return of Returnable Gate Pass will be generated against RGP number & how
To make changes in the return of RGP
Field Value/Comments
Enter the RGP number on which material was sent
Output - Results
RGPReturn changed
Comments
Procedural Steps
Transaction Code
ZMMP_RGPRET01 - Create
ZMMP_RGPRET02 - Change
ZMMP_RGPRET03 - Display
Page | 205
Field Name
Reference
RGP
Document
No.
RGP
Document
Year
Reference
Material
Document
Number
RGP
Description
Enter the RGP number on which
material was sent to Vendor
R/O/C
R
Page | 206
Comments
was received
Page | 207
As soon as User presses Save button, system will change Return RGP Number.
Page | 208
Overview
Store Person need to send Returnable Gate Pass when a material goes out from the company and when
material will come back then Return of Returnable Gate Pass will be generated against RGP number & how to
display the RGP return.
Field Value/Comments
Enter the RGP number on which material was sent
Output - Results
RGPReturn Display
Comments
Procedural Steps
Transaction Code
ZMMP_RGPRET01 - Create
ZMMP_RGPRET02 - Change
ZMMP_RGPRET03 - Display
Page | 209
Field Name
Reference
RGP
Document
No.
RGP
Document
Year
Reference
Material
Document
Description
Enter the RGP number on which
material was sent to Vendor
R/O/C
R
Page | 210
Comments
Document
Enter the Date on which material
was received
Page | 211
As soon as User press Enter button, system will display RGP return.
Page | 212
Overview
Store Person need to send Non Returnable Gate Pass when a material goes out from the company on
returnable basis.
Field Value/Comments
Output - Results
Comments
Page | 213
Transaction Code
MIGO
Page | 214
Field Name
Movement
Type
Material
Code
Quantity
Description
Enter the Movement type for
NRGP
Material code for the material
R/O/C
M
Plant
Plant Code
Storage
Location
Vendor
Cost Center
Storage Location
M
M
Page | 215
Comments
Note- As soon as User presses Save button, system will generate Material Document Number.
Page | 216
Overview
Whenever a material will go outside the company and is not expected to return then Non Returnable Gate Pass will
be required during sending the material out
Prerequisite:
1. Appropriate material documents should be there
Business Process:
3. Non Returnable Gate Pass Print Output
Sr.
Activity
N
o.
1
Enter Material document number
T Code
Remarks
ZMMF_NR
GP
Procedural Steps
In the Screen Returnable Gate Pass Generation enter the following Data:
Field Name
Material
Document
Number
Description
Enter the material document
generated for Non Returnable
Gate Pass
R/O/C
R
Page | 217
Comme
nts
Click PRINT to
get the print out.
Click here to see
the print preview.
Page | 218
Page | 219
9. Physical Verification
1. MM-MIGO-Physical Inventory Verification
Overview
Physical inventory verification is required to be done.
Business Process Description Overview
Most companies carry out physical inventory verification periodically. When a company does not have
many material management items, it is better to manually create single inventory documents. From these
documents, a company can physically count material to enter into the system.
Plant
Key that identifies the plant for which the inventory document is
being created.
Storage Location
Key that identifies the Sloc for which the inventory document is
being created.
Output - Results
Physical inventory document is
manually created in the system.
Comments
This is the material in stock list which will be helpful for physical
verification.
Page | 220
SR.
Step
Mode
TCode
Responsibility
SAP
MB52
Stores
Manual
N/A
Manual
N/A
SAP
MIGO
Stores
Procedure Steps
Via Menus
MB52
Page | 221
Page | 222
Description
Enter Material No.
R/O/C
O
Company
Code
Plant
Plant number
Storage
location
Storage location
Special
stock
Comments
If you want to
have total stock
,dont enter the
material.
Click here
to convert the
document to text format.
Page | 223
Via Menus
MIGO
Select Goods receipts Other - movement type 701, and enter the below information,
Field Name
Material
No.
Quantity
Plant
Description
Enter Material No.
R/O/C
R
R
R
Storage
location
Storage location
Cost center
Reason for
the
movement
Page | 224
Comments
Page | 225
Field Name
Material
No.
Quantity
Plant
Description
Enter Material No.
R/O/C
R
R
R
Storage
location
Storage location
Cost center
Reason for
the
movement
Comments
Page | 226