Академический Документы
Профессиональный Документы
Культура Документы
Projects sponsors and the Congestion Management Agencies (CMAs) are responsible for the information presented in the checklists.
Questions about specific projects should be directed to the projects sponsor and the CMA.
From MTC Resolution 3765:
"CMAs will review completed project checklists and will make them available through their websites, and to their countywide Bicycle/Pedestrian
Advisory Committees (BPACs) for review and input to ensure that routine accommodation is considered at the earliest stages of project
development. The checklist outlined in Recommendation 7 should be the basis of this discussion prior to projects entering the TIP."
Project description Installation of accessible pedestrian signals and pedestrian countdown signals for
safety and access improvement at various locations in San Francisco.
Agency SFCTA
Other
Other
1 of 4 11/21/2009 10:54 AM
Routine Accommodations Checklists > View Checklist http://rac.mtc.ca.gov/rachecklist/checklistResponseStaticViewPrepare.do...
Mid-block crossings
Elderly or disabled
School age children
Other
Other
Other
2 of 4 11/21/2009 10:54 AM
Routine Accommodations Checklists > View Checklist http://rac.mtc.ca.gov/rachecklist/checklistResponseStaticViewPrepare.do...
Other
Other
3 of 4 11/21/2009 10:54 AM
Routine Accommodations Checklists > View Checklist http://rac.mtc.ca.gov/rachecklist/checklistResponseStaticViewPrepare.do...
Bicycle Boulevards
Bicycle parking
Sidewalks on both sides of street
Widened sidewalks
Frequent crosswalks
Goat path
Pedestrian-actuated traffic signals or routine pedestrian cycle
Bicycle actuated traffic signals or routine bicyclist cycle
High visibility crosswalks
Pedestrian-level lighting
ADA-compliant ramps
Traffic signal push buttons
Refuge islands on roadways
Other
Other
4 of 4 11/21/2009 10:54 AM