CODE REF:
BS EN ISO
14692-4:2002
covering:
Petroleum and natural
gas industries
Glass-reinforced
plastics (GRP) piping
Part 4: Fabrication,
installation and
operation
Sect 5:
Sect 5.1:
This part of ISO 14692
assumes that the fittings and
pipes have been correctly
manufactured and inspected
according to the criteria
given in ISO 14692-2.
PROC. REF:
WENCO Quality
Management System
Sect 5.2:
Page 1 of 8
CURRENT STATUS
WENCO GRP CONSTRUCTION QUALITY ASSURANCE & CONTROL INSPECTION CHECK LIST
CODE REF:
PROC. REF:
Sect 5.3:
System design
documentation
Sect 5.4:
Installer requirements
Sect 5.5:
Installation methods shall
be agreed between the
Installation methods
Page 2 of 8
CURRENT STATUS
WENCO GRP CONSTRUCTION QUALITY ASSURANCE & CONTROL INSPECTION CHECK LIST
CODE REF:
PROC. REF:
Sect 5.5.6.2:
Page 3 of 8
CURRENT STATUS
WENCO GRP CONSTRUCTION QUALITY ASSURANCE & CONTROL INSPECTION CHECK LIST
CODE REF:
PROC. REF:
5.5.8
Page 4 of 8
CURRENT STATUS
WENCO GRP CONSTRUCTION QUALITY ASSURANCE & CONTROL INSPECTION CHECK LIST
CODE REF:
PROC. REF:
Sect 5.6:
System testing
Sect 5.7:
Inspection
Page 5 of 8
CURRENT STATUS
WENCO GRP CONSTRUCTION QUALITY ASSURANCE & CONTROL INSPECTION CHECK LIST
CODE REF:
PROC. REF:
Sect 5.8:
Certification and
documentation
Sect 5.8.2:
Pressure test
certificate
Sect 5.9:
Repair after
installation
Sect 6:
Sect 6.1:
Operations
Operator's
documentation
Page 6 of 8
CURRENT STATUS
WENCO GRP CONSTRUCTION QUALITY ASSURANCE & CONTROL INSPECTION CHECK LIST
CODE REF:
Sect 6.2:
Sect 6.2.1.4
Sect 6.2.3
PROC. REF:
Maintenance and
repair
Surface and mechanical
damage
a)
b)
c)
critical applications;
applications involving a hazardous fluid;
applications involving operation at a
pressure greater than the design pressure
given in Table 3.
Sect 6.3:
Repair methods
Sect 6.4:
Page 7 of 8
CURRENT STATUS
WENCO GRP CONSTRUCTION QUALITY ASSURANCE & CONTROL INSPECTION CHECK LIST
CODE REF:
Sect 6.5:
Sect 6.6:
Annex F (normative)
Occupational Health
and Safety Act
PROC. REF:
Requirements for
testing and recertification
Decommissioning
Health and safety
Client HSE and
Contingency Planning
Page 8 of 8
CURRENT STATUS