Rev: 1
SAFETY PLAN
Rev: 1
CONTENTS
1. PURPOSE
2. SCOPE
3. SAFETY POLICY
4. RESPONSIBILITIES
4.1
EXECUTIVE MANAGER
4.2
PROJECT MANAGERS
4.3
SAFETY MANAGER
4.4
SAFETY OFFICER
4.5
PROJECT ENGINEERS
4.6
SAFETY INSPECTORS
4.7
FOREMAN/SUPERVISORS
4.8
ALL EMPLOYEES
4.9
TRAINING
5.2
SAFETY MEETINGS
5.2.1 GENERAL SAFETY TOOLBOX MEETINGS
5.2.2 DAILY CREW SAFTY MEETINGS / STAND UP MEETINGS
5.2.3 PROJECT SAFETY COMMITTEE MEETING
5.2.4 SITE SAFETY INSPECTION
5.2.5 SAFETY AUDIT
SAFETY PLAN
Rev: 1
5.2.6 DRILLS
7.
6.1
DEFINITION
6.2
6.3
6.4
6.5
6.6
8.2
8.3
FORKLIFT TRUCKS
8.4
DUMPERS
8.5
VEHICLES
8.6
8.7
8.8
8.9
ELECTRICTY
SAFETY PLAN
Rev: 1
ENVIRONMENTAL
9.1 ILLUMINATION
9.2 NOISE
9.3 WASTE MANAGEMENT
SAFETY PLAN
Rev: 1
1.
PURPOSE
2.
SCOPE
SAFETY POLICY
We believe that our resources (Manpower & Machinery) are the key to the
successful execution of any project.
It is therefore the Companys policy to ensure safety at work site and
camps for all Companys operatives/resources as well as its
Subcontractors personnel/resources working at site. (Please see EXHIBIT
B, Company's Health safety & Environmental Policy)
The Executive Manager directs all Project Managers and Project Team
Members to strictly adhere to and implement this Safety Plan, at all levels
to ensure the safety at the work site and camps.
The Companys safety policy signed by the Executive Manager shall be
displayed at all companys sites.
SAFETY PLAN
Rev: 1
4.
RESPONSIBILITIES
4.1
EXECUTIVE MANAGER
4.3
PROJECT MANAGER
SAFETY PLAN
Rev: 1
CONSTRUCTION MANAGER
SAFETY OFFICER
SAFETY PLAN
Rev: 1
PROJECT ENGINEERS
written
instructions
on
safety
related
items
whenever
SAFETY PLAN
Rev: 1
4.6
SAFETY INSPECTORS
SAFETY PLAN
Rev: 1
FOREMEN / SUPERVISORS
SAFETY PLAN
Rev: 1
ALL EMPLOYEES
SAFETY PLAN
Rev: 1
Subcontractor's Site Manager will provide his workers with a safe and
healthy work environment. He will be responsible for promoting safety,
and health awareness among his entire work force at all times.
He will ensure that the conduct of work is in accordance with their Health
and Safely Plan, that adequate resources and attention is provided by
SUBCONTRACTOR organization to Safety on the Project.
He will:
a. Familiarize himself and comply with CONSTRUCTION ENTERPRISES
COMPANY, Qatari State, and company regulations, including contents
of this Health and Safety Plan.
b. Provide safe construction equipment, tools for the work and protective
equipment for his workers.
c. Ensure that the construction work is being executed in the safest
manner.
d. Maintain the entire work area in a safe, healthy and environment
friendly condition, instructing his supervisors to take immediate
corrective action if he detects non-conformance. Deploy adequate
number of safety officers based on their Manpower and in adherence to
the Qatari rules and regulations.
e. Attend Project safety meetings as required.
f. Promote in-house safety incentive schemes.
k. Provide safety training for his workforce in consultation with main
contractors Safety Officer
h. Maintain records of employee's qualifications and training.
4.10 SUBCONTRACTOR'S SUPERVISORY PERSONNEL
SAFETY PLAN
Rev: 1
5.1
TRAINING
Paramount to having an effective safety program is the knowledge
to enable personnel to work safely. It is CEC's responsibility to
ensure that all personnel associated with Project have sufficient
knowledge.
-
SAFETY PLAN
Rev: 1
SAFETY MEETINGS
FOREWORD
SAFETY PLAN
Rev: 1
a. "Stand up" meetings are far more specific than Tool-Box talks and
concentrate on the detail of the work to be done, such as:
I Hazard identification planning.
II Permit to Work conditions, limitations and precautions.
III Fire Hazards and means of prevention.
IV Dangerous/hazardous substances and their control (As per
Material Safety Data Sheets - MSDS).
V Emergency
Procedures,
escape
routes,
local
alarms/telephones, etc.
Other general aspects of safety, e.g. PPE, house keeping and safe access
should
also be included. These are conducted weekly by the safety officer as
listed below
ab. Company and Subcontractor "Stand up" meetings will always be
called by the Supervisor who is directly in-charge of the job/task, to the
operators performing the work at the job-site. They are usually
conducted at each shift change or immediately prior to starting a new
task.
bc. The duration of "Stand up" meetings should be for as long as
necessary, until the workers fully understand the hazards associated
and the precautions to be taken.
cd. SUBCONTRACTOR Safety Officers will monitor / adjust the meetings
as part of their regular daily assignment duties in cooperation with
CEC's Safety Officer.
*Note: Details of Stand up" meetings will also be recorded on the Monthly
Safety Performance Report.
5.2.3 PROJECT SAFETY COMMITTEE MEETING
Project Safety Committee Meeting will be conducted once in a month and
to be presided by the Project Manager. The Committee shall comprise of
the following:
-
Department Managers
Client Representatives
Nominated Supervisors
Subcontractors' Managers/Supervisors
SAFETY PLAN
Rev: 1
FOREWORD
SAFETY AUDITS
SAFETY PLAN
Rev: 1
In order to evaluate the effectiveness of this Safety Plan and to apply the
principle of self-assessment and continuous improvement, CEC will ensure
that a procedure for self-assessment has been efficiently implemented.
An inspection plan will be maintained by :by:
5.5.1 Internal safety audits which will indicate the conformance or nonconformance in adhering to the CEC and CUSTOMER Safety
Procedure.
5.5.2 The project's monthly safety statistics
5.5.3 Analysis of the Monthly Report data whichdata, which includes
the number of injuries, nature of each injury and its root cause/s.
The Safety Officer is responsible to conduct the entire safety inspection
program and reports his findings directly to the Project Manager.
5.2.6 DRILLS
To ensure that all employees know their duties and responsibilities and
what to do in case of an emergency, drills shall be conducted
atconducted at the schedule decided by the Safety Officer.
MUSTER POINTS will be pre-established and will be made known to
everyone in the project.
A written report shall be prepared immediately after each drill and this
shall include the scenario, the time the drill started and the time the drill
ended. Comments to improve the response to the emergency drill shall
be discussed to concerned team leaders, who shall be nominated by the
Project safety Committee.
6.0
6.1
SAFETY PLAN
Rev: 1
SAFETY PLAN
Rev: 1
FREQUENCY RATE =
SEVERITY RATE =
INCIDENCE RATE =
SAFETY SCORE =
1,000,000
In case of property damage other than a fire or injury incident, the person
who finds the damage will;
I. Take necessary action to prevent the extension of damage and
II. Report to CONSTRUCTION ENTERPRISES COMPANY Site Safety
Department immediatelyDepartment immediately.
EVACUATION
NOTICE OF INCIDENT
SAFETY PLAN
Rev: 1
As per CUSTOMER safety Regulations for Contractors, CEC shall, at its own
expense, supply its personnel employed at the site of the works with
adequate protective equipment which shall be maintained in good
conditions or replaced. A regular audit of PPE's shall be carried out. ( Pls.
see EXHIBIT system)
All PPE's shall conform with ANSI and/or BS standards. All PPE's shall be
maintained in good condition and shall be worn at all times as required by
the task to be performed and indicated by notices and instructions.
PROTECTIVE CLOTHING
HELMET
SAFETY PLAN
Rev: 1
SAFETY SHOES
I Welding
II Grinding
III Chipping, Hammering and Shearing at any location
IV Assisting sand/grit blasting operations
V Cutting and Burning (tinted)
d. Eye protection should comply to recognized standard ANSI 287 or BS
2092, welders and welder's helper eye protection is covered under BS
679 and BS 1542. (BS EN 166 398)
EAR PROTECTION
SAFETY PLAN
Rev: 1
8.1
CRANES
All cranes will have Third Party test certificates and be operated only by
qualified personnel. The cranes will not be operated without a banksman.
Cranes will not 'travel ' in plant areas without a bankman leading it.
Outriggers must be fully extended when a lift is taking place.
The following precautions must be taken while operating a crane.
1. Carry out routine daily checks for obstructions, conditions,
cleanlinessand cleanliness (in accordance with the planned
Maintenance Inspection Programme)
2. Ensure that the correct capacity chart is used and never overload the
crane.
3. Banksmen must be trained and use standard / international signals
when giving directions.
4. They must wear reflective vests for easy identification. Cranes should
not be operated without a banksman.
5. No personnel other than authorised operators will ride on moving
cranes, forklifts or any other lifting gear.
6. The out riggers of the crane will be fully extended. Spreader pads to be
placed beneath them.
7. Never leave the machine without an Operator while a load is
suspended (where applicable barricade areas during lifting operations).
8. Tag lines of sufficient length will be used to guide suspended loads.
9. Never lift suspended loads over people.
SAFETY PLAN
Rev: 1
10. Do not swing the machine, unless the area in front and behind the
machine, is clear.
11.
At the end of work the boom must be left in the free swing" position.
Tower crane will be fitted with a wind speed indicator, an audible alarm in
the operator's cabin and at the base of the crane.
If the wind velocity is near the manufacturer's maximum safe working
limit, the crane should not be operated until the conditions improve. A
proper means of communication will always be maintained between the
operator and banksmen at all times. A special procedure is issued for the
safe use of tower cranes.
HEAVY LIFTS
SAFETY PLAN
Rev: 1
All critical lifts require a rigging and lifting plan, which must be approved
by the Client Company prior to the work taking place.
A critical lift is defined as a lift;
- over operating plant;
- exceeding 85% of the crane's SWL'
- within close proximity to overhead power cables;'
- when moving critical items e.g. items that are essential to the
construction and cannot be replaced easily;
- when the height involved is in excess of (30.5 metres);
- certain other types of lifts as determined by Client Company.
*The absolute limit of approach to live overhead power lines is:
Up to 250,000 volts (6.1 metres)
Up to 345,000 volts (7.62 metres)
Up to 500,000 volts (10.67 metres)
LIFTING GEARS
Only properly manufactured lifting gear which has been tested and
certified, serial numbered and marked/stamped with it'sits Safe Working
Load (SWL) will be allowed on Site.
Certification must be by a 'competent examiner or authority' (acceptable
to CONSTRUCTION ENTERPRISES COMPANY and Client Company.
REQUIREMENTS
a. All lifting gear will be colour coded for inspection purposes. Frequency
of inspections will be on a three monthly schedule.
b. Steel lashings, bands and rope will not be used for lifting purposes.
c. Chains and slings will not be shortened by "knotting", or lengthened by
the use of nuts and bolts.
d. All lifting gear must be in good condition, free of rust, kinks,
frayed/broken wires and stretched links or hooks. Nylon slings must be
free of wear/damage. Damaged lifting gear must not be used and
should be destroyed.
SAFETY PLAN
Rev: 1
e. Padding/protection
objects/materials.
must
be
used
when
lifting
sharp
edged
.
.
.
.
.
.
8.2
a mobile chassis;
SAFETY PLAN
Rev: 1
c. The maximum gradient that the mobile platform can be operated on,on
should be indicated alongside the operator's controls.
d. All controls, switches, levers and buttons will be clearly marked,
showing their function and method of operation and be clearly visible
to the operator.
e. The manufacturer's recommended tyre pressures will be marked
adjacent to each tyre,
f. The floor of the work platform will be of a non-slip surface and be
designed to allow water drainage.
g. All sides of the work platform will be enclosed by a top guard rail, 1
metre high, and include an intermediate guard rail at an equal distance
between the floor and top rail. All sides must be enclosed by a toe
board not less than 15 - centimetres high.
h. Access gates will open to the inside of the work platform. When
released the gates will automatically return to the closed and locked
position.
i. Mobile platforms which are used on gradients with the platform raised
should be fitted with an inclinometre and warning alarm.
j.
SAFETY PLAN
Rev: 1
FORKLIFT TRUCKS
a.
b.
c.
d.
e.
f.
g.
Each Fork-lift will be equipped with a horn and front and reversing
lights.
SAFETY PLAN
Rev: 1
h.
i.
j.
OPERATIONAL SAFETY
a.
b.
c.
f.
g.
h.
i.
j.
k.
Vehicles and trailers being loaded by a fork-lift truck will have the
brakes set/wheels choked.
I.
m.
Loads must not exceed the safe lift capacity of the Fork-lift truck.
n.
Fork -lifts will be parked correctly with the forks resting on the ground
and the engines turned off.
o.
SAFETY PLAN
Rev: 1
p.
Forklifts will not be overloaded nor misused. Never exceed its capacity.
Where required, use other equipment specified for the job such as mobile
cranes.
a.
b.
DUMPERS
SAFETY PLAN
Rev: 1
a. Ensure that the Dumper is in neutral gear and the parking brake is
firmly set.
b. Make sure that the correct hand crank is used for the type of Dumper
engine to be started.
c. The handle on the crank must not be damaged and must rotate freely.
d. If the starting crank fails to release when the engine starts,
immediately stop the engine and stand clear until the crank has
stopped rotating.
DUMPER LOADING
a. Dumpers must not be overloaded. The load must be evenly distributed
in the skip. When loading (as far as possible), the Dumper must be
positioned on level ground with the parking brake firmly set.
b. When the dumper is being loaded by an excavator or other mechanical
means, the driver will dismount and stand clear of the Dumper.
c. Tipping of the skip will only be done from the driver's seat, not by
standing to the side of the Dumper.
d. Oversized or projecting loads will be properly secured and a red
warning flag attached to the end of the projecting material.
e. If a suitable towing attachment is fitted to the Dumper, only a purpose
made towing pin will be used.
f. The Dumper load must not block the driver's vision or restrict his
movement in the driver seat.
TRAVELLING
SAFETY PLAN
Rev: 1
a. When dumping into excavations, pits or over ledges, a "chock log" will
be placed to prevent the Dumper from falling over the edge.
b. "Chock logs" will be placed and securely pinned at least 1 metre from
the edge to prevent the loaded Dumper from causing a collapse of the
ledge or embankment.
c. The "chock log" will be of a size that will effectively stop the wheels of
the Dumper.
d. The parking brake will be applied prior to tipping. Riding the clutch to
hold the Dumper in position is strictly prohibited.
e. The skip will be not left in a tipped position and used as a dozer to
backfill or scrape the ground.
8.5
VEHICLES
The violation of safe driving rules and poorly maintained vehicles are a
leading cause of accidents on construction sites.
Some of the factors that lead to unsafe vehicle operations are:
.
.
SAFETY PLAN
Rev: 1
The possession of a valid license does not always ensure that the driver is
properly trained or that he has the proper attitude to be a safe driver.
Shaping the driver's attitude and habits are a major part of any successful
vehicle accident prevention programme. Drivers must be trained to
understand the benefits of being a safe driver.
Driver must also be trained and understand the need to drive defensively,
so that hazards of other unsafe drivers can be avoided.
DRIVER AND OPERATOR QUALIFICATION
Drivers and equipment operators must hold a valid Qatari driving license,
together with other appropriate certifications or permits for the type and
class of vehicle, or equipment they are authorized to drive or operate.
Defensive driving training must be given to all drivers in the company.
SPEED LIMIT AT WORK SITE
All drivers are obliged to comply with the speed limit at work site and on
the roads.
8.6
SAFETY PLAN
Rev: 1
SAFETY PLAN
Rev: 1
Cartridges operated tools will be stored separate from the fixing pins and
cartridges. Signatures are obtained prior to issue of C.O.T. and cartridges,
a strict control is kept over issue procedures. Records will be kept of
number of cartridge strips issued and number of cartridge strips returned.
Spent cartridge strips will not be disposed of by way of incineration of any
type.
(There may be an unspent cartridge in the strip)
8.7
PRE-WORK CHECKS
SAFETY PLAN
Rev: 1
1. Use of Safety shields. Use safety spectacles and shields during grinding
operations
2. Dress Properly. Do not wear loose clothing. They can be caught in
moving parts. Gloves and non-skid footwear are recommended when
working outdoors.
USE
1 Ensure that the operating speed marked on the disc is tighter than the
operating speed of the grinder.
2. Be careful not to damage spindle, the flange (especially the installing
surface) or the lock nut. Damage to these parts could result in wheel
breakage.
3. Hold the tool firmly.
4. Keep hands away from rotating parts.
5. Make sure that the wheel is not in contact with the work piece before
the switch is turned on.
6. Before using the machine on an actual work piece, let it run for a while.
Watch for vibration or wobbling that could indicate poor installation or
poorly balanced wheel.
7. Use the specified surface of the wheel to perform grinding.
8. Watch out for flying sparks. Hold the tool so that sparks fly away from
you, other persons or flammable materials.
9. Do not leave the machine running.
10. Do not touch the work piece immediately after operation; it may be
extremely hot and could burn your skin.
SAFETY PLAN
Rev: 1
11.
12. Do not use Grinding Machines in damp or wet lotions. Keep work
area well illuminated. Do not expose the machine to rain. Do not use in
the presence of flammable liquids or gases.
13. Store Idle Tools. When not in use. Grinders should be stored in dry,
and kept in locked up cabinets.
14. Do not abuse electric cord. Never carry tool by cord or yank it to
disconnect from socket. Keep cord from heat, oil and sharp edges.
15.
16. Disconnect tools when not in use, before servicing and when
changing accessories.
17. Remove adjusting keys and wrenches. Form habit of checking to see
that keys and adjusting wrenches are removed from tool before turning
it on.
18. Avoid unintentional starting. Do not carry plugged-in tool with finger
on switch. Be sure switch is OFF when plunged in.
19.
20. For outdoors use extension cords intended for use outdoors and so
marked. Stay alert. Watch what you are doing, use common sense. Do
not operate tool when you are tired.
21. Guard against electric shock by making sure that a GFI (Ground
Fault Interrupter) is installed. Prevent body contact with grounded
surfaces. For examples pipes, radiators, ranges, refrigerated
enclosures.
WORK LOCATION
Keep Work Area clean: Keep work area free from obstructions and
flammable liquids.
RECORDS
SCAFFOLDS
Scaffolding will be erected, altered, dismantled by qualified scaffolders
only
SAFETY PLAN
Rev: 1
Scaff tag system to be issued. Green for OK scaffolding, red for keep
off.
SAFETY PLAN
Rev: 1
8.9
ELECTRICITY
I
II
III
IV
V
VI
Unauthorized/untrained people.
Damaged/faulty equipment,
Poor insulation
Inadequate earthing methods,
Not following procedures for isolation,
Excavation works,
SAFETY PLAN
Rev: 1
a. Equipment
Equipment will be inspected and tested according to Contractors
preventative maintenance practices and all recognised standards.
During operation of these procedures, if items are found to be faulty,
they will be removed from service immediately. If they cannot be
repaired they will be removed from Site. Records will be kept to show
such action.
b. Insulation
During routine inspections and tests, the insulation of electrical items
will be checked. Where it is found to be damaged or incomplete the
item will be removed from service. All wiring will be insulated and
where there is a possibility of physical damage the wiring must be
further protected by metal conduits or armouring. Insulation will be
provided at all locations where it is possible for workers to come into
contact with live equipment.
c. Earthing
Earth cables will be tested for continuity and resistance to ensure that
they are effective for that particular application. Remedial action will be
taken where they
are found inadequate or ineffective. Until such remedial action is taken
the item of equipment will be taken out of service.
Earthing or bonding conductors must be of adequate cross-sections
area for the safe carriage of any expected fault current for the time it
takes the fuse to operate and disconnect the supply.
d. Isolation Procedures
Detailed as a part of the Permit to' Work System. Isolations are
intended to prevent accidental contact with live electrical equipment.
Work cannot officially be carried out on electrical systems until a
Competent
Person has indicated, in writing, on a work permit, that he has isolated
the
system by means of locks, using the lock out/tag out procedure. The
person
issuing the work permit must witness the isolation.
e. Work in the Vicinity of Live Equipment
SAFETY PLAN
Rev: 1
EXCAVATION
SAFETY PLAN
Rev: 1
SAFETY PLAN
Rev: 1
FIRE PREVENTION
A Fire Warden and alternative Fire Warden will be appointed for each office
and work area. Their names will be posted in visible locations.
The Fire Warden's duties will include;
a. A good understanding of the emergency procedures and phone
numbers.
b. Checking that emergency exits are clear, emergency doors are not
locked and that there are adequate means of escape.
c. Checking that fire extinguishers are in their proper locations and
operational.
d. Checking that rubbish/combustibles are removed from the work area
on a daily basis.
e. Checking that all lights and equipment are switched off as required.
f. Reporting all potential fire hazards.
FIRE EXTINGUISHERS
SAFETY PLAN
Rev: 1
FIRE DRILLS
SAFETY PLAN
Rev: 1
a. Fire Wardens and suitable personnel will be trained in the use of fire
extinguisher and emergency procedures. Personnel will be chosen from
all ranks/positions. All personnel will be informed of basic fire fighting
procedures.
b. Other fire training requirements will be conducted by Corporate Safety
jointly with Site Safety Department.
These requirements will include but not be limited to:
- basic fire fighting using extinguisher and water
- rescue procedures and techniques
- basic first aid for burns treatment
8.13
HOUSEKEEPING
SAFETY PLAN
Rev: 1
for
COMPRESSED AIR
Compressed air must be used for the purpose for which it is provided.
General Requirement:
-
SAFETY PLAN
Rev: 1
8.15
The procedure of CUSTOMER on the storage and use of gas cylinders shall
be strictly adhered to.
a. Gas cylinders will be kept clean. Stored away from organic substances,
rubbish
and from direct sunlight.
b. Cylinders shall be stored in a dry and well ventilated places.
c. Cylinders will be securely fixed upright o avoid falling over. Also the
protective cap must be placed in position when not in use.
d. While in use the cylinders must be kept vertical preferably on racks.
Cylinders will be stored in upright position.
e. Hoses not in good condition will not be used. Care will be taken to see
the hoses are not coiled up around the cylinder.
f. It is forbidden:
to handle cylinders by their valves
to carry the liquefied cylinders, if the valve is not properly closed
and the protective cap is not fixed tightly
- to use a leaking cylinder
- to check leakage with a flame
- to set the pressure of acetylene gas above 1.0 bar
- to manipulate the torch flame near to against cylinders
- to manipulate Torch or Gas preheat without flash back arrestors
installed on the hose to torch connection.
g. All gasAll gas cylinders will be fitted with flash back arrestors.
-
8.16
MAN-RIDER BASKETS
SAFETY PLAN
Rev: 1
a. Man-rider boxes will not be lowered with the crane controls in a "free
fall" setting. When lowering man-rider baskets, the crane will be in
"power controlled" setting.
b. The safe working load and maximum number of personnel will be
marked on each man-rider box.
c. All sides of the man-rider basket will be enclosed by a top guard rail,
1.1 metres high and include an intermediate guard rail at an equal
spacing between the floor and the top rail. All sides must be enclosed
by a toe board not less than 203 mm high.
d. The floor of the man-rider box will be of solid non-skid surface with
drain points to prevent water accumulation.
e. The crane hook used for raising and lowering man-rider baskets must
be equipped with a safety latch to prevent displacement of the slings
from the hook.
f. A separate safety line will be provided and secured to the crane main
hook for workers to attach their safety harness.
g. A 4-legged sling will be used for securing the box to the crane main
hook
h. If necessary a minimum of two taglines could be used to control lateral.
movement of the man rider basket
OPERATIONAL SAFETY
a. All man-rider lifting operations will be controlled by a "competent
person".
b. Standard hand signals will be used. Where hand signals are impractical
due to distance or height, two way radio communications will be used.
c. Man-rider boxes will not be used during adverse weather conditions
such as electrical (thunder) storms, high winds and/or heavy rains.
d. Each person in the man-rider basket will wear an approved safety
harness. The lanyard will be securely attached to the crane hook safety
line at all times.
e. Personnel must not sit or stand on the guard rails or use other means
to gain extra height or reach.
f. While raising or lowering, hands and arms will be kept inside the
man-rider box.
g. Tools and materials will not be thrown or dropped from the man-rider
basket.
SAFETY PLAN
Rev: 1
h. Each time before raising the man-rider box, the following checks will be
made:
I. Check that the crane is properly set up. If wheel mounted, check
that
outriggers are fully extended and jack pads are in place.
II. Check that slings, shackles, attachment points and the man-rider
basket
are in good condition.
III. Check that the slings and safety line are securely placed on the
crane hook.
IV. Check that each person is wearing a safety harness and any other
required Personnel Protective Equipment (PPE).
V. Check that each person's safety harness lanyard is securely
attached to
the crane hook safety line.
VI. Ensure that each person clearly understands the task he is to
perform and the safe work rules for man-rider boxes.
*NOTE: When flame-cutting, or welding, a suitable fire extinguisher must
be
installed inside the man-rider basket.
8.17
SAFETY PLAN
Rev: 1
8.18
PILE DRIVING
SAFETY PLAN
Rev: 1
ENVIRONMENTAL
The company will assure that each operation does not create any risks to
the health of employees or general public or the environment and will
conduct its operation with full concern for the protection of public health
and property from harmful pollution of land, air and water.
In all activities the company will meet a standard specified by the Qatar
Environment regulations and Customer. The Company will cooperate and
participate, in the development of environmental control programmes and
regulations.
It is the responsibility of each employee of CEC to operate in compliance with
established policy and that they do not present necessary risk to employees,
general public or environment.
9.1
ILLUMINATION
Suitable and adequate provisions for Site lighting will be made throughout
the period of construction, until such time that new permanent facilities
may be utilised.
GENERAL STANDARDS
a. All "site-wide" general access lighting requirements will be provided,
such as:
SAFETY PLAN
Rev: 1
NOISE
WASTE MANAGEMENT
SAFETY PLAN
Rev: 1
First Aid;
Canteen;
Main Offices;
Warehouse - Lay-down Yard;
Toilets;
Rest Areas;
Pedestrian Access;
No Entry;
IX Fire Points;
X Muster Point
d. General signs around the Site, such as "Good Housekeeping" etc. (in
different languages).
d. Common Health and Safety notice-boards.
e. Accident Prevention and statistics sign at the main Site Office.
f. Poster campaign at Canteen and Office areas.
g. Hazardous area signs.
*Note: Subcontractors will follow the same policy with in their own
established work zones.
10.2 INCENTIVE BONUS
The
UNUSUAL WEATHER
SAFETY PLAN
Rev: 1
b.
SAFETY PLAN
Rev: 1
SAFETY RECORDS
13.1 SITE SAFETY AUDITING/INSPECTION RECORDS
13.1.1ENVIRONMENTAL CONDITIONS
13.1.2FIRST AID
13.1.3PPE
13.1.4HOUSEKEEPING
13.1.5GENERAL SAFETY
SAFETY PLAN
Rev: 1
13.1.6HAND TOOLS
13.1.7DESIGN & ERECTION FOR SHUTTERING WORK
13.1.8ACCESS TO AND EGRESS FROM THE WORKPLACE
13.1.9EDGE PROTECTION OPENINGS
13.1.10
13.1.11
NOTICE BOARD
13.1.12
13.1.13
POWER TOOLS
13.1.14
SCAFFOLDS
13.1.15
SERVICES UNDERGROUND
13.1.16
13.1.17
TEMPORARY BUILDINGS
13.1.18
TEMPORARY ELECTRICITY
13.1.19TRAFFIC MANAGEMENT
13.1.20
13.1.21
13.1.22
13.1.23
13.1.24
SAFETY RECOMMENDATION
SAFETY PLAN
Rev: 1
Area
Audited/inspected by
______________
Subcontractor
______________
EXCELLENT
10
VERY GOOD
GOOD
Supervisor Responsible
For
the
--------------------------------------------
NOT APPLICABLE
from site. Is he N/A
a registered carrier as required by the
Area around the rubbish and waste storage site kept tidy
10
Site tidiness
11
area
MARKS
SAFETY PLAN
Rev: 1
TOTAL MARKS
COMMENTS/REMARKS
REMARKS
SAFETY OFFICER/
SIGNATURE : SAFETY INSPECTOR
SITE SAFETY AUDIT/INSPECTION
Area
Audited/inspected by
______________
Subcontractor
______________
Supervisor
Responsible
for the Area
EXCELLENT
10
VERY GOOD
GOOD
FAIR
POOR
NOT APPLICABLE
N/A
_______________
_______________
MARKS
SAFETY PLAN
Rev: 1
COMMENTS/RECOMMENDATIONS:
Area
Audited/inspected by
______________
Subcontractor
______________
Supervisor
Responsible
for the Area
_______________
_______________
EXCELLENT
10
VERY GOOD
GOOD
FAIR
POOR
NOT APPLICABLE
N/A
SAFETY PLAN
Rev: 1
4
5
Are the First Aid boxes regularly inspected that it's contents
are in line with the guidelines contained in the approved
code of practice and their contents replaced as necessary ?
10
TOTAL MARKS
COMMENTS/RECOMMENDATIONS:
Area
Audited/inspected by
______________
Subcontractor
______________
Supervisor
Responsible
for the Area
_______________
_______________
EXCELLENT
10
VERY GOOD
GOOD
FAIR
POOR
NOT APPLICABLE
N/A
SAFETY PLAN
Rev: 1
MARKS
Protective footwear
Safety belt
Hand protection
Ear protection
Safety harness
Respiratory protection
10
shields as
TOTAL MARKS
COMMENTS/RECOMMENDATIONS:
Area
Audited/inspected by
______________
Subcontractor
______________
Supervisor
Responsible
for the Area
_______________
_______________
EXCELLENT
10
VERY GOOD
GOOD
FAIR
POOR
NOT APPLICABLE
N/A
SAFETY PLAN
Rev: 1
MARKS
13.1.5 - HOUSEKEEPING
Openings protection
Maintenance barricades
10
11
TOTAL MARKS
COMMENTS/RECOMMENDATIONS:
Area
Audited/inspected by
______________
Subcontractor
______________
Supervisor
Responsible
for the Area
_______________
_______________
EXCELLENT
10
VERY GOOD
GOOD
FAIR
POOR
NOT APPLICABLE
N/A
SAFETY PLAN
Rev: 1
MARKS
Gates secured
TOTAL MARKS
COMMENTS/RECOMMENDATIONS:
Area
Audited/inspected by
______________
Subcontractor
______________
Supervisor
Responsible
for the Area
_______________
_______________
EXCELLENT
10
VERY GOOD
GOOD
FAIR
POOR
NOT APPLICABLE
N/A
SAFETY PLAN
Rev: 1
MARKS
10
TOTAL MARKS
COMMENTS/RECOMMENDATIONS:
Area
SAFETY PLAN
Rev: 1
Audited/inspected by
______________
______________
Subcontractor
Supervisor
Responsible
for the Area
_______________
_______________
EXCELLENT
10
VERY GOOD
GOOD
FAIR
POOR
NOT APPLICABLE
N/A
TOTAL MARKS
COMMENTS/RECOMMENDATIONS:
MARKS
SAFETY PLAN
Rev: 1
Area
Audited/inspected by
______________
Subcontractor
______________
Supervisor
Responsible
for the Area
_______________
_______________
EXCELLENT
10
VERY GOOD
GOOD
FAIR
POOR
NOT APPLICABLE
N/A
All Ladders the correct access for the job or should Scaffold
could be considered
TOTAL MARKS
COMMENTS/RECOMMENDATIONS:
MARKS
SAFETY PLAN
Rev: 1
Area
Audited/inspected by
______________
Subcontractor
______________
Supervisor
Responsible
for the Area
_______________
_______________
EXCELLENT
10
VERY GOOD
GOOD
FAIR
POOR
NOT APPLICABLE
N/A
TOTAL MARKS
COMMENTS/RECOMMENDATIONS:
MARKS
SAFETY PLAN
Rev: 1
Area
Audited/inspected by
______________
Subcontractor
______________
Supervisor
Responsible
for the Area
_______________
_______________
EXCELLENT
10
VERY GOOD
GOOD
FAIR
POOR
NOT APPLICABLE
N/A
TOTAL MARKS
COMMENTS/RECOMMENDATIONS:
MARKS
SAFETY PLAN
Rev: 1
Area
Audited/inspected by
______________
Subcontractor
______________
Supervisor
Responsible
for the Area
M
AR
KS
Are
the following
displayed ?
clearly
Emergency
numbers and
telephones
telephone
location of
_______________
_______________
EXCELLENT
10
VERY GOOD
GOOD
FAIR
POOR
NOT APPLICABLE
N/A
SAFETY PLAN
Rev: 1
TOTAL MARKS
COMMENTS/RECOMMENDATIONS:
Area
Audited/inspected by
______________
Subcontractor
______________
Supervisor
Responsible
for the Area
Cranes/lifting
appliances
thoroughly inspected weekly
& results recorded
All crane
marked
controls
clearly
_______________
_______________
EXCELLENT
10
VERY GOOD
GOOD
FAIR
POOR
NOT APPLICABLE
N/A
SAFETY PLAN
Rev: 1
Training of banksmen
10
Overall condition
TOTAL MARKS
COMMENTS/RECOMMENDATIONS:
Area
Audited/inspected by
______________
Subcontractor
______________
Supervisor
Responsible
for the Area
_______________
_______________
EXCELLENT
10
VERY GOOD
GOOD
FAIR
POOR
NOT APPLICABLE
N/A
MARKS
Are
power
tools
subjected
to
inspection
qualified/competent person at regular intervals
by
operating on a reduced
SAFETY PLAN
Rev: 1
TOTAL MARKS
COMMENTS/RECOMMENDATIONS:
Area
Audited/inspected by
______________
Subcontractor
______________
Supervisor
Responsible
for the Area
13.1.15 - SCAFFOLDS
Condition of ladders
_______________
_______________
EXCELLENT
10
VERY GOOD
GOOD
FAIR
POOR
NOT APPLICABLE
N/A
SAFETY PLAN
Rev: 1
Base plate/punching on
Bracings
10
Toe boards
11
General alignments/stability
12
Caster brakes
13
Guard rails
14
TOTAL MARKS
COMMENTS/RECOMMENDATIONS:
Area
Audited/inspected by
______________
Subcontractor
______________
Supervisor
Responsible
for the Area
_______________
_______________
EXCELLENT
10
VERY GOOD
GOOD
FAIR
POOR
NOT APPLICABLE
N/A
MARKS
Plans
of
known
underground
services
clearly
and
SAFETY PLAN
Rev: 1
TOTAL MARKS
COMMENTS/RECOMMENDATIONS:
Area
Audited/inspected by
______________
Subcontractor
______________
Supervisor
Responsible
for the Area
_______________
_______________
EXCELLENT
10
VERY GOOD
GOOD
FAIR
POOR
NOT APPLICABLE
N/A
No Smoking
MARKS
SAFETY PLAN
Rev: 1
Compressed Gas
Scaff Tags
Muster points
Conformance
Regulations
10
11
of
all
signs
and
notices
to
the
Qatar
TOTAL MARKS
COMMENTS/RECOMMENDATIONS:
Area
Audited/inspected by
______________
Subcontractor
______________
Supervisor
Responsible
for the Area
_______________
_______________
EXCELLENT
10
VERY GOOD
GOOD
FAIR
POOR
NOT APPLICABLE
N/A
SAFETY PLAN
Rev: 1
MARKS
Cleanliness of toilets
10
TOTAL MARKS
COMMENTS/RECOMMENDATIONS:
Area
Audited/inspected by
______________
Subcontractor
______________
EXCELLENT
10
VERY GOOD
GOOD
FAIR
POOR
NOT APPLICABLE
N/A
Supervisor responsible
For
the
---------------------------
Area
SAFETY PLAN
Rev: 1
13.1.19
- TEMPORARY ELECTRICITY
COMMENTS/RECOMMENDATIONS:
MARKS
Defects on cables/insulation/receptacles
No entangling of cables
10
11
12
13
14
15
16
17
TOTAL MARKS
SITE SAFETY AUDITING/INSPECTION
Area
Audited/inspected by
______________
Subcontractor
______________
Supervisor
Responsible
for the Area
System
to
control
the
movement of vehicles on site
_______________
_______________
EXCELLENT
10
VERY GOOD
GOOD
FAIR
POOR
NOT APPLICABLE
N/A
SAFETY PLAN
Rev: 1
8
9
10
11
TOTAL MARKS
COMMENTS/RECOMMENDATIONS:
Waste
I.D No
Description of Waste
Sourc
e
Classificatio
n
Quantit
y
Date
SAFETY PLAN
Rev: 1
Name
Signature
Date
CECF S 07
Rev 0
Rev Date
Project
Date & Time of incident
Location
Description of incident: (Describe in details, use additional sheets,
sketches if required)
SAFETY PLAN
Rev: 1
Witness
Submitted by
Position
Signature
Date
CECF S 09
13.4 SAFETY INDUCTION TRAINING
PROGRAMME
REV 0
REV DATE
Page 1 of 1
Project
Date of
Training
Topics
Sl No
Name of Participants
Designation
Signature
SAFETY PLAN
Rev: 1
CECF S 010
13.5 TOOL BOX TALKS PROGRAMME
REV 0
REV DATE
Page 1 of 1
Project
Date of
Training
Topics
Sl No
Name of Participants
Designation
Signature
SAFETY PLAN
Rev: 1
CECF S 08
13.6 FIRE EXTINGUISHER INSPECTION REPORT
REV 0
REV DATE
Page 1 of 1
Project
Date
Location
Inspected by
ITEM NO
MODEL/TYPE
CAPACITY
LOCATION
REMARKS&SIGN
SAFETY PLAN
Rev: 1
CECF S 013
13.7 ELECTRICAL ISOLATION PERMIT
REV 0
REV DATE
Page 1 of 1
LOCATION OF WORK:
DATE/TIME
PERFORMING AUTHORITY:
PERFORMER:
EQUIPMENT BEING WORKED ON:
NAME:
DATE/TIME
SIGNATURE:
SAFETY PLAN
Rev: 1
SIGNATURE:
PERFORMING AUTHORITY
RETURNED
TO
PERFORMER
SIGNATURE/DATE
SIGNATURE/DATE
13.8
Project Site:
Location:
Inspected By:
Inspection Date:
Job Number:
Job Title:
SAFETY ASSESSMENT
1. FIRE PREVENTION
2. HOUSE KEEPING
SAFETY PLAN
Rev: 1
3. SCAFFOLD/MOBILE TOWERS
Planking
Operator's
Hood
(Air
Air Filters (Cool Air to Hood)
Air Intake Location
Dead Man's Control
Hoses Property Grounded
Operator's
Protective
HeIper's Protective Clothing
Remote Area/Warning Signs
Condition of Air Purity
Other Comments:
6.POWER TOOLS/EQUIPT
Tool Rest
Overall Condition
Correct Grinder Disc Speed
Cable/Hose Connection
Operator's
Protective
Equipment
Shoring/Trench Box/Sloping
Spoil Clearance
Barriers/Warning Signs/Lights
Access/Egress (Ladders)
Cross Overs
Void Space Procedures
Air Test
Rescue Equipment
Other Comments:
9. GAS / ELECTRIC WELDING
8. HEAVY EQUIPMENT
10.CONCRETE FORMWORKS
SAFETY PLAN
Rev: 1
Gauges/Hoses Condition
Operator's Protective Equipment
Cable Cord: No Splice 10' of Holder
Electrode
Holder/Gnd.
Clamp
Ventilation
Approved Welding Connectors
Other Comments:
11.COMPRESSED GAS
Cylinders secured
Proper Storage(Shade/Separation)
Protective Caps In Place
Condition of Cylinders/Connections
Proper Handling
Proper Color Coding
Other Comments:
Other
Comments:
Medical Facilities/Supplies
Designated Smoking Area
Washing Facilities
Drinking Water/Cups
Toilet Facilities/Sanitation
Ventilation
Eating Facilities
Full Time Medic on Site
Ambulance Service
Other Comments:
14. TRANSPORTATION
SAFETY ASSESSMENT(CONTD)
13. AIR COMPRESSORS
Licensed Operators
Overall Operating Condition
Tires/Lights/Brakes/Signals/Et
Fire Extinguishers
Other Comments:
Correct Voltage
Ground
Fault
Interrupters
Circuit 3-Wire Ground
Receptacles/Plugs
Service Panel Fused
Overall Condition
Warning Signs
Hazardous Locations
Explosion Proof Fixtures
SAFETY PLAN
Rev: 1
Other Comments:
Other Comments:
Isolated Storage
Warning Signs
Area Locked
Lattice/Boom Damage
Labels
Two Blocked
Other Comments:
RECOMMENDED ACTION:
Project No:
PREPARED BY
QATAR
BUILDINGCONSTRUCTION
ENGINEERING COMPANY YARD
ISSUED BY
APPROVED BY
TITLE:
ENTERPRISES
SAFETY PLAN
Rev: 1
Site
Officer
Safety
Construction
Manager
DOCUMENT No.
COMMENTS:
REJECTED:
NAME:
POSITION:
DATE:
TIME:
ACCEPTANCE TO RE-START THE WORK:
NAME:
POSITION:
DATE:
TIME:
Project No
PREPARED BY
ISSUED BY
APPROVED BY
TITLE:
Site
Officer
Safety
Inspector
Construction
Manager
DOCUMENT No.
13.10
Safety
SAFETY RECOMMENDATION
Date Issued:
Date Returned:
To
PLEASE HAVE THE FOLLOWING UNSAFE CONDITIONS OR DEVIATION FROM
STANDARD PROCEDURE CORRECTED
SAFETY PLAN
Rev: 1
SAFETY DEPARTMENT
RECOMMENDATION FOLLOWED ( )
WORK COMPLETED
DATE
RECOMMENDATION REJECTED ( )
Copy of this recommendation is on file in the Safety Department. The Safety Department is instructed
to send a detailed list of all un-answered recommendations more than ten (10) days old to the
Construction Manager at the end of each period
(signed
Foreman
In
Charge
Work Activity
Labour
High
(Pouring Slab)
Level
Method
Hazards
Risks
Population
Exposed
Controls
Statutory
Controls
House
Consultation
Scaffolding/Working
Platform,
Access
equipment
inspections Head protection.
in Skin and Eyes - avoid contact, gloves, personal washing.
Feet - site is foot protection zone, safety boots to be worn
Manual handling - operative to receive kinetic handling
training.
Above to be discussed at a brief pre-work meeting with
employees
SAFETY PLAN
Rev: 1
Documentation
Implementation
Information
Instruction
Training
PPE
Monitoring
System Review
To use this generic assessment, take into account the local circumstances
to each Site/phase and tailor the assessment to local needs if and as
required. Emergency procedures, including evacuation and the provision
of First Aid, are required for the job.
RISK ASSESSMENT FORM
Work Activity
Method
Hazards
Risks
Population
Exposed
Controls Statutory
Controls In-house
Consultation
Documentation
Type of Risk
SAFETY PLAN
Rev: 1
Implementation
Information
Instruction
Training
PPE
Monitoring
Systems Review
To use this generic assessment, take into account the local circumstances
to each Site/phase and tailor the assessment to local needs if and as
required. Emergency procedures, including evacuation and the provision
of First Aid, are required for the job.