Current
Blue Book
194.3 Citations
Regulations
SFMTA home > Traffic > Construction > Blue Book > Section 10: San Francisco Police Department Officers
(SFPD)
Traffic Control by Uniformed San Francisco Police Officers assigned to work 10B Construction (referred to herein
as officers) may be required under certain circumstances, such as a Special Traffic Permit or Contract
specifications.
The Contractor shall coordinate deployment of officers with the San Francisco Police District Construction
Coordinator for the area where construction is taking place (see page 51, Appendix C). The Contractor shall make
a deposit to the SFPD in the amount of $2,000 unless otherwise specified by the SFPD. The Contractor shall pay
SFPD each invoice within 30 calendar days of the invoice date.
Search for
Traffic links:
Top
Updates
Construction
Events
Trucks & Buses
Safety
Sitewide links:
SFMTA Home
Search
sfmta.com
Site Map
Legal
About sfmta.com
Contact Us
511 Traffic
511 Rideshare
A Central Sgt. Mark Hernandez 415-327-4718 415-315-2449
The officers shall be paid a minimum of four hours per day. If the number of work hours exceeds four hours, the
officers shall be paid for one additional hour for travel time. For a twelve-hour shift, the officers shall be paid
thirteen hours per ordinance.
The Contractor shall notify the San Francisco Police District Construction Coordinator regarding the schedule and
number of officers required at least 4 calendar days in advance of the scheduled date. A Map of the Police Districts
can be found in Map 6 on page 51, Appendix C. The pager and fax numbers for the Coordinators of each Police
District is listed in the table on page 52. If you have problems contacting a coordinator, call the Public Service
Lieutenant at 415-553-7942 / cell: 415-254-1242. The minimum time to cancel is 24 hours.
Each day, Contractor shall furnish each officer a copy of the STP (if one is issued) before beginning work at the
site to ensure that the officers are familiar with the conditions on the permit. Failure to furnish all officers copies
of the permit may result in the officers canceling the job, thereby placing the contractor in violation of Traffic Code
Section 194 (see page 24, Appendix A).
SFPD reserves the right to re-assign officers to other duties, in case of emergencies. SFPD may adjust the number
of officers at a site based on site conditions.
Updates
Where to Park
Color Curbs
Enforcement
Meters
Permits
Top
SFMTA Home
Webmaster
Site Map
Legal
About sfmta.com
Contact Us
511 Traffic
511 Rideshare
Search for Parking & Traffic only entire site Find it!
San Francisco DPT is part of the SFMTA. Copyright © 2000-2009 SFMTA. All rights reserved. Updated February 27, 2009