Академический Документы
Профессиональный Документы
Культура Документы
Projects sponsors and the Congestion Management Agencies (CMAs) are responsible for the information presented in the checklists. Questions
about specific projects should be directed to the projects sponsor and the CMA.
From MTC Resolution 3765:
"CMAs will review completed project checklists and will make them available through their websites, and to their countywide Bicycle/Pedestrian
Advisory Committees (BPACs) for review and input to ensure that routine accommodation is considered at the earliest stages of project
development. The checklist outlined in Recommendation 7 should be the basis of this discussion prior to projects entering the TIP."
Project description Pavement Renovation of Bush Street, between Van Ness Avenue and
Presidio Avenue, and Euclid Avenue, betweeen Presidio Avenue and
Masonic Avenue. Work includes: pavement resurfacing, concrete base
repair, concrete sidewalk reconstruction, concrete curb reconstruction,
concrete parking strip repair, and concrete curb ramp construction.
Agency SFCTA
Other
Other
The closest bike route is 1 block away.
✔ Mid-block crossings
✔ Elderly or disabled
✔ School age children
Other
Smoother pavement and ADA compliant curb ramps.
Other The project will produce smooth pavement surfaces and ADA compliant curb
ramps that will improve bicycle and pedestian travel.
Other
The Presidio
Other
Other
Better Streets Policy
✔ Bicycle parking
✔ Sidewalks on both sides of street
✔ Widened sidewalks
✔ Frequent crosswalks
✔ Goat path
✔ Pedestrian-actuated traffic signals or routine pedestrian cycle
✔ Bicycle actuated traffic signals or routine bicyclist cycle
✔ High visibility crosswalks
✔ Pedestrian-level lighting
✔ ADA-compliant ramps
✔ Traffic signal push buttons
✔ Refuge islands on roadways
Other
Other Approved traffic control plans will be enforced to ensure access for bicycles and
pedestrians.
What agency will be responsible for ongoing The Dept. of Public Works is responsible for the maintenance of the right-of-way of
maintenance of the facility Bush Street.