AL NAFISI INDUSTRIAL BUILDINGS

ESPAC WALL PANELS


Sl no

Description

Qty

Unit

BLOCK A
150mm thick vertical pannel
600mm height lintel pannel
Vertical pannels joint filling (grouting )
Glue filling
Starter Bar

256
3
5
2690
319

m3
m3
m3
Kg
Kg

Supplying and Erecting the horrizontal slab pannel


Tie beam concrete
Tie beam form work
Tie beam steel reinforcement
Dust removing and cleaning all pannels by air pressure

8
101
1392
1710

m3
m2
Kg
m2

Rate
BHD

Amount BHD

SUPERSTRUCTURE WORKS BY ESPAC SYSTEM


supplying and Erecting the wall pannel

A
B
C
D
E

F
G
H
J
K

Supply and fixing fiber glass tape for pannel joints.

Welding point

Scaffolding

Painting

3490

m2

A
B
C
D
E

BLOCK B
150mm thick vertical pannel
600mm height lintel pannel
Vertical pannels joint filling (grouting )
Glue filling
Starter Bar

553
22
12
6240
705

m3
m3
m3
Kg
Kg

Supplying and Erecting the horrizontal slab pannel


Tie beam
Tie beam form work
Tie beam steel reinforcement
Dust removing and cleaning all pannels by air pressure

17
221
2958
4158

m3
m2
Kg
m2

F
G
H

66.000 16,896.000
105.000
315.000
32.000
160.000
0.080
215.200
0.330
105.270

35.000
5.000
0.330

280.000
505.000
459.360
171.000
711.720
80.000

5931

0.100
0.120

Nos

10.000

Item

J
K

Supply and fixing fiber glass tape for pannel joints.

Welding point

Scaffolding

2.000

6,980.000

66.000 36,498.000
105.000 2,310.000
32.000
384.000
0.080
499.200
0.330
232.650

35.000
5.000
0.330

595.000
1,105.000
976.140
415.800
1,631.520
1,080.000

13596

0.100
0.120

108

Nos

10.000

Item

1/21

3,500.000

7,500.000

AL NAFISI INDUSTRIAL BUILDINGS


ESPAC WALL PANELS
Sl no

Description

Qty

Unit

Painting

7423

m2

A
B
C
D
E

BLOCK C
150mm thick vertical pannel
600mm height lintel pannel
Vertical pannels joint filling (grouting )
Glue filling
Starter Bar

523
17
11
5730
622

m3
m3
m3
Kg
Kg

F
G
H

Supplying and Erecting the horrizontal slab pannel


Tie beam
Tie beam form work
Tie beam steel reinforcement

14
188
2436

m3
m2
Kg

Dust removing and cleaning all pannels by air pressure

3818

m2

Supply and fixing fiber glass tape for pannel joints.

Welding point

Scaffolding

Painting

Rate
BHD
Amount BHD
2.000 14,846.000

66.000 34,518.000
105.000 1,785.000
32.000
352.000
0.080
458.400
0.330
205.260

35.000
5.000
0.330

490.000
940.000
803.880

381.800
1,517.760
1,100.000

12648

0.100
0.120

110

Nos

10.000

7074

Item

7,050.000

m2

2.000 14,148.000
162,201.960

A
B
C
D
E

PROJECT 2
150mm thick vertical pannel
600mm height lintel pannel
Vertical pannels joint filling (grouting )
Glue filling
Starter Bar

282
9
6
3220
351

m3
m3
m3
Kg
Kg

F
G
H
J

Supplying and Erecting the horrizontal slab pannel


Tie beam
Tie beam form work
Tie beam steel reinforcement
Dust removing and cleaning all pannels by air pressure

9
111
1566
2087

m3
m2
Kg
m2

Supply and fixing fiber glass tape for pannel joints.

6810

Welding point

64

2/21

66.000 18,612.000
105.000
945.000
32.000
192.000
0.080
257.600
0.330
115.830

35.000
5.000
0.330

315.000
555.000
516.780

0.100
0.120

208.700
817.200

Nos

10.000

640.000

AL NAFISI INDUSTRIAL BUILDINGS


ESPAC WALL PANELS
Sl no

Description

Scaffolding

Painting

Qty

Unit

Rate
BHD

Item
3810

3/21

m2

Amount BHD
6,600.000

2.000

7,620.000

Supply and Fixing Balexco New series-100/45 with standard finish, 6mm Guardian HD Blue tempered glass, 12mm airspacer 6

W-01 (2000X2300) Powder coated Aluminum framed Double glazed sliding and fixed panels
Nos
11
300
3300

W-02 (2000X2300) Powder coated aluminum framed with double glazed sliding and fixied panels
Nos
18
300
5400

W-03 (800x2300) Powder coated aluminum framed with double glazed sliding and fixied panels.
Nos
20
120
2400

W-04 (2000X1300) Powder coated aluminum framed with double glazed sliding and fixed panels
Nos
5
170
850

W-05 (2000X1300) Powder coated aluminum framed with double glazed sliding and fixed panels
Nos
4
170
680

W-06 (800X1300)Powder coated aluminum framed with sliding panels


Nos
11
170
1870

W-07 (1200X1300) Powder coated aluminum framed with double glazed sliding and fixed panels
Nos
11
102
1122

W-08 (800X1300)Powder coated aluminum framed with double glazed awning and fixed panels
Nos
4
80
320

W-09 (800X725) Powder coated aluminum framed with double glazed awning and fixed panels
Nos
14
42
588
16530

11000

5530

empered glass, 12mm airspacer 6mm clear tempered glass.

11

300

3300

18

300

5400

20

120

2400

170

850

170

680

11

170

1870

11

102

1122

80

320

14

42

588

Total Built Up Area Sqm 1439.000


1.0 EARTH WORKS
item
A Earth Excavation works
2.0 Filling and Compacting works
A
Filling 150mm and 300mm armour stone mixed with desert
fill in excavated area and well compacitng
B
400mm thick B'Class fill with well compacting works first
layer.
C
Backfilling B'class fill with well compacting up the grade slab
(Second Layer)
D 50mm thick crusher fine filling Sqm 506.000
E Anti treatment in excavated area Sqm 1035.000
F Moisture Protections
1000 Guage polythene sheet laying on footing Sqm 1310.000
Two coats of Bitumen primer Sqm 640.000
3.0 SUBSTRUCTURAL WORKS
50mm thick Blinding concrete for footing and Ground Beam

Isolated Footing concrete works Cum 60.000


Ground Beam Concrete works Cum 35.000
100mm thick Bed concrete works with B.R.C A252 Sqm 506.000
Lift wall concrete works upt to Ground level Cum 3.000
Two Layer Infilled Block Works Sqm 127.600
200mm wide DPC Provision RM 319.000
Supply and fixing 12mm thick flexel board. item
4.0 SUPERSTRUCTURAL WORKS
Coloumn Concrete works Cum 51.000
Beam Concrete Works Cum 122.000

Cast in Situ Slab Concrete works Cum 23.500


Copping Concrete works (200x200) Cum 5.000
Lintel Concrete works Cum 12.000
Staircase Concrete works Cum 10.100
Lift wall infilled block works. Sqm 118.500
B Precast concrete slab
150mm thick Hollow Core slab Sqm 1285.400
50mm thick Concrete screeding on top of the HCS Sqm 740.000
5.0 MASONRY WORKS AND WATERPROOFING WORKS
200mm thick Insulated Block works in External walls Sqm 645.000
200mm thick Normal Hollow block works in Internal wall. Sqm 1522.000
150mm thick Normal Hollow Block works in Internal wall
Internal wall Sqm 4059.000
Exrternal wall Sqm 1019.000
C ROOF WATERPROOFING WORKS
50mm thick concrete screed Sqm 510.000
35mm thick polyurathe foam insulation Sqm 510.000
Two coats of Bitumin primer coat Sqm 510.000
4mm thick membrane sheet Sqm 532.000
Aluminium Flashing 200mm thick Mtr 118.000
D Bathroom, Toilet and Wet area Water proofing woks
6.0 FINISHING WORKS
FLOOR TILES
Ground floor, first floor and roof floor bathroom, kitchen,
bed room, living, dinning and passage area.

Skirting tiles
100mm High tiles ,Proper cutting and fixing skirting tiles for

ground , first and roof floor area.

STAIRCASE
Staircase (Landing, Steps Threads and Riser with Skirting)
WALL TILES fixing by Glue.
Kitchen Wall Tiles Sqm 398.000
Bath Room Wall Tiles Sqm 871.000
B Prepare and apply 15mm thick cement and sand plaster for
walls (Unibond Admixtures)
A fixing Ceramic floor and wall tiles in required area including
groutings,joint filling and finishing etc..
A
walls
External Interlock Paving works including proper bedding
and leveling.
Interlock Paving works Sqm 284.000
B CEILING FINISHING WORKS
Gypsum suspended ceiling systems including all
supports,suspension systems and flat design and paint
finishing.
Ordinary Gypsum Boards Sqm 1124.000

C PAINT WORKS
Prepare and applying two coat of primer,two coat of wall
leveling putty and Two coats of Vinyal emulusion paints on
Internal wall.
Prepare and applying two coat of primer and two coat of
external emulusion paint on plasterd wall and required area
Ceiling paint

7.0 Aluminium Windows works


Supply and Fixing Balexco New series100/45 with standard
finish, 6mm Guardian HD Blue tempered glass, 12mm
airspacer 6mm clear tempered glass.

W01 (2000X2300) Powder coated Aluminum framed


Double glazed sliding and fixed panels
Nos 11.000
W02 (2000X2300) Powder coated aluminum framed with
double glazed sliding and fixied panels
Nos 18.000
W03 (800x2300) Powder coated aluminum framed with
double glazed sliding and fixied panels.
Nos 20.000
W04 (2000X1300) Powder coated aluminum framed with
double glazed sliding and fixed panels
Nos 5.000
W05 (2000X1300) Powder coated aluminum framed with
double glazed sliding and fixed panels
Nos 4.000
W06 (800X1300)Powder coated aluminum framed with
sliding panels
Nos 11.000
W07 (1200X1300) Powder coated aluminum framed with
double glazed sliding and fixed panels
Nos 11.000
W08 (800X1300)Powder coated aluminum framed with
double glazed awning and fixed panels
Nos 4.000

W09 (800X725) Powder coated aluminum framed with


double glazed awning and fixed panels

7.0 BOUNDARY WALL AND EXTERNAL PAVING WORKS


1 Excavation works for footings. Cum 81.000
2 Backfilling B'class fill with well compacting works Cum 40.500
3 50mm thick Blinding concrete works Cum 3.200
Footing concrete works including proper reinforcement and
shuttering works.

Ground Beam concrete works including proper


reinforcement and shuttering works
Moisture protection laying 1000 guage polythene sheet ,
applying bitumen primer and DPC Provision
7 Coloumn concrete works Cum 6.200

8 150mm thick Copping concrete works Cum 2.500


9 200mm thick Normal Hollow Block works Sqm 198.800
10 Internal and External wall plastering works Sqm 453.600
11 Internal and External Paint works Sqm 453.600
8.0 ELECTICAL INSATLLATION AND FIRE ALARM WORKS
Main Details
Supply and Fix 250A TPN MCCB with Bus Bar Nos 1.000
Supply and Fix SMP 63A TP+63ATP+63ASP MCCB,s Nos 1.000
To Boundary wall works summary BHD 0.000
Supply, install, fix. Connect and commission all wiring back
to distribution boards, termination,conduits,try, trunking
boxes, flexible conduits and wiring with final fixtures fixing
National Cable will be used for all wiring, PVC Pipes from
Interplast UAE/Comet UAE or equivalent will be used for all
piping. All switches and sockets will be Schneider PVC finish.
Panel board and DB's shall be B.S.L.I with Ge.
Breakers/M.S.L.I.L.S Breakers.
To Aluminum windows works summary BHD 0.000
Supply and Fix 63A TPN MCCB enclosure Nos 10.000
Supply and Fix TPN DB Nos 10.000
Supply in LayCable from Main MCCB to DB's (Approx:
425mtr)
Mtrs 425.000
Power Supply for Pump Point Nos 2.000
Power supply for lift point Nos 1.000
Wiring to Float Switch Nos 3.000
Supplyand Fixing Main Telephone Junction BOX Nos 1.000
Supply and Fixing Tele/TV/Antena Junction Box Nos 8.000
150mm dia Duct for EDD Cable Item 1.000
50mm dia Duct for Telephone cable entry Item 1.000
Necessary GI Trunking Item 1.000
Earthing System Item 1.000
PVC Conduit and CableLighting/Fans/Socket/AC Outlet
Wiring to Light Point Nos 435.000
Wiring to 13A socket outlet (Single) Nos 128.000
Wiring to 13A Socket outlet (Double) Nos 20.000
Wiring to Emergency light point Nos 8.000
Wiring to 13A Socket outlet (W/P) Nos 3.000
ELECTRICAL INSTALLATION WORKS CONTND.
Wiring to cooker switch socket outlet Nos 11.000
Wiring to Water Heater Point Nos 37.000
Wiring to Bell push point Nos 10.000

Wiring to Ceiling fan point Nos 11.000


Wiring to Exhaust fan point Nos 46.000
Conduiting and Draw wire for Telephone point Nos 22.000
Conduiting and Draw wire for TV antenna outlet Nos 34.000
Conduiting and Draw wire Intercom device point Nos 11.000
Wiring to 1 Phase Split AC unit Nos 53.000
Wiring to FA points Nos 1.000
Fire Alarm System Typical (Conduits only)
Wiring to Smoke Detector Nos 12.000
Wiring to Heat Detector Nos 12.000
Wiring to Break Glass Nos 4.000
Wiring to Fire Alarm Bell Nos 4.000
PVC insulated copper cable in super high impact heavy
gauge 20mm PVC conduit
9.0 PLUMBING INSTALLATION WORKS
Providing and install accessories valves,tapes,spouts, water
supply line,rain water drain line, other drainage line and
final fittings Fixing works as per the drawings.
ALL FINAL FITTINGS SUPPLIED BY CLIENT
Water Closet fixing and its distribution pipe with its related
necessary fittings and its drainage connection.
Nos 38.000
Wash Basen point fixing and its hot/cold wate pipe,flexible
pipe and plunch elbow and its drainage connection
Nos 38.000
Kitchen sink point hot/cold water piping and its drainage
connection to the nearest drain sump.
Nos 11.000
Cubical Shower tray fixing andits hot/cold waterpiping and
drainage piping room tob to nearest drain sump Nos 27.000
Floor trap point fixing with necessory piping Nos 49.000
Abulution Point Nos 38.000
Rain water outlet (including side wall grating) Nos 10.000
Water Heater fixing and outlet piping and necessaory fittings
works.
Nos 11.000
Outside Drainage fixing and connections with UPVC pipes
including all civil works. item 1.000

Supply and fixing Manhole including all pipe fittings works


Nos 10.000
PLUMBING WORKS CONTD..
Washing machine point fixing and its water pipe,flexible
pipe for drainage connection to the nearest drain sump.
Nos 11.000
Manifold brass type each bathroom and necessary fittings
for hot/cold water supply
Water Inlet connection
Water Pump Fixing works including necessory piping and
fittins works
Roof water tank fixing and fixing of interconnecting valve
and its necessory pipe works.(Supply and Fixing 650 US G
capacity Horizontaly fiber white type)
Nos 4.000
Ground tank storage tank and fixing of interconnecting valve
and its piping works(Supply and Fixing 650 US G capacity
Horizontaly fiber white type)

Pressure pump fixing and necessory fittings works Nos 1.000


External water supply line works item
A/C Drainage Nos 54.000

Priliminaries(including site office, safety fencing,traffic permission for site


access,temporary power and water connection)
BHD

ed with desert

the grade slab

427 m3

g Sqm 1310.000

Ground Beam

A252 Sqm 506.000

13 m3

HCS Sqm 740.000

al walls Sqm 645.000


nternal wall. Sqm 1522.000
48 m2

Item

om, kitchen,

1135 m2

kirting tiles for

1358 m

68 m2

sand plaster for

d area including

coat of wall
sion paints on
2794 m2
1019 m2

d required area

with standard

m2

11

framed with

18

20

framed with

framed with

11

framed with

11

14

works Cum 40.500

orcement and

7 m3

6.4 m3

Item

Sqm 453.600

CCB,s Nos 1.000

ll wiring back

ixtures fixing

be used for all


der PVC finish.

OX Nos 1.000
ox Nos 8.000

t Nos 22.000
let Nos 34.000
oint Nos 11.000

spouts, water

ith its related

e pipe,flexible

terpiping and
mp Nos 27.000

Nos 10.000
essaory fittings

UPVC pipes

Item

ttings works

10 Nos

ssary fittings

10 Nos

1 Item
1 Nos

ecting valve
ng 650 US G

4 Nos

onnecting valve

1 Nos

orks Nos 1.000

ng,traffic permission for site