A Note on Advanced Ultra Super Critical Technology - Boiler Design

Page 1 of 6

Uploaded: August 2011

A Note on Advanced Ultra Super Critical Technology - Boiler Design


(300 BAR 700 C)
Advanced USC - 800 MW
z
z
z

Boiler design is being developed to suit 300bar, 700/700C cycle.


The boiler will be of Once thru supercritical with spiral WW tubing
Design concepts of Barh-ll 660 MW and Krishnapatnam 800 MW have been used while evolving the design
Comparison of Advanced USC Vs Once thru Supercritical
Description

Advanced USC 800 MW

OTSC 800 MW

Boiler type

Conv. two Pass

Circulation

Once thru Supercritical with low load recirculation Once thru Supercritical with low load recirculation

Conv. two Pass

Layout

Side Mill Layout

Side Mill Layout


Boiler Parameters

Description

Load
HP Heater In
BMCK TMCK 60% TMCR 35% BMCR

Main Steam
Steam flow at SH Outlet t/h

2160.0 1955.5

1123.3

756.0

Pressure at SH Outlet kg/cm2 (g)

308.0

306.4

204.8

131.2

Temperature at SH Outlet C

703.0

703

703.0

703.0

Reheat Steam
Steam flow at RH Outlet t/h

1694.7 1617.1

1009.9

724.1

Pressure at HPT Outlet RH Inlet kg/cm2(g)

73.28

69.74

48.13

26.51

Temperature at HPT Outlet RH Inlet C

455.4

4476

458.4

404.3

Pressure drop allowed GRHU / RH / HRHL kg/cm2

2.75

2.61

1 82

1.02

Pressure at RH Outlet IPT Inlet kg/cm2 (g)

70.53

67.13

46.31

25.49

Temperature at RH Outlet IPT Inlat C

703.0

703.0

703.0

703.0

Feed Water C

3092

305.0

270.0

2400

Salient Design Parameters @ BMCR


Description

Unit

Advanced use 800 MW OTSC 800 MW

Boiler Parameters
Main Steam Flow

tph

2160

2600

Main Steam Pressure

kg/cm2(g)

308

255

MS/RH Steam Temp.

703/703

568/596

Feed water temp

309.2

294.2

SH Duty

MkCal/h

1178

1246

RH Duty

MkCal/h

242

291

Total

MkCal/h

1420

1537

7.6

Base

Heat Duty

% Reduction of Total Heat Duty %


Fuel Analysis Coal
Description (Source / Type)

Unit

Design Coal

Worst Coal

Proximate Analysis

(70% Indian + 30% Imported)

Indian

Fixed carbon

38.0

30.0

Volatile Matter

26.0

20.0

http://www.infraline.com//power/topical/349AdvanceUSCTBoilerDesign.aspx

10/10/2014

A Note on Advanced Ultra Super Critical Technology - Boiler Design

Moisture

Page 2 of 6

8.0

12.0
38.0

Ash

28.0

Total

100

100

HHV

Kcal/kg

4700

4100

LHV

Kcal/kg

Ash

kg/ 10 Kcal

Ultimate Analysis
Carbon

51.2

41.38

Hydrogen

3.00

2.85

Sulphur

0.40

0.50

Nitrogen

1.50

0.75

Oxygen (difference)

7.90

4.52

Moisture

8.00

12.0

Ash

28.00

38.0

Hard Grov Index

50

50

IT-Initial deformation temp

Deg C

1150

1150

ST - Softening temp H = W

Deg C

1200

HT Hemispherical temp H = W / 2

Deg C

Over 1400

1300

FT = fusion temp

Deg C

Over 1400

1400

A - S2O2

56.66

61.85

A - Al2 O3

27.46

27.36

B - Fez O3

7.60

5.18

B - CoO

1.81

1.47

B - MgO

0.96

1.00

B - Na2 O

1.20

0.71

1.94

1.84

Ash Characteristics

Ash Constituents

B - K2 O

A - Ti O2

P2 O5

1.10

0.54

SO3

0.27

0.05

Base/ Acid Ratio

0.16

Fe2 O3 / CaO Ratio

3.54

Chloride

Site Conditions
z
z
z

Ambient temperature : 27 Deg. C


Relative Humidity : 60%
Plant elevation above MSL : 351 m

Salient Features of the Boiler Proposed


z
z
z
z
z
z
z
z
z
z
z
z
z
z

Once Through sliding pressure supercritical boiler


Spiral wall evaporator
Conventional Two-pass
Radiant reheat
Balanced draft
Low load start-up system
Tilting Tangential firing system
Side mill layout, cold PA system
Two axial reaction FD fans
Two axial reaction PA fans
Two axial reaction ID fans
Two regenerative Tri-sector air heaters
Eight vertical spindle high performance bowl mills
ESP to suit outlet dust emission requirement

http://www.infraline.com//power/topical/349AdvanceUSCTBoilerDesign.aspx

10/10/2014

A Note on Advanced Ultra Super Critical Technology - Boiler Design

Page 3 of 6

Pressure Part Arrangement

SH / RH / ECO Arrangement
z
z
z

No. of SH Stages : 3 (Div. Panel + SH Platen + Finish SH)


No. of RH Stages :2 (LTRH + Finishing RH)
No. of ECO stages : 1 (Economiser)

Design Criteria
z
z
z

Control Range : 60% TMCR -100% BMCR


Flue Gas Velocity (SH / RH / ECO Sections) : 10 m/s
Excess Air : 20% @ 100% BMCR

http://www.infraline.com//power/topical/349AdvanceUSCTBoilerDesign.aspx

10/10/2014

A Note on Advanced Ultra Super Critical Technology - Boiler Design

Page 4 of 6

Furnace Heat Loadings


Description

Unit

Adv. USC 800 MW Typical 800 MW (SC)

NHI

MkCal/h

1746

1894

PA Loading

MkCal/h-m2

4.16

4.52

EPRS Loading

10s kCal/h-m2

Volumetric Loading kCal/h-m3

1.49

1.62

64577

70478

SCHEDULE OF ACTIVITIES FOR ADVANCED USC BOILER DESIGN


BOILER PARAMETERS

11/05/2011

FUEL ANALYSIS

11/05/2011

SITE CONDITIONS

11/05/2011

FURNACE SIZING

01/06/2011

THERMAL DESIGN OF SH, RH & ECONOMISER

10/06/2011

FINILISATION OF PRESSURE PART ARRANGEMENT

30/06/2011

DESIGN OF SH, RH, ECONOMISER HEADERS, INTER CONNECT PIPING

JULY 2011 TO FEB 2012

DESIGN OF SH, RH, ECONOMISER TUBING


CIRCULATION CALCULATION
SIZING OF WATERWALL HEADERS AND TUBING
SELECTION OF STARTUP SYSTEM COMPONENTS & RECIRCULATION PUMP
DESIGN VETTING BY ALSTOM OR EXTERNAL CONSULTANT TO BE SENT ON MARCH 2012
Project Status of Advanced Ultra Super Critical Boiler (300 bar and 700 C)
The following performance engineering calculations (Conceptual design) has been carried out
z

z
z
z
z

z
z
z

Furnace Sizing
{ Spiral wall height
{ Vertical Wall height
Number of stages of Superheater and Reheater
Location of Superheaters and Reheaters
Heating surface area of Superheater, Reheater in Radiation zone and in Convection zone
Preliminary heating surface arrangement data of Superheater and Reheater (Tube OD, Transverse Pitch, Longitudinal Pitch, Number of loops, Number of
element per assembly, Number of assemblies)
Soot blower location. Furnace opening requirements
Economiser area requirement.
Back pass height requirement

The final pressure part arrangement will be finalised after analysing the feasibility of using T91 materials for Water wall tubes and fins
Advanced Ultra Super Critical Technology
Test Loop for testing fire side corrosion properties of advanced materials

http://www.infraline.com//power/topical/349AdvanceUSCTBoilerDesign.aspx

10/10/2014

A Note on Advanced Ultra Super Critical Technology - Boiler Design

Page 5 of 6

Test Loop Tubing


Tube OD, mm Thickness, mm

ASME Spec,

52.0

11.50

N06617

52.0

9.50

SA 213 S304H

54.0

5.60

SA 213 T91

44.5

moo

SA 213 T91

Test Loop Headers and Pipes


Description

OD, mm Thickness, mm ASME Spec.

SH INLET UNK

159.0

30.0

SA 335 P22

SHIN LET HEADER

219.1

25.0

SA 335 P91

SH OUTLET HEADER

219.1

40.0

N06617

SH OUTLET LINK

127.0

20.0

N06617

LINK AFTER PRV

168.3

20.0

N06617

UNK FROM LTSH

127.0

20.0

SA 335 P22

UNK AFTER PRV-LTSH

127.0

8.0

SA 213 Gr B

MIXING Piece

219.1

40.0

N06617

UNK TO HRH

219.1

32.0

SA 335 P22

Schedule of Valves and Fitting


DESCRIPTION

VALVE TYPE SIZE NB/INCH OPERATION

MAX. WORKING PARAMETER

QTY No. REMARKS

Press. kg/cm2 (g) Temp Deg.C


Gate

150

164.4

555

Link from LTSH Isolation Gate

127

173.3

434

219.1

49

555

MO

49

5S5

Test Loop inlet Isolation

Link to HRH Isolation

Gate

SH Vent Valve

GLV

Test Loop PRVs

PRV

127

164.4

715

LTSH Outlet PRV

PRV

127

173.3

434

2 ton/hr Capacity

Other Equipments
Equipments

Details

Qty

Remarks

Flow Meter at SH Inlet Link OD 159 x 130 mm x mm

Flow range is 0 to 20 t/h

MTM Thermocouples

Outside Gas path - 700 deg.C

http://www.infraline.com//power/topical/349AdvanceUSCTBoilerDesign.aspx

10/10/2014

A Note on Advanced Ultra Super Critical Technology - Boiler Design

Acromat Thermocouples

20

PT

TE-TT

Header Thermocouples

Page 6 of 6

Inside Gas Path -1200 deg.C

2 nos - 540 deg.C 2 nos 700 deg.C

Project Status - Test loop for testing the Fire-side Corrosion property of Advanced Materials (Super 304 H & Inconel 617)
z
z
z

Meeting was held among IGCAR, NTPC and BHEL on 26th May 2011 at Trichy. BHEL presented on the Test loop proposed
Dadri 210 MW unit is taken as reference for implementing the Test loop (final confirmation is to be received from NTPC)
It is decided to place the test loop in the open upper furnace of 210 MW which is in Radiation zone

Project Status - Test loop for testing the Rre-side Corrosion property of Advanced Materials (Super 304H & Irtconel 617)
The following work has been carried out
z
z
z
z
z
z
z
z

The tap-off point of steam for test loop


The steam flow requirement.
Heating surface area requirement
The arrangement of test loop (00, length, Number of assemblies, Number of tubes per assembly)
Requirement of steam flow measurement, isolation Valves, Pressure Reducing valves, Mixing piece
Sizes of Critical pipes & headers
Cooling requirement of the outlet steam from the test loop
Tentative System Scheme.

The exact tap-off location will be finalised jointly by NTPC and BHEL during Site Visit.
The next course of action will be to review the test loop design, finalization of specification and material forecasting.