Вы находитесь на странице: 1из 2

ETO Check List - Metal Expansion Joint

Doc. no. F0301-01


Rev. 02 Date: 01.09.2013

Company Name

NTUA, GEOTECHNICAL DIVISION, CIVIL ENGINEERING DEPARTMENT


...................................................................................................................................................

Date

12/5/2014
. . ..................................................................................................

Contact Person

ALEXANDROS VALSAMIS
...................................................................................................................................................

Plant / Project

ENSSTRAM RESEARCH PROJECT


. . ..................................................................................................

Your Reference

DR.
...................................................................................................................................................

Time of Delivery

. . ..................................................................................................

Country

GREECE
...................................................................................................................................................

Time for Quote

. . ..................................................................................................

Item Type

. .AN1
. . . . . . . . .TYPE
. . . . . . . . . . . .EXPANSION
. . . . . . . . . . . . . . . . . . . . . . . . .JOINTS
.....................

Quantity*

. .8. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Type of Quote* Budgetary

Purchase

Bellow and operating conditions


DN*

. .100
. . . . . . (114.3mm)
.....................................................

Design pressure (BarG)

.............................

Medium* . .Natural
. . . . . . . . . . . Gas
. . . . . . . or
. . . . Oil
..............................
Min. test pressure (BarG)
Bellows

Number of cycles required


Design temperature (C)

............................................................

Design Standard* EJMA

System:*

Operating pressure (BarG)*

.............................

EN 13445

Velocity of flow (m/s)


Treatment:

EN 13480

....................................

.....................................................

EN 14917

AD 2000

Exhaust (open)

. .10
.........................

Solid particles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Medium condition: Gas

.................................................................

Material:

. .1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Pressure (closed)

Operating temperature (C)*

. .-10~40
..........................

Liquid Fluid group1): Gr. 1

External forces from system (N)


Other requirement:

Gr. 2

...............................................................

.....................................................................................

Other standards .............................................................................................

Dimensions and movements


Movements*

Axial compression dx (mm)

Lateral dy2) (mm)

Angular Ry 2) ()

Installation

....................................

. .0. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. .20
.........................................................

Neutral length (mm)

....................................................

.0. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Springrate (N/mm)

. .-. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. .0. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Springrate (N/mm)

. .-. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Springrate (N/Deg.)

................................................................

Axial extension dx 2) + (mm)


Lateral dz (mm)
Angular Rz ()

. .-. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Build-in length (mm)*

. .100~200mm
..........................................................

Position

Horizontal

Vertical

Connections and accessories*


Weld ends
Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Min. wall thickness (mm) . . . . . . . . . . . . . . . . . . . . . . . . . . Corrosion/erosion allowance (mm) . . . . . . . . . . . . . . . . . . . . . . . . . . Welding preparation . . . . . . . . . . . . . . . . . . . . . . . . .

Flange (std.) Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Flangenorm . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Fixed flange Loose flange


Flange (spec.) Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Out. diameter (mm) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . PCD (mm) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

No. holes (pcs.) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Hole diameter (mm) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Thickness (mm) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Fixed flange Loose flange

Not machined at the sealing surface
Machined at the sealing surface Ra 3.2 Ra 6.3 Ra 12.6 Other . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Minimum wall thickness (mm) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Minimum internal diameter (mm) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Sleeve
Limit rods
Tie rods Hinge Gimbal
No hardware Special . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Hardware
Insulation
Inside hardware Outside hardware No insulation Painting requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Remarks

..................................................................................................................................................................................................................................................................................

Documentation
Material certificates

EN 10204:2004 3.1

Certificate of origin

.....................................................................................................................

Welding certificates Yes

No

Welding procedures

Approval from 3 party Yes

No

If yes, describe

rd

Remarks

Yes

No

NDT-reports

Yes

No

.............................................................................................................................

. .Will
. . . . . .be
. . . . .used
. . . . . . . .for
. . . . .experimental
. . . . . . . . . . . . . . . . . . . .purposes,
. . . . . . . . . . . . . . . as
. . . . .a. . .new
. . . . . . .methodology
. . . . . . . . . . . . . . . . . . . .for
. . . . .underground
. . . . . . . . . . . . . . . . . . . .(natural
. . . . . . . . . . . .gas
. . . . . . or
. . . . oil)
. . . . . .pipelines
. . . . . . . . . . . . . .crossing
. . . . . . . . . . . . . active
. . . . . . . . . .faults.
. . . . . . . . . .During
. . . . . . . . . . .the
. . . . . experiments
. . . . . . . . . . . . . . . . . . . there
. . . . . . . . .will
. . . . . .be
. . . . no
...............

. .internal
. . . . . . . . . . . .pressure
. . . . . . . . . . . . . .and
. . . . . .the
. . . . . .pipe
. . . . . . .will
. . . . . .be
. . . . empty.
................................................................................................................................................................................................................
. .The
. . . . . . actual
. . . . . . . . . . purchase
. . . . . . . . . . . . . . .order
. . . . . . . . .may
. . . . . . .be
. . . . .up
. . . . to
. . . .16
. . . . .joints,
. . . . . . . . . depending
. . . . . . . . . . . . . . . . .on
. . . . .the
. . . . . cost.
..................................................................................................................................................................

Replacement reason

.....................................................................................................

Damage / why . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

How long in operation

.....................................................................................................

Supplier

1)

2)
*

Group 1: Explosive, flammable, very poisonous, poisonous.


Group 2: All other mediums not mentioned in group 1.
Please see drawing Bellows movements on page 2.
Required field

.....................................................................................................................................

Div. EJ. Internal Check:


Sales:
Name

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Date . . . . . . . . . . . . . . . . . . . . . . . .

Enigeering:

Name

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Date . . . . . . . . . . . . . . . . . . . . . . . .

Order release:

Name

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Date . . . . . . . . . . . . . . . . . . . . . . . .

EagleBurgmann Expansion Joint Solutions will take responsibility of products and designs made based on the supplied information. In case any important information is not shared on the data sheet
EagleBurgmann Expansion Joint Solutions refrain from liabilities caused by that fact. It is the responsibility of EBSaSe to provide all relevant information needed to design an expansion joint.
EagleBurgmann Bredan A/S Odinsvej 1 DK-6950 Ringkoebing Phone: +45 7536 1811 Fax: +45 9732 6535 sales@dk.eagleburgmann.com www.eagleburgmann-ej.com

ETO Check List - Metal Expansion Joint


Doc. no. F0301-01
Rev. 01 Date: 01.09.2013

Bellows Movements

5. Inline pressure balanced expansion joint

10. Double bellows with gimbals and weld ends

1. Single bellows with weld ends

6. Corner relieved expanison joint

11. Single bellows with flanges

2. Single bellows with weld ends and tie rods

7. Single hinged bellows

12. Single bellows with flanges and tie rods

3. Double bellows with weld ends

8. Single bellow with weld ends and gimbals

13. Double bellows with flanges

4. Double bellows with weld ends and tie rods

9. Double bellows with weld ends and hinges

14. Double bellows with flanges and tie rods

Additional comments:

Please provide us with the final axial, lateral and angular springrates of the joints.
.............................................................................................................................................................................................................................................................................

..............................................................................................................................................................................................................................................................................................................................

EagleBurgmann Expansion Joint Solutions will take responsibility of products and designs made based on the supplied information. In case any important information is not shared on the data sheet
EagleBurgmann Expansion Joint Solutions refrain from liabilities caused by that fact. It is the responsibility of EBSaSe to provide all relevant information needed to design an expansion joint.
EagleBurgmann Bredan A/S Odinsvej 1 DK-6950 Ringkoebing Phone: +45 7536 1811 Fax: +45 9732 6535 sales@dk.eagleburgmann.com www.eagleburgmann-ej.com

Вам также может понравиться