Conga Project
A3SP
Form 000.450.F2013
Date 14Oct2011
Page 1 of 3
Equipment Description:
Tag No.'s:
RFQ / P.O. Number:
Originator:
A3SP-2-1011-01-P/FAB
File Number:
=
Inspect
R =
Review
Verify
W =
ACTION TYPE:
= Hold Point
X =
O = Observation Point
INSPECTION ACTIVITY
FLUOR
I
f
f
Weld Procedures
Date:
03-Jul-2013
of
DEFINITIONS:
Witness
Assignment Date:
Assignment Page:
REQUIREMENT TYPE:
I
A. Puentes / C. Gallardo
Rev.:
COMMENTS
H
f
f
f
See item IV
f
f
f
f
f
All welds shall be 100% visually examined prior to, and after welding in accordance AWS D1.1
See item IV
See item IV
f
f
f
Refractory/Fireproofing Test
Results
Copyright 2011, Fluor Corporation. All Rights Reserved.
Form 000.450.F2013
Date 14Oct2011
Page 2 of 3
FLUOR
I
COMMENTS
H
f
f
X
X
All welds shall be 100% visually examined prior to, and after welding in accordance AWS D1.1
Acceptance Criteria AWS D1.1
f
X
X
c2
10% in Welds
f
f
f
f
VI. SUPPLEMENTAL
VERIFICATION (as reqd per
P.O. / Specifications)
Bolt, Nuts and Washers
Final Dimensional
f
f
Form 000.450.F2013
Date 14Oct2011
Page 3 of 3
SUPPLIER ACTION REQUIRED - applies to Hold and Observation columns only. Supplier is to note all 'X' marks and transfer those points
to their Inspection and Test Plans. The Fluor SQS representative will review the other action types (noted as b, c or f) with the supplier
during the Supplier Quality Alignment Meeting. These other action types are to be addressed in the Supplier's Inspection and Test Plans or
supporting Quality System.