SECTION 02100
SITE CLEARING
TABLE OF CONTENTS
1.
Description....................................................................................................................... 2
2.
GENERAL SPECIFICATIONS
02100
1 of 11
DESCRIPTION
This work consists of clearing, grubbing, removal of top soil, and removal and
disposal of all vegetation and debris within the project limits, excepting those
objects designated to remain in place or to be removed in accordance with other
sections of these Specifications.
This work also includes the preservation from injury or defacement of all
vegetation and objects designated to remain.
2.
2.1
CONSTRUCTION REQUIREMENTS
GENERAL
The Engineer will establish the limits of work and designate all trees, shrubs,
plants and other things to remain. The Contractor shall protect and preserve all
items designated to remain.
2.2
All surface objects and all trees, timber, rotten wood, stumps, roots, snags,
brush, other vegetation, rubbish, and other protruding obstructions, not
designated to remain, shall be cleared and/or grubbed, including disposal
as required. Only trees of diameter greater than 200mm measured 1.0 metre
above ground level will be paid for separately under sub-section 02100-2.
Trees and brushes smaller than this will be dealt with under Clearing and
Grubbing.
(b)
(c)
In roadway cut areas, all stumps and roots shall be removed to a depth of
not less than 50 cm below the finished subgrade level.
(d)
Clearing and grubbing of pits, channel changes, and ditches shall be made
only to the depth necessitated by the excavation within those areas.
(e)
Voids left after removal of roots shall be filled with suitable material and
compacted.
GENERAL SPECIFICATIONS
02100
2 of 11
2.3
2.4
TOPSOIL STRIPPING
(a)
(b)
In general the removal of topsoil shall include only the removal of soil
which is sufficiently fertile to encourage or sustain the growth of vegetation.
(c)
Removal of topsoil over any designated area shall be to the depth of 20cm
below the original ground and at least 30cm under the bottom of the lowest
road foundation layer. This excavated soil shall be stockpiled separately
from other excavated material.
(d)
2.5
The Contractor shall have the right to use un-saleable timber (or saleable
timber when permission is granted in writing by the appropriate
government agency or authority) for his own purposes in connection with
the Contract; always provided that he has ascertained and complied with
the requirements of the relevant government agency or authority.
(b)
(c)
All other timber, except timber to be used, and all brush, stumps, roots, logs,
and other refuse from the clearing and grubbing operation shall be disposed
of at locations provided by the Contractor.
GENERAL SPECIFICATIONS
02100
3 of 11
(d)
3.
3.1
3.2
The roadway and adjacent areas shall be left with a neat and finished
appearance. No accumulation of debris shall remain on or adjacent to the
right-of-way.
(b)
Clearing and grubbing and tree removal and protection in disposal sites,
material sites, borrow pit sites, haul roads and temporary construction areas
shall not be paid for when such sites are outside the areas designated for
clearing and grubbing. The Contractor is permitted to exercise his own
option as whether to use such disposal sites or borrow pit sites.
BASIS OF PAYMENT
The work measured as provided above shall be paid for based on the appropriate
unit price shown in the Bill of Quantity. The payment shall be full compensation
for furnishing all labour, materials, tools, equipment and incidental necessary to
do the work and for doing Site Clearing (Clearing and Grubbing including
removal and other necessary works) Removal of Existing Trees in the designated
areas and locations directed by the Engineer. Payment shall include costs for
removal and dipsosal of the resulting materials.
Name
Unit of Measurement
02100-1
square metre
02100-2
each
GENERAL SPECIFICATIONS
02100
4 of 11
SECTION 02200
DEMOLITION AND REMOVAL OF EXISTING STRUCTURES
AND OBSTRUCTIONS
TABLE OF CONTENTS
1.
Description......................................................................................................................6
1.1 Submittals.........................................................................................................................6
2.
Construction Requirements.........................................................................................7
GENERAL SPECIFICATIONS
02200
5 of 11
1.
DESCRIPTION
Demolition and Removal of Existing Structures consist of the removal, wholly
or in part, and satisfactory disposal of blocks of masonry of an individual size
greater than 1 cubic meter, of all buildings, hedges, fences, structures,
pavements regardless of their nature (asphalt, concrete, etc.), curbs, and any
other obstructions which are not designated or permitted to remain. Demolition
includes the salvage of designated materials and proper backfilling (in
accordance with specification requirements) of any and all trenches, holes and
pits resulting from demolition and removal work.
Right-of-way acquisition may not be completed in all areas at the start-up of the
construction period and the Contractor shall schedule the work associated with
this Specification Section accordingly.
Obstructions or other items that are designated for removal and disposal
elsewhere in the Contract Documents shall be dealt with in accordance with the
relevant stipulated requirements.
1.1
SUBMITTALS
The Contractor shall prepare and submit to the Engineer, for respective
approval prior to starting the work, the following:
(a)
(b)
(c)
(d)
Detailed drawings showing the areas for disposal of the material from
this item, or for stockpiling of the recovered material if it is planned to be
used for other items.
GENERAL SPECIFICATIONS
02200
6 of 11
2.
2.1
CONSTRUCTION REQUIREMENTS
GENERAL
Demolition and Removal of Existing Structures shall be executed by the
Contractor within and adjacent to roadways and on right-of-ways, as shown on
the Drawings or as directed by the Engineer.
2.2
(a)
The Engineer may instruct that materials recovered from demolition work
shall remain the property of the Employer unless specifically provided
otherwise in the Contract Documents.
(b)
(c)
(d)
(e)
(f)
In the case that the material to be removed is, in the Engineers opinion,
usable for other items, the volume of the re-usable material shall be
measured and paid only for the item for which it will be used.
(g)
GENERAL SPECIFICATIONS
02200
7 of 11
(b)
The Contractor shall arrange for the discontinuance of all utility services
that serve the building or buildings in accordance with the respective
requirements and regulations of the relevant government agencies and
utility agencies involved.
(c)
(d)
The Contractor shall keep the Engineer informed of his plans for the
performance of any work in connection with the sealing off of such
outlets in order that proper inspection may be provided at the time the
work is performed.
(e)
(f)
All debris shall be removed from basement areas and concrete floors
broken. The area shall then be filled with previous backfill material
simultaneously with the breaking of the foundation walls so that the
previous backfill material will be well integrated with the pieces of
broken concrete.
(g)
(h)
(i)
Bridges, box culverts, concrete pipes and other drainage structures in use
by traffic shall not be removed until satisfactory arrangements have been
made to accommodate traffic. Unless otherwise directed, the substructures
of existing water structures shall be removed to the extent necessary to
avoid influence on new works.
(j)
GENERAL SPECIFICATIONS
02200
8 of 11
2.3
(k)
(l)
(m)
Usable components of steel, wood and concrete bridges shall remain the
property of the Employer and when directed by the Engineer to be
salvaged, shall be carefully dismantled without damage. Steel members
shall be match marked, unless such match marking is waived by the
Engineer. All salvaged material shall be stored as requested by the
Engineer.
REMOVAL OF CURBS
(a)
(b)
GENERAL SPECIFICATIONS
02200
9 of 11
2.4
2.5
3.
3.1
(b)
3.2
BASIS OF PAYMENT
The work measured as provided above shall be paid as undermentioned. The payment shall be full compensation for furnishing
all labour, materials, tools, equipment and incidentals necessary to
do the work and for doing all the demolition in the designated
locations or areas as specified in these Specifications, including back
filling if necessary. The unit price for any work under this clause will
be deemed to include any precautions or special working methods
necessary to avoid damage to abutting material designated to remain.
Any such damage shall be rectified by the Contractor at his own
expense. All work shall be as directed by the Engineer including the
GENERAL SPECIFICATIONS
02200
10 of 11
GENERAL SPECIFICATIONS
Name
Unit of Measurement
Demolition
m3
02200
11 of 11