Вы находитесь на странице: 1из 56

ANALYSTS BRIEFING : No.

3/2013
August 22, 2013

Highlights

Q2/2013 Financial Results

EGCO Groups Overview

Highlights
Q2/2013 Financial Results
EGCO Groups Overview

Highlights

Q2/2013 Financial Results

EGCO Groups Overview

Highlights
Q2/2013 Highlights
Project Highlights
New Project Acquisition

Post Q2/2013 Highlights


Divestment of EGCO's investment in JV
Signing Power Purchase Agreement

Highlights

Q2/2013 Financial Results

EGCO Groups Overview

XPCL
Xayaburi, Laos PDR
SCOD: January 2019
NED Expansion
Lopburi
TWF

COD: May 2, 2013

Chaiyaphum
COD: July 18, 2013

Solarco
Phase 1: Suphan Buri
Phase 2-5: Nakhon Pathom
SCOD: December 2013

COD Achievement: 1 project

GIDEC
Songkhla

Under Construction: 4 projects

SCOD: January 2014

Highlights

Q2/2013 Financial Results

EGCO Groups Overview

NED Expansion
Project Description
Type: Solar Power Plant
Contracted Capacity: 8 MW

Location: Wang Ploeng, Lopburi Province


Shareholders: EGCO 33.33%, CLP 33.33%, DGA 33.33%

Project Progress
-

COD on May 2, 2013

Highlights

Q2/2013 Financial Results

EGCO Groups Overview

Theppana Wind Farm Power Project (TWF)


Project Description
Type: Wind Farm Power Plant
Contracted Capacity: 6.9 MW

Location: Watabak, Chaiyaphum Province


Shareholders: EGCO 90%, PVI Group 10%

Project Progress

COD on July 18, 2013.

Highlights

Q2/2013 Financial Results

EGCO Groups Overview

Solarco Solar Power Project (Solarco)


Project Description
Type: Solar Power Plants
Contracted Capacity: 6x9.5 MW

Location: Phase 1 - Suphan Buri Province


Phase 2-6 - Nakhon Pathom Province
Shareholders: EGCO 49%, Yanhee Solar Power 51%
Expected COD: September - December 2013
Project Progress
-

Most of PV module and main equipment were delivered to site,


construction work is ongoing.

Ending Q2/2013, the progress of work was from 36.60%


87.60%.
7

Highlights

Q2/2013 Financial Results

EGCO Groups Overview

Hat Yai Municipal Waste Power Plant (GIDEC)


Project Description
Type: Municipal Solid Waste Plant
Contracted Capacity: 6.5 MW

Location: Hat Yai, Songkhla Province


Shareholders: EGCO 50%, IEC Green Energy 50%
Expected COD : January 2014
Project Progress
-

The construction work for main equipment is ongoing.

Ending Q2/2013, the progress of work was 85%.

Highlights

Q2/2013 Financial Results

EGCO Groups Overview

Xayaburi Power Company Limited (XPCL)


Project Description
Type: Hydropower Project, Run of River
Installed Capacity: 1,285 MW

Contracted Capacity with EGAT: 1,220 MW


Contracted Capacity with EDL: 60 MW
Location: Xayaburi District, Laos PDR
Shareholder: EGCO 12.5%, CK 57.5%, Natee Synergy 25%,
PT Construction and Irrigation Co., Ltd. 5%
SCOD: January 2019
Project Progress
- The design and excavation work of the three main structures,
namely Navigation Lock, Spillway and Intermediate Block are
ongoing.
-

Ending Q2/2013, the progress of work was 10.13%.


9

Highlights

Q2/2013 Financial Results

EGCO Groups Overview

Highlights
Q2/2013 Highlights
Project Highlights
New Project Acquisition

Post Q2/2013 Highlights


Divestment of EGCO's investment in JV
Signing Power Purchase Agreement

10

Highlights

Q2/2013 Financial Results

EGCO Groups Overview

Boco Rock Wind Farm (BRWF)


Project Description
Type: Wind Farm Power Plant (Green field)
Installed Capacity: 113 MW

Turbine: Totaling 67 GE Wind Turbine Generators (WTG)


- 58 WTG x 1.7 MW
- 9 WTG x 1.6 MW
Location: New South Wales, Australia
PPA: 15 years with Energy Australia Pty Ltd.
(100% of output purchased by Energy Australia)
Shareholders: EGCO 100%
SCOD: February 2015
BRWF
Stage-1
11

Highlights

Q2/2013 Financial Results

EGCO Groups Overview

Highlights
Q2/2013 Highlights
Project Highlights
New Project Acquisition

Post Q2/2013 Highlights


Divestment of EGCO's investment in JV
Signing Power Purchase Agreement

12

Highlights

Q2/2013 Financial Results

EGCO Groups Overview

Conal Holding Corporation (Conal)


Details of Divestment

Sale all existing EGCOs share in Conal (40% of shares in Conal)

Conal holds the share in:


1)

Alto Power Management Corporation, a management company

2)

Southern Philippines Power Corporation, a 55 MW diesel power plant

3)

Western Mindanao Power Plant Corporation, a 110 MW diesel power plant

13

Highlights

Q2/2013 Financial Results

EGCO Groups Overview

Highlights
Q2/2013 Highlights
Project Highlights
New Project Acquisition

Post Q2/2013 Highlights


Divestment of EGCO's investment in JV
Signing Power Purchase Agreement

14

Highlights

Q2/2013 Financial Results

EGCO Groups Overview

New Khanom Power Plant (KN4)


Project Description
Type: Combined Cycle Power Plant

Installed Capacity: 977 MW


Contracted Capacity: 930 MW
Location: Khanom, Nakhon Si Thammarat Province

Shareholder: EGCO 100%


SCOD: June 2016

15

Highlights

Q2/2013 Financial Results

EGCO Groups Overview

Highlights
Q2/2013 Financial Results
EGCO Groups Overview

16

Highlights

Q2/2013 Financial Results

EGCO Groups Overview

Million Baht
7,000
6,000

6,100

5,000
4,000
3,000
2,000
1,000

4,310
1,790

+ 251
or
14.02%

2,041

76
1,714

57
1,984

Q2/2012

Q2/2013

Power
Generation

Others

Gain on
Combination

17

Highlights

Q2/2013 Financial Results

EGCO Groups Overview

Million Baht
9,000
8,000

7,825

7,000
6,000
5,000
4,000
3,000
2,000

4,310
3,515

+ 617
or
17.55%

4,132
116

135
3,380

4,016

1,000
0
6M 12

Power
Generation

6M 13

Others

Gain on
Combination

18

Highlights

Q2/2013 Financial Results

Million Baht
6,500
6,000
5,500
5,000

Increase in AP
KEGCO
214
Rayong
36
BLCP
(94)
GPG
(97)

Result from Acquisition


QPL
450
SPP5
46
GPS
58
TWF
(2)
NED
23
GIDEC (4)
SPP2
46
APPC (19)
SPP3
25
MME
(14)
SPP4
18
EGCO (350)

4,500

3,873

4,000

3,515
3,500

3,574
59

3,000

4,150

2,000
1,500
1,000
500

4,132

4,132

(18)
277

299

Operating Performances
BLCP
280
EGCOM Tara
5
GEC-SPP
235
Conal
(2)
QPL
162
Rayong
(2)
EGCO Cogen 150
Roi ET green (14)
NED
24
GPG
(33)
SPP3
16
KEGO
(119)
SPP4
6
NTPC
(194)
ESCO
6
EGCO
(221)

2,500

EGCO Groups Overview

Result from Deferred tax


EGCO
317
KEGCO
6
SPP3
(3)
Conal
(7)
GEC
(9)
BLCP
(71)
Rayong
(103)
QPL
(150)

0
6M 2012

6M 2013

19

Highlights

Q2/2013 Financial Results

ESCO 81 MB, 2%
KEGCO 116 MB,2%

ET 67 MB, 1%

EGCO Groups Overview

Conal 33 MB, 1%

Rayong 167 MB
3%

SOLAR 367 MB
(GPS, SPP2-5, NED)

NTPC 377 MB

BLCP 1,223 MB
8%

25%

8%

9%

SPP 414 MB(GEC,


EGCO COGEN,ROIET Green)

21%
20%

Quezon 1,022 MB
(QPL,QMS,PEPOI)

GPG(KK2) 958 MB
20
Note: Excluding EGCO, MME , APPC , GIDEC, TWF

Highlights

Q2/2013 Financial Results

Total Outstanding
As of 31 March 2013

EGCO Groups Overview

Total Outstanding
As of 30 June 2013
AUD 44 M

Total Outstanding
(Baht Equivalent)

USD 759 M

USD 750 M

JPY 314 M

JPY 314 M

THB 12,360 M

THB 16,402 M

THB 34,470 M

THB 39,340 M
21

Highlights

EGCO Groups Overview

Q2/2013 Financial Results

EGCO + Subsidiaries

Times (X)

Unit: MB

0.8

0.73

0.70
0.66

0.7

Debt
49,619

0.6

Equity
67,555

0.5
0.39

0.4

Debt
0.28

0.3

0.28
0.23

Equity
EGCO only

0.25
0.21

0.2

Unit: MB
0.23

0.18

0.1

0.43

0.41

0.41

0.15

0.18

0.17

Debt
23,588

0.11

Equity
55,156

EGCO+Subsidiaries

EGCO only

Debt

Equity

22

Highlights

Q2/2013 Financial Results

EGCO Groups Overview

Q2/2013

Beginning Balance of Cash and Deposits at financial institutions

1,217

Net Cash Received from Operating Activities

148

Dividend received from subsidiaries JVs & Other

2,601

Net Cash Payments in Investing Activities


Investment in subsidiaries & JVs
Shareholder Loan

Others

(1,707)
(210)
(1,315)

(182)

Net Cash Payments in Financing Activities


Loans from financial institution (net)
Interest Payment
Dividend Payment
Ending Balance of Cash and Cash Deposits at financial institutions

(1,547)
405
(241)
(1,711)
713
23

Highlights

Q2/2013 Financial Results

EGCO Groups Overview

Highlights
Q2/2013 Financial Results
EGCO Groups Overview

24

Highlights

Q2/2013 Financial Results

EGCO Groups Overview

EGCO Groups Overview


EGCO Shareholders

Progress of Work
Portfolio and Corporate Strategies

25

Highlights

Q2/2013 Financial Results

EGCO Groups Overview

As of March 22, 2013


NDF*
50.11%

EGAT
25.41%
TEPCO
50%

NVDR
NVDR
10.33%
10.43%

TEPDIA
23.94%

Others
49.89%

Mitsubishi
50%

Foreign
Investors
20.88%

* Nuclear Damage Liability Facilitation Fund

Thai
Investors
19.44%

26

Highlights

Q2/2013 Financial Results

EGCO Groups Overview

EGCO Groups Overview


EGCO Shareholders

Progress of Work
Portfolio and Corporate Strategies

27

Highlights

Q2/2013 Financial Results

EGCO Groups Overview

TP Cogeneration Project (TP Cogen)


Project Description
Type: Cogeneration Power Plant
Installed Capacity: 125 MW

Contracted Capacity with EGAT : 90 MW


Contracted Capacity with IUs: 20 MW with 50 T/Hr of steam
Location: Ban Pong, Ratchaburi Province
Shareholder: EGCO 100%
SCOD: June 2016
Project Progress
- In process of EIA study for power plant and natural gas pipeline,
EPC Selection, PPA & SPA negotiation with customer and
conceptual design for natural gas pipeline.
- Other necessary project development activities are ongoing.
28

Highlights

Q2/2013 Financial Results

EGCO Groups Overview

SK Cogeneration Project (SK Cogen)


Project Description
Type: Cogeneration Power Plant
Installed Capacity: 125 MW

Contracted Capacity with EGAT : 90 MW


Contracted Capacity with IUs: 20 MW with 50 T/Hr of steam
Location: Ban Pong, Ratchaburi Province
Shareholder: EGCO 100%
SCOD: June 2016
Project Progress
- In process of EIA study for power plant and natural gas pipeline,
EPC Selection, PPA & SPA negotiation with customer and
conceptual design for natural gas pipeline.
- Other necessary project development activities are ongoing.
29

Highlights

Q2/2013 Financial Results

EGCO Groups Overview

TJ Cogeneration Project (TJ Cogen)


Project Description
Type: Cogeneration Power Plant
Installed Capacity: 125 MW

Contracted Capacity with EGAT: 90 MW


Contracted Capacity with IUs: 16 MW with 10T/Hr of steam
Location: Klongluang, Pathum Thani Province
Shareholder: EGCO 100%
SCOD: June 2017
Project Progress
-

In process of EIA study for power plant and natural gas pipeline,
EPC Selection and conceptual design for natural gas pipeline.

Other necessary project development activities are ongoing.


30

Highlights

Q2/2013 Financial Results

EGCO Groups Overview

Quezon Expansion Project


Project Description
Type: Coal Fired Power Plant
Installed Capacity: 500 MW

Location: Quezon Province, The Philippines


Shareholders: EGCO and MPG Corp
Expected COD: Q1/2018
Project Progress
- Development and investment terms are under negotiation.

31

Highlights

Q2/2013 Financial Results

EGCO Groups Overview

EGCO Groups Overview


EGCO Shareholders

Progress of Work
Portfolio and Corporate Strategies

32

Highlights

Q2/2013 Financial Results

EGCO Groups Overview

Currently, EGCO Groups portfolio comprises of 19 operating power plants, totaling contracted
capacity 4,510.32 MWe.
Power Plant

Contracted Cap.
(MW)

MW Equity

IPPs

Power Plant

Contracted Cap.
(MW)

MW Equity

Renewable

Rayong

1,174.99

1,174.99

NED

63.00

21.00

KEGCO

748.00

748.00

SPP2

8.00

8.00

GPG (Khaeng Khoi 2)

1,468.00

734.00

SPP3

8.00

8.00

BLCP

1,346.50

673.25

SPP4

6.00

6.00

3,330.24

SPP5

8.00

8.00

26.00

15.60

6.90

6.21

SPPs

GPS (Phase 1-4)

EGCO COGEN

110.85

88.68

ROI-ET GREEN

8.80

6.19

GEC-GCC

107.00

53.50

GEC-NKCC

126.00

63.00

Overseas

GEC-SCC

121.00

60.50

NTPC (Nam Theun 2)

GEC-GYG

20.20

10.10

QUEZON

281.97

TWF

72.81

1,070.00

374.50

460.00

450.80
825.30

33

Highlights

Q1/2013
IPPs

SPPs

Renewable

EGCO Groups Overview

Q2/2013 Financial Results

Current Portfolio
Overseas

IPPs

SPPs

Renewable

Overseas

72.81 MWe

66.60 MWe
851.70 MWe

281.97 MWe

825.30 MWe

281.97 MWe
3,330.24 MWe

Total 4,530.51 MWe

3,330.24 MWe

Total 4,510.32 MWe

Remark: Increase in Renewable portion from TWF; 6.21 MWe


Decrease in Oversea portion from sale of Conal; 26.4 MWe

34

Highlights

Q2/2013 Financial Results

EGCO Groups Overview

Currently, EGCO Groups portfolio consists of 5 under construction power plants, 3 under
development projects and 1 potential project, totaling contracted capacity 1,754.18 MWe.
Power Plant

Contracted Cap.
(MW)

MW Equity

Under Construction

Contracted Cap.
(MW)

MW Equity

500.00

250.00

Potential Project

Solarco

57.00

27.93

GIDEC

6.50

3.25

BRWF

113.00

113.00

New Khanom Power


Plant

930.00

930.00

1,280.00

160.00

XPCL

Power Plant

1,234.18

Under Development
TJ Cogeneration

90.00

90.00

TP Cogeneration

90.00

90.00

SK Cogeneration

90.00

90.00
270.00

Quezon Expansion
Project

250.00

Consequently, EGCO Groups


portfolio will become
6,264.50 MWe.
35

Highlights

EGCO Groups Overview

Q2/2013 Financial Results

Q1/2013
Under Construction

Current Portfolio

Under Development

Under Construction

Under Development

Potential Project

Potential Project

197.39 MWe

270 MWe
1,150 MWe

Total 1,617.39 MWe

250 MWe

270 MWe

1,234.18 MWe

Total 1,754.18 MWe

Remark: Increased in Under Construction portion from KN4 and BRWF; 930 MWe and 113 MWe respectively

36

Highlights

Q1/2013
IPPs
Renewable
Under Construction
Potential Project

EGCO Groups Overview

Q2/2013 Financial Results

SPPs
Overseas
Under Development

Current Portfolio
IPPs
Renewable
Under Construction
Potential Project

SPPs
Overseas
Under Development

250 MWe
270 MWe

1,150 MWe

270 MWe
197.39 MWe

1,234.18 MWe
3,330.24 MWe

851.70
MWe

66.60 MWe
281.97 MWe

Total 6,147.90 MWe

3,330.24 MWe
851.70
MWe

72.81 MWe
281.97 MWe

Total 6,264.50 MWe

37

Highlights

Q2/2013 Financial Results

EGCO Groups Overview

EGCO Groups other business portfolio comprises of 5 companies:

Company

Business Type

EGCO Engineering and Service Co., Ltd. (ESCO)

O&M

Eastern Water Resources Development and Management Plc. (EASTW)

Water

Egcom Tara Co., Ltd. (Egcom Tara)

Water

Absolute Power P Co., Ltd. (APPC)

Bio Diesel

Manambang Muara Enim Co., Ltd. (MME)

Coal Mining

38

Projects in pipeline
Under Construction Projects

Solarco

Under Development Projects

Potential Projects

GIDEC

New Khanom
Power Plant
BRWF

TP Cogeneration
SK Cogeneration

TJ Cogeneration

Quezon
Expansion
Xayaburi
Hydro Power

2013

2014

2015

2016

2017

2018

2019

2020
39

Highlights

Q2/2013 Financial Results

EGCO Groups Overview

Operate power plant portfolio to achieve optimum efficiency

Manage projects under construction to achieve on


time/on budget completion

Secure new investment opportunities in Thailand and Asia


Pacific Region
40

Q&A

41

THANK YOU

42

43

EGCO Groups Overview

Q2/2013 Financial Results

As of June 2013, Thailands Power Installed Capacity was 33,141.02 MW.


7.3%

EGAT

15,010.13

MW

IPP

12,741.69

MW

9.0%

45.3%

SPP

2,984.60

MW

IMPORT

2,404.60

MW

33,141.02

MW

Total

38.4%

EGAT

IPP

SPP

IMPORT

44

EGCO Groups Overview

Q2/2013 Financial Results

Natural Gas is the primary source of fuel for Thailands Power Generation.
2.8%

13.7%

NATURAL GAS

22,102.19

MW

HYDRO

5,540.78

MW

COAL

4,556.00

MW

16.7%
66.7%

OTHERS*
Total

942.05

MW

33,141.02

MW

* OTHERS = Fuel Oil, Diesel, Renewable

NATURAL GAS

HYDRO

COAL

OTHERS*

45

EGCO Groups Overview


30,000

26,121.10 MW
(April 26, 2012)

Q2/2013 Financial Results

26,598.14 MW
(May 16, 2013)

+ 1.8%
23,900.21 MW
(May 24, 2011)

25,000

20,000

15,000

2008

2009

2010

2011

2012

2013

46

Key Financial Data:


FX Variance MD&A
EGCO Groups Overview
EGCO
Rayong Power Plant
KEGCO
EGCO Cogen
Roi-Et Green
ESCO
ET
PEPOI
Quezon
QMS
SPP2
SPP3
SPP4
SPP5
TWF
YEH
Total Subs FX
BLCP
GPG
GEC(GCC, NKCC, SCC, GYG)
CONAL
NTPC
NED
GPS
APPC
GIDEC
MME
Total JVEs FX
Grand Total

Q2/2013 Financial Results


Q2/2012
(40.00)
(0.04)
0.00
(6.80)
(8.10)
(3.00)
(0.35)
94.33
(0.85)
(0.20)
0.33
0.67
35.99
510.48
(87.25)
(27.63)
1.01
176.87
(0.03)
573.46
609.44

Q2/2013
(680.29)
0.01
(8.19)
(0.85)
10.48
1.43
(11.13)
0.45
(2.01)
0.22
(4.01)
(17.78)
(711.68)
377.18
(124.09)
(36.38)
0.38
288.50
0.00
0.02
505.63
(206.05)

+/(640.29)
0.04
0.01
(1.40)
7.25
13.48
1.78
(105.46)
1.30
(1.81)
(0.33)
(0.67)
0.22
(4.01)
(17.78)
(747.67)
(133.30)
(36.84)
(8.75)
(0.63)
111.64
0.03
0.02
(67.83)
(815.50)

47

Key Financial Data:


Financial Ratio Highlights
EGCO Groups Overview

Q2/2013 Financial Results

6M/2012

6M/2013

Debt to Equity (Time)

0.56

0.73

Net Debt to Equity (Time)

0.42

0.74

7,783.23

4,123.66

EPS (Baht)

6.94

7.68

Operating Cash Flow / share (Baht)

1.38

3.24

125.44

126.81

Net Profit before FX* (Million Baht)

BV / share (Baht)

* FX gains/losses from Income Statements including financial cost from foreign currency loans (EGCO & Subs) and JVs

48

Key Financial Data:


Segmental Operating Results, Ended June 30, 2013
EGCO Groups Overview

6M2013

Q2/2013 Financial Results

Subsidiaries

Joint Ventures

Power Generation

Power Generation

Subsidiaries

Joint
Ventures

Others

Others

Holding

Rayong
EGCO
power KEGCO
Cogen
plant

EGCO

Sales of Electricity

- 1,110 1,079 1,244

- Capacity Payment

- 1,051 1,046

- Energy Payment

61

Sales of Water

Service Income

Cost of Sales

761

Cost of Services

Gross Profit

350

EBITDA

(643)

EBIT

Roi-Et
Green

SPP4

SPP3

YEH

SPP2

SPP5

TWF

QPL

BLCP

GCC,
NKCC,
SCC,
GYG

GPG

NED

Total
Power
generation

CONAL NTPC

GPS

APPC GIDEC

ESCO

ET

PEPOI

QMS

Total
Other
businesses

Grand
Total

MME

- 4,796

8,509

8,509

2,176

2,176

- 4,796

6,334

6,334

153

153

153

364

169

40

573

574

- 2,814

5,563

44

44

5,607

249

116

31

396

396

- 1,981

2,948

115

109

53

286

3,234

19

93

88

(1) 2,293 2,093 1,515

503

215

161 1,054

139

(15)

(3)

9,465

107

97

40

(14)

238

9,704

72

19

73

70

(1) 1,883 1,567 1,132

366

167

78

795

100

(15)

(3)

6,391

95

89

40

(14)

219

6,610

35

45

47

45

(3)

984 1,223

958

299

119

33

376

73

(19)

(4)

3,958

81

67

31

(13)

174

4,132

35

45

(10)

47

45

(7)

962 1,287

939

292

119

34

459

73

(19)

(4)

3,870

80

67

32

(13)

49
174

4,044

167

23

29

31

30

59

20

32 1,186

147

23

29

31

30

679 1,131

81

19

25

27

26

399

113

87

830

739

148

75

70

91

(667)

278

278

79

66

55

Net Profit before FX

(658)

167

115

63

54

Net Profit

(837)

167

115

62

65

Key Financial Data:


Segmental Operating Results, Ended June 30, 2012
EGCO Groups Overview

6M2012

Q2/2013 Financial Results

Subsidiaries

Joint Ventures

Power Generation

Power Generation

Holding

Rayong
EGCO
power KEGCO
Cogen
plant

EGCO

Roi-Et
Green

SPP4

SPP3

YEH

SPP2

SPP5

TWF

QPL

BLCP

GCC,
NKCC,
SCC,
GYG

GPG

NED

CONAL

Total
Power
generation

NTPC

GPS

APPC GIDEC

Others

ESCO

ET

Total
Other
businesses

Others

PEPOI

QMS

Grand
Total

MME

Sales of Electricity

- 1,090

863

711

191

58

60

14

- 3,226

6,213

6,213

- Capacity Payment

- 1,015

833

36

26

1,910

1,910

- Energy Payment

75

31

675

165

58

60

14

- 3,226

4,303

4,303

Sales of Water

144

144

144

Service Income

355

164

523

523

Cost of Sales

760

714

787

81

18

19

- 1,955

4,340

4,340

Cost of Services

240

41

110

393

393

Gross Profit

329

150

(77)

110

40

41

10

- 1,270

1,873

115

103

54

274

2,147

EBITDA

4,192

801

487

94

46

43

(15)

11

795 1,925 1,739

270

146

167 1,266

50

12,027

95

96

40

232

12,259

EBIT

4,166

243

24

(64)

84

30

26

(15)

11

597 1,411 1,293

134

112

80 1,051

35

9,218

85

85

40

211

9,429

Net Profit before FX

3,927

235

14

(87)

68

11

(15)

530 1,109 1,087

72

72

41

570

7,660

74

62

30

168

7,828

Net Profit

3,966

235

14

(87)

72

12

(15)

628 1,262 1,077

71

72

44

620

14

7,994

71

61

30

(0)

50
162

8,157

Operating Performance (IPPs) :


Annual Net Generation & Electricity Sales for the Year 2008-2012
Net Generation
10,848
5,770

10,770
5,311

4,004

6,361

5,816
2,127

4,976

8,813

10,617

NT2

9,857

10,036

KK II

4,783

5,643

2,952

BLCP

9,329

10,018

KEGCO

5,000

2,249

10,000

5,577

15,000

8,960

10,175

REGCO

5,476

GWh

2008

2009

2010

2011

2012

29,649
8,107

18,505
1,762

2,167

7,672

2,170

2,258

6,317

2,788

2,535
-

2,319

3,722
-

3,212

10,000

3,894

20,000

22,655

17,868

22,750

17,706

22,506

30,000

17,909

20,255

MM Baht

20,741

Electricity Sales

2008

2009

2010

2011

2012

EGAT is the sole offtaker for electricity produced by Rayong Power Plant and KEGCO under long term cost-plus based Power Purchase Agreements (PPAs).
REGCO and KEGCO receive the capacity payment (Rayong Power Plant) or availability payment (KEGCO) for maintaining the availability of the power plants, regardless of whether the electric power will be supplied to EGAT or not.

51

Operating Performance (IPPs) :


Major Maintenance Expenses for the Year 2012
EGCO Groups Overview

Q2/2013 Financial Results

Million Baht
Rayong Power Plant
Quarter

Actual

Actual

Actual

Actual

Spare Parts

0.92

17.06

54.17

12.45

84.60

Service Charge

8.18

25.17

64.60

57.21

155.16

9.10

42.23

118.77

69.66

239.76

Total

Total

KEGCO
Quarter

Actual

Actual

Actual

Actual

Spare Parts

13.08

37.40

47.96

29.88

128.32

Service Charge

16.07

33.63

86.38

11.86

147.94

29.15

71.03

134.34

41.74

276.26

Total

Total

52

Operating Performance (IPPs) :


Major Maintenance Expenses for the Year 2013
EGCO Groups Overview

Q2/2013 Financial Results

Million Baht
Rayong Power Plant
Quarter

Actual

Actual

Budget

Budget

Spare Parts

10.67

2.12

13.48

0.00

26.27

Service Charge

25.74

23.12

21.49

9.51

79.86

36.41

25.24

34.97

9.51

106.13

Total

Total

KEGCO
Quarter

Actual

Actual

Budget

Budget

Spare Parts

19.09

15.93

36.85

115.37

187.23

Service Charge

21.84

33.03

37.11

71.86

163.84

40.93

48.96

73.95

187.23

351.07

Total

Total

53

Operating Performance (IPPs) :


Operating Performance Equivalent Availability Factor
EGCO Groups Overview

Q2/2013 Financial Results


2012

Rayong Power Plant


Plant Type

1Q12

2Q12

3Q12

4Q12

Target EAF (%)

Actual EAF (%)

Target EAF (%)

Actual EAF (%)

Target EAF (%)

Actual EAF (%)

Target EAF (%)

Actual EAF (%)

CCGT #1

99.00

99.95

97.14

98.78

98.91

99.98

88.16

91.57

CCGT #2

98.88

99.95

97.89

98.69

90.76

94.02

97.16

98.10

CCGT #3

98.38

99.35

79.21

90.89

98.91

93.46

97.28

96.51

CCGT #4

99.44

99.87

98.26

98.78

77.72

78.20

69.10

74.91

2013

Rayong Power Plant


Plant Type

1Q13

2Q13

3Q13

4Q13

Target EAF (%)

Actual EAF (%)

Target EAF (%)

Actual EAF (%)

Target EAF (%)

Actual EAF (%)

Target EAF (%)

Actual EAF (%)

CCGT #1

81.85

85.83

98.44

99.06

98.80

95.90

CCGT #2

99.63

99.66

97.60

98.47

82.25

96.74

CCGT #3

90.19

92.95

97.60

98.44

99.64

95.90

CCGT #4

99.49

100.00

98.31

99.10

97.87

96.65

2012

KEGCO
Plant Type

1Q12

2Q12

3Q12

4Q12

Target EAF (%)

Actual EAF (%)

Target EAF (%)

Actual EAF (%)

Target EAF (%)

Actual EAF (%)

Target EAF (%)

Barge #1

93.00

88.94

89.27

Actual EAF (%)


-

Barge #2

91.00

98.76

91.00

99.75

91.00

89.78

90.39

99.69

CCGT #3

81.82

86.77

88.60

74.60

88.60

94.40

86.60

93.91

2013

KEGCO
1Q13

2Q13

3Q13

4Q13

Plant Type
Target EAF (%)

Actual EAF (%)

Target EAF (%)

Actual EAF (%)

Target EAF (%)

Actual EAF (%)

Target EAF (%)

Actual EAF (%)

Barge #1

Barge #2

94.00

99.51

63.01

66.83

78.67

92.90

CCGT #3

79.87

87.31

80.53

86.88

91.66

66.22

Operating Performance (IPPs) :


Net Generation and Fuel Consumption
EGCO Groups Overview

Q2/2013 Financial Results

Rayong Power Plant


CCGT #1- 4

2012
1Q12

2Q12

2013
3Q12

4Q12

1Q13

2Q13

Net Generation
- By Natural Gas (GWh)

1,138

- By Secondary Fuel (GWh)

0.160

1,101
-

1,044
-

722
-

979

1,146

0.170

Fuel Consumption
- By Natural Gas (MMBTU)
- By Secondary Fuel (Million Litre)

9,823,707
0.040

9,515,501

6,287,046

8,432,352

9,904,901

0.040

KEGCO
Barge # 2

9,025,465

2012
1Q12

2Q12

2013
3Q12

4Q12

1Q13

2Q13

Net Generation
- By Natural Gas (GWh)

141

- By Secondary Fuel (GWh)

145

131

146

142

98

1,676,533

1,875,388

1,791,289

1,286,936

Fuel Consumption
- By Natural Gas (MMBTU)

1,775,680

- By Secondary Fuel (Million Litre)

CCGT # 3

1Q12

1,850,363
-

2Q12

3Q12

4Q12

1Q13

2Q13

Net Generation
- By Natural Gas (GWh)
- By Secondary Fuel (GWh)

1,192
-

983
-

1,284
-

1,290
-

1,162

1,181

9,571,503

Fuel Consumption
- By Natural Gas (MMBTU)
- By Secondary Fuel (Million Litre)

9,604,779

10,842,732

10,335,010

10,286,267

9,404,137

0.005

0.017

0.004

0.012

55

0.01

For further information, Please contact


Investor Relations at Tel. 02-998-5147-8
or E-mail: ir@egco.com

56

Вам также может понравиться