Food and Drug Administration Consolidation

White Oak, MD

design collaboration documentation construction

THE CAMPUS

The Food and Drug Administration consists of approximately seven thousand employees spread
throughout forty buildings in eighteen
separate locations around the Washington, DC metropolitan area. A new
state-of-the-art campus currently underway in White Oak, Maryland, will
consolidate most of the organizations
employees into one location and will
better serve the agencys needs from
an efficiency, space utilization, workflow and knowledge-sharing basis.

COGENERATION
PLANT

SOUTHEAST
PARKING
GARAGE,
1730 CARS

LOGISTICS
BUILDING

TRUCK
SCREENING
AREA

Food and Drug Administration Consolidation

CDRH
OFFICE

CBER/CVM
OFFICE

NORTHEAST
PARKING
GARAGE,
634 CARS
LIFE SCIENCES
LABORATORY VIVARIUM

NORTH
PARKING
GARAGE,
1050 CARS

ENGINEERING/
PHYSICS
LABORATORY

CBER LAB
CBER LAB

MAIN
COMMONS

CDER OFFICE I

VISITOR
PARKING LOT,
282 CARS

CDER OFFICE II

VISITOR
SCREENING
NORTHWEST
EMPLOYEE
PARKING LOT,
450 CARS

CENTRAL SHARED USE

OC/ORA
OFFICE

BROADCAST
STUDIO

BUILDING ONE

SOUTHWEST
PARKING
GARAGE,
1400 CARS

CDER
OFFICE I
ENTRY
FORECOURT
MICHELSON
ROAD

GATE
#AMPUSPROGRAMDIAGRAM

MAHAN ROAD
9

LEGEND

The current plan calls for a 4.7 million sq-ft campus that will comprise
twenty structures to be constructed in
phases over eleven years. Included
in the plan are lab spaces, offices, a
credit union, conference areas, training spaces and cafeterias.

The Campus

CHILD CARE
CENTER

COMPLETED
UNDER CONSTRUCTION
UNDER DESIGN
FUTURE

DESIGN

collaboration documentation construction

OC/ORA

When completed, the Office of the


Commissioner/Office of Regulatory
Affairs (OC/ORA) complex will be
an essential component of the FDA
campus, housing 1258 employees in
an 82-foot-wide footprint, along with
training spaces, a credit union and a
cafeteria. The wings of the complex
are connected through two atriums
that enclose the full height of the
building between a pair of bowed
curtain walls. Each curtain wall is
equipped with horizontal sun fins that
appropriately limit or accentuate the
amount of light entering the spaces.

Phase V

Office of the Commissioner/ Office of Regulatory Affairs


Food and Drug Administration Consolidation

DESIGN

collaboration documentation construction

Advanced Massing Studies

Initial Massing Studies


Revit Building was instrumental in
the architecture of the two earlier office complexes on the FDA campus.
OC/ORA is the first structure on
the campus whose design involved
a collaboration between architects
and engineers on a BIM platform.
In addition, the software has been
configured to generate dynamic area
analyses, detailed solar studies and
renderings of the building during development to better relate the design
intent to the client.

Option # 1 is studied further

Option # 1A

MASSING

Revit offered the ability to quickly


generate and calculate both massing and floor area totals for numerous options simultaneously for the
study of massing elements. This
procedure allowed the design team
to make the most informed, efficient
decisions about which design option
would yield the best configuration.

Option # 2

Area and Program Summary - OPTION 6-6-6


Total Program

Total
Building break down
Building 1
Wing F
Total for Bld 1 and Wing F
Total Program for G,H,I
Difference from program wing GHI
Total Current G,H,I
Wing G
Wing H
Wing I
Tunnel

Grand Total

Total Gross Gross Office Gross SU


546,600
453,600
93,000

Total Gross Gross Office Gross SU Gross Tunnel Gross Bridge


93,452
78,452
15,000
94,950
74,950
20,000
188,402
153,402
35,000
358,198

300,198

58,000

(44,629)

(31,606)
331,804
139,285
107,879
84,640

58,000
18,200 1st floor only
39,800 1st and 2nd floor

402,827
139,285
126,079
124,440
13,023

591,229

485,206

93,000

Office Population Utilization Rate


1,440

315

140
238

560
315

953

315

1053

1,431

315

339

Area Schedule

K:\FDA_SU\1000General\1600Calcs\Area\FDA-OC-ORA Area and Program Summary.xls

Option # 1B

(100)

Option # 3

2006-05-30 Summary(666)

Phase V

Option # 4

Office of the Commissioner/ Office of Regulatory Affairs


Food and Drug Administration Consolidation

Option # 1C

DESIGN

collaboration documentation construction

SOLAR STUDIES

Using the tools within Revit, the design team performed solar studies on
a variety of shading devices. These
studies enabled the design team to
best select the optimum configuration to maximize energy efficiency
and limit solar glare. In this case, sun
shades were selected for the windows with the most exposure, which
limited cost to the owner as well.

6/21 12:00

6/21 13:00

6/21 14:00

6/21 15:00

6/21 16:00

Phase V

Office of the Commissioner/ Office of Regulatory Affairs


Food and Drug Administration Consolidation

DESIGN

collaboration documentation construction

MULTI-DISCIPLINE

The project is a strong example of the


collaboration that can be achieved
with Revit Building, Revit Structure
and Revit Systems. The project team
worked together to create a single,
unified model that would more accurately represent the building in its
completed state. From edge-of-slab
dimensions and duct locations to
column sizes and curtain walls, the
models that were developed were a
result of a dialogue between team
members that instigated resolution
in the initial stages of development,
rather than late in the construction
documents phase.

Interiors

Mechanical
Electrical
Plumbing

The collaboration that was achieved


through the use of Revit Building,
Structure and Systems allowed designers to focus on the problematic
areas of the building together as a
team, rather than individually.
Structure

Architecture

Phase V

Food and Drug Administration Consolidation

COLLABORATION

design

documentation construction

STRUCTURE

Revit Structure provided yet another


dimension to the evolving benefits of
BIM modeling. With the advantage
of Copy/Monitor and interference
checking, the engineers were able to
coordinate column sizes, beam sizes
and locations, slab openings, duct
runs and shear walls with the architects with minimal disruptions.

Revit Interference Checker identifies a structural column protruding through


an architectural roof

Phase V

Office of the Commissioner/ Office of Regulatory Affairs


Food and Drug Administration Consolidation

Revit structure model exported to ETABS for structural analysis

COLLABORATION

design

documentation construction

JOINT
SEALANT

JOINT
SEALANT

WINDOW
ANCHOR

48

SF2
WALL
ASSEMBLY

209

13

66

STEEL
STUD

13

B
U
I
L
D
I
N
G

40

A-522 A-410

57

51
Mahan
Road

CITY/ST./ZIP

White
Oak,
Maryland

BUILDING
NO.

MD0821

OTHER

1246

BUILDING
NO.

H21F
INTERIOR
WALL
ASSEMBLY,
2HR
RATED.

Food
and
Drug
Administration
Consolidation
Montgomery
County
Campus

CONCRETE
CURB
FDA
CDRH
Office
Building
SEE
STRUCTURAL
200307320
DRAWINGS

PROJECT

DESCRIPTION
PROJECT
NO.
GSA

PM

ISSUE
FOR
CONSTRUCTION
INTERIOR
EXPANSION
06-15-2006
JOINT
COVER,
CUSTOM
SECTION
DETAILS
COLOR,
2
HR
RATED
A-522 .DWG

SUBMISSION

level
05
128556

SUB.
DATE

GENERAL
SERVICES
ADMINISTRATION

FILE
NAME
D
R
A
W
I
N
G

FLOOR
NO.
DATE
DRAFTED: 03/31/06

DRAWN
BY

Author

CHECKED
BY

Checker

SHEET
SIZE:
914
X
1219

DISCIPLINE

SHEET
TYPE

A-522

3A
A-522

NATIONAL
CAPITAL
REGION

R14

2060
758

C
E
R
T
I
F
I
C
A
T
I
O
N

4064

1246
K
E
Y

P
L
A
N

2060

9.6

57

Food and Drug Administration Consolidation

4F
A-522

DATE

K
E
Y

P
L
A
N

CONS.
CONTR.

DESCRIPTION

CONS.
WORK
PRIME
A/E
RTKL
Associates
Inc.

SUB

A/E

LEVEL
01
112300

CONSTR.
CON.
STREET

FDA
CDRH
Office
Building
51
Mahan
Road

CITY/ST./ZIP

White
Oak,
Maryland

BUILDING
NO.

MD0821

OTHER

MW5F2
WALL
ASSEMBLY

BUILDING
NO.
Food
and
Drug
Administration
PROJECT
1:100Consolidation
TITLE
Montgomery
County
Campus

3000

MATCH
LINE

GS11P94EGC0011
MATCH
LINE

MARK

FACILITY
CODE

P
R
O
J
E
C
T

SF2
WALL
ASSEMBLY

A/E
CONC.
NO.

GRAPHIC
SCALE

9000

A-405

200

8.8
8.6

A/E
TASK
NO.

NAME
B
U
I
L
D
I
N
G

EMR
133891

1369

MATCH
LINE
MATCH
LINE

1:50

PROJECT

0
DESCRIPTION

SF2
WALL
ASSEMBLY
W/GL-06

FDA
CDRH
Office
Building

10
m

A/E
CONC.
NO. GS11P94EGC0011
PROJECT
NO.
200307320
C
O
N
T
R
A
C
T
O
R
S

LEVEL
01
112300

MATCH
LINE

R
E
V
I
S
I
O
N

N
O
T
E
S

2719

9.8

GRAPHIC
SCALE

SF2
WALL
ASSEMBLY

8G

A/E
TASK
NO.

GSA

PM

CONS.
CONTR.

8C

WALL
SECTION
@
ATRIUM

BRIDGE,
EAST

NAME

A-503

B
U
I
L
D
I
N
G

FLOOR
NO.STREET
BUILDING
NO.

8E
A-103B A
-103

LEVEL
03B

1
:
100

1
:
50

ATRIUM
LOBBY
WALL
SECTION-2

1
:
50

8E

GROUND
Ground
107931
107931

SHEET
SIZE:
914
X
1219

A-503

FACILITY
CODE

DRAWING
NO.
Food
and
Drug
Administration
PROJECT
Consolidation
DISCIPLINE
SHEET
TYPE
TITLE

PROJECT
DESCRIPTION
PROJECT
NO.

Montgomery
County
Campus

SEQUENCE

FDA
CDRH
Office
Building
200307320

GSA

PM
SUBMISSION

8D
A-410 A-100C

MD0821

BUILDING
NO.

ISSUE
FOR
CONSTRUCTION

WALL
SECTION
@
ATRIUM
EAST
SUB.
DATE

DRAWING
TITLE

design collaboration

A-410 A-100B

1
:
50

PROPERTY
OF
THE
US
GOVERNMENT.
COPYING,
DISSEMINATION,
OR
DISTRIBUTION
OF
THESE
DRAWINGS,
PLANS,
OR
SPECIFICATIONS
TO
UNAUTHORIZED
PERSONS
IS
PROHIBITED.

THIRD
FLOOR
PLAN
-
AREA
B

A-103B .DWG

FLOOR
NO.
DRAWN
BY

Author

CHECKED
BY

Checker

DRAWING
NO.

8F

06-15-2006

DOCUMENTATION
A-103B
FILE
NAME

A-410 A-100B

.DWG

White
Oak,
Maryland
DATE
DRAFTED: 11/02/05

Checker

300

OTHER

FDA
CDRH
Office
Building
51
Mahan
Road

DRAWN
BYCITY/ST./ZIP
Author
CHECKED
BY

P
R
O
J
E
C
T

SECTION
DETAIL
4
@
SAW
TOOTH
FOR
DIMENSIONS
AND

1
:
5
PROPERTY
OF
THE
US
GOVERNMENT.
COPYING,
DISSEMINATION,
OR
DISTRIBUTION
OF
THESE
DRAWINGS,
PLANS,
OR
SPECIFICATIONS
TO
UNAUTHORIZED
PERSONS
IS
PROHIBITED.
NIOTES,
SEE
8A,
THIS
SHEET

SAW
TOOTH
DETAILS

CONSTR.
CON.

150

FILE
NAME

900

GROUND
Ground
107931
107931

RTKL
Associates
Inc.

SUB

A/E

DRAWING
TITLE

150

GROUND
1 A-210 2
Ground
107931
107931

D
R
A
W
I
N
G

STEEL
FLANGE
WITH
CUTOUT
FOR
CONTINUOUS
RACEWAY

716

CONTINUOUS
UNISTRUT
RACEWAY
FOR
FLUORESCENT

300 450

8G

WALL
SECTION
@
ATRIUM
BRIDGE,
WEST

1
:
50

PLAN
NORTH
N

WALL
AMW5F2
ASSEMBLY
B
SF2
WALL
ASSEMBLY
W/GL-08
C
1/2 1
2
3m
D OH
MATCH
LINE

D
R
A
W
I
N
G

Center for Devices and Radiological Health

LEVEL
02
116364

C
E
R
T
I
F
I
C
A
T
I
O
N

758
620
668

10.6

10

MW5F2
WALL
ASSEMBLY

900

GROUND
107931

900

300

8A
A-410 A-100B

OH

MATCH
LINE

5C
A-522DESCRIPTION

DATE

11.3
11.1
11

Plans, sections and details generated using Revit


8

A/E
SUB.
DATEPRIME
06-15-2006

Ground
107931

A-503 A-804

level

03
PLAN
120428
NORTH

B
C

MATCH
LINE
MATCH
LINE

MARK

TYP.

MATCH
LINE

MATCH
LINE

R
E
V
I
S
I
O
N

N
O
T
E
S

4250
3000

OH

SUBMISSION
ISSUE
FOR
CONSTRUCTION
CONS.
WORK

254

ATRIUM
LIGHTING
FIXTURES

8A
A-522

MATCH
LINE

10.3

MW5F2
WALL
ASSEMBLY

170

3209
C 826

8E

STEEL
FRAMING
SEE
STRUCTURAL
DRAWINGS

12.1

8C A-204

SIM

A-410

IW1
ASSEMBLY

4369

OPEN
TO
BELOW

3205
B 816

G15C

2271

A-410

LEVEL
04
124492

G10C

MECHANICAL
3209

4F
A-522

ACOUSTICAL
MATERIAL

9000

2958

12.4

SF2
WALL
ASSEMBLY

G15C

G15C

8G

ASSEMBLY

S22D

S22D

Shen
Milson
&
Wilke,
Inc.

C
O
N
T
R
A
C
T
O
R
S

1100

TYP.

Rolf
Jensen
&
Associates,
Inc.
Acoustics

13

1
:
5

9000
MECH
3205

G10C

729

TYP.

CROSS
BRACE
SEE
STRUCTURAL
DRAWINGS

4064

TELE
3275

5467
G15C

184

2
BAR
PIPE
SNOW
GUARD

2B
A-660

200

G10C

1659

30
175
2

13.2

MW1X
WALL
ASSEMBLY

level

03
152
16
120428

9000

2719

75

LEVEL
01
112300

STAIR
#2

LEVEL
02
116364

S22D

2106

S22D

DN

3648

G15C

Life
Safety

FURRING
CHANEL

GWB
W/
METAL
STUD

1990

G10C

2060

4064
64

200

H21F
INTERIOR
WALL
2A
A-806
ASSEMBLY,
2HR
RATED.

3275
C 825

A-522

GWB
W/
METAL
STUD

12

1689

OPP

Geotechnical
Engineering

Schnabel
Engineering
OH
5A
Associates

LBH
Consulting
Group

4064

R.O.

H21C

104

3119
K1 816

ELEV
#4

ELEV
#3

Greenhorne
&
O'
Mara,
Inc.

Topographic
Surveying

A.
Morton
Thomas
&
Associates,
Inc.

758

176
89

2100
MECH
3119

Site/Civil/Environmental

Hanscomb
Associates,
Inc.

1246

13

2002
729

A-503
A-410
H21C

48

200
3F
A-750

Cost
Estimating

H11
HORIZONTAL
ASSEMBLY

91

4064

R.O.

748
1253

4064

200
1253
TYP.

TYP.

G15C

TYP.

RTKL
Associates,
Inc.

MW5F2
WALL
SECTION
DETAIL
6
@
SAW
TOOTH

4G

H21C

H21C

668

3F

A-750
GUTTER
L.P.

305

7
126

65

R.O.

57

130
200

G15C

78
4064

1659

48

GUTTER
H.P.
S22D

S22D

LEVEL
01
112300

8D
A-220

3648

TYP.

In
association
with

STEEL
FRAMING
SEE
STRUCTURAL
DRAWINGS

3052
K 115

OH

PUBLIC
BUILDING
SERVICE

SEQUENCE

13.5

G10C

R.O.

RO

FDA
CDRH
Office
Building

STREET

149.225
(5.875")

1
:
5

ROOF
L.P.
132620

RTKL
Associates
Inc.

CONSTR.
CON.

3550

UP

3648

WOOD
BLOCKING

3075

101

MATCH
LINE
C/B

Intermittent
Stock
Steel

O
31.75mm
Pipe
(Final
Size
T.B.D.
by
Structural
Engineer)
Steel
Flange
w/
Cutout
for
Continuous
Raceway

8F
A-523
53.975
(2.125")

32

B
-

5467

2106

25

114.300
(4.5")

INTERIOR
RAILING
SYSTEM

OH

381

Continuous
Raceway
for
Fluorescent
&
Downlight
w/
Receptacle
Outlets
(Size
of
Raceway
T.B.D.
by
Engineer)

H12
HORIZONTAL
SIM
ASSEMBLY
8G

LEVEL
02
A-211
116364

A-410

3E
A-750

INTERMITTENT
STOCK
STEEL
PIPE

SUB

A/E

DRAWING
NO.

SF2
WALL
ASSEMBLY

5C
A-522

G15C

CABLE
SEE
STRUCTURAL
DRAWINGS

A
-

ALIGN

ALIGN
48

RO

4064

2854
184.150
(7.25")

(2x)
3/8-16
MTG.
6
NUTS
PER
MTG.
BRACKET
B

A-410

5E
A-750

3100B
M 441

BRIDGE
3100

8F

4369

PAINTED
ALL
EXPOSED
SURFACES
COLOR
SELECTED
BY
ARCHITECT

63.5
(2.5")

RN

OH

3100A
M 441
8A

914

120.65 (4.75")

G10C

S22D

9100

54

ELECT
3103

G10C

S22D

CK
DE
L
871838
TA
ME

OF

ES
UL
OD

A-407
A-205 8E

0.4m

11

DRAWING
TITLE

3552

3103
B 830

M
4

8H

114.3
(4.5")

3687
B 816

1100

3648

K.6

748

G15C

5452

3648

A-804

MECH
3687

356
3539
C1 826

PARAPET
133239

8A

4064

G10C

3648

G15C

4D
A-565

1
:
5

356

MATCH
LINE
A/B

U-BOLT

0.2

64
58

OPP.
WO/
SUNSHADE

SECONDARY
SEAL

200

3683
B 830

G10C

G10C

K.3

STEEL
STUD

620

3689
C1 825

48

2821

3683

TELE
3689

G10C

MECHANICAL
3539

0.1

GS11P94EGC0011

H21F
INTERIOR
WALL
ASSEMBLY,
2HR
L
RATED.
LEVEL
04
124492
RP

6F
A-805

4F

LEVEL
02
116364G15C

A-300

STEEL
FRAMING
SEE
STRUCTURAL
12315
DRAWINGS

RM

EXPANSION
JOINT
5
@
SAW
TOOTH

A-503 A-503

5ELECT

1659

2938

4064

RO

4E

1709

G10C

SIM.

STEEL
FRAMING
SEE
STRUCTURAL
DRAWINGS

A/E
CONC.
NO.
A/E
TASK
NO.
CONS.
CONTR.
CONS.
WORK
PRIME
A/E

Elevators

5180

EXPANSION
COVER
WP5JOINT
CURTAIN
WALL
INSULATION

level

03
8D A-205
120428

305

9100

8A
A-800

3F
A-630

8E
A-710

102

5D
A-300

CONCRETE
CURB

CW1
WALL
ASSEMBLY

8C

9100

J.7J.8

TYPICAL
SLIDE
BEARING
ELEMETS
SEE
STRUCTURAL
DRAWINGS

MEN
3603

A-800

SPRINKLER
(REF
TO
FIRE
PROTECTION
DWGS.)

SF2
WALL
ASSEMBLY

WOOD
BLOCKING

EMR
133891

R.O.

1247

2854 RO

9100

130

600

INTERIOR
EXPANSION
JOINT
COVER,
CUSTOM
COLOR,
2
HR
RATED

SECTION
DETAIL
3
@
SAW
TOOTH

4E
A-800

8D

8A
A-565

3603
Y 211

MECH
GRILL

ROOF
H.P.
132823

INSULATION
DRAPE

153

WP4

STEEL
FRAMING
SEE
STRUCTURAL
DRAWINGS

STEEL
FRAMING
&
CROSS
BRACE
WOMEN
SEE
STRUCTURAL
3673
DRAWINGS

1
:
5

LEVEL
04
124492

11785

SIM.
WO/
SUNSHADE

level

03
120428

R11

2785

WP3

4200

9100

WP6

369

1078

127

105

2F
A-806

3673
Y 211

INSULATION
DRAPE

2064

9100

CW1
WALL
ASSEMBLY

3607
C 826

A-204
4C

STEEL
SUPPORT

R12

A-503 A-804

WP7
3376

EQ

430610

INTERIOR
EXPANSION
JOINT
COVER,
CUSTOM
COLOR,
2
HR
RATED

Shen
Milson
&
Wilke,
Inc.

1:5

2%
SLOPE

COMPOSITE
METAL
FACED
PANEL
COPING

6F
A-523

2754

6675

R13

4C

RL

PENTHOUSE
TOP
OF
STEEL
L.P.
137506

750

EXPANSION
JOINT
COVER

H11
HORIZONTAL
ASSEMBLY

RK

8870

2064

RH.7 RJ

3130

54

PARAPET
Rolf
Jensen
&
Associates,
Inc.
133239
Acoustics

FACILITY
CODE

MW5F2
WALL
ASSEMBLY
H

118
117

EQ

RH

LEVEL
04
124492

172

1
:
5

1
:
5A-522

4369

8A
A-523

PLAN
DETAIL
@
SAW
TOOTH
DETAIL
@
ATRIUM
LOBBY
WALL
SECTION-3
OH SECTION
4F

8F

A-522 A-410

A-503 A-106B

A-504
Life
Safety

LBH
Consulting
Group

SECONDARY
SEAL

TITLE

EXTERIOR
level
05 SPINKLER
APPLICABLE
ONLY
FOR
GROUND
AND
LEVEL
1
128556

370

Schnabel
Engineering
Associates
3D

PROPERTY
OF
THE
US
GOVERNMENT.
COPYING,
DISSEMINATION,
OR
DISTRIBUTION
OF
THESE
DRAWINGS,
PLANS,
OR
SPECIFICATIONS
TO
UNAUTHORIZED
PERSONS
IS
PROHIBITED.

11

57

RO

9000

H11
HORIZONTAL
ASSEMBLY

2G

1
:
5

MATCH
LINE
A/B

48

1
:
5
RG.5

INTERIOR

66

Geotechnical
Engineering

A.
Morton
Thomas
&
Associates,
Inc.
Elevators

PROJECT

METAL
PANEL
TRIM

200

3000

RG

1253

400

EXPANSION
JOINT
3
@
SAW
TOOTH
8C
SECTION
DETAIL
@
TYP.LOBBY
INT.WALL-5

A-503 A-410

level
05
128556

153

2D

1
:
5

4064

A-522 A-410

D
330

200

3048

1078

PLAN
DETAIL
8A
SECTION
DETAIL
@
TYP.LOBBY
INT.WALL-3
8A/A-566

level
05
128556
SEE

RCPS

1369

Greenhorne
&
O'
Mara,
Inc.

Topographic
Surveying

758

13

A-503
Site/Civil/Environmental

Cost
Estimating

DESCRIPTION

DATE

NAME

SF2
WALL
ASSEMBLY

729

ALIGN
S3
CEILING/SOFFIT
ASSEMBLY

RTKL
Associates,
Inc. 4G Opp

2060

406

2002

2731

4064

ANGLE
FRAMES
GWB
W/
METAL
STUD

75

INSULATION
DRAPE

R.O.

ROOF
L.P.
132620

H21F
INTERIOR
WALL
ASSEMBLY,
2HR
RATED.

EXPANSION
JOINT

57

2754

EXANSION
JOINT

MW5F2
WALL
ASSEMBLY
152

2854

STEEL
STUD

In
association
with

Hanscomb
Associates,
Inc.

MATCH
LINE

FIRESTOPPING

ROOF
L.P.
W2A
WALL
ASSEMBLY
132620
25
H21F
INTERIOR
WALL
ASSEMBLY,
2HR
STEEL
STUD 235
mm
RATED.

203

RO

MECH
GRILL

SECTION
DETAIL
2D/A-503

MATCH
LINE
MATCH
LINE

1246

803

STRUCT.
STEEL
ROOF
H.P.
(MC
150mm
X
17.9mm)
132823
FACE
BRICK

1426

ROOF
H.P.
132823

B
C

MATCH
LINE

4064

FLUID
APPLIED
(INVERTED)
ROOF
SYSTEM

PARAPET
STRUCT.
STEEL
133239
(200mm
X
200mm)

3F
A-523

PARAPET
ANCHOR
DEVICE
133239
ROOF
H.P.
5A
ROOF
L.P.
CONT.
MTL
ANGLE
132823
A-503 (BY
CLOSURE
132620MANUF.)

R
E
V
I
S
I
O
N

N
O
T
E
S

EMR
133891

MATCH
LINE

FIRE
SAFING

EMR
133891
ANCHOR
DEVICE

GRAPHIC
SCALE

ANGLE
FRAMES

3D
A-504

PLAN
NORTH
N

EXPANSION
JOINT
COVER
MATCH
LINE

C
O
N
T
R
A
C
T
O
R
S

PARAPET
133239
ROOF
H.P.
ROOF
L.P.
132823
132620

ANGLE
FRAMES

CONCRETE
CURB
SEE
STRUCTURAL
DRAWINGS

Phase IV

116364

MARK

FIRE
SAFING

FIRESTOPPING

FIRESTOPPING

8A

EXTERIOR
LEVEL
02

ANGLE
FRAMES

LEVEL
01
112300

STAINLESS
STEEL
FLASHING

PLAN
DETAIL
2G/A-503

A-503

Opp

WOOD
BLOCKING

SECTION
DETAIL
5A/A-503

PARAPET
133239

C
-

4G
A-503

JOINT
SEALANT

48

95

level

03
120428

GENERAL
SERVICES
ADMINISTRATION
PUBLIC
BUILDING
SERVICE
NATIONAL
CAPITAL
REGION

P
R
O
J
E
C
T

H12
HORIZONTAL
ASSEMBLY

SECTION
DETAIL
5D/A-503

SECONDARY
SEAL

EXTERIOR

SF2
WALL
ASSEMBLY

EXPANSION
JOINT
COVER

PARAPET
133239

EMR
133891

FURRING
CHANEL

DRIP
EDGE

2D
H21F
INTERIOR
WALL
ASSEMBLY,
A-503 2HR
RATED.

TOP
OF
CURTAIN
WALL

METAL
PANEL
SILL

13
32

416

184

STEEL
STUD

CONT.
MTL
ANGLE
CLOSURE
(BY
MANUF.)

209

130

32

WOOD
BLOCKING

1
:
5

SF2
WALL
ASSEMBLY

48

JOINT
SEALANT

114

EXPANSION
JOINT
COVER

EXPANSION
JOINT
COVER

EXPANSION
JOINT
4
@
SAW
TOOTH

66

400

1
:
5

66

FLEXIBLE
WATERPROOF
MEMBRANE
CLOSURE

5A

401
370

A-503

A-503 A-503

J
H

SECTION
DETAIL
@
TYP.LOBBY
INT.WALL-4

A-522 A-410

EXPANSION
JOINT
-
3D

153

1
:
5

212

C
E
R
T
I
F
I
C
A
T
I
O
N

5C

1
:
5

A-503

64

114

K
E
Y

P
L
A
N

SECTION
DETAIL
@
TYP.LOBBY
INT.WALL-2

4E

SECTION
DETAIL
@
ATRIUM
LOBBY
WALL
SECTION-1

SECTION
DETAIL
3E/A-505

2A

48

MATCH
LINE
C/B

5A
A-522 A-410

EXPANSION
JOINT

SECTION
DETAIL
3G/A-504

4F
A-522 A-410

SF2
WALL
ASSEMBLY
66

Currently under construction, the


Center for Devices and Radiologi- 5
1
cal Health (CDRH) will house 1277
employees and support spaces in a
six-story, 62-foot-wide footprint. One
6
dominant design strategy incorpo-3
rates a saw-tooth skylight over the
interior 2 atrium in order to enhance
the lighting of the interior space. Out- 7
side, a network of paths and courtyards unites the building with the
other structures on the campus.
Following CDER 2 and the North Ga-4
rage, the CDRH Office Building became the third complex on the FDA
campus to achieve a complete set
of bidding documents utilizing Revit
4
Building.
The design team incorporated the lessons learned from previous projects to increase efficiency,5
precision and productivity.

FIRE
SAFING

H21F
INTERIOR
WALL
ASSEMBLY,
2HR
RATED.

32

2814

CDRH

184

57

32

4064

280

JOINT
SEALANT

DATE
DRAFTED: 09/07/05

A-410 A-100B

SHEET
SIZE:
914
X
1219

construction

DISCIPLINE

SHEET
TYPE

SEQUENCE

PROPERTY
OF
THE
US
GOVERNMENT.
C

150

225

EXPANSION
JOINT

Life
Safety

LBH
Consulting
Group

Rolf
Jensen
&
Associates,
Inc.
Acoustics

NO.
4
STAINLESS
STEEL
FINISH
(BRUSHED)
,
6
mm
THICK.

930
R

R
630

27

13
215

NO.
4
STAINLESS
4
STEEL
FINISH
A-819
(BRUSHED)
ON
MDF
SUBSTRATE

ST-3

R
14
60

GROUND
107931

28

SECTION
DETAIL
3E/A-505

STRUCT.
STEEL
(76mm
X
76mm)

1080

5
A-819 A-810

CONCIERGE
DESK
EAST
ELEV.

1
:
10

100

MEDIUM
DENSITY
FIBER
BOARD
(MDF)
0
,PAINTED
12

3
SECTION
DETAIL
3G/A-504

GROUND
107931

CONCIERGE
Isometric

100

STRUCT.
STEEL
(76mm
X
76mm)

A-819 A-810

CONCIERGE
DESK
WEST
ELV.

1
:
10

MATCH
LINE

225

MARK

100

WD-01
ON
MDF
SUBSTRATE

ST-3

BRIDGE
CDRH
LAB

1080
865

765

865

WD-01
ON
MDF
SUBSTRATE

NO.
4
STAINLESS
STEEL
FINISH
(BRUSHED)
ON
MDF
SUBSTRATE

4E
A-540

MEDIUM
DENSITY
FIBER
BOARD
(MDF)
,PAINTED

100

BRIDGE
OC/ORA
2
CONCIERGE
DESK
2
A-819 A-819

1
:
10

TUNNEL
BULD
1

CONCIERGE
Isometric

A-819 A
-100

DESCRIPTION

PROJECT
NO.

200307320

GSA

PM
SUBMISSION

ISSUE
FOR
CONSTRUCTION

SUB.
DATE

06-15-2006

PLAN
DETAIL
8A/A-566

CONCIERGE
DESK

A-5

.DWG

A-819

FLOOR
NO.
DRAWN
BY

DATE
DRAFTED: 05/09/06

Author

CHECKED
BY

2A

Checker

SHEET
SIZE:
914
X
1219

A-819

H11
HORIZONTAL
ASSEMBLY

EXPANSION
JOINT
-
3D
SHEET
TYPE

SEQUENCE

H
4E

SECONDARY
SEAL

172

DN

BUILDING
2

TUNNEL
CDER2
TUNNEL
CDER
LAB

TUNNEL
CDER2
839
m

GS11P94EGC0011

EXPANSION
JOINT
COVER

PARAPET
133239

4C

CONCRETE
CURB
SEE
STRUCTURAL
DRAWINGS

Total
Cost

SECTIO

A-503 A-804

CONS.
CONTR.
CONS.
WORK
PRIME
A/E
SUB

A/E

INSULATION
DRAPE

RTKL
Associates
Inc.

CONSTR.
CON.
NAME

FDA
CDRH
Office
Building

STREET

51
Mahan
Road

CITY/ST./ZIP

White
Oak,
Maryland

BUILDING
NO.

TUNNEL
BULD
1

MD0821

OTHER
BUILDING
NO.

PROJECT
DESCRIPTION
PROJECT
NO.

FDA
CDRH
Office
Building
200307320

GSA

PM
SUBMISSION

ISSUE
FOR
CONSTRUCTION

SUB.
DATE

06-15-2006

FILE
NAME

CONCIERGE
DESK
A-819

.DWG

FLOOR
NO.
DRAWN
BY
CHECKED
BY

DRAWING
NO.

Author

DATE
DRAFTED: 05/09/06

Checker

SHEET
SIZE:
914
X
1219

DISCIPLINE

SHEET
TYPE

A-819

DN

CBER/CVM
OFFICE
BUILDING
71

22
m
22
m
TUNNEL
CBER
m
A-503LAB
A-503

1
:
5 530
530
m
6
TUNNEL
CDER1
1101
m
1101
m
TUNNEL
CDER2
839
mU-BOLT
839
m
A
TUNNEL
CDER
LAB 363
m
363
m
7
TUNNEL
CDRH
LAB 375
m
C
375
m
TUNNEL
CSU1
485
m
485
m
TUNNEL
CSU2
633
m
633
m
8
TUNNEL
OC/ORA
28
m
TUNNEL
OC/ORA
108
m
8A
ATRIUM
LIGHTING
136
mFIXTURES
A-503

1
:
5
TUNNEL
4483
m
5A

Food
and
Drug
Administration
Consolidation
Montgomery
County
Campus

SEQUENCE

153

2384

EXPANSION
JOINT
4
@
SAW
TOOTH

2384
2384
2384
2384
120.65 (4.75")

2384
(2x)
3/8-16
MTG.

NUTS
PER
MTG.
BRACKET
B

2384

52067
52067
1263319
1263319
2623882
2623882
2000021
2000021
865349
865349
894365
894365
1155152
1155152
1508497
1508497
67480
257321
324801
10687452

114.3
(4.5")

63.5
(2.5")

184.150
(7.25")

114.300
(4.5")

2384
A
-

Continuous
Raceway
for
Fluorescent
&
Downlight
w/
Receptacle
Outlets
(Size
of
Raceway
T.B.D.
by
Engineer)

B
-

Intermittent
Stock
Steel

O
31.75mm
Pipe
(Final
Size
T.B.D.
by
Structural
Engineer)
Steel
Flange
w/
Cutout
for
Continuous
Raceway

C
-

2384
2384

53.975
(2.125")
149.225
(5.875")

CBER
LA
BUILDINGB

72

CDER
OFFICE
EXPANSION
BUILDING
51

OC/ORA
OFFICE
BUILDING
32

TUNNEL
OC/ORA
28
m

Name

0.5m

A/E
TASK
NO.

DRAWING
TITLE

CBER
LA
BUILDIN B
G
52

CENTRAL
SHARED
USE
II

TUNNEL
CSU2
633
m

BUILDING
3

OC/ORA
OFFICE

BUILDING
31

TUNNEL
OC/ORA
108
m

CENTRAL
SHARED
USE

BUILDING
ONE

TUNNEL
OC/ORA

A/E
CONC.
NO.

0.2

ANIMAL
FACILITY
BUILDING
10

TUNNEL
BULD
1
22
m

FIRESTOPPING
0

TUNNEL
CDER
LAB
363
m

TUNNEL
CDER1
1101
m

TUNNEL
CSU1
485
m

TUNNEL
CDRH
LAB

Area
Schedule
Tunnel
Tunnel
Unit
Area
Price

5
1:10

PROJECT

DN

TUNNEL
CDER1

TUNNEL
CSU2

INSULATION
DRAPE

FDA
CDRH
Office
Building

WOOD
BLOCKING

PROPERTY
OF
THE
US
GOVERNMENT.
COPYING,
DISSEMINATION,
OR
DISTRIBUTION
OF
THESE
DRAWINGS,
PLANS,
OR
SPECIFICATIONS
TO
UNAUTHORIZED
PERSONS
IS
PROHIBITED.

TUNNEL
CBER
LAB

TUNNEL
CSU1

DESCRIPTION

EXPANSION
JOINT
COVER

MATCH
LINE

DATE

TITLE

SICS
LAB

GROUND
107931

CDER
OFFICE
BUILDING
22

BRIDGE
CSU2

PROJECT

FLEXIBLE
WATERPROOF
MEMBRANE
CLOSURE

FACILITY
CODE
DN

LIFE
SCIENCES
LAB
BUILDING
64

CDER
OFFICE
BUILDING
21

BRIDGE
CSU1
8

TUNNEL
CDRH
LAB
375
m

P
R
O
J
E
C
T

6
13
215

215

25

NO.
4
STAINLESS
STEEL
FINISH
(BRUSHED)
ON
MDF
SUBSTRATE
STRUCT.
STEEL
(76mm
X
76mm)

13

BRIDGE
CDRH

D
R
A
W
I
N
G

NO.
4
STAINLESS
STEEL
FINISH
(BRUSHED)
,
6
mm
THICK.

150

ENGINE
ERING/P
HY

510

BUILDIN
G
62

510

BRIDGE
CDER
LAB

EXANSION
JOINT
EXPANSION
JOINT

64

R
E
V
I
S
I
O
N

N
O
T
E
S
GRAPHIC
SCALE

BRIDGE
CDER1

C
O
N
T
R
A
C
T
O
R
S

3G
A-540

B
U
I
L
D
I
N
G

BRIDGE
CBER
LAB

SECTION
DETAIL
2D/A-503

MD0821

Food
and
Drug
Administration
Consolidation
Montgomery
County
Campus

A-503

4
CONCIERGE
DESK
BRIDGE
CBER
A-819 A-819

1
:
10

ST-3

White
Oak,
Maryland

BUILDING
NO.
BUILDING
NO.

GROUND
107931
NO.
4
STAINLESS
STEEL
FINISH
(BRUSHED)
ON
MDF
SUBSTRATE

4E
A-540

3E
A-540

CITY/ST./ZIP

PLAN
DETAIL
2G/A-503

OTHER

PLAN
NORTH
N

B
C

MATCH
LINE
MATCH
LINE

150

100

MATCH
LINE

MATCH
LINE

K
E
Y

P
L
A
N

755

765

1080

GROUND
107931

EDGE
OF
STAINLES
STEEL

NO.
4
STAINLESS
STEEL
FINISH
(BRUSHED)
ON
MDF
SUBSTRATE

4G
A-540

MEDIUM
DENSITY
FIBER
BOARD
(MDF)
PAINTED

51
Mahan
Road

C
E
R
T
I
F
I
C
A
T
I
O
N

38

215

STRUCT.
STEEL
(76mm
X
76mm)

OPP

STREET

DISCIPLINE

1080

NO.
4
STAINLESS
STEEL
FINISH
(BRUSHED)
,
6mm
THICK

Details can be expressed both two-dimensionally and three-dimensionally


NO.
4
STAINLESS
STEEL
FINISH
(BRUSHED)
ON
MDF
SUBSTRATE

FIRESTOPPING

FDA
CDRH
Office
Building

A-503
DRAWING
NO.
(BRUSHED)

150

325

510
ST-3

SECTION
DETAIL
5A/A-503
RTKL
Associates
Inc.

NAME

NO.
4
STAINLESS COPYING,
WD-01
PROPERTY
OF
THE
US
GOVERNMENT.
DISSEMINATION,
OR
DISTRIBUTION
OF
THESE
DRAWINGS,
PLANS,
OR
SPECIFICATIONS
TO
UNAUTHORIZED
PERSONS
IS
PROHIBITED.
STEEL
FINISH

3G
A-540

865

3
NO.
4
STAINLESS
STEEL
FINISH
(BRUSHED)
,
6mm
THICK

WD-01
ON
MDF
SUBSTRATE

CONS.
CONTR.

CONSTR.
CON.

DRAWING
TITLE

D
R
A
W
I
N
G

215

1
:
10

304

A/E
TASK
NO.

FILE
NAME

A-819 A
-100

P
R
O
J
E
C
T

CONCIERGE
DESK

H12
HORIZONTAL
ASSEMBLY

SECTION
DETAIL
5D/A-503

PRIME
A/E

PROJECT

865
A-819

0.5m

CONS.
WORK
SUB

A/E

TITLE

93

2E
A-540

0.2
GS11P94EGC0011

FACILITY
CODE

A-819 A-100B

153

25

NO.
4
STAINLESS
STEEL
FINISH
(BRUSHED)

A-819

TOP
OF
CURTAIN
WALL

1:10
A/E
CONC.
NO.

130

150

1310
R

765

400

510

52

130

Shen
Milson
&
Wilke,
Inc.

ST-3

215

EXPANSION
JOINT
COVER

3 3077

TUNNEL
CBER
LAB
530
m

13510

1
:
2000

Center for Devices and Radiological Health


In
association
with

No.

Food
and
Drug
Administration
Consolidation
Montgomery
County
Campus

GENERAL
SERVICES
ADMINISTRATION
PUBLIC
BUILDING
SEVICE

Description

DOCUMENTATION
TUNNEL
AREA
PLAN

design collaboration

Date

Project
number
Date

200307320
10-13-2005

construction
X

100

05
5:48:53
PM

Plan TUNNEL
and schedule indicating tunnel dimension and cost
1

280

Geotechnical
Engineering

Schnabel
Engineering
Associates

Elevators

3G
A-540

A-819

DESCRIPTION

Greenhorne
&
O'
Mara,
Inc.

Topographic
Surveying

A.
Morton
Thomas
&
Associates,
Inc.

GRAPHIC
SCALE

215

ST-3

C
O
N
T
R
A
C
T
O
R
S

70

NO.
4
STAINLESS
STEEL
FINISH
(BRUSHED)

ST-3

KEYBOARD
TRAY

MATCH
LINE

Site/Civil/Environmental

Hanscomb
Associates,
Inc.
WD-01

NO.
4
STAINLESS
STEEL
FINISH
(BRUSHED)

EDGE
OF
STAINLESS
STEEL

1
:
10

Food and Drug Administration Consolidation

NATIONAL
CAPITAL
REGION

12

R
800

RTKL
Associates,
Inc.

30

13

765

GENERAL
SERVICES
ADMINISTRATION
PUBLIC
BUILDING
SERVICE

In
association
with

CONCIERGE
DESK
2

Phase IV

Cost
Estimating

The schedule shown demonstrates


how each tunnel was itemized in relation to cost and area. Using similar tools, the design team controlled
quantities with information that was
constantly updated as the project
progressed.

G
9

25

NO.
4
STAINLESS
STEEL
FINISH
(BRUSHED)

During the documentation phase,


Autodesk Revit allowed the design
team to extract critical information
from the model in order to precisely
quantify materials for cost estimating. This benefit assured the owner
that the project budget would be on
budget
A-819 A-819

848

NO.
4
STAINLESS
STEEL
FINISH
(BRUSHED)
ON
MDF
SUBSTRATE

SCHEDULING

NO.
4
STAINLESS
STEEL
FINISH
(BRUSHED)
ON
MDF
SUBSTRATE

60

865

GROUND
107931

MATCH
LINE

DATE

R
E
V
I
S
I
O
N

N
O
T
E
S

4E
A-540

B
C

MATCH
LINE
MATCH
LINE

MARK

PLAN
NORTH
N

MATCH
LINE

MATCH
LINE

B
U
I
L
D
I
N
G

OPP

ST-3

4E
A-540

1
:
10

WD-01
ON
MDF
SUBSTRATE

100

510

CONCIERGE
DESK
WEST
ELV.

A-819 A-810

150

1
:
10

WD-01
ON
MDF
SUBSTRATE

STRUCT.
STEEL
(76mm
X
76mm)

MEDIUM
DENSITY
FIBER
BOARD
(MDF)
PAINTED

CONCIERGE
DESK

3E
A-540

A
K
E
Y

P
L
A
N

765

4G
A-540

100

A-819 A-819

GROUND
107931
EDGE
OF
STAINLES
STEEL

NO.
4
STAINLESS
STEEL
FINISH
(BRUSHED)
ON
MDF
SUBSTRATE

NO.
4
STAINLESS
STEEL
FINISH
(BRUSHED)
ON
MDF
SUBSTRATE

865

1080

CONSTRUCTION DOCUMENTS

When developing construction documents, the BIM model becomes


highly advantageous by providing the
6
contractor another method
of visualizing the finished product. Since each
section, elevation, reference, schedule and plan are simply views of the
same virtual model, every
element of
7
the details become seamlessly coordinated with its corresponding reference, increasing clarity in the field.

STRUCT.
STEEL
(76mm
X
76mm)

755

WD-01
ON
MDF
SUBSTRATE

100

38
215

WD-01

325

NO.
4
STAINLESS
STEEL
FINISH
(BRUSHED)
,
6mm
THICK

C
E
R
T
I
F
I
C
A
T
I
O
N

NO.
4
STAINLESS
STEEL
FINISH
(BRUSHED)

3G
A-540

510
ST-3

865

NO.
4
STAINLESS
STEEL
FINISH
(BRUSHED)
,
6mm
THICK

304

100

2E
A-540

1
:
5

PARKING GARAGE

The North Parking Garage was the


second project to produce full bid
documents using Revit. With a variety of elevation changes, the 800car garage was well-suited to take
advantage of Revits full range of
three-dimensional capabilities. In
addition, capacity studies of the garage allowed the architects to design
with efficiency of space in mind.
The North Parking Garage is now in
use.

View rendered using Accurender incorporated into the BIM software

Phase IIIA

North Garage
Food and Drug Administration Consolidation

Construction photo showing nearly complete garage

CONSTRUCTION

design collaboration documentation

CDER 2

The Center for Drug Evaluation and


Research Office Building 2 (CDER
2) also implements a narrow, 62-foot
floor plate, along with under-floor air
distribution, to provide an effective
floor-to-floor height and superior flexibility. This six-story structure houses
1118 employees and support spaces. The interior atrium incorporates
the main entry to the campus as
well as break-out spaces for meeting
rooms.
The completion of the CDER 2 Office Building construction documents
marked the beginning of the design
teams efforts using Revit. Due to its
complexity and size, the project presented the team with numerous challenges; however these challenges
also provided opportunities and immediate benefits that were realized
throughout the design process and
during coordination.

Phase IIIB

Center for Drug Evaluation and Research Building 2


Food and Drug Administration Consolidation

Revit generated rendering looking SW

10.01.06 Construction photo

CONSTRUCTION

design collaboration documentation

VISUALIZE

Revit was also instrumental in allowing the design team to create realtime architectural building renderings for use in studies, presentations
to the client, in-house coordination
and marketing. Within minutes, the
team was able to generate renderings in-house by simply modifying
the graphical representation of the
building data.
Walk-through images also became a
part of our presentations to the client.
Using the same model that had been
created for building documentation,
the design team was able to quickly
produce video files that illustrated
the design intent.

Revit generated section perspective

FEWER RFIS

Due to the precise dimensioning and


coordination inherent to BIM, the
General Contractor has issued fewer
Requests for Information than with
standard building documents. This
has resulted in more efficient and
expedited schedules and less construction waste.

Revit generated rendering looking NE

Phase IIIB

02.02.07 construction photo looking NE

Center for Drug Evaluation and Research


Food and Drug Administration Consolidation

CONSTRUCTION

design collaboration documentation

ATRIUM

Revit geometry rendered using 3d Studio MAX

10.01.06 construction photo

Phase IIIB

Center for Drug Evaluation and Research


Food and Drug Administration Consolidation

CONSTRUCTION

design collaboration documentation

Food and Drug Administration Consolidation


White Oak, MD
SUMMARY

Autodesk Revit was instrumental in


the development of the campus for
the consolidated Food and Drug Administration due to its ease of use
and precise documentation. As a
result, the design team quickly adopted Revit as the primary software
for both design and documentation
for future projects.

Revit generated birds eye view

design collaboration documentation construction