Contents
1. Models
2. Project Brief
3. g
Figures & Quantities
Q
4. Structural Overview
5. Sequence of Work
TOWER
R
10. Photographs
Model
Spire
Residence (L108)
Floors Above 160 floors
TOWER
R
Hotel (L39)
THE B
Project Brief
.Consultants
.Construction Period
THE B
• Buttressed core
– Three wings arranged around central core
– Each wing supports other two
Analysis Model
Structural Overview
Hotell Residential
H R id i l
Floor plan
TOWER
BURJ T
THE B R
T
Tower Seismic
S i i DDesign
i
C-1 C-3
[Section A-A]
C-2
wing-C
A wing-
wing
B
[Work Sequence]
Level 0
Le el -1
Level 1
TOWER
R
Level -5
5
6 to 8 levels below
Level -6 3levels below
Level -7 Wing Wing Corridor Corner Slab
Level -8 Slab Slab
THE B
Level -9
9 Center Lobby Slab
N+0
Form Form
Additional Form
N-1 Raking Shore
TOWER
R
Form
N-2
1/2 of
1/2 of Raking 1/2 of Raking Raking
Shore Shore Shore
BURJ T
N3
N-3
2/3 of
2/3 of Prop
N-4 Prop
1/3 of
THE B
2/3 of Prop
Prop
N-5
. Hoist - 14 cages
Ph
Phase 1 (Ground
(G d ~ L100) : H/C#1
H/C#1~#4
#4 (8
(8cages)) T/C#M2 T/C#M3
Phase 2 (L100 ~ L142) : H/C#5~#6 (4 cages)
Phase 3 (L142 ~ SL2) : H/C#7 (2 cages)
Jump
p Hoist : Jump#1,
p , Jump#2
p (2( cages)
g )
H/C#3 4
H/C#3~4
TOWER
R
H/C#7
. Concrete Pump - 4 nos.
Pump#1~#3 (Ground Level) : High Pressure H/C#5~6
BURJ T
P
Pump#4
#4 (L124) for
f Secondary
S d Pumping
P i
H/C#1~2
T/C#M1
CPB#2~#4. for Wing core : 28m Boom
Cranage & Hoisting
Tower Crane – Installation Method
Con’c Placing
g
T/C#M2 T/C#M3 Boom
M380D M220D
Climbing
Core wall form
3rd Bracket
Installation
TOWER
R
Installation
Height : 48m
Top
collar
BURJ T
T/C#M1 :
M440D
Clamping Height
THE B
: 15.5 ~ 17m
Bottom
collar
Cranage & Hoisting
Tower Crane - Dismantling Method TOP OF SPI RE
T/ STEEL EL: +704. 9
SPI RE LEVEL 5
T/ STEEL EL: +656. 1
Multi Step
p Method 1st Station
23
22
21
SPI RE LEVEL 4
T/ STEEL EL: +646. 4
20
19 SPI RE LEVEL 3
T/ STEEL EL: +633. 6
16
SPI RE LEVEL 2 - MEZZA
T/ STEEL EL: +620. 8
15 SPI RE LEVEL 2
W
T/ STEEL EL: +617. 6
2nd
13
- Station: L99
LEVEL 162 / SPI RE LEV
T/ SLAB EL: +608. 0
12
11
LEVEL 161
T/ SLAB EL: +601. 9
10
LEVEL 160
LEVEL 159
3nos. Recovery
y Crane LEVEL 158
7
LEVEL 157 4
LEVEL 155
2
LEVEL 154
LEVEL 153
LEVEL 152
LEVEL 151
LEVEL 150
LEVEL 149
LEVEL 148
LEVEL 147
TOWER
R
LEVEL 145
LEVEL 143
LEVEL 142
LEVEL 141
LEVEL 140
LEVEL 135
BURJ T
LEVEL 130
LEVEL 125
LEVEL 120
LEVEL 115
THE B
LEVEL 110
2nd Station
LEVEL 105
S6 S5 S4 S3 S2 S1
LEVEL 100
LEVEL 99
Cranage & Hoisting
TOP OF SPI RE
T/ STEEL EL: +704. 9
SPI RE LEVEL 5
T/ STEEL EL: +656. 1
SPI RE LEVEL 4
T/ STEEL EL: +646. 4
SPI RE LEVEL 3
T/ STEEL EL: +633. 6
W SPI RE LEVEL 2
T/ STEEL EL: +617. 6
10
LEVEL 160
LEVEL 157 4
3
SPI RE LEVEL 5 - M
T/ STEEL EL: +659.
LEVEL 156 2
SPI RE LEVEL 5
1 T/ STEEL EL: +656.
LEVEL 155
LEVEL 153
LEVEL 151
LEVEL 149
LEVEL 148
SPI RE LEVEL 3 - M
T/ STEEL EL: +640.
by
y Ogawa
g OT4520 LEVEL 145
Favco
TOWER
R
SPI RE LEVEL 2 - M
T/ STEEL EL: +627.
LEVEL 143
LEVEL 142
LEVEL 141
242R W
SPI RE LEVEL 2 - M
T/ STEEL EL: +620.
SPI RE LEVEL 2
T/ STEEL EL: +617.
LEVEL 135
L161 LEVEL 161
T/ SLAB EL: +601. 9
10
LEVEL 159
7
LEVEL 125
LEVEL 158
LEVEL 120
Main T/C 5
LEVEL 157 4
LEVEL 155
LEVEL 110
LEVEL 154
LEVEL 105
S6 S5 S4 S3 S2 S1
LEVEL 100
LEVEL 99
Cranage & Hoisting
TOP OF SPI RE
T/ STEEL EL: +704. 9
SPI RE LEVEL 5
1st Station
T/ STEEL EL: +656. 1
SPI RE LEVEL 4
T/ STEEL EL: +646. 4
SPI RE LEVEL 3
T/ STEEL EL: +633. 6
W SPI RE LEVEL 2
T/ STEEL EL: +617. 6
LEVEL 160
LEVEL 157
LEVEL 155
LEVEL 153
LEVEL 151
LEVEL 149
LEVEL 148
SPI RE LEVEL 3 - MEZ
T/ STEEL EL: +640. 0
by Ogawa OT4520.
OT4520 LEVEL 145
TOWER
R
LEVEL 143
SPI RE LEVEL 2 - MEZ
T/ STEEL EL: +620. 8
LEVEL 142
LEVEL 141
LEVEL 140
Favco 242R W SPI RE LEVEL 2
T/ STEEL EL: +617. 6
LEVEL 135
L161 LEVEL 161
T/ SLAB EL: +601. 9
LEVEL 130
BURJ T
Favco
LEVEL 125
SDD3/10
LEVEL 120
LEVEL 115
THE B
LEVEL 110
2nd Station
LEVEL 105
S6 S5 S4 S3 S2 S1
LEVEL 100
LEVEL 99
Cranage & Hoisting
TOP OF SPI RE
T/ STEEL EL: +704. 9
SPI RE LEVEL 5
T/ STEEL EL: +656. 1
SPI RE LEVEL 4
T/ STEEL EL: +646. 4
SPI RE LEVEL 3
T/ STEEL EL: +633. 6
W SPI RE LEVEL 2
T/ STEEL EL: +617. 6
LEVEL 160
LEVEL 159
LEVEL 158
LEVEL 156
LEVEL 155
LEVEL 153
LEVEL 152
LEVEL 150
LEVEL 149
LEVEL 148
LEVEL 147
LEVEL 145
TOWER
R
LEVEL 143
LEVEL 142
LEVEL 141
LEVEL 140
Ogawa
OT4520
Step 4 : Favco SDD3/10 Dismantling LEVEL 135
VEL 105
LEVEL 130
S6 S5 S4 S3 S2 S1
VEL 100
LEVEL 120
L99 VEL 99
LEVEL 115
THE B
LEVEL 110
Favco
SDD3/10
2nd Station LEVEL 105
S6 S5 S4 S3 S2 S1
LEVEL 100
LEVEL 99
Concrete Placement
Concrete Placement Method
Target Height
Ground ~ L145 531 m Direct Pumping
(RC Structure)
Secondary Pump on
L146 ~ L160M 624 m Re-pumping
L124 (East wing 442m)
2 nos
nos. of Main
TOWER
R
. Concrete
C t Pl
Placing
i Boom
B
. Pipe Lines
CPB#2
- D150mm, THK 11mm
- 5 Lines (1 for back up)
Concrete Placement
Pipe Line Schedule Pinnacle
Line#1. (L160)
for Center Core Top of Finial : Spire
Line#5 (L160)
Line#5. L160Mezzanine : Steel Structure
for Back up
L154 : RC Structure
Pump#4.
P #4
(Secondary Pump on L124) Line#3. (L124)
for East Wing
Line#4. (L112)
Line#2. (L139) for West Wing
for South Wing
TOWER
BURJ T
THE B R
Pumping
p g Area
Pump#1~#3
Concrete Placement
Re-pumping
Spire1
Line#5 : Back up (~L154)
( L154)
(682m)
4500
Line#1 (~L154)
W1
S1 E1
S2 E2
Concrete Hopper 00
45
00
45
: L160 ~ S
Spire1
i 1 (58
(58m)) 00 45
00
45
CPB#2
CPB#1
L160 Mezzanine (624m)
TOWER
R
Pumping Location
Line#2 (~L139)
L124 (442m)
THE B
: Vertical
V ti l LiLine P
Position
iti
Secondary Pump
Survey & Monitoring
XYZ
XYZ
XYZ
TOWER
R
XYZ
BURJ T
THE B
Survey & Monitoring
GPS RTK
XYZ
XYZ
ANTENNA ANTENNA
ANTENNA
TOWER
R
REFERENCE
BURJ T
STATION
THE B
Survey & Monitoring
Level 146
Monitoring Program
Level 138
g & Extensometer
. Strain Gauge Level 92
: Middle
Middl Fl
Floor LLevell between
b t Outrigger
O ti Floors
Fl
: Level 5, 16, 19, 26, 39, 43, 58, 72, 76, 92, Level 58
. Wind
Wi d Speed/Direction,
S d/Di ti Temperature,
T t Humidity
H idit
- Location ; Level 5, 43, 76, 112, 146 Level 26
(Tower Outside)
Level 19
THE B
Level 16
Completion of Lifting
Thank
Th k you !
THE B
BURJ T
TOWER
R
THE B
BURJ T
TOWER
R
THE B
BURJ T
TOWER
R
Thank
Th k you !