Академический Документы
Профессиональный Документы
Культура Документы
+923003637580
FATEH PUR
KAMAL
MECHANICAL ENGINEER
RAHIM YAR
KHAN,
PUNJAB,
riazmalik80@yahoo.com
Construction Engineer with a 13-year record of success all phases of multimillion-dollar construction,
Infrastructure, superfund and environmental projects for government and private-sector clients. Experience
Objective
includes construction oil refineries, Fertilizer plants, oil & Gas plants and managing crews of a variety of other
Construction/demolition projects.
Backed by strong credentials and a proven history of on-time, on-budget and high-quality project completions.
Construction/Demolition Projects
QA/QC / Field Engineering
Site Safety/OSHA Compliance
Key Skills
Subcontractor/Crew Supervision
Employment:
Projects: 01) Well 98, 6 Feeder line at SUI GAS FIELD (4.0 km )(July 2013 to .)
02) Well 28, 8 Feeder line at KANDH KOT GAS FIELD (1.2 km) (Jan to June 2013)
03) Well 99, 8 Feeder line at SUI GAS FIELD (1.0 km) (Mar to May 2013)
Employment:
Projects: 01) 02 No. Water storage tank (17 x 7.5 M), SUI GAS FIELD, SUI (May. Dec 2012)
02) 07 No. Water storage tank (11 x 7.5 M), SUI GAS FIELD, SUI (Jan.-Aug. 2012)
03) 20 Water flow line at SUI GAS FIELD, SUI (05 km phase 03) (Jan. July 2012)
Employment:
Projects:01) Well 04, 4Feeder line, Well Heads Fabrication at CHACHAR GAS FIELD (0.7 km) (Oct-Dec 2011)
02) Well 89 8 Feeder line, Well Heads Fabrication at SUI GAS FIELD, SUI(3.5 km)(May - July 2011)
03) Well (05,11,15,16,18) 6Feeders lines, Well Heads Fabrication / Modification project
at ADHI OIL & GAS FIELD RWP (19 km) (Nov10- Sep2011)
04) 20 Water flow line at SUI Gas FIELD, SUI - KASHMORE (21 km 02 phase) (Sep 2010-July2011)
Employment: MOODY INTERNATIONAL PAKISTAN (CSS/QA Inspector)
Projects: 01) Naimat Basal Oil and Gas Facility Tando Adam, Sindh ( Kamal North 02 Flow line ,Naimat Basal 02
Flow line) ,wellhead, compressor & Fabrication, erection of Manifold )
02) Kausar Oil and Gas Facility (Matyari ,Sindh) Up gradation compressor, fin fan cooler & Fabrication,
erection of Manifold
Working:
(01) Incinerator Relocation & Flare TIP Installation Project at Kadan Wari Gas Field
(02) Wartsila Cooling Tower Fabrication & Erection Project at SAWAN Gas Field
Client :
OMV (Kadan wari / Sawan Gas Field) ( Mar 2009 to Sep 2009)
Organization: DESCON Engineering Limited Lahore (QA/QC Supervisor)( Jan. 2007 To Mar 2009)
Project
Highlights
Client :
Projects:
Detail study scope of work, Quality Inspection Plans procedures & specifications before starting the job.
Co-ordination with client for inspection formats as per requirements.
Responsible for the overall execution of the QIP at Project site through a well-managed team.
Awareness of international Codes and standards ASME, ASTM, API.
Responsible for Qualification of welding procedures & WQT.
Experienced in process piping fabrication, erection ,Steel Structure & tank involved in preparation of detail
schedule & progress and welding according to Codes ,standards, Procedure & Client specification,
Responsibi
lities
Monitor all-critical activities like Sand Blasting, Painting, Welding, NDT, PWHT, Hydro-testing, Flushing
according to Codes ,standards, Procedure, QIP and Project Specification.
Supports field procurement, system turn over and commissioning. Support Construction management and
engineering at site in preparation of daily/weekly reports, gathering data, obtaining drawings/deliverables
from vendors and Head office engineering,
Installation and Inspection of Vessel, column, Heat Exchangers, Drum
Interpretation of Radiographs as per codes and specification.
Responsible for ensuring that N C R's are raise for every rejection / rework as occurred / pointed out by
the QA&QC inspectors / execution.
Verification & Preparation of As-Built plan & piping isometric drawings.
Perform field walk downs / inspections to review the work for conformance with the design drawings,
applicable codes/standards and company policies/procedures. Prepare punch-list,
Supervision of various activities from Mobilization to ROW preparation, Stringing, Production Welding,
Lowering, HS Sleeve installation, Pigging, Hydrostatic Testing, Shutdown, Commissioning Punch list
killing of cross country pipe line.
Responsible for maintaining up-to-date quality records as per Customer requirements,
Responsible for the preparing of Test Pack and to submit a final dossier to Customer
Personal
Fathers Name :
Language
Ghulam Yaseen
Urdu, English
Date of Birth :
01 Feb. 1980
Nationality
CNID
:
:
Pakistani
31301-3431065-3
Domicile