Вы находитесь на странице: 1из 4

+923002109945

MUHAMMAD RIAZ MALIK

+923003637580
FATEH PUR
KAMAL

MECHANICAL ENGINEER

RAHIM YAR
KHAN,
PUNJAB,

riazmalik80@yahoo.com
Construction Engineer with a 13-year record of success all phases of multimillion-dollar construction,
Infrastructure, superfund and environmental projects for government and private-sector clients. Experience

Objective

includes construction oil refineries, Fertilizer plants, oil & Gas plants and managing crews of a variety of other
Construction/demolition projects.
Backed by strong credentials and a proven history of on-time, on-budget and high-quality project completions.
Construction/Demolition Projects
QA/QC / Field Engineering
Site Safety/OSHA Compliance

Key Skills

Infrastructure Improvement Projects

Subcontractor/Crew Supervision

Bidding / Estimating / Proposals / Cost Controls

B-Tech (Hons.) Mechanical Technology from Preston University Karachi


Academics

Diploma of Associate Engineer Mechanical from GOVERNMENTT COLLAGE OF TECHANOLOGY


BAHAWAL PUR (Punjab Board of Technical Education Lahore) in 1999

Secondary School Certificate (SSC) Bahawalpur in 1994.

Environmental awareness course form BRITSH SAFETY COUNCIL.


Training on
Safety &
Environme
ntal

HSE Course from MOODY International certification


Confined Space Safety course B P PAKISTAN
Awareness OSHA Hazardous Waste Operations & Emergency Response (HAZWOPER)
Construction Safety, Confined Space Entry and First Aid

Professional Experience Over 13 years:


Working:

PAKISTAN PETROLIUM LTD (Site Engineer) (OCT 2010 to ..)

Employment:

SARTAJ AHMAD KHAN ASSOCIATES (Jan 2013 to .)

Projects: 01) Well 98, 6 Feeder line at SUI GAS FIELD (4.0 km )(July 2013 to .)
02) Well 28, 8 Feeder line at KANDH KOT GAS FIELD (1.2 km) (Jan to June 2013)
03) Well 99, 8 Feeder line at SUI GAS FIELD (1.0 km) (Mar to May 2013)
Employment:

ALLIANCE INSPECTION AND ENGINEERING SERVICES (Jan 2012 to Dec 2012)

Projects: 01) 02 No. Water storage tank (17 x 7.5 M), SUI GAS FIELD, SUI (May. Dec 2012)
02) 07 No. Water storage tank (11 x 7.5 M), SUI GAS FIELD, SUI (Jan.-Aug. 2012)
03) 20 Water flow line at SUI GAS FIELD, SUI (05 km phase 03) (Jan. July 2012)
Employment:

BUREAU VERITAS PAKISTAN (OCT 2010 to Jan.2012)

Projects:01) Well 04, 4Feeder line, Well Heads Fabrication at CHACHAR GAS FIELD (0.7 km) (Oct-Dec 2011)
02) Well 89 8 Feeder line, Well Heads Fabrication at SUI GAS FIELD, SUI(3.5 km)(May - July 2011)
03) Well (05,11,15,16,18) 6Feeders lines, Well Heads Fabrication / Modification project
at ADHI OIL & GAS FIELD RWP (19 km) (Nov10- Sep2011)
04) 20 Water flow line at SUI Gas FIELD, SUI - KASHMORE (21 km 02 phase) (Sep 2010-July2011)
Employment: MOODY INTERNATIONAL PAKISTAN (CSS/QA Inspector)
Projects: 01) Naimat Basal Oil and Gas Facility Tando Adam, Sindh ( Kamal North 02 Flow line ,Naimat Basal 02
Flow line) ,wellhead, compressor & Fabrication, erection of Manifold )
02) Kausar Oil and Gas Facility (Matyari ,Sindh) Up gradation compressor, fin fan cooler & Fabrication,
erection of Manifold
Working:

BP(British Petroleum Ltd) (Sep 2009 to Oct 10)

Organization: HARIS & COMPANY Lahore (Mechanical Engineer)


Projects

(01) Incinerator Relocation & Flare TIP Installation Project at Kadan Wari Gas Field
(02) Wartsila Cooling Tower Fabrication & Erection Project at SAWAN Gas Field

Client :

OMV (Kadan wari / Sawan Gas Field) ( Mar 2009 to Sep 2009)

Organization: DESCON Engineering Limited Lahore (QA/QC Supervisor)( Jan. 2007 To Mar 2009)

Project
Highlights

Client :

Engro Chemical Dahari, Sindh (Jan 2008 to Mar 2009)

Projects:

(01) Ammonia / urea Expansion plant enven 1.3


(02) Cross Country Raw Water pipe line

Detail study scope of work, Quality Inspection Plans procedures & specifications before starting the job.
Co-ordination with client for inspection formats as per requirements.
Responsible for the overall execution of the QIP at Project site through a well-managed team.
Awareness of international Codes and standards ASME, ASTM, API.
Responsible for Qualification of welding procedures & WQT.
Experienced in process piping fabrication, erection ,Steel Structure & tank involved in preparation of detail
schedule & progress and welding according to Codes ,standards, Procedure & Client specification,
Responsibi
lities

Also complete the modification works as per site requirements,

Monitor all-critical activities like Sand Blasting, Painting, Welding, NDT, PWHT, Hydro-testing, Flushing
according to Codes ,standards, Procedure, QIP and Project Specification.
Supports field procurement, system turn over and commissioning. Support Construction management and
engineering at site in preparation of daily/weekly reports, gathering data, obtaining drawings/deliverables
from vendors and Head office engineering,
Installation and Inspection of Vessel, column, Heat Exchangers, Drum
Interpretation of Radiographs as per codes and specification.
Responsible for ensuring that N C R's are raise for every rejection / rework as occurred / pointed out by
the QA&QC inspectors / execution.
Verification & Preparation of As-Built plan & piping isometric drawings.

Perform field walk downs / inspections to review the work for conformance with the design drawings,
applicable codes/standards and company policies/procedures. Prepare punch-list,

Supervision of various activities from Mobilization to ROW preparation, Stringing, Production Welding,
Lowering, HS Sleeve installation, Pigging, Hydrostatic Testing, Shutdown, Commissioning Punch list
killing of cross country pipe line.
Responsible for maintaining up-to-date quality records as per Customer requirements,
Responsible for the preparing of Test Pack and to submit a final dossier to Customer
Personal

Fathers Name :
Language

Ghulam Yaseen

Urdu, English

Date of Birth :

01 Feb. 1980

Nationality
CNID

:
:

Pakistani
31301-3431065-3

Domicile

Punjab(Rahim Yar Khan)

Вам также может понравиться