Austin Energy
8th largest community-owned electric utility serving
435,000 meters and a population of approximately one
million
437 square miles of service area covering City of Austin,
Travis County and portions of Williamson County.
Owns and operates generation, transmission, and
distribution
System peak load - 2714 MW
Annual budget - $1.3 billion
First public power utility in Texas to earn Diamond Level
recognition (2011) as a Reliable Public Power Provider
(RP3) by the American Public Power Association (APPA);
again in 2013 (eligible every 2 years)
Austin, Texas
Goal by 2020
Current State
Renewables
Carbon
17.6% reduction
(2012)
Efficiency
371 MW savings
(2013)
Affordability
Reliability
Customer Satisfaction
83%
71% (2013)
3
Organization
Smart Grid
& System
Operations
CFO
Distribution
Services
North
CES
General
Manager
Deputy GM
& COO
Electric
Service
Delivery
Distribution
Services
South
Planning
Deputy GM
Chief&Admnis
CAO
Reg Affairs
& Corp Com
Support
Services
Substation &
Transmission
Distribution Automation
AMI Meter
Voltage
Energy
Storage
Capacitor
Bank
EV Charging
AMI Meter
Voltage
(EOL)
Relay or
Line Monitor
LTC
Recloser
Substation
Capacitor
Bank
Mid-Line
Regulator
Fault Indicators
Distributed
Generation
AMI Meter
Voltage
AC /
Heat Pumps
Water
Heater
Pool
Pumps
Sensing
Operating
Evolution of ADMS
D-SCADA
*Centralized
intelligence working
with distributed
intelligence to make a
Smart Utility
OMS
ADMS Enhancements
Enhancement
Functionality Delivered
Integrated Voltage
Var Control (IVVC)
Fault Location,
Isolation, and Service
Restoration (FLISR)
Leverage other
Intelligent Initiatives
ADMS Interfaces
AMI /
Meter Data
Remote
Access
Storm
Center
(MDMS)
SCADA
CIS
(EMS)
ADMS
PI
Historian
OMS
D-SCADA
DMS
Advanced Apps
Video
Wall
Front End
GIS
ICG
Overflow
IVR
AVL
processor
MAS
Call
Center
Mobile
Work
11
12
Hardware/Software Choices
Operating Systems / ESB / Integrations
13
Requirements
Infrastructure Staged
Design
Development
Interface Development
Factory Testing
Site Testing
Optimization & Training
Early Completion Go-live
Go-live*
14
ADMS Landbase
ADMS Geo-Schematic
ADMS Substation
18
ADMS Schematic
Questions?
David Tomczyszyn, P.E.
David.Tomczyszyn@austinenergy.com