Course Outline
Duration: 2 days
PDU Credits: 14 (Category A)
Demand for Primavera P6 Professional schedulers is growing in the Engineering and
Construction industry. Many contractors are being required to provide schedules and
reports in P6 Professional formats. To help meet this demand, Ten Six offers training
that focuses specifically on the needs of engineering and construction professionals
looking to learn Primavera P6 Professional.
This training course provides the fundamentals of Primavera P6 Professional as used
in engineering and construction. Because P6 is typically used as a stand-alone and
often mobile system in this industry, we have created a course that bypasses the multiuser, enterprise functionality and cuts directly to what is needed to build and manage a
robust construction/engineering schedule.
This course has been developed with the help of construction industry
professionals that use P6 in the field. Schedule data and techniques utilized in this
class are based upon real projects and real industry method of operation.
Using Primavera P6 Contractor? No problem. The skills obtained in this class will map
perfectly to this cut-down version of the P6 Professional software.
Course Contents
Lesson 1: Introduction & Learning Objectives
Relationship types in P6
Creating relationships
Understanding the forward and backward pass and Critical Path Method (CPM)
Applying constraints to activities
Adjusting the duration and finish date of your project
Creating resources
Pricing resources
Assigning resources to activities
Working with the Resource Usage Profile and analyzing resource assignments
Analysis overview
Analyzing resource availability
Mitigating resource overloads