PETROLEUM EXPLORATION (PVT) LTD.

15, Nazimuddin Road, Sector F-10/4, P.O. Box 1440, Islamabad, Pakistan
Tel: 92-51-2299031-36 (6 Lines), Fax: 92-51-2299028
E-Mail: scm@pepl.com.pk. Web: www.pepl.com.pk

PEL/M&P/1701/13

INVITATION TO BID
TENDER ENQUIRY NO. PEL/BADIN-S/036/13 & PEL/BADAR-2/035/13,
DATED 20-09-2013 , FOR CIVIL WORKS.

1) INTRODUCTION

Petroleum Exploration (Pvt.) Limited (PEL), a Pakistani Exploration and Production Company in
private sector (hereinafter referred to as the Company), invites Sealed Bids from well-reputed
Civil Construction Companies for the Civil Works described in the Schedule of Requirement (Bill
of Quantities) as Annexure B enclosed. PEL requests that the following instructions are to be
strictly adhered in submission of the Bid documents:
2) INSTRUCTIONS TO BIDDERS:
2.1 Only the Bids of bonafide recipients of the Tender Document will be entertained. Upon
receipt of this invitation to tender, please confirm the receipt thereof immediately by
fax, e-mail or courier to PEL at the following addresses:
Attn: Khawaja Manzur Hussain
General Manager (Materials & Procurement)
15, Nazimuddin Road, Sector F-10/4, P.O. Box 1440, Islamabad,
Pakistan
Tel: 92-51-2291671, 2299031-36 (6 Lines), Fax: 92-51-2299028
E-Mail: scm@pepl.com.pk
(With copy to the following e-mail)
mud@pepl.com.pk
In the event a potential bidder decides not to quote, please send us your decline via
facsimile or e-mail.
2.2
PEL reserves the right to amend or revise the tender documents prior to the date
set for the closing of the tender. All bidders will be informed of any such change through an
Addendum to the tender.
2.3 Your quotation must reach on or before 1600 Hrs on October 07, 2013 in Sealed
Envelopes which will bear words Confidential and Tender Enquiry No. PEL/BADINS/036/13 & PEL/BADAR-2/035/13.
2.4 PEL reserves the right to increase or decrease the quantities/scope of work or reject any
or all bids and may not necessarily accept the lowest bidder without assigning any
reasons what so ever.
2.5 For ease of comparison, prices are to be quoted item-wise, as described in the Schedule
of Requirement (Bill of Quantities), (Annexure B & Annexure C).
2.6 PEL shall be free from any obligation of opening bids in the presence of bidders. PEL
shall not be responsible for any costs / expenses incurred by the bidders in connection
with the preparation / delivery of bid.
2.7 Bidder shall maintain high safety standards and comply with PELs HSE procedures.
2.8 PEL does not encourage advance payment. However, Mobilization/Fixed charges
can be invoiced by the Contractor immediately on completion of mobilization of
crew and equipments at the job site. The balance final amount of the bill will be paid
within 45-60 days of receipt of duly verified invoice by PELs after completion of work
and final acceptance of the work performed by the Contractor.
2

2.9 Closing date of the Tender is October 07, 2013.


2.10 All quotations without exception shall firm and irrevocable for PEL acceptance for a
minimum period of 90 days from the tender closing date.
2.11 CVs of all personnel up to the supervisor level to be deployed at site and indicated in
the firms organ gram shall be supplied with the bid documents.
2.12 Contractor is to provide its profile, project schedule at the time of bidding.
2.13 Details of similar projects completed in the past five years shall be provided.
2.14 Complete list of current projects being executed by the bidder, with project cost,

shall be provided with the bid.


2.15 Detailed list of manpower to be deployed for the project shall be provided.
2.16 The company (PEL) reserves the right to appoint one or more contractors

dividing the job suitably for early completion if required.

ANNEXURE A
3. TERMS & CONDITIONS
The Bidders are expected to examine all instructions, forms, terms & conditions and
specifications attached/included in these tender documents. Failure to furnish all information
required by the tender documents or submission of a Bid not substantially responsive to the
tender documents will be at the Bidders risk and may result in the rejection of their Bid.
1.

BID PRICES:

Prices must be quoted on lump sum basis inclusive of all taxes and duties, indicating unit price
and total Bid prices at the end.
2.

ISSUANCE OF INTENT AND SERVICE CONTRACT

The Company shall inform the successful Bidder of its intent. The arrangements between PEL
and the successful bidder shall be governed solely by a subsequent written Service Order or a
Contract.

3.

PAYMENT:

Payment will be made within 45-60 days after submission of Invoice/ Bill duly verified and
supported by the authorized PEL representative.
Payment to the Contractor will be subjected to the deduction of withholding tax, as per
prevailing Income Tax Laws of Pakistan (where applicable), Bidders claiming exemption must
submit copy of Valid Tax Exemption Certificate.
4.

COMPLETION PERIOD:

As mentioned in the Schedule of Requirement. However, the Bidder may quote the best
possible completion period convenient to him. Earlier completion, if quoted, will be preferred.
1.

TAXES AND DUTIES

A Contractor (foreign or a local) shall be entirely responsible for payment of all taxes, duties,
levies, license fees, etc. incurred until completion of the contracted Services to the Company.
5.

INSPECTION AND TEST

Please note that all civil construction materials are to be of very good quality and from
reliable sources. PEL reserves the rights to inspect all materials, equipments tools and
implements at Contractors works to ensure that the Contractor has the required capability, skill
and workmanship to carry out the assigned Services.
6.

HEALTH, SAFETY & ENVIRONMENT

Contractor(s) shall at all times comply with and shall cause its employees to abide by, all safety,
security, health and environment rules and regulations in force at the site of the work or
4

otherwise prescribed by the laws of Pakistan. PEL shall not be responsible for any injury, death
or any other accident suffered by the Contractor(s) during operation/execution of the Civil
Works.
7.

APPLICABLE LAW

The Contract shall be interpreted in accordance with the laws of the Pakistan.
4. SCOPE OF WORK-CIVIL WORKS-GENERAL
The Civil Scope of work includes, but is not limited to, furnishing of all equipments/Tools,
skilled / unskilled labour, supervision & supply of all construction material /consumables which
are required to perform all the operations in connection with the completion of the construction
of well location in accordance with the attached Bill of Quantities , Annexure B
5. SPECIAL TERMS & CONDITIONS

Bidder is responsible to analyze and use appropriate equipment required to


complete the work in time and meeting the specifications and standards.
The quantities given in the BOQ are estimated, payment will be made on the
basis of actual physical quantities measured at the site.
PEL reserves the right to change/modify Location design drawing and quantities
before or during construction phase to meet requirement of rig finally selected to
drill PEL well location.
The financial proposal shall be in the form of BOQ, Annexure B.
6. EQUIPMENT

All equipments shall be inspected and approved by PELs representative before


mobilization to site.
Please provide a complete list of equipment to be deployed for the project.
Contractors equipment and materials stored at the plant site must meet plant
safety regulation and all kind of preventive measures shall be taken against fire,
theft, and all other workplace hazards.
PEL reserves the right to inspect and verify the Contractors work being done at
any stage and may stop the work if not according to specifications, standard &
grades.
7.

TIMELY COMPLETION OF THE PROJECT

If the Contractor feels delay in progress of the work, he shall work overtime and use all
such additional equipment and/or personnel as may be necessary in timely completion
of the work within the dates specified in the Contract at no additional cost to the
Company (PEL).

8. PENALITY CLAUSE

In case the work has been delayed except Force Majeure a penalty equivalent to 5%
per week of the total value of the Contract will be imposed on the Contract and will be
deducted from the final invoice(s).

ANNEUXUREB
6

APPROXIMATE BOQS FOR AYESHA-1 WELL CIVIL WORKS

Item.No
1

DESCRIPTION
Earth Work

Unit
BOQ

Unit rate

Total
(PKR)

CFt

418,890.0

35

1,46,61150

CFt

4,557

500

22,78,500

CFt

910

380

3,45,800

CFt

910

210

1,91,100

CFt

584

630

3,67,920

Supply & filling of earth at location area and camp site from contractor's
arranged borrow area including watering and compaction in layers not
exceeding 6inch upto a total of 3-layers to the required grade and elevations. Earthfill
compaction will be upto 95% of AASHTO maximum dry density. The
thickness of
earth fill should be 1.5-ft.All vegetation and all such unsuitable material such
as contaminated oil, Organic material, rubble, hedges, trees, stumps, roots,
guard
rails, concrete sleepers, foundations, lamp posts, abandoned electrical cables
and pipes, existing vegetation, minor steel, concrete, disused paving, debris,
loose
windblown material and other foreign material, etc shall be transported and
disposed to an approved company designated area.

Rig Pad Foundation


2.1 Reinforced Cement Concrete 1:2:4
Providing & laying of cement concrete of ratio 1:2:4
including reinforcement steel (Grade 60) including
formwork, curing of concrete & transportation of
material & equipments to complete the works in all
respects. The size of rig pad is (46.2638.042.5-feet).
2.2 Plain Cement Concrete 1:4:8
Providing & laying of plain cement concrete 1:4:8 of
6-inch thickness. (46.26x38.04x0.5)
2.3 Gravel
Providing & laying gravel of 6-inch thickness.

Cellar Work
3.1 Reinforced Cement Concrete 1:2:4
Construction of Cellar with RCC concrete 1:2:4
including reinforcement steel (Grade 60) including
formwork, curing of concrete & transportation of
material & equipments to complete the works in all
respects. The size of cellar is 12x'12'x1=144
Lomg wall (2)x12'x1x10x=240
Short wall (2) x10'x1'0x1'=200
Thickness of cellar walls is 1-ft.

3.2 Plain Cement Concrete 1:4:8

CFt

95.000

300

28,500

CFt

98.00

210

20,580

RFt
RFt

132
100

944.10
6,258

1,24621
6,25800

CFt

300

332

99,600

Each

1000

4000

CFt

975

500

4,87500

CFt

2,310

500

11,55000

CFt

1,250

210

2,62500

CFt

975

500

4,87500

Providing & laying of plain cement concrete 1:4:8 of


6-inch thickness.
3.3 Gravel
Providing & laying gravel of 6-inch thickness.

Conductor Pipe
a) Digging of bore hole of 26-inch dia (40 m).
b) Insertion of conductor pipe of 20-inch dia in 26-inch
dia bore hole.
c) Filling space between bore hole and conductor pipe
upto 40 m deep with PCC 1:3:6.
d) Anchoring Conductor Pipe with steel reinforcement
bars.

Foundation for Mud Pumps


5.1 Plain Cement Concrete 1:2:4
Providing & laying of cement concrete of ratio 1:2:4
including formwork, curing of concrete &
transportation of material & equipments to complete the
works in all respects. Thickness of foundation should be 1.5-ft.
(The foundations should be lined with Polythene/impermeable sheets to
avoid any damaged due to water).

Foundation for Mud Tanks


6.1 Plain Cement Concrete 1:2:4
Providing & laying of cement concrete of ratio 1:2:4
including formwork, curing of concrete & transportation
of material & equipments to complete the works in all
respects. Thickness of foundation should be 1.5-ft.
(The foundations should be lined with Polythene/impermeable sheets to
avoid any damaged due to water).

6.2 Gravel
Providing & laying gravel of 6-inch thickness.

Foundation for Generators


7.1 Plain Cement Concrete 1:2:4
Providing & laying of cement concrete of ratio 1:2:4
including formwork, curing of concrete & transportation
of material & equipments to complete the works in all
respects.Thickness of foundation should be 0.75ft.

(The foundations should be lined with Polythene/impermeable sheets to


avoid any damaged due to water).

7.2 Gravel

CFt

750

210

1,57500

CFt

950

500

4,75000

CFt

750

223

1,67250

CFt

5,000

30

150,000

CFt

225

200

45000

CFt

1,100

30

33000

Sq.Ft

225

400

90,000

Providing & laying gravel of 6-inch thickness.

Foundation for Diesel Oil Tank


8.1 Plain Cement Concrete 1:2:4
Providing & laying of cement concrete of ratio 1:2:4
including formwork, curing of concrete & transportation
of material & equipments to complete the works in all
respects.The size of foundation is 60'x26'x0.5'
(The foundations should be lined with Polythene/impermeable sheets to
avoid any damaged due to water).
8.2 Brick walls 1.125'x3'x60x(3 Nos)

Construction of Flare Pit


9.1 Excavation
Excavation in soil for cutting pits or water pits with
compacted and dressed base and slopes in true
dimensions of 50-ft20-ft5-ft.
9.2 Brick Lining
Providing & laying of brick lining in 1:6 cement sand
mortar for flooring, containment areas, pad foundations
including curing of work, transportation of all material
at site to complete the work in all respects.

10

Construction of Rubbish Pit


10.1 Excavation
Excavation in soil for cutting pits or water pits with
compacted and dressed base and slopes in true
dimensions of 20-ft13-ft4-ft.
10.2 Brick Lining
Providing & laying of brick lining in 1:6 cement
sand mortar for flooring, containment areas, pad
foundations including curing of work, transportation
of all material at site to complete the work in all
respects.

11

Erection of Barbed wire fence


Break-up Rate
A. Barbed Wire

RFt

Providing G.I. barbed wire at 9"9" square spacing.


B. Angle Iron Post

RFt
9

Providing angle iron of section 2"2"1/4".

RFt

C. Snake Protection Sheet


Providing G.I. sheet of gauge and 3-ft wide for
snake anti-climbing protection.
D. Erection of fence (labour & concrete)

RFt

Erection of fence (labour & concrete work) as per


drawing.
Total

RFt

5,824

6000

3,49,44000

Each

40,000

80,000

RFt

1,800

425

7,65000

RFt

600

3030

18,18000

CFt

100,000

30

30,00,000

RFt

800

350

2,80,000

Each

50,000

50,000

CFt

1,500

400

600,000

RFt

2,000

2000

40,00,000

Main Gate
Providing & fixing 20-ft wide, fence installed double
leaf main gate.

12

Tube well Works


a) Water supply pipes G.I fittings of size 2-inch ,
3/4-inch & 1/2-inch dia.
b) Water supply pipe 4-inch dia

13

Waste Mud Pits


Excavation
Excavation in soil for cutting pits or water pits with
compacted and dressed base and slopes in true
dimensions of 95'95'5'02 Nos.
The pits should be 10-ft away from mud tanks.

14

Brick Drainage
Brick drain size 18-inch18-inch deep and wall
thickness of 9-inch with 4.5-inch bottom thickness
with C.M 1:6, 1/2-inch plaster inside drain all-around.

15

Water Tank
Providing & installation of fibre water tank of
capacity 300 Gallons placed on 2 brick pillars and
connecting with water mains.

16

Foundations for 50 Nos Pota Cabins


Brick foundations C.M 1:4 with 1/2-inch plaster on
all sides of size 10-ft1-ft1-ft. Two brick steps in
front of pota cabin doors are also to be made.

17

Sewerage Pipe Lines


Providing, laying and complete fixing with all
required fittings of 4-inch dia RCC pipe lines with
pota cabin main hole 2-ft2-ft and connecting with

10

septic tanks.

18

Construction of Septic Tanks

Each

60,000

2,40,000

Sq.Ft

725

500

3,62500

Sq.Ft

196

2000

3,92000

Sq.Ft

30,000

30

9,00,000

CFt

1,150

CFt

160

210

33,600

CFt

200

630

1,26,000

Construction of Septic Tank with brick masonary


and plaster work of size 21ft4ft of 4ft depth

19

Living Facilities for Rangers


Construction of living facilities with brick masonary
C.M 1:6 and plaster and T-iron & Girder, roof tiles
according to drawings & specifications.

20

Security check Post


Construction of temporary check posts 14-ft14-ft with
same specifications as of item 19 in C.M 1:6 P.C.C and plaster, T-iron and
Grider roof tiles
with polythene sheet and mud plaster. 4 Nos.

21

Chemical Resistance Membrane pit


Excavation for 2 Nos waste pit. Compacted and dressed base and slopes in
true dimensions of size 120'x120'

22

Generator Foundation (Camp Site)


Plain Cement Concrete 1:2:4

630

7,24,500

Providing & laying of cement concrete of ratio 1:2:4


including formwork, curing of concrete &
transportation of material & equipments to complete
the works in all respects.Thickness of foundation
should be 0.5-ft.
(The foundations should be lined with Polythene/impermeable sheets to
avoid any damaged due to water).
Gravel
Providing & laying gravel of 6-inch thickness.

23

Foundation for Diesel Tank (Camp Site)


Providing & laying of cement concrete of ratio 1:2:4
including formwork, curing of concrete &
transportation of material & equipments to complete
the works in all respects.Thickness of foundation
should be 0.5-ft.
(The foundations should be lined with Polythene/impermeable sheets to
avoid any damaged due to water).

11

24

Access Road

RFt

56,433

2000

11,28,66000

RFt

68

907

61,676

CFt

563

300

1,68900

Each

1
30,000

30,000

550

1,44,37500

Construction of 20-ft wide & 6" high road by earth filling including watering
and compaction in layers not exceeding compacted 6-inch thickness to the
required grade and elevations. Earthfill compaction will be upto 95% of
AASHTO maximum dry density. Water bound macadam of 3-inch thickness.

25

Pipe Culverts
Providing & laying of pipe dia 24" for culverts (on
the basis of jobs) of pre-cast reinforces concrete.

26

Chemical Pad
PCC 1:4:8
Providing & laying of Plain cement concrete
pad 3" thick foundation foundations including curing of work,
transportation of all material at site to complete the
work in all respects.

27

Tandoor
Providing & installing Tandoor in kitchen in all
respects.

28

CFt

Water Bound Macadam

26,250

Supply & laying 3-inch down crushed stone (Rock


Moram) compacted layers including voids filling with
stonedust/khaka at areas as directed by the engineer.

19,81,37497

TOTAL

COMPLETION PERIOD:
3 Weeks from the date of award of Contract.

ANNEXURE C

12

APPROXIMATE BOQS FOR BADAR-2 WELL CIVIL WORKS

Item.No

DESCRIPTION

Unit
BOQ

CFt

Earth Work
Supply & filling of earth at location area and camp site

500,000.0

Unit rate

Total
(PKR)

35

1,75,00,000

site from contractor's arranged borrow area including


watering and compaction in layers not exceeding 6-inch
upto a total of 3-layers to the required grade and
elevations. Earthfill compaction will be upto 95% of
AASHTO maximum dry density. The thickness of earth
fill should be 1.5-ft.

Rig Pad Foundation


2.1 Reinforced Cement Concrete 1:2:4

CFt

4,557

500

22,78500

CFt

910

380

3,45,800

CFt

910

210

1,91,100

CFt

584

630

3,67,920

CFt

95.000

300

28,500

CFt

98.00

210

20,580

Providing & laying of cement concrete of ratio 1:2:4


including reinforcement steel (Grade 60) including
formwork, curing of concrete & transportation of
material & equipments to complete the works in all
respects. The size of rig pad is (46.2638.042.5-feet).
2.2 Plain Cement Concrete 1:4:8
Providing & laying of plain cement concrete 1:4:8 of
6-inch thickness. (46.26x38.04x0.5)
2.3 Gravel
Providing & laying gravel of 6-inch thickness.

Cellar Work
3.1 Reinforced Cement Concrete 1:2:4
Construction of Cellar with RCC concrete 1:2:4
including reinforcement steel (Grade 60) including
formwork, curing of concrete & transportation of
material & equipments to complete the works in all
respects. The size of cellar is 12x'12'x1=144
Lomg wall (2)x12'x1x10x=240
Short wall (2) x10'x1'0x1'=200
Thickness of cellar walls is 1-ft.
3.2 Plain Cement Concrete 1:4:8
Providing & laying of plain cement concrete 1:4:8 of
6-inch thickness.
3.3 Gravel
Providing & laying gravel of 6-inch thickness.

13

Conductor Pipe
a) Digging of bore hole of 26-inch dia (40 m).
b) Insertion of conductor pipe of 20-inch dia in 26-inch

RFt
RFt

132
100

944
6258

1,24608
6,25800

CFt

300

332

99,600

Each

1000

40,000

CFt

975

500

4,87500

CFt

2,310

500

11,55000

CFt

1,250

210

2,62,500

CFt

975

500

4,87500

CFt

750

210

1,57,500

CFt

950

500

4,7500

dia bore hole.


c) Filling space between bore hole and conductor pipe
upto 40 m deep with PCC 1:3:6.
d) Anchoring Conductor Pipe with steel reinforcement
bars.

Foundation for Mud Pumps


5.1 Plain Cement Concrete 1:2:4
Providing & laying of cement concrete of ratio 1:2:4
including formwork, curing of concrete &
transportation of material & equipments to complete the
works in all respects. Thickness of foundation should be 1.5-ft.
(The foundations should be lined with Polythene/impermeable sheets to
avoid any damaged due to water).

Foundation for Mud Tanks


6.1 Plain Cement Concrete 1:2:4
Providing & laying of cement concrete of ratio 1:2:4
including formwork, curing of concrete & transportation
of material & equipments to complete the works in all
respects. Thickness of foundation should be 1.5-ft.
(The foundations should be lined with Polythene/impermeable sheets to
avoid any damaged due to water).

6.2 Gravel
Providing & laying gravel of 6-inch thickness.

Foundation for Generators


7.1 Plain Cement Concrete 1:2:4
Providing & laying of cement concrete of ratio 1:2:4
including formwork, curing of concrete & transportation
of material & equipments to complete the works in all
respects.Thickness of foundation should be 0.75ft.
(The foundations should be lined with Polythene/impermeable sheets to
avoid any damaged due to water).

7.2 Gravel
Providing & laying gravel of 6-inch thickness.

Foundation for Diesel Oil Tank

14

8.1 Plain Cement Concrete 1:2:4


Providing & laying of cement concrete of ratio 1:2:4
including formwork, curing of concrete & transportation
of material & equipments to complete the works in all
respects.The size of foundation is 60'x26'x0.5'
(The foundations should be lined with Polythene/impermeable sheets to
avoid any damaged due to water).
8.2 Brick walls 1.125'x3'x60x(3 Nos)

CFt

750

223

1,67,250

CFt

5,000

30

1,50,000

CFt

225

200

45,000

CFt

1,100

30

33000

Sq.Ft

225

400

90,000

Construction of Flare Pit


9.1 Excavation
Excavation in soil for cutting pits or water pits with
compacted and dressed base and slopes in true
dimensions of 50-ft20-ft5-ft.
9.2 Brick Lining
Providing & laying of brick lining in 1:6 cement sand
mortar for flooring, containment areas, pad foundations
including curing of work, transportation of all material
at site to complete the work in all respects.

10

Construction of Rubbish Pit


10.1 Excavation
Excavation in soil for cutting pits or water pits with
compacted and dressed base and slopes in true
dimensions of 20-ft13-ft4-ft.
10.2 Brick Lining
Providing & laying of brick lining in 1:6 cement
sand mortar for flooring, containment areas, pad
foundations including curing of work, transportation
of all material at site to complete the work in all
respects.

11

Erection of Barbed wire fence


Break-up Rate
A. Barbed Wire

RFt

Providing G.I. barbed wire at 9"9" square spacing.


B. Angle Iron Post

RFt

Providing angle iron of section 2"2"1/4".


C. Snake Protection Sheet

RFt

Providing G.I. sheet of gauge and 3-ft wide for


snake anti-climbing protection.
D. Erection of fence (labour & concrete)

RFt

Erection of fence (labour & concrete work) as per

15

drawing.
Total

RFt

3,500

6000

2,10,000,00

Each

40,000

80,000

RFt

1,800

425

7,65000

RFt

600

330

18,18000

CFt

100,000

30

30,000,00

RFt

800

350

2,80,000

Each

50,000

50,000

CFt

1,500

400

6,00,000

RFt

2,000

2000

40,000,00

Each

60,000

240,.000

Main Gate
Providing & fixing 20-ft wide, fence installed double
leaf main gate.

12

Tube well Works


a) Water supply pipes G.I fittings of size 2-inch ,
3/4-inch & 1/2-inch dia.
b) Water supply pipe 4-inch dia

13

Waste Mud Pits


Excavation
Excavation in soil for cutting pits or water pits with
compacted and dressed base and slopes in true
dimensions of 95'95'5'02 Nos.
The pits should be 10-ft away from mud tanks.

14

Brick Drainage
Brick drain size 18-inch18-inch deep and wall
thickness of 9-inch with 4.5-inch bottom thickness
with C.M 1:6, 1/2-inch plaster inside drain all-around.

15

Water Tank
Providing & installation of fibre water tank of
capacity 300 Gallons placed on 2 brick pillars and
connecting with water mains.

16

Foundations for 50 Nos Pota Cabins


Brick foundations C.M 1:4 with 1/2-inch plaster on
all sides of size 10-ft1-ft1-ft. Two brick steps in
front of pota cabin doors are also to be made.

17

Sewerage Pipe Lines


Providing, laying and complete fixing with all
required fittings of 4-inch dia RCC pipe lines with
pota cabin main hole 2-ft2-ft and connecting with
septic tanks.

18

Construction of Septic Tanks


Construction of Septic Tank with brick masonary
and plaster work of size 21ft4ft of 4ft depth

16

19

Living Facilities for Rangers

Sq.Ft

725

500

3,62500

Sq.Ft

196

2000

3,92,000

Sq.Ft

30,000

30

9,00,000

CFt

1,150

630

724,500

CFt

160

210

35600

CFt

200

630

1,26,000

RFt

6,600

2000

1,32,000,00

Construction of living facilities with brick masonary


C.M 1:6 and plaster and T-iron & Girder, roof tiles
according to drawings & specifications.

20

Security check Post


Construction of temporary check posts 14-ft14-ft with
same specifications as of item 19 in C.M 1:6 P.C.C and plaster, T-iron and
Grider roof tiles
with polythene sheet and mud plaster. 4 Nos.

21

Chemical Resistance Membrane pit


Excavation for 2 Nos waste pit. Compacted and dressed base and slopes in
true dimensions of size 120'x120'

22

Generator Foundation (Camp Site)


Plain Cement Concrete 1:2:4
Providing & laying of cement concrete of ratio 1:2:4
including formwork, curing of concrete &
transportation of material & equipments to complete
the works in all respects.Thickness of foundation
should be 0.5-ft.
(The foundations should be lined with Polythene/impermeable sheets to
avoid any damaged due to water).
Gravel
Providing & laying gravel of 6-inch thickness.

23

Foundation for Diesel Tank (Camp Site)


Providing & laying of cement concrete of ratio 1:2:4
including formwork, curing of concrete &
transportation of material & equipments to complete
the works in all respects.Thickness of foundation
should be 0.5-ft.
(The foundations should be lined with Polythene/impermeable sheets to
avoid any damaged due to water).

24

Access Road
Construction of 20-ft wide & 3-ft high road by earth
filling including watering and compaction in layers not
exceeding compacted 6-inch thickness to the required
grade and elevations. Earthfill compaction will be
upto 95% of AASHTO maximum dry density. Water

17

bound macadam of 3-inch thickness.

25

Pipe Culverts
Providing & laying of pipe dia 24" for culverts (on

RFt

96

907

87,072

CFt

563

300

1,68,900

Each

1
30,000

30,000

550

2,22,75,000

the basis of jobs) of pre-cast reinforces concrete.

26

Chemical Pad
PCC 1:4:8
Providing & laying of Plain cement concrete
pad 3" thick foundation foundations including curing of work,
transportation of all material at site to complete the
work in all respects.

27

Tandoor
Providing & installing Tandoor in kitchen in all
respects.

28

Water Bound Macadam

CFt

40,500

Supply & laying 3-inch down crushed stone (Rock


Moram) compacted layers including voids filling with
stonedust/khaka at areas as directed by the engineer.

28

Repair of existing two bridges & access road

As per actual
requirement

9,48,39730

TOTAL

COMPLETION PERIOD:
3

Weeks from the date of award of Contract.