Академический Документы
Профессиональный Документы
Культура Документы
Severity
Date:
27-11-2013
JSA #:
04/JSA-13
AHT. SWIBER
Vessel: ANNA
Page #
of
Band
Labels
Review / Revision #
Barricade
Fall Harness
Face Shield
Goggles
Likelihood
Hard Hat
Hearing Protection
Safety Glasses
Permit__________________________________________
Leather Gloves
Steel-Toed Footwear
Other __________________________________________
Date:
PPE
/ Permits
Job:
Cotton
Gloves Required For
FireThis
Extinguisher
Severity:
1 = Slightly Harmful
2 = Harmful
3 = Extremely
Risk
Criteria Harmful
High
Moderate
Lockout/Tagout Tolerable Work Vest
All Crew
To Be Performed By:
Descriptions
Likelihood:
A = Highly Unlikely
B = Unlikely
C = Likely
Air Hose
Hammer Wrench
Scaffold
Portable Lighting
Other ____________________________________
Chain Fall
Cutting Torch
Impact Gun
Sledge Hammer
Welding Lead
Other ____________________________________
Come-along
Electrical Cord
Ladder
Tag Line
Rigging
/ Rigging Points
Required
For This Job:
Nylon Sling ______
______
______
Wire Rope Sling ______
Size
______
______
Shackle ______
______
______
______
______
Shackle ______
______
______
______
______
______
Shackle ______
______
______
______
______
______
Shackle ______
______
______
SWL
Qty.
______
______
______
______
Size
Choking
Existing Padeye
Vertical
SWL
Qty.
Size
SWL
Qty.
Basket
KOM-SOPM-10 Revision : 1
Page 1 of 2
Transfer hose
Connecting hose
Prepared By:
Potential Hazards
KOM-SOPM-10 Revision : 1
Reviewed By:
S = Severity
Toolbox talk / Test engines and all related equipment prior to approach /
confirm to bunker ship ready to receive vessel / Approch slowly and
manoeuvre vessel carefully /Master to exercise discreation and good
judgments whether to continue operation or to cancel if weather
unfavaurable / Maintain Good communication with bunker ship / Ensure
vessel have good vender to avoid steel to steel contact / stop all hot work /
SOPEP equipment in placed / Contingencies preparedness.
Keep deck clean and tidy / Controlled passing of hose / Dont hold hose to
close to bulwalk top / Work orderly, dont rush concentrate on the job being
done.
Colour coding of Fuel and water manifold & hoses coupling / hose
connection to be done by competent person / connection to be double
checked by duty engineer / Keep hand fingers away from coupling when
connecting / Connecting to be done by two persons
Test engines and all related equipment prior to casting off / Confirm bunker
ship ready to release vessel / Ensure propeller is clear and all lines on deck /
good communication between bridge and deck crew / Master to exercise
good seaman ship to manoeuvre vessel clear of bunker ship / MSDS /
Gloves, cover alls, bunker procedure.
Approved By:
RUSDY / MASTER
Page 2 of 2