Вы находитесь на странице: 1из 10
Camm 780.872.5558 780.872.5587 #1128 6704—44 Street Lloydminster, AB. TV 18 ENGINEERING CALCULATION COVER SHEET Client- Erin Rommel Design & Drafting Phone: 306-825-3490 Contact ~ Fax Project- Cabin Deck & Carport cel APT, Anca 0k Deck beam Oke = Dick Heuk ok — 4-01 LAG serew EL Bie min fvitinaticw Tint Stack At Ledger &)stup connect — Fag. bs, Calculations ~ Performed by: SHB. Reviewed by: Ge Approved by: ‘e-mail: Samia Bhuiyan@2GENG.ca Date: 2012. Date: a iS Date: ® WST Dack Toiak 3 - Deck five load =I 9kpa = 3961 Pst ee eee cave ee Apri eee Pe ib we ost Tee Bee Fact tond per widtl = 195% a0een) + 1Sk3967 «1 2 261 F 59505 = e561 wte/te M@BL— + = ReK'4 = B5-GIKIAK# — BSER BAS XOS = 23gD78 — 45213 —— js = 79397665 ke = | a 56692 Be eatsel- 2 BelKITA5 - 56678 + 90972 bb = (4105 kn) - BHD mee SECT IG ~ SGI K RS 2 993772 - B3207¢ = 49206 wb-ft BSC XB KOS 2-453 ” @p S6e 99x 6S ~ WTCIK EES O'S 37591 — rears? WPS bb- Ft (2-55 kN.m Is skins 7°70 KN-m Vv bls 2 187 RN So, 8x% Toiat «a aeerfebee cam CChulars) Be DE KOS 636E 53 Wb = 28-33 kW 209179 ult * a Re fe > 30°30 KN.m Mr = 461 KN-m> hme Ve = ANE kn Ra Refer to fog 4 Coracdiiirs Unfecterel Live Lond only Relies 361 K1AY 7 — 396 (K BAS KO'S + 9881-8 -20019 = 61a ~ Kes 262-33 oo RO = s9-61K Ios — 262-33 = 60431 — 20239 = aoe Wie Vro7 ule 2 6158 N/mm 2209 Lines Ey 2 SS x Ware! A ethens = see ae ° Aalto Se 616K (tae z04 yt i ee » 4244 x10? S es Caiz0nd wot) So 130% 304 ( 52% 12) Sepruce Pre 20F “EF Street Grade & Ra = ee as KN f Vs osyk os 2833 4%, o329m" = 0 - Rig Bearing Area > gM 2 22571 a2'57 I So 24x 24x18 is Ok swt Esk ng Te eal 4 pS wy BEGLEY. Toe a 2 ~ Bi 12 518 N. Thm EsSny> Fel 5 Boer TS Ren BL Bee Fock Lead = 69417 Me [16 = e = 41560 W(t Ve = a1S 63x Iexos + 3305-02 tb 2 1GD KN Me ew 2 + 15 R016 Ute = 20°62 KNom Vn = 430 ew Mn 242 enem Refer te page © un ape 2 9868 (FE Mee po tees 2 529 def [wean Re = 235 )86 Re = 294 WP 2 gal N/mm Fon beam 2 294 Lb /iE = 22944 MISE oF 4 a ote + REL igs me Sweet Es Sy wea Basie Sg 321 x SK 304-94 Fea BS> = NTAT 7 R108 Nom > er (use emt So ox ft guomey Arca = HZ MY ayagm™ 2 onaarodaa nv KigA Beasung BER FIFA KITE Ine So adnaawia” a OK. Taye = 59 Pst De eke enfm’ = 2°22 Pat fe (tS x20 VSR FA) x Feck gad ot 6 ('a5 x20'92 TSK TAX ID 2 (eer + 7s) A033 2 1BN 4G Le J wtaen Vy = (BH tex1e Kos 2 1075-7 by (4785 KW) Mg 2 yt Fe eS soaite lS = 430272 Lb-Ft S834 DuNm me Pox ania Ma 27797 Me Ve 5 89 vy Mes ape = soxras = 665 Sh/utate = 097 /mw = lex seas ee 5 Bee amp n(ex sos sing? Ba * Ss once = BAEWXIO? Noma > Est pee Foundaticw chick Roof ik w= i6/a =84t Fleer Thi ws aft Mall Ws eft jauee € Roof tL = ta Kra = 25 por MOM DL OBES = B77 PH DL > O75 kpa = 1566 bo Fleez ii = = RAkPA > 50 psE lkra 2 209pse BD 5425) K Faet ude (vas x209 prsxso)re Gas 1566 FOF [ASKEIF x EXD) $09 +2566 4 175" « 12a wpe Ae aeuly ct ees ‘ 1780. 72.5558 372.5557 1128, 5708-48 Lloydminster, AB ENGINEERING CALCULATION Steet rev 1E8 lent Phone! @ contact re - - Project col “2412 Ledger Connection te) Stud | 1015-7 Lb (4785 kN) Zz ws 3 count Ge eek Jece oo $0, 3g DIA® Ley Sexe A aM sd Wh Bim mn Onde Sd Sa FE DIA Log Sem, With Seound Se eck Shedd W Bc mee pestacTom see w ove WW" DIA Lag Some vith be = 2 tol be 22H Latgoh & Bud inden © As 23x14 = 34220 Am 2USKTC = BGR 2 5250 Bm 2 BL > oss a2 724 x SAIXI = PBF Vy Ik DIA Jag Serer with be = Ahm m4, Pe nje 8% om ay AEs ae Qn H46xX32KIX1 at Cy neg, Kot mye 2 57H TAT Qn = ex asrsx int © T2AKNDY — ATR ea eee {700.872.5558 #1128, 5704-44 Set De 780.872.5557 Lloydminster, AB TOV 18 ENGINEERING CALCULATION lent, Phone: @ contac; a — Projgot_______ at: Bit YU DIK hag Sexe vith Lp ( j ned / Merah ma ey ax = 21015 \ \ 123 K\\/ An = 2053 5a Ix = Gaae KN / an = aybxadeaser el = + kal > uy ok So 3f- He" DIA Kay Seuces 3 jee pRabe ak sti the geantt Myer & Stud connecticw Var DIA\ bag Sencar th hp > in / Wye 232, Wal , Be = 16RS Os PORE MS-AKIK | = 52 KW tors , > wpe 4-1 DIA bag Sore> WV ain omen \fenitiateow sock stud at d-axio Ladges’ & stud connettoew — i Lote +: 780.872.5558 #1128, 5704 - 44 Street AS SITUA TRE CRS Wie ENGINEERING CALCULATION tent Prone ® Contact Fax Project — a DA Leg Sones ith lp > 3% 2-aK10 ‘ Sra hs 2 17869 0" Awe 2 36K Ho 5040, mm* 254 Bn = Qt x MF. Km x KE ote = VEKIAHD | = = 545 kW Ve OK ar Yorn Lag Sens ail Le 3K lf 23 Ks r Fp = 26S Qu = bPxXR6RS KIKI a 456 KN ONY So We need 4-14 DIA Lag Screw W/ 75 emmy Biretiatier To Stadia ot La hedger 2 Stud Conncetion — 2” RIGID INSULATION oT [BeLow GRADE EXT. 2’ MIN “ YN c To) 10"@ CONCRETE PIER 4'—0" HIGH | r/w 3-10M FULL DEPTH AND 10M RINGS @ 24” o/c EXT. VERTICAL REBAR TO FTG 24"x24"x12” FOOTING BASE w/ 3-10M REBAR e.w FOOTING AND PIER OUTSIDE BUILDING LINE

Вам также может понравиться