2014 Edition
VPOWER GENERATION
Table of Contents
Content
Chapter 1
1.
2.
3.
4.
5.
6.
Wrong activation. .
7.
Battery...
Chapter 2
1.
Common Operation..
2.
3.
4.
5.
Chapter 3
Daily maintenance.....
Chapter 4
Maintenance plan... 19
Chapter 5
Troubleshooting.. ... 20
Chapter 6
18
Chapter 1
1.
2.
been shortened.
If around the engine engine, the generator should not been started.
mixing into.
-- Inspect the lubricating system to make sure whether leakage exist.
Fuel Oil System
-- Inspect whether the valve of the fuel pipe is open.
-- Inspect whether the fuel pipe leaks.
-- Inspect the oil level of the fuel box to make sure that fuel should been supplied
before it is exhausted.
-- The vehicle must be level when checking the oil level to make sure the
measurement is correct.
CAUTION:
Never oprate the engine with the oil level below the low mark or above the high
mark.Wait at least 5 minutes after shutting off the engine to check the oil. This
allows time for the oil to drain to the oil pan.
-- Check the valve of the fuel oil pipeline to have to leak.
Air cleaner System
-- Inspect whether the air-cleaner device is clean and observe the indicator (if
with)when generator running.
-- Inspect the oil level of the oil tray of the wet air-cleaning device(if used).
-- Under extremely dirty conditions an air pre-cleaner can be used. Clean the
pre-cleaner jar and dry-type air cleaner dust pans daily or more often, as necessary,
depending on operating conditions.
The switch function of circuit.
-- Inspect whether all the terminal indicator lights of the switch system of
internal-combustion engine are ok.
-- Check the engine monitor system daily (push button to test) per the manufacturers
recommentation to verify proper operation.
Battery
-- Inspect whether the electricity bottle liquid is enough, and its proportion should be
higher than 1.265.
CAUTION:
When using jumper cables to start the engine, make sure to connect the cables in
parallel:positive(+) to positive(+) and negative (-) to negative(-). When using an
external electrical source to start the engine, turn the disconnect switch to the OFF
position. Remove the key before attaching the jumper cables.
Belt
-- Inspect the intensity of the strap of cooling fan and the charger(if one strap is
found wore, the whole group should been changed)
3
-- Measure the belt tension in the center span of the pulleys. Refer to the
manufacturers recommendations for the use of the belt tension gauge.
-- Visually check the belts every 250 hours or 6 months.Replace the belts that are
cracked or frayed. Adjust belts that have a glazed or shiny surface which indicates
belt slippage. Correctly installed andtensioned belts will show even pulley and belt
wear.
-- The belt must be correct tension, correct size or length, pulley alignment, correct
installation.
Control connecting pole
-- Inspect whether liquid force or the lubricating of the electronic timing pull pole is
sufficient.
-- If with wind-blocking gate controller, confirm whether the system is good and
lubricating is enough.
-- Well-ventilated.
-- Confirm whether the ventilating system of the crankcase of the
internal-combustion engine is good.
3.
3 ~ 8 bar
2 bar
194 ~ 226 oF ( 90 ~ 108 oC )
160 ~ 202 oF ( 60 ~ 95 oC )
2150F(1020C)
90 oF ( 32 oC )
Above CF
A . Check that the air switch of the controlling-panel should be on the OFF
position.
B . Turn the select switch on the MANUAL position, and then press down
START key.
C . Check every voltage by the switchover phase-order switch.
D . Check whether the frequency is normal or not.
F . Stop the engine and turn the switch on the AUTO position.
2 ) Loaded Test.
A . Check that the select switch is on the OFF position.
B . Check that the air switch of the controlling-panel is on the ON position.
C . Turn off the Mains electricity, the set will activate automatically after some
time.
D . Check every voltage by switchovering the phase-order switch.
E . Check whether the frequency is normal or not by the cymometer.
F . Check the load current by the amperemeter.
G . Check the oil-pressure (4~8 bar).
H . Check the temperature of the water.
Running the set 30 minutes under the situation of more than 50% of the rated load,
if the status is very well, you can turn to city electricity for power supply. And
before stopping, the set should be running unloaded for a period of time for
cooling.
I. Allow the engine to idle three to five minutes before shutting it off after a load
operation. This allows adequate cool down of pistons, cylinder liners, bearings
and turbocharger componens.
J. Turn the ignition key switch to the off position, the engine stop running. If
the engine fairs to stop running. Rotate the manual fuel shutoff thumb screw
counterclockwise to make sure the valve is not being held open by the manual
override screw.
Remark: International standard (CAN/CAS-C282-M89, 1989.5) regulates that all
generator should run loaded for 60 minutes every month.
5.
DANGER
The danger emblem indicates that if no close attention is paied to, it will cause
people injury and death, generation damage.
WANRNING
The warning emblem indicates that if no close attention is paied to, it will cause
serious people injury and death, generation damage.
CAUTION
The caution emblem indicates that if no close attention is paied to,it may cause
people injury or generation damage.
Remark :These emblems should been paied attention to during install,operation or
maintenance,but it does not mean danger.
These safety emblems should been pasted on the relative obvious position of the
generator group to remind the operators or maintenance technician of paying
attention to these potential danger. As to the explanation of these emblems,you can
refer to all the safety precautions in this manual to make sure whether you have
understood the meaning of these emblems like emblems loss or damage which
should been exchanged quickly.
6.
Wrong activation
Warning
7.
Battery
Warning
cause sparking.
-- The battery should been installed at well-ventilated place, and far away from
flammable gas.
The electrolyte of the battery can cause serious injury or death. the electrolyte can
cause permanent hurt to eyes,can burn skin and ablate clothes. So when working
around battery, should wear safety antiseptic glove. If electrolyte spatters to skin,
should rinse for 15 minutes with sufficient clean water. If electrolyte spatters to
eye, you should seek the first-aid kit for medicining. The battery cant be appened
vitriol or it may cause the electrolyte metamorphosing.
Exploding will cause serious hurt or death, the gas liberated by the battery may
cause exploding, so around the battery smoking is prohibited and blaze or sparkle
generation is prohibited. Especially when the battery is charging, you should avoid
touching the terminal with tools, avoil exploding caused by sparkle. Before you
move the battery, you should turn off the watch, finger ring and other bullion
ornements. Do not connecte the anode and the cathode of the activation generation
shortly. Do not tset the capacity of the electric-bottle in the way of short, the
sparkle may emblaze the gas liberated by the battery or steam of fuel oil. The case
contained
battery should be put in the breezy place to avoid explosive
gathering. Do not pull out the electric tie-in when charging to avoid sparkle
generation.Before pulling out the electric tie-in, you should turn off the power of
the charger first.The cathode of the power should be dismantled first and
connected last.
-- Removal: Disconnect the (-) negative battery cable first, then disconnect the (+)
positive cable.
-- Connect: Connect the (+) positive battery cable first, then connect the (-) negative
cable.
--
Do not add cold coolant to a hot engine. Engine castings can be damaged. Allow
the engine to cool to below 50 before adding coolant.
Air cleaner:
Clean the air cleaner jar and pans daily or more often, as necessary, depending on
-operating conditions.
Other
Check the oil pressure indicators, temperature indicators, warning lights and other
-gauges to make sure they are operational.
Check the engine monitor system (push button to test) per the manufacturers
-recommendation to verify proper.
2.
3.
Note: panel electric elements arrangement may not agree with actual, please use the actual
arrangement shall prevail.
ymbol
W1
term
Genset Controller
DSE 8610
W2
PB1
L
B1
A
SW1
SW2
SW3
SW4
SW5
SW6
4.
10
4.1
ICON DESCRIPTIONS
11
4.2
4.2.1
OPERATION
CONTROL
Control of the DSE 8610 module is via push buttons mounted on the front of the module
with STOP/RESET, MANUAL, AUTO, ALARM MUTE/LAMP TEST and START functions.
For normal operation these are the only controls which need to be operated. The smaller push
buttons are used to access further information such as engine instruments and load switching.
Detail of their operation is covered later in this document. The following descriptions detail the
sequences followed by a module containing the standard factory configuration. Always refer
to your configuration source for the exact sequences and timers observed by any particular
module in the field.
CAUTION: - The module may instruct an engine start event due to external influences.
Therefore, it is possible for the engine to start at any time without warning. Prior to performing
any maintenance on the system, it is recommended that steps are taken to remove the battery
and isolate supplies.
12
4.2.2
Automatic mode is used to start the set in response to an external start requirement from another
device. A number of options exist for the remote start input (selectable using 5xxx configuration
software).
Remote Start on Load input indicates to the controller that it should start the set, and run off load.
Remote Start on Load input indicates to the controller that it should start the set, synchronise (if
required) and share load with any other sets in the system.
Remote Start on Load Demand input indicates to the controller that it should start the sets,
synchronise (if required) and share load with any other sets in the system, automatically starting and
stopping sets on changing load demand.
NOTE: - If a digital input configured to panel lock is active, changing module modes will
and i
panel lock is active the Panel lock indicator (if configured) illuminates.
NOTE:- If the Remote Start signal is removed during the Start Delay timer, the unit will
t
db
t t
After the above delays the Fuel Solenoid (or enable ECU output if configured) is energised, then
one second later, the Starter Motor is engaged.
NOTE:- If the unit has been configured for CAN Bus, compatible ECUs will
receive the start command via CAN Bus. Refer to the Manual CAN and DSE Wiring. Part
No. 057- 004 for more information on utilising DSE modules with electronically
controlled engines.
The engine is cranked for a pre-set time. If the engine fails to fire during this cranking attempt then
the starter motor is disengaged for the pre-set rest period. Should this sequence continue beyond the
13
-- VPOWER-- Operation Manual -set number of attempts, the start sequence will be terminated and Fail to Start fault will be displayed.
When the engine fires, the starter motor is disengaged and locked out at a pre-set frequency
measured from the alternator output. Alternatively, a Magnetic Pickup mounted on the flywheel housing
can be used for speed detection (This is selected by PC using the 5xxx series configuration software).
Rising oil pressure can also be used to disconnect the starter motor, however it cannot be used for
underspeed or overspeed detection.
NOTE:-A load transfer will not be initiated until the Oil Pressure has risen. This
prevents excessive wear on the engine.
After the starter motor has disengaged, the Safety On timer is activated, allowing Oil Pressure, High
Engine Temperature, Under-speed, Charge Fail and any delayed Auxiliary fault inputs to stabilise
without triggering the fault.
If the system has been started by a remote start off load input, the set will run off load.
Otherwise, the Warm Up timer, if selected, is initiated, allowing the engine to stabilise. After the
Warm-up timer has expired then the module will close the load switching device.
In the case of a single generator system, the Generator Contactor/Breaker will be instructed to
close. The generator will then supply the requirements of the load.
On a multi-set system, if the common generator bus is live, the 8610 module will first synchronise
the generator to the bus before closing the Generator Contactor/Breaker.
A token is held by the module that first closed onto the dead bus and as only one token exists for
each multi-set system, this prevents other sets in the system from attempting to close their own
breakers.
For added security, the modules also monitor the bus. If this is found to be live, then the
synchronisation process begins.
Once the load switching device is closed, the 8610 will then ramp to share the load with the other
generators in the system.
NOTE:-A load transfer will not be initiated until the Oil Pressure has risen. This
prevents excessive wear on the engine.
When the Remote start signal is removed, the Stop delay timer is initiated. Once this has expired,
the module will ramp the load from the generator to remaining set (Multi-set systems only). The
Generator Contact/Breaker will open and the Cooling timer is then initiated, allowing the engine a
cooling down period off load before shutting down. Once the Cooling timer expires, the Fuel Solenoid
is de-energised, bringing the generator to a stop.
14
-- VPOWER-- Operation Manual -For full details of multi-set operation please refer to the manual The Guide to sync and load share
Pt1
Should the Remote Start signal be re-activated during the cooling down period, the set will return on
load.
NOTE:- When synchronising is enabled, the bus is checked before closing any
load switching device. If the bus is live, synchronising will take place before any closure
takes place.
- Synchronising can be disabled if the application does not require this function.
Contact your genset supplier in the first instance for further details.
- The internal Scheduler can be configured to operate the system in the same manner
as described for the Remote start input. Please refer to the 5xxx Configuration Software
manuals for full details on the feature.
4.2.3
provide fault finding and diagnostic testing of the various operations normally performed during
Automatic mode operation.
MANUAL, mode is selected by pressing the pushbutton. An LED besides the button will illuminate to
confirm this operation. When the START (
sequence.
NOTE: - There is no Start Delay in this mode of operation.
If the pre-heat output option has been selected, this timer will be initiated and the auxiliary output
selected energised.
After the above delay, the Fuel Solenoid (or ECU output if configured) is energised, and then one
second later, the Starter Motor is engaged.
NOTE:- If the unit has been configured for CAN Bus, compatible ECUs will receive
the start command via CAN Bus. Refer to the Manual CAN and DSE Wiring. Part No. 057004 for more information on utilising DSE modules with electronically controlled
engines.
The engine is cranked for a pre-set time. If the engine fails to fire during this cranking attempt then
the starter motor is disengaged for the pre-set rest period. Should this sequence continue beyond the
set number of attempts, the start sequence will be terminated and Fail to Start will be displayed.
When the engine fires, the starter motor is disengaged and locked out at a pre-set frequency
measured from the Alternator output. Alternatively, a Magnetic Pickup mounted on the flywheel housing
can be used for speed detection (This is selected by PC using the 5xxx series configuration software).
Rising oil pressure can also be used to disconnect the starter motor; however, it cannot be used for
underspeed or overspeed detection.
After the starter motor has disengaged, the Safety On timer is activated, allowing Oil Pressure,
15
-- VPOWER-- Operation Manual -High Engine Temperature, Under-speed, Charge Fail and any delayed Auxiliary fault inputs to
stabilise without triggering the fault.
Once the engine is running, the Warm Up timer (if selected) is initiated, allowing the engine to
stabilise before it can be loaded. Once the warm up timer has expired the generator is then
available to go on load and the Generator Available LED will illuminate on the front panel.
The generator will run off load unless:
1. A Remote Start on load signal is applied
2. An on-load run is configured in the scheduler.
3. The Close Generator button is pressed.
On a multi-set system, if the common generator bus is live, the 8610 module will first synchronise
the generator to the bus before closing the Generator Contactor/Breaker to close.
A token is held by the module that first closed onto the dead bus and as only one token exists,
this prevents other sets in the system from attempting to close their own breakers.
For added security, the modules also monitor the bus. If this is found to be live, then the
synchronisation process begins.
During the parallel run the module can be configured to either run at a fixed level output, such as
when used in parallel with an infinite bus. Alternatively, it can be configured to load share with
other generators on the bus. For full details of these mode please refer to the manual The Guide
to sync and load share Pt1
If the Open Generator button is pressed while in parallel, the module will ramp the load on the
If the Open Generator button is pressed and the generator is connected to the common generator
bus then the load is ramped off the generator and the contactor/breaker is opened.
If Auto mode is selected and the remote start on load signal not active, and the scheduler is not
calling for a run, then the Return Delay Timer will start.
Once this has expired then the module will exit parallel operation and will ramp the load back to the
remaining generators. It will then open the Generator Contactor/Breaker. The generator will then run
off load allowing the engine a cooling period.
Selecting STOP (O) de-energises the FUEL SOLENOID, bringing the generator to a stop.
WARNING: - Operation of the STOP button in any mode will stop the generator operation
and return the load switching system to a safe state. This operation may lead to loss of
supply to the load. It is recommended that the STOP button is only operated once the
generator is OFF LOAD and the mains supply provides power to the load.
- Synchronising can be disabled if the application does not require this function.
Contact your genset supplier in the first instance for further details.
- When synchronising is enabled, the bus is checked before closing any load witching
device. If the bus is live, synchronising will take place before any closure takes place.
:- Upon closing the load switching device, the module checks that the bus becomes live.
If it does not, an alarm is generated to indicate the problem.
5.
). Then press the Start button( ),The generator will running,observed the
volt and RPM, They are normal , then press the load switch(
the volt and RPM, They are normal , then press the button (
generator will automatically monitor the volt, RPM, phase angle on the MAINS, and
auto close the Gen ACB.
).The genset will running when it received the remote starting signal.
The controller of the generator will automatically monitor the volt, RPM, phase angle
on the MAINS, and auto close the Gen ACB.
17
6. Detailed the maintenance procedures too much, please refer to ENGINE &
ALTERNATOR Operation and maintenance Manual.
18
STAND BY GENSET: Half a year replaced the fuel filter ---TYPE: FS1006
QUANTITY`: 2entries
2OIL FILTER
filterSTAND BY GENSET: Half a year replaced the by pass oil filter---TYPE : LF777
QUANTITY : 2entries
5AIR FILTER
GENSET: one year replaced the air filter, Also according to the filter indicator to replaced.
---TYPE : AH1135QUANTITY : 2entries
6MIXING TANK WATER
coolant water
7REMOTE TANK WATER
coolant water
8DAILY OIL TANK Check the oil level daily, added fuel oil in time.
9LUBRICATION OIL Replacement of half a year.
10THE GENERATOR SET IN A SMALL MAINTENANCEPlease refer to Engine
Opration and Maintenance Manual.
11THE GENERATOR SET IN A HEAVY MAINTENANCEPlease refer to Engine
Opration and Maintenance Manual.
19
Chapter 5
Troubleshooting
CAUSE
Battery voltage too low or bad;
CORRECTIONS
Charge or replace;
20
Fuel contaminated
Detailed the maintenance procedures too much, please refer to Engine & Alternator
Operation and maintenance Manual.
21
Chapter 6
Tel08522687 6517
Fax08522687 6854
E-mail : sales@vpowerhk.com
Design
Manufacture
Service
Generator Set Manufacturer
Parallel Panel Manufacturer
Power Quality & Saving System
Power Monitoring System
Environmental Management
Filtering Equipment & System
Genuine Engine Parts
Engine Overhaul Services
22