Item No.
1
2
3
4
5
Description
Qty. Required
160 DS
Sealant Tape - Butyl
75 (1900mm)
Flashing Screw
16
Speed Nut
16
Corner Washer
2
Sealant Cartridge
1
Polyurethane (not included)
290 DS
80 (2000mm)
18
18
2
2
2. Flashing Screw - 2
(50mm)
stainless steel
(76mm)
dia.
3. Speed Nut
4. Corner Washer - 3
www.solatube.com
v1.4
Diagram A
Step 1. For 4 (102mm) high flashings, draw a circle 1 (25mm) smaller than the inside
of the turret base onto the roof panel. For 6 (152mm) high flashings, draw a circle 13/4 (44mm) inside of the turret base. Draw a second line outlining the outer flange
perimeter. Diagram A
small
circle
1-1.75
(25-44mm)
NOTE: Depending on rib pattern as well as size and location of flashing; the turret may intersect: none, one, or multiple ribs. When necessary to trim flashing flange due to conflict with adjacent rib, maintain
minimum 2-1/2 (64mm) wide flange and rib/turret spacing to provide
adequate sealant bed and adequate width for water runoff. If water
flow is significantly blocked, water level may rise above rib overlap joint
flashing turret
and cause leaks.
flashing flange
Either octagonal or
min.
2.25
round cut flashing
(64mm)
bases may be used.
roof downslope
Step 2. On the lower half of the flashing, trace the intersecting outline of the roof
panel rib(s) onto the base flange and turret section as shown. Diagram B
Diagram B
rib spacing
rib
outline
2 3/4
(51mm)
Diagram C
Step 3. Remove flashing. For 4 (102mm) high flashings, draw a horizontal line 2
above top edge of smaller circle. For 6 (152mm) high flashings, draw a
horizontal line 2-3/4 (70mm) above top edge of smaller circle. From the two points
where this line intersects the outer circle, connect two straight lines to the small
circle as shown. With tin snips, cut roof panel along resulting tulip shaped line
(marked cutout area). Diagram C
(51mm)
horizontal
line
cutout
area
www.solatube.com
v1.4
Step 4. If rib segments are more than 1/4 (6mm) wide, cut and form end caps out of scrap cutout material and cap the
up-slope ribs. Diagram D & E
Diagram E
Diagram D
upslope
ribs
end cap
roof hole
corner
roof downslope
Diagram F
Step 5. Slip upper edge of flashing base under horizontal cut in roof panel then
lower flashing onto roof. Diagram F Cut lower portion of flashing as outlined in step
2 to allow roof ribs to protrude through flashing as shown in Diagram G & H.
Ensure the flange fits snugly into upper corners of roof hole and lower portion of
flashing fits tightly over rib(s).
end view
Diagram H
Diagram G
end view
butyl tape
butyl tape
Diagram I
Step 6. Trace a line along the horizontal roof cut onto flashing base. Remove flashing and apply butyl sealant tape on
top of the upper portion of the flashing 1/4 (6mm) above the
horizontal roof cut line. Apply butyl sealant tape on the bottom of the lower portion of the flashing base 1/4 (6mm) in
from the outer edge starting and ending below the horizontal roof cut line (include area around the rib cut-out(s). Set
flashing aside. Fill exposed roof rib ends with extra butyl
sealant tape to seal ends. Note: To apply butyl sealant
tape, unroll directly onto flashing surface as you remove
backing paper. Butyl tape will not bend around corners
without removing backing.
top view
bottom view
www.solatube.com
v1.4
Diagram I
Diagram I
Diagram J
Diagram J
Step 7. Using wire brush, appropriate solvent, and rag; clean and dry roof surfaces that will come in contact with flashing. Install flashing snugly into the
that will come in contact with flashStep 7. Using wire brush, appropriate solvent, and rag; clean and dry roof surfaces
horizontal roof cutout
roof panel. Ensure that flange fits
ing. Install flashingsnugly
snugly
the
bore
intointo
upper
corners of roof
3/16 hole
horizontal roof cutout
(5mm)
roof panel. Ensurehole,
thatand
flange
fitsthe lower portion
ensure
bore
of
flashing
fits
over
rib(s).
Pre-bore
snugly into upper corners of roof
3/16 hole
3/16 holes
3/16 (5mm) holes at the intersection
5 (127mm) typical
(5mm)
hole, and ensure the
lower portion
spacing
(5mm)
of flange and horizontal roof cut
of flashing fits overout,
rib(s).
at 5 Pre-bore
(127mm) increments
3/16 holes
the intersection
3/16 (5mm) holes ataround
the perimeter of the flash5 (127mm) typical
spacing
(5mm)
ing, androof
adjacent
of flange and horizontal
cut to both sides of
ribs as shown. Diagram J
Diagram K
corner washer
fastener
Diagram K
butyl
sealant tape
corner washer
butyl
sealant tape
Diagram L
seal inside
roof rib
downslope
roof rib
a 1/2
(13mm) bead
polyurethane
roof sealant into all exposed
Step 10. Forceroof
sealant
overof joint
between
Step 9. Spread polyurethane
overlap joints and fastening penetrations. Force into crevices, then detail and
rib and turret located inside turret.
feather edges with putty knife. Be sure to cover all exposed butyl tape with
Diagram L
polyurethane sealant as butyl tape is not designed to be exposed to outside elements. This will also prevent dirt and dust buildup on the butyl tape.
Diagram M
Diagram M
Diagram L
seal inside
downslope
polyurethane
sealant
(13mm)
beadInstallation
of polyurethane
roof sealant
into all exposed
Step 10. Force a 1/2
For the
most current
Instructions, please
visit www.solatube.com/instructions
International,
Inc. Copyright 2007
2210crevices,
Oak Ridge Way,then
Vista, CA
92081-8341
overlap joints and Solatube
fastening
penetrations.
Force into
detail
and
feather edges with putty knife. Be sure to cover all exposed butyl tape with
polyurethane sealant as butyl tape is not
to be exposed please
to outside
eleFordesigned
more information
Call
ments. This will also prevent dirt and dust buildup on the butyl tape.
231-399-0700
Diagram M
Email: sales@eco-buildingproducts.com
Diagram M
www.solatube.com
v1.4
polyurethane
sealant
4
For the most current Installation Instructions, please visit www.solatube.com/instructions
Solatube International, Inc. Copyright 2007
www.solatube.com
v1.4