Вы находитесь на странице: 1из 7

R

PAGE

___

OF

___

NO.

JOB NO.
CLIENT
LOCATION
SUBJECT

REVISION

DATE

00-3310

BY

PT.VICO INDONESIA
BADAK FIELD, EAST KALIMANTAN

CHECK

RECTANGULAR 2nd PILE ARRANGEMENT

PILE FOUNDATION
c
=
2.400
h
=
0.600
k
=
0.500
n
=
1.800
p
=
1.800
q
=
0.300
gc
=
2.400
gs
=
1.560

AR

REVIEW
APPR.

m
m
m
m
m
m
t/m3
t/m3

p
n

Pile Arrangement
L
=
D
=
ID
=
gp
=
Ap
=
p
=
sp
=
mx
=
ny
=
n
=

12
300
180
0.109
0.0707
0.9425
1.80
2
1
2

m
mm
mm
t/m
m2
m
m
nos
nos
nos

pile length
pile outside diameter
pile inside diameter
pile weight
pile area
pile perimeter
length between pile
number of pile x-dir
number of pile y-dir
total number of pile

Efficiency Group Pile for Axial


arc.tg D/sp
q
=
1 - q.[(ny - 1).mx + (mx - 1).ny]/90.mx.ny
Eg1
=

=
=

9.46
0.95

Efficiency Group Pile for Lateral


sp/(6.D) >0,5
Eg2
=

1.00

Pile Allowable Capacity


PC
=
0.95
PT
=
0.95
PH
=
1.00
PM
=
1.00
LOADING DATA

x
x
x
x
(see page

Vertical Load at each pedestal


Vertical Load
Horizontal Load at each pedestal
Seismic Load

Moment Load at each pedestal


Seismic Moment

Combined Vertical Load


E(O)
=

V1 + V2

22.06
21.74
1.31
2.39

=
=
=
=

degrees

20.96
20.65
1.31
2.39

ton
ton
ton
ton

allowable compression
allowable tension
allowable lateral
allowable moment

V1
V2

=
=

1.230
1.203

ton
ton

at pedestal 1
at pedestal 2

H1x
H1y
H2x
H2y

=
=
=
=

-0.001
0.000
0.001
0.000

ton
ton
ton
ton

at pedestal 1
at pedestal 1
at pedestal 2
at pedestal 2

M1x
M1y
M2x
M2y

=
=
=
=

-0.018
0.000
-0.005
0.000

ton m
ton m
ton m
ton m

at pedestal 1
at pedestal 1
at pedestal 2
at pedestal 2

2.433

ton

Combined Horizontal Load


HSx
=
H1x + H2x
HSy
=
H1y + H2y

=
=

0.000
0.000

ton
ton

Combined Moment Load


Excentricity cause by vertical load
ex
=
[V1.(c/2-n/2) + V2.(c/2+n/2)] / E(O) - c/2
MSx
=
M1x + M2x
MSy
=
M1y + M2y + E(O).ex

=
=
=

-0.010
-0.023
-0.024

m
ton m
ton m

Foundation Weight
Wf
Wpi
WF

=
=
=

1.73
2.61
4.33

ton
ton
ton

footing weight
pile weight
total weight

=
=

0.000
0.000

ton
ton

< 1.31ok

=
=
=

(h.c.k).gc
(n.L).gp
Wf+Wpi

PILE CAPACITY
Lateral Load (x - direction)
Total Horizontal Force (Hx)
Hx
=
HS(O)
H1
=
Hx / n
Total Axial Force (Pu)
Qg
=
WF+E(O)
My

MS(O)+HS(O).k

=
=

6.767
0.024

ton
ton.m

wy
Pu+
Pu-

=
=
=

S xi2 / xi
Qg / n + My / wy
Qg / n - My / wy

=
=
=

3.600
3.390
3.377

m
ton
ton

< 20.96...ok
> 0ok

Total Axial Force


Qg
=
WF+E(O)
Qg/n
Q1
=

=
=

6.767
3.384

ton
ton

< 20.96...ok

Total Horizontal Force


Hp
=
HS(O)

0.000

ton

< 1.31ok

0.024

ton

< 2.39ok

=
=

9.474
0.045

ton
ton.m

4.3084 ton.m/m'

1.2925 ton.m/m'

Lateral Load (y - direction)

Total Moment Force


Mp
=
MS(O)+HS(O).k
Rebar Calculation for Pilecap of Foundation
L
P
M

=
=
=

1.800
m
1,4.[WF+E(O)]
1,7.1,1.MSy + 1,7.1,1.HSx.k/2

Maximum Positif Moment


M+
=
M + 1/4.P.L

P
M
L

Maximum Negatif Moment


M=
30%.M+
Design of Flexural Reinforcement

Bottom Reinforcement
b
=
100
h
=
50
d
=
42.5
fc'
fy
M+
Rn
r
r min

=
=
=
=
=
=
=
13

As
D

kg/cm
210
kg/cm2
4000
4.3084 ton.m/m'
M+ / (0,9.b.d2)
0,85 .fc' / fy [1 - (1 - 2.Rn / 0,85 .fc')0.5]
0.0018
larger r bd & r min.bd
@

Top Reinforcement
b
=
100
h
=
50
d
=
42.5
fc'
fy
MRn
r
r min

=
=
=
=
=
=
=
13

As
D

cm
cm
cm

150

As =

8.84

=
=

2.6503
0.00067

7.65

=
=

0.7951
0.00020

7.65

cm2/m'

=
=

113.88
63.19

cm
ton

6.33

ton

cm2/m'

cm /m'

cm
cm
cm
2

kg/cm
210
kg/cm2
4000
1.2925 ton.m/m'
M- / (0,9.b.d2)
0,85 .fc' / fy [1 - (1 - 2.Rn / 0,85 .fc')0.5]
0.0018
larger r bd & r min.bd
@

150

As =

8.84

cm /m'

Check of Punching Shear


two way action shear
kg/cm2
fc'
=
210
d
=
42.5
cm
1/2.p.(D+d)
bo
=
(pile critical perimeter)
j Vn
0,85.1,06(fc')0.5 bo.d
=
Pu+

1,7.1,1.Qp

< 63.19...ok

SETTLEMENT CALCULATION
Bg
Lg
m
Ep
cp
Esp
cs
Ess

=
=
=
=
=
=
=
=

0.30
2.10
0.3

m
m

200000

kg/cm2

6.5

t/m2
=

250.cp

3.175
250.cs

t/m2
=

pile group width


pile group Length
poisson ratio
modulus of elasticity of pile
cohesion of soil below the tip of the pile
1625
t/m2 modulus elasticity of soil below the tip of the pile
cohesion of soil average along the pile shaft
793.75
t/m2 modulus elasticity of soil average along the pile shaft

Immediate Settlement due to Pile deformation


Qp
Qg/n
=
=
3.38
ton
Qwp
=
0.049
ton
end bearing contributed by pile load
Qws
=
3.331
ton
friction contributed by pile load

x
Si1

=
=

0.67
triangular friction distribution on pile
[Qwp + x.Qws].L /(Ap.Ep)
=

0.0002

=
=

0.6936
1E-04

t/m2

=
=

4.2136
0.0004

Immediate Settlement of Pile


Si
=
Si1 + Si2 + Si3

0.0007

Immediate Settlement of Group Pile


Sg
Si.(Bg/D)0.5
=

0.0007

Immediate Settlement due to End Bearing Load


Iwp
=
0.82
influence factor
qwp
Qwp/Ap
=
Si2

qwp.D/Esp .(1-m ).Iwp

Immediate Settlement due to Friction Load


Iws
2+0,35.(L/D)0.5
=
influence factor
Si3

[Qws/p.L].D/Ess .(1-m2).Iws

Consolidation Settlement at Center of Group Piles


Pc
=
preconsolidation pressure
eo
=
initial void ratio
Cc
=
compression index
=
0,75.(eo - 0.8)
Hough approach for highly micaceous soils
Cs
=
swell index
=
1/6.Cc
H
=
settlement calculation for 12.5 m below footing
Qg
=
6.77
ton
Dp
Qg / [(Bg+z).(Lg+z)]
=

2/3L
L

1
2

If Pc < Po Normally Consolidation (NC) - Eq.1


S Cc.H/(1+eo) .log [(Po+DP)/Po]
Sc
=
If Po < Pc < Po+Dp Over Consolidation (OC) - Eq. 2
S Cs.H/(1+eo) .log [pc/po] + Cc.H/(1+eo) .log [(Po+DP)/Pc]
Sc
=
If Pc > Po + Dp Over Consolidation (OC) - Eq. 3
S Cs.H/(1+eo) .log [(Po+DP)/Po]
Sc
=
H (m)

z (m)

gs (t/m2)

Pc (t/m2)

eo

Cc

Cs

Dp (t/m2) Po (t/m2)

Sc (m)

8.5
9.5
10.5
11.5
12.5

0.5
1.5
2.5
3.5
4.5

1.590
1.590
1.590
1.590
1.660

10.5
21
21
21
14

2.05
1.64
1.64
1.64
1.16

0.9375
0.63
0.63
0.63
0.27

NC
NC
NC
NC
NC

3.2534
1.0443
0.5254
0.318
0.2136

24.016
25.606
27.196
28.786
30.411

0.017
0.0041
0.002
0.0011
0.0004

S Sc

0.0246

0.0253

25.32

mm

Total settlement at Center of Group Piles


Sig + Sc
Scenter
=
=
Material Take Off
Foundation
Pile
Rebar (75 kg/m3)
Formwork (4.96 m2/m3)
Leveling concrete (50 mm)
Excavation

Total
0.72
24.00
54.00
3.57
0.07
2.24

unit
m3
m
kg
m2
m3
m3

Eq. 1
Eq. 1
Eq. 1
Eq. 1
Eq. 1

check

Backfill
Soil Disposal
Bowplank

2.24
0.00
6.00

m3
m3
m1

f
e

f
a
h2
t

h1
backfill

Вам также может понравиться