Вы находитесь на странице: 1из 12

KINGDOM OF SAUDI ARABIA

MINISTRY OF HOUSING
AL-KHARJ SITE (PACKAGE-02)

MONTHLY STATEMENT NO.01

Employer:

MINISTRY OF HOUSING (MOH)

Consultant:

SAUDI ARABIAN PARSONS LTD. (SAPL)

Contractor:

AL-AYUNI INVESTMENT & CONTRACTING CO.

Apply on:

Month: JUNE, 2014

Sheet1of1
MONTHLY STATEMENT NO.01
Month: JUNE, 2014

KINGDOM OF SAUDI ARABIA

MINISTRY OF HOUSING AL-KHARJ SITE


PACKAGE-02

Employer:
MINISTRY OF HOUSING (MOH)
Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)
Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

ITEM SUMMARY SHEET


Bill No.:
IRRIGATION RESERVOIR AND PUMPING STATION
Description: SITE DEVELOPMENT INCLUDING AUXILIARY STRUCTURES
Item No.:
1.0 (1.1)

Sub-Bill No.

Description

Unit

BOQ Estimated
(Quantity)

Upto Date
(Quantity)

Previous Month
(Quantity)

This Month
(Quantity)

7=5-6

All works should be as per Local Authority requirements


1.0

SITE DEVELOPMENT INCLUDING


AUXILIARY STRUCTURES

1.1

Site Grading Works including clearing and grubbing, earthworks and


other items to complete as per specifications

Total Carried Forward to Grand Summary

Prepared By:

Contractor Representative
Al-Ayuni Investment & Contracting Co.

Sq.m

3,785.000

3,600.019

Sq.m

3,785.000

3,600.019

3,600.019

3,600.019

Checked By:

Consultant Representative
Saudi Arabian Parson Ltd. (SAPL)

Sheet1of1
MONTHLY STATEMENT NO.01
Month: JUNE, 2014

KINGDOM OF SAUDI ARABIA

MINISTRY OF HOUSING AL-KHARJ SITE


PACKAGE-02
Employer:
Consultants:
Contractor:

MINISTRY OF HOUSING (MOH)


SAUDI ARABIAN PARSONS LTD. (SAPL)
AL-AYUNI INVESTMENT & CONTRACTING CO.

Bill No.:
Description:
Item No.:

Irrigation Reservoir and Pumping Station


Clearing & Grading
1.0

ITEM MEASUREMENT SHEET

Sr. No.

Description

Unit
3

1.1

Site Grading works including clearing and


grubing, earthworks and other items to
complete as per specifications

1.1

Clearing & Grading

Nos

Quantity
3
(m )

Remarks

8 = (4x5x6x7)

For Quantity Ref


Drawing No.

Approved Northing & Easting

002_02_17_03_001

Northing

Easting

(i)

2663289.714

734556.000

(ii)

2663298.391

734615.370

(iii)

2663233.803

734564.172

(iv)

2663242.479

734623.541

Total upto date Quantity (Sq.m)

Sq.m

60.00

60.00

3,600.019

3,600.019

Previously Certified. (Sq.m)

This Month Quantity (Sq.m)

3,600.019

Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.

Checked By:
Consultant Representative
Saudi Arabian Parson Ltd. (SAPL)

Sheet1of1
MONTHLY STATEMENT NO.01
Month: JUNE, 2014

KINGDOM OF SAUDI ARABIA

MINISTRY OF HOUSING AL-KHARJ SITE


PACKAGE-02

Employer:
MINISTRY OF HOUSING (MOH)
Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)
Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

ITEM SUMMARY SHEET


Bill No.:
IRRIGATION RESERVOIR AND PUMPING STATION
Description: IRRIGATION TANK RESERVOIR & INTAKE CHAMBERS
Item No.:
2.0 (2.1)

Sub-Bill No.

Description

Unit

BOQ Estimated
(Quantity)

Upto Date
(Quantity)

Previous Month
(Quantity)

This Month
(Quantity)

7=5-6

Construction of RC Reservoir & Intake chamber comple with civil,


mechanical and electromechanical as shown on the drawings and
stardard with MOH.
2.0

2.1

IRRIGATION TANK RESERVOIR &


INTAKE CHAMBERS
Earthworks
Excavation in all type of soil including rocks by using equipment,
mechanical tools and store excavated soil for backfilling in approved
area and remove the remaining to backfilling area

Total Carried Forward to Grand Summary

Prepared By:

Contractor Representative
Al-Ayuni Investment & Contracting Co.

Cum

5,670.000

3,445.959

Cum

5,670.000

3,445.959

3,445.959

3,445.959

Checked By:

Consultant Representative
Saudi Arabian Parson Ltd. (SAPL)

Sheet1of1
MONTHLY STATEMENT NO.01
Month: JUNE, 2014

KINGDOM OF SAUDI ARABIA

MINISTRY OF HOUSING AL-KHARJ SITE


PACKAGE-02
Employer:
Consultants:
Contractor:

MINISTRY OF HOUSING (MOH)


SAUDI ARABIAN PARSONS LTD. (SAPL)
AL-AYUNI INVESTMENT & CONTRACTING CO.

Bill No.:
Description:
Item No.:

Irrigation Reservoir and Pumping Station


Structural Excavation
2.0

Sr. No.

Description

Unit

Nos

NGL

ExcLevel

Differ-

Avg.
Height

Width

Length

Quantity
3
(m )

Remarks

7 = (5-6)

8 = Avg-

10

11 = (8x9x10x4)

2.1
1.1
(i)
(ii)
(iii)
(iv)
(v)
(vi)
(v)

(vi)
(vii)

ITEM MEASUREMENT SHEET

Excavation in all type of soil including roaks by


using equipment etc. and store excavated material for
backfill
Underground Storage Tank
Grid A Line 1 ~7
Grid B Line 1 ~7
Grid C Line 1 ~7
Grid D Line 1 ~7
Grid E Line 1 ~7
Grid F Line 1 ~7
Sump Portions
With Grid A Line 4 (Section C & D)
With Grid A Line 1 (Section C & D)
Grid b/w C1~D1 & Line b/w 1~2 (Sec K & I)
Sump Pit (b/w Grid D1~E1 Line 0~1)
Electrical Room Foundations
Footing
Tank Inlet Station
Inlet Tank Portion
Inlet Sump Pit Portion

Total upto date Quantity (Cum)


Previously Certified. (Cum)
This Month Quantity (Cum)

Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.

For Quantity Ref Drawing No.


WIR No. 0294& 0294 (Rev-1)
Cum
Cum
Cum
Cum
Cum
Cum

1
1
1
1
1
1

465.673
465.441
465.441
465.022
465.022
465.208

460.749
460.774
460.799
460.824
460.649
460.874

4.924
4.666
4.642
4.198
4.373
4.334

4.795
4.654
4.420
4.285
4.354

Cum
Cum
Cum
Cum

1
1
1
1

460.749
460.749
460.831
465.208

459.249
459.249
459.331
461.923

1.500
1.500
1.500
3.285

1.500
1.500
1.500
1.485

Cum

465.022

464.123

0.899

0.899

Cum
Cum

1
1

465.208
465.208

462.724
460.874

2.484
4.334

2.484
4.334

29.000
29.000
29.000
29.000
29.000
Avg
Avg
Avg

5.250
5.000
5.000
5.000
5.250

730.077
674.830
640.864
621.397
662.820

002_02_17_03_003a & 06_001


002_02_17_03_003a & 06_001
002_02_17_03_003a & 06_001
002_02_17_03_003a & 06_001
002_02_17_03_003a & 06_001

2.877
2.877
3.500
1.400

9.934
9.934
15.986
2.911

002_02_17_03_003a & 08_006


002_02_17_03_003a & 08_006
002_02_17_03_003a & 08_006
002_02_17_03_003a & 08_006

2.000

2.000

7.192

002_02_17_03_003a & 08_008

3.875
1.975

3.850
3.850

37.058
32.955

002_02_17_03_003a & 08_008


002_02_17_03_003a & 08_008

2.302
2.302
3.045
1.400

C/C
C/C
C/C
C/C
C/C
Avg
Avg
Avg

3,445.959
3,445.959

Checked By:
Consultant Representative
Saudi Arabian Parson Ltd. (SAPL)

Sheet1of1
MONTHLY STATEMENT NO.01
Month: JUNE, 2014

KINGDOM OF SAUDI ARABIA

MINISTRY OF HOUSING AL-KHARJ SITE


PACKAGE-02

Employer:
MINISTRY OF HOUSING (MOH)
Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)
Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

ITEM SUMMARY SHEET


Bill No.:
IRRIGATION RESERVOIR AND PUMPING STATION
Description: IRRIGATION TANK RESERVOIR & INTAKE CHAMBERS
Item No.:
2.0 (2.2)

Sub-Bill No.

Description

Unit

BOQ Estimated
(Quantity)

Upto Date
(Quantity)

Previous Month
(Quantity)

This Month
(Quantity)

7=5-6

Construction of RC Reservoir & Intake chamber comple with civil,


mechanical and electromechanical as shown on the drawings and
stardard with MOH.
2.0

IRRIGATION TANK RESERVOIR &


INTAKE CHAMBERS
Concreting works:
Supply and installation of the following concrete work items to include
acessories to complete as per specifications

2.2

Blinding Concrete

Total Carried Forward to Grand Summary

Prepared By:

Contractor Representative
Al-Ayuni Investment & Contracting Co.

Cum

105.000

80.132

Cum

105.000

80.132

80.132

80.132

Checked By:

Consultant Representative
Saudi Arabian Parson Ltd. (SAPL)

Sheet1of1
MONTHLY STATEMENT NO.01
Month: JUNE, 2014

KINGDOM OF SAUDI ARABIA

MINISTRY OF HOUSING AL-KHARJ SITE


PACKAGE-02
Employer:
Consultants:
Contractor:

MINISTRY OF HOUSING (MOH)


SAUDI ARABIAN PARSONS LTD. (SAPL)
AL-AYUNI INVESTMENT & CONTRACTING CO.

ITEM MEASUREMENT SHEET


Bill No.:
Description:
Item No.:

Irrigation Reservoir and Pumping Station


Blinding Concrete
2.2

Sr. No.

Description

Unit
3

Nos

Quantity
(m3)

Remarks

8 = (4x5x6x7)

Supply and installation of concreteing works


items including accessories as per
specifications
2.2

For Quantity Ref


Drawing No.

100mm thk Blinding Concrete


Underground Storage Tank

(i)

Grid A ~ B Line 1 ~ 7

Cum

28.650

25.650

0.100

73.487

002_02_17_03_003

With Grid A Line 4 (Section C & D)

Cum

1.850

1.850

0.100

(0.342)

002_02_17_03_003

With Grid A Line 1 (Section C & D)

Cum

1.850

1.850

0.100

(0.342)

002_02_17_03_003

Grid b/w C1~D1 & Line b/w 1~2

Cum

3.500

4.045

0.100

(1.416)

002_02_17_03_003

Slope Portion (Avg- width followed)

Cum

1.875

1.425

0.100

0.534

002_02_17_08_006

Bed Portion

Cum

1.000

1.000

0.100

0.100

002_02_17_08_006

Slope Portion (Avg- width followed)

Cum

1.875

1.425

0.100

0.534

002_02_17_08_006

Bed Portion

Cum

1.000

1.000

0.100

0.100

002_02_17_08_006

Slope Portion (Avg- width followed)

Cum

3.045

1.803

0.100

0.549

002_02_17_08_006

Slope Portion (Avg- width followed)

Cum

3.150

1.803

0.100

1.136

002_02_17_08_006

Bed Portion

Cum

2.500

2.045

0.100

0.511

002_02_17_08_006

Sump Pit (b/w Grid D1~E1 Line 1)

Cum

1.400

1.400

0.100

0.196

002_02_17_08_006

Grid C1~D1 Line 0~1 (Section F)

Cum

4.700

4.700

0.100

2.209

002_02_17_03_006

Side footing (Section F)

Cum

4.600

0.500

0.100

0.690

002_02_17_03_006

Inlet Tank Portion

Cum

3.875

3.850

0.100

1.492

002_02_17_03_006

Inlet Sump Pit Portion

Cum

1.800

3.850

0.100

0.693

002_02_17_03_006

Sump Deduction

Sump Portion Blinding Concrete


(ii)

(iii)

(iv)

(v)

With Grid A Line 4 (Section C & D)

With Grid A Line 1 (Section C & D)

Grid b/w C1~D1 & Line b/w 1~2

Electrical Room
(vi)

Tank Inlet Station


(vii)

Total upto date Quantity (Cum)

80.132

Previously Certified. (Cum)

This Month Quantity (Cum)

80.132

Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.

Checked By:
Consultant Representative
Saudi Arabian Parson Ltd. (SAPL)

Sheet1of1
MONTHLY STATEMENT NO.01
Month: JUNE, 2014

KINGDOM OF SAUDI ARABIA

MINISTRY OF HOUSING AL-KHARJ SITE


PACKAGE-02

Employer:
MINISTRY OF HOUSING (MOH)
Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)
Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

ITEM SUMMARY SHEET


Bill No.:
IRRIGATION RESERVOIR AND PUMPING STATION
Description: IRRIGATION TANK RESERVOIR & INTAKE CHAMBERS
Item No.:
2.0 (2.3)

Sub-Bill No.

Description

Unit

BOQ Estimated
(Quantity)

Upto Date
(Quantity)

Previous Month
(Quantity)

This Month
(Quantity)

7=5-6

Construction of RC Reservoir & Intake chamber comple with civil,


mechanical and electromechanical as shown on the drawings and
stardard with MOH.
2.0

IRRIGATION TANK RESERVOIR &


INTAKE CHAMBERS

2.3

Concrete including rebars, formwork, waterstop, construction joints


and sealent as per dwg & specifications

2.3.1
2.3.2
2.3.3
2.3.4
2.3.5

Slab on grade
Elevated Slab
Walls
Columns
Beams

Cum
Cum
Cum
Cum
Cum

572.000
330.000
210.000
21.000
21.000

393.135
-

Total Carried Forward to Grand Summary

Cum

1,154.000

393.135

Prepared By:

Contractor Representative
Al-Ayuni Investment & Contracting Co.

393.135
-

393.135

Checked By:

Consultant Representative
Saudi Arabian Parson Ltd. (SAPL)

#REF!
MONTHLY STATEMENT NO.01
Month: JUNE, 2014

KINGDOM OF SAUDI ARABIA

MINISTRY OF HOUSING AL-KHARJ SITE


PACKAGE-02
Employer:
Consultants:
Contractor:

MINISTRY OF HOUSING (MOH)


SAUDI ARABIAN PARSONS LTD. (SAPL)
AL-AYUNI INVESTMENT & CONTRACTING CO.

ITEM MEASUREMENT SHEET


Bill No.:
Description:
Item No.:

Irrigation Reservoir and Pumping Station


Concrete works (Slab on Grade)
2.3

Sr. No.

Description

Unit
3

Nos

Quantity
3
(m )

Remarks

8 = (4x5x6x7)

Concrete including rebars, formwork,


waterstop,construction of joints and sealant
etc.
2.3.1

For Quantity
Ref Drawing No.

Slab on Grade (Base Slab)

WIR No. 0682 (Rev-1)

Underground Tank
(i)

Grid A ~ B Line 1 ~ 7

Cum

28.350

25.350

0.500

Sump Deduction

(iii)

(iv)

(v)

With Grid A Line 4 (Section C & D)

Cum

1.850

1.850

0.500

(1.711)

002_02_17_03_003

With Grid A Line 1 (Section C & D)

Cum

1.850

1.850

0.500

(1.711)

002_02_17_03_003

Grid b/w C1~D1 & Line b/w 1~2

Cum

3.500

4.045

0.500

(7.079)

002_02_17_03_003

With Grid A Line 4 (Section C & D)

Slope Portion (Avg- width followed)

Cum

1.875

1.425

0.500

2.672

002_02_17_08_006

Bed Portion

Cum

1.000

1.000

0.500

0.500

002_02_17_08_006

Slope Portion (Avg- width followed)

Cum

1.875

1.425

0.500

2.672

002_02_17_08_006

Bed Portion

Cum

1.000

1.000

0.500

0.500

002_02_17_08_006

With Grid A Line 1 (Section C & D)

Grid b/w C1~D1 & Line b/w 1~2

Slope Portion (Avg- width followed)

Cum

3.045

1.803

0.500

2.745

002_02_17_08_006

Slope Portion (Avg- width followed)

Cum

3.150

1.803

0.500

5.679

002_02_17_08_006

Bed Portion

Cum

2.500

2.045

0.500

2.556

002_02_17_08_006

Sump Pit (b/w Grid D1~E1 Line 1)

Cum

1.300

1.300

0.300

0.507

002_02_17_08_006

Electrical Room
(vi)

Grid C1~D1 Line 0~1 (Section F)

Cum

4.700

4.700

0.200

4.418

002_02_17_08_007

Side footing (Section F) under slab

Cum

4.600

0.300

0.500

2.070

002_02_17_08_007

Tank Inlet Station (Base Slab)


(vii)

002_02_17_03_003

Sump Portion
(ii)

359.336

Inlet Tank Portion

Cum

3.750

3.600

0.300

13.500

002_02_17_03_006

Inlet Sump Pit Portion

Cum

1.800

3.600

0.500

6.480

002_02_17_03_006

Total upto date Quantity (Cum)

393.135

Previously Certified. (Cum)

This Month Quantity (Cum)

393.135

Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.

Checked By:
Consultant Representative
Saudi Arabian Parson Ltd. (SAPL)

Sheet1of1
MONTHLY STATEMENT NO.01
Month: JUNE, 2014

KINGDOM OF SAUDI ARABIA

MINISTRY OF HOUSING AL-KHARJ SITE


PACKAGE-02

Employer:
MINISTRY OF HOUSING (MOH)
Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)
Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

ITEM SUMMARY SHEET


Bill No.:
IRRIGATION RESERVOIR AND PUMPING STATION
Description: IRRIGATION TANK RESERVOIR & INTAKE CHAMBERS
Item No.:
2.0 (2.5)

Sub-Bill No.

Description

Unit

BOQ Estimated
(Quantity)

Upto Date
(Quantity)

Previous Month
(Quantity)

This Month
(Quantity)

7=5-6

Construction of RC Reservoir & Intake chamber comple with civil,


mechanical and electromechanical as shown on the drawings and
stardard with MOH.
2.0

2.5
2.5.1
2.5.2
2.5.3
2.5.4
2.5.5
2.5.6

IRRIGATION TANK RESERVOIR &


INTAKE CHAMBERS
WATERPROOFING
Supply and install waterproofing and protection layer including all
items to complete as per specification
Epoxy Sulfide (1000 micron thk.) coating inside
waterproofing membrance with protective board
waterproofing membrance underslab
Torch applied waterproofing membrane
waterproofing on pipe opening
50mm thk minimum cement screed

Sqm
Sqm
Sqm
Sqm
Sqm
Sqm

3,480.000
600.000
1,176.000
998.000
6.000
2,048.000

801.318
801.348

Total Carried Forward to Grand Summary

Cum

8,308.000

1,602.666

Prepared By:

Contractor Representative
Al-Ayuni Investment & Contracting Co.

801.318
801.348

1,602.666

Checked By:

Consultant Representative
Saudi Arabian Parson Ltd. (SAPL)

Sheet1of1
MONTHLY STATEMENT NO.01
Month: JUNE, 2014

KINGDOM OF SAUDI ARABIA

MINISTRY OF HOUSING AL-KHARJ SITE


PACKAGE-02
Employer:
Consultants:
Contractor:

MINISTRY OF HOUSING (MOH)


SAUDI ARABIAN PARSONS LTD. (SAPL)
AL-AYUNI INVESTMENT & CONTRACTING CO.

ITEM MEASUREMENT SHEET


Bill No.:
Description:
Item No.:

Irrigation Reservoir and Pumping Station


Waterproofing membrane under slab
2.5

Sr. No.

Description

Unit
3

Nos

Quantity
2
(m )

Remarks

8 = (4x5x6x7)

Supply and installation of waterproofing and


protection layers including all accessories
2.5.3

For Quantity Ref


Drawing No.

Waterproofing membrane

WIR No. 0539 & 0442

Underground Storage Tank


(i)

Grid A ~ B Line 1 ~ 7

Sqm

28.650

25.650

Sump Deduction

(iii)

(iv)

(v)

002_02_17_03_003

With Grid A Line 4 (Section C & D)

Sqm

1.850

1.850

(3.423)

002_02_17_03_003

With Grid A Line 1 (Section C & D)

Sqm

1.850

1.850

(3.423)

002_02_17_03_003

Grid b/w C1~D1 & Line b/w 1~2

Sqm

3.500

4.045

(14.158)

002_02_17_03_003

Sump Portion
(ii)

734.873

With Grid A Line 4 (Section C & D)

Slope Portion (Avg- width followed)

Sqm

1.875

1.425

5.344

002_02_17_08_006

Bed Portion

Sqm

1.000

1.000

1.000

002_02_17_08_006

Slope Portion (Avg- width followed)

Sqm

1.875

1.425

5.344

002_02_17_08_006

Bed Portion

Sqm

1.000

1.000

1.000

002_02_17_08_006

With Grid A Line 1 (Section C & D)

Grid b/w C1~D1 & Line b/w 1~2

Slope Portion (Avg- width followed)

Sqm

3.045

1.803

5.490

002_02_17_08_006

Slope Portion (Avg- width followed)

Sqm

3.150

1.803

11.359

002_02_17_08_006

Bed Portion

Sqm

2.500

2.045

5.113

002_02_17_08_006

Sump Pit (b/w Grid D1~E1 Line 1)

Sqm

1.400

1.400

1.960

002_02_17_08_006

Electrical Room

(vi)

Grid C1~D1 Line 0~1 (Section F)

Sqm

4.700

4.700

22.090

002_02_17_03_006

(vi)

Side footing (Section F)

Sqm

4.600

0.500

6.900

002_02_17_03_006

Tank Inlet Station


(vii)

Inlet Tank Portion

Sqm

3.875

3.850

14.919

002_02_17_03_006

Inlet Sump Pit Portion

Sqm

1.800

3.850

6.930

002_02_17_03_006

Total upto date Quantity (Sq.m)

801.318

Previously Certified. (Sq.m)

This Month Quantity (Sq.m)

801.318

Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.

Checked By:
Consultant Representative
Saudi Arabian Parson Ltd. (SAPL)

Sheet1of1
MONTHLY STATEMENT NO.01
Month: JUNE, 2014

KINGDOM OF SAUDI ARABIA

MINISTRY OF HOUSING AL-KHARJ SITE


PACKAGE-02
Employer:
Consultants:
Contractor:

MINISTRY OF HOUSING (MOH)


SAUDI ARABIAN PARSONS LTD. (SAPL)
AL-AYUNI INVESTMENT & CONTRACTING CO.

ITEM MEASUREMENT SHEET


Bill No.:
Description:
Item No.:

Irrigation Reservoir and Pumping Station


50mm thk minimum Cement Screed
2.5

Sr. No.

Description

Unit
3

Nos

Quantity
2
(m )

Remarks

8 = (4x5x6x7)

Supply and installation of waterproofing and


protection layers including all accessories
2.5.3

For Quantity Ref


Drawing No.

Waterproofing membrane

WIR No. 550 & 556

Underground Tank (Under Slab)


(i)

Grid A ~ B Line 1 ~ 7

Sqm

28.450

25.450

Sump Deduction

(iii)

(iv)

(v)

With Grid A Line 4 (Section C & D)

Sqm

1.850

1.850

(3.423)

002_02_17_03_003

With Grid A Line 1 (Section C & D)

Sqm

1.850

1.850

(3.423)

002_02_17_03_003

Grid b/w C1~D1 & Line b/w 1~2

Sqm

3.500

4.045

(14.158)

002_02_17_03_003

With Grid A Line 4 (Section C & D)

Slope Portion (Avg- width followed)

Sqm

1.875

1.425

5.344

002_02_17_08_006

Bed Portion

Sqm

1.000

1.000

1.000

002_02_17_08_006

Slope Portion (Avg- width followed)

Sqm

1.875

1.425

5.344

002_02_17_08_006

Bed Portion

Sqm

1.000

1.000

1.000

002_02_17_08_006

With Grid A Line 1 (Section C & D)

Grid b/w C1~D1 & Line b/w 1~2

Slope Portion (Avg- width followed)

Sqm

3.045

1.803

5.490

002_02_17_08_006

Slope Portion (Avg- width followed)

Sqm

3.150

1.803

11.359

002_02_17_08_006

Bed Portion

Sqm

2.500

2.045

5.113

002_02_17_08_006

Sump Pit (b/w Grid D1~E1 Line 1)

Sqm

1.400

1.400

1.960

002_02_17_08_006

Electrical Room (Under Slab)


(vi)

Grid C1~D1 Line 0~1 (Section F)

Sqm

4.700

4.700

22.090

002_02_17_03_006

Side footing (Section F)

Sqm

4.600

0.500

6.900

002_02_17_03_006

Tank Inlet Station (Under Slab)


(vii)

002_02_17_03_003

Sump Portion
(ii)

724.053

Inlet Tank Portion

Sqm

3.875

3.850

14.919

002_02_17_03_006

Inlet Sump Pit Portion

Sqm

1.800

3.850

6.930

002_02_17_03_006

Inlet Tank Roof

Sqm

3.500

3.100

10.850

002_02_17_08_008

Total upto date Quantity (Sq.m)

801.348

Previously Certified. (Sq.m)

This Month Quantity (Sq.m)

801.348

Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.

Checked By:
Consultant Representative
Saudi Arabian Parson Ltd. (SAPL)

Вам также может понравиться