COST DATA
2013-14
INDEX
Sl.
No.
A
B
C
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
Description
ABSTRACT of rates of 33 KV / 11 KV / LT Lines
Rates for CENTRALIZED MATERIALS
Cost Data for Hilly and Tribal areas as adopted by Irrigation Department in the State
33 KV Line over 9.1 Mts. PSCC Poles at 105 Mts.Span WL 280 Kgs
33 KV Line over 9.1 Mts. PSCC Poles at 80 Mts.Span WL 280 Kgs
11 KV Line over 8 Mts. PSCC Poles at 60 Mts.Span WL 140 Kgs
11 KV Line over 8 Mts. PSCC Poles at 65 Mts.Span WL 200 Kgs
11 KV Line over 8 Mts. PSCC Poles at 60 Mts.Span WL 140 Kgs
11 KV Line over 8 Mts. PSCC Poles at 65 Mts.Span WL 200 Kgs
6.3 KV Line over 8 Mts. PSCC Poles at 90 Mts.Span WL 140 Kgs
6.3 KV Line over 8 Mts. PSCC Poles at 90 Mts.Span WL 200 Kgs
LT 3 Ph.5 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs
LT 3 Ph.5 Wire line (Horizontal) over 8 Mts. PSCC Poles at 60 Mts.Span WL 200 Kgs
LT 3 Ph.5 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs
LT 3 Ph.5 Wire line (Horizontal) over 8 Mts. PSCC Poles at 60 Mts.Span WL 200 Kgs
LT 3 Ph.4 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs
LT 3 Ph.4 Wire line (Horizontal) over 8 Mts. PSCC Poles at 60 Mts.Span WL 200 Kgs
LT 3 Ph.4 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs
LT 3 Ph.4 Wire line (Horizontal) over 8 Mts. PSCC Poles at 60 Mts.Span WL 200 Kgs
LT 1 Ph. 3 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs
LT 1 Ph. 2 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs
L.T.AB Cable (3x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs
L.T.AB Cable (2x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs
L.T.AB Cable (1x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs
L.T.AB Cable (3x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 200 Kgs
L.T.AB Cable (2x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 200 Kgs
L.T.AB Cable (1x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 200 Kgs
Erection of 100 KVA 11/433 KV Conventional Distribution Transformer
Erection of 16 KVA 11/433 KV Conventional Distribution Transformer on single pole structure
Erection of 63 KVA 11/433 KV Conventional Distribution Transformer
Erection of 25 KVA 11/433 KV Conventional Distribution Transformer on single pole structure
Erection of 40 KVA 11/433 KV Conventional Distribution Transformer on single pole structure
Erection of 15 KVA 6.3/0-240V CSP Transformer(Oil immersed) on 9.1Mtr PSCC Pole
Erection of 15 KVA 6.3/0-240V CSP Transformer(Oil immersed) on 8 Mts PSCC Pole
Erection of 15 KVA 6.3/0-240V Amorphous metal core Transformer(Oil immersed) on 8 Mts PSCC Pole
Release of single phase Agl. Service erected on support
Release of poly phase Agl. Service erected on support
Release of 1 ph ( high quality). Domestic & non-domestic service
Release of 1 ph (electronic). Domestic & non-domestic service
Release of 1 ph Domestic & non-domestic service
Release of 3 ph. ( electronic meter) Domestic & non-domestic service
Release of 3 ph. (electronic meter) Domestic & non-domestic service
Release of poly phase ( high quality) Indl.service upto 15 HP
Release of Industrial service with poly phase CT operated meter upto 15 HP
Release of Industrial service with poly phase CT operated meter above 15 HP
Release of Street light service (1 -ph electonic meter)
Erection of 33/11 KV Sub-station with1 No.Power Transformer & 3 Nos. 11 KV feeders
( with 11 KV 2 MVAR Capacitor Bank)
Page No.
1
2 - 11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
55
55
56
Sl.
No.
Particulars of items
No. of Span
Wind.pr. W.Load Type of pole
poles/
in
in kg/m2 in kg.
being used
KM Mtrs.
Size of Conductor
Cost in
Rs.
33 KV Line
75
280
12
105
377330
33 KV Line
100
280
14
80
395410
11 KV Line
75
140
8 Mtr PSCC
18
60
55 Sqmm AAAC
240990
11 KV Line
100
200
8 Mtr PSCC
17
65
55 Sqmm AAA
245700
11 KV Line
75
140
8 Mtr PSCC
18
60
34 Sqmm AAA
194290
11 KV Line
100
200
8 Mtr PSCC
17
65
34 Sqmm AAA
199000
6.3 KV Line
75
140
8 Mtr PSCC
13
90
34 Sqmm AAAC
126560
6.3 KV Line
100
200
8 Mtr PSCC
13
90
34 Sqmm AAA
133120
75
140
8 Mtr PSCC
16
65
270360
10
100
200
8 Mtr PSCC
18
60
286190
11
75
140
8 Mtr PSCC
16
65
223660
12
100
200
8 Mtr PSCC
18
60
239490
13
75
140
8 Mtr PSCC
16
65
240100
14
100
200
8 Mtr PSCC
15
60
244460
15
75
140
8 Mtr PSCC
16
65
193410
16
100
200
8 Mtr PSCC
15
60
197800
17
75
140
8 Mtr PSCC
16
65
34 Sqmm AAA
162460
18
75
140
8 Mtr PSCC
16
65
132740
19
L.T. AB Cable
75
140
8 Mtr PSCC
16
65
3x16+25 Sqmm
147640
20
L.T. AB Cable
75
140
8 Mtr PSCC
16
65
2x16+25 Sqmm
131480
21
L.T. AB Cable
75
140
8 Mtr PSCC
16
65
1x16+25 Sqmm
115630
22
L.T. AB Cable
100
200
8 Mtr PSCC
16
65
3x16+25 Sqmm
155720
23
L.T. AB Cable
100
200
8 Mtr PSCC
16
65
2x16+25 Sqmm
139550
24
L.T. AB Cable
100
200
8 Mtr PSCC
16
65
1x16+25 Sqmm
123700
25
251040
26
2,12,910
27
120770
28
138070
29
174140
30
62870
31
48270
32
51540
33
3120
34
6870
35
Release of single phase domestic and non domestic service with High Quality meter
3660
36
Release of single phase domestic and non domestic service with High Quality meter
3200
37
Release of single phase domestic and non domestic service with High Quality meter
3520
38
Release of single phase domestic and non domestic service with 3 Phase Energy meter
8490
39
Release of single phase domestic and non domestic service with Electronic meter
8340
40
Release of poly phase Industrial service upto 15 H.P with Energy meter
10530
41
12860
42
Release of poly phase Industrial service upto 15 H.P with C.T. operated meter
12860
43
3310
44
Erection of 33/11 K.V. Substation with 1x5MVA power transformer & 3 Nos. 11KV feeders
10912000
Unit
Rupees
MT
56155
MT
56402
MT
55347
Each
6016
Each
3105
Each
1504
Each
1844
Each
2006
Each
11000
10
Each
12802
11
MT
84506
12
MT
46895
13
MT
55000
14
MS Channel 75 x 40mm
MT
55000
15
MS Angle 65 x 65 x 6mm
MT
54500
16
MS Angle 50 x 50 x 6mm
MT
54500
17
MS Flat 50 x 6mm
MT
55200
18
MS Flat 75 x 8mm
MT
55200
19
MS Rod 20mm
MT
55536
20
MS Rod 16mm
MT
55250
21
Cement
MT
5800
22
HT Steel wire-4mm
MT
60743
23
MT
63738
24
MT
65104
25
GI Wire 4 mm
MT
59819
26
MT
80628
27
GI Bolts and Nuts with Washers full thread(5/8" X 2 1/2 ', 3', 4')
MT
80628
28
C R Sheet 1.6mm
MT
42000
29
M S Plate 12mm/6mm
MT
36600
30
Torsteel 10mm/12mm
MT
34200
Sl. No
REC Specification
No.
Unit
Rupees
13/1979
183
33 KV Pin Insulator
33 KV GI Pin
-do-
156
-do-
920
-do-
188
649
11 KV Pin Insulator
3/1971(R-1993)
32
11 KV GI Pin
-do-
53
11 KV Post Insulator
-do-
226
-do-
224
10
-do-
192
11
3/1991(R-1993)
80
12
137
13
LT Pin Insulator
4/1972 D-1
(R-1979)
10
14
LT GI Pin
-do-
26
15
LT Shackle Insulator
-do-
10
16
LT Shackle Hardware
-do-
34
17
HT Guy Insulator
21/1981
28
18
LT Guy Insulator
-do-
15.75
19
-do-
1113
20
-do-
216
21
117
22
1418
23
511
24
508
Sl. No
REC Specification
No.
Unit
Rupees
25
375
26
214
27
208
28
1076
29
424
30
358
31
394
32
487
33
416
34
319
35
268
36
172
37
123
38
132
39
Bracing set with double X arms with 9.1 Mts PSCC poles
set
4158
40
set
3564
41
Kg
193
42
Kg
193
Sl. No
REC Specification
No.
Unit
Rupees
KM
235223
KM
130957
1/1971(R-1993)
33/1984(R-1993)
KM
49166
-do-
KM
28149
-do-
KM
17870
26/1993(R-1987)
KM
2627
SUBHEAD-IV : CABLES
1
4.00 Sq.mm
- do -
KM
4172
6.00 Sq.mm
- do -
KM
5253
10.00 Sq.mm
- do -
KM
8343
25.00 Sq.mm
- do -
KM
23072
50.00 Sq.mm
- do -
KM
38146
70.00 Sq.mm
- do -
KM
49955
95.00 Sq.mm
- do -
KM
61350
120.00 Sq.mm
- do -
KM
73725
10
150.00 Sq.mm
- do -
KM
94500
11
185.00 Sq.mm
- do -
KM
115710
KM
22104
50.00 Sq.mm
KM
40479
70.00 Sq.mm
KM
52839
120.00 Sq.mm
KM
77250
KM
36889
KM
83997
KM
167596
KM
25000
Sl. No
REC Specification
No.
Unit
Rupees
KM
659613
KM
448114
KM
358432
KM
320330
KM
242739
KM
183620
KM
143795
KM
87742
KM
25750
KM
36427
KM
47316
KM
167000
32/1984
32/1984
175
- do -
82
- do -
113
3 x 35 Sq.mm
63/1993
KM
288226
3 x 95 Sq.mm
- do -
KM
454303
3 x 120 Sq.mm
- do -
KM
576934
3 x 185 Sq.mm
- do -
KM
673986
3 x 300 Sq.mm
- do -
KM
1001492
5763
9910
Sl. No
REC Specification
No.
Unit
10
11KV 3x300 Sqmm Heat shrinkable cable Termination Kits suitable for
Indoor type.
11
11KV 3x300 Sqmm Heat shrinkable cable Termination Kits suitable for
Outdoor type.
12
13
14
Rupees
8914
11958
8775
13411
23637
20565
31176
3x35+35 Sqmm.
KM
219898
3x70+70 Sqmm.
KM
318653
3x120+70 Sqmm.
KM
476000
3x185+70 Sqmm.
KM
429020
KM
1621767
KM
1156566
2856190
3169500
3 x 400 Sq.mm
3 x 185 Sq.mm
63/1993
4230597
5588956
Transformer Oil
KL
82396
7/1974(R-1993)
23436
27501
34595
37522
Sl. No
REC Specification
No.
Unit
Rupees
43590
60485
70115
96748
103237
10
3-Ph 100 KVA Amorphous/CRGO core conventional type copper wound DTR
with BEE 5 star rating Conventional DTR (Cu)
135423
11
3-Ph 160 KVA Amorphous/CRGO core conventional type copper wound DTR
with BEE 5 star rating Conventional DTR (Cu)
211348
12
315618
13
492077
14
531833
15
37522
418319
5
6
12/1979(R-1993)
413788
22/1983
215550
234179
270430
23394
19839
23394
20029
Sl. No
REC Specification
No.
Unit
Rupees
16758
14640
11 KV CTs (50-25/1-1A)
11 KV CTs 200-100/5-5A
14463
11 KV CTs 400-200/1-1A
13564
11 KV CTs 200-100/1-1A
13125
10
11 KV CTs (600-300/1-1-0.577A)
14758
59/1993
18960
19570
44263
11 KV PT (3 Phase)
15789
60/1993
28998
42000
19949
13738
8250
7349
3081
1670
1724
10
310
11
33 KV HG Fuse set
Set
9450
12
11 KV HG Fuse Set
Set
1889
13
Set
457
14
LT HG Fuse Set
Set
1313
15
15900
43/1987
16/1981
(R-55/1987)
55/1987
Sl. No
REC Specification
No.
Unit
Rupees
16
18770
17
6371
18
3244
19
8475
20
194054
21
117887
LT Switched capacitors
a 1x9 KVAR
b 1x10 KVAR
E
E
2548
2614
E
E
E
1000000
895869
1295000
22
23
24
Sectionalizers
588444
25
Auto - Reclosures
925206
26
171658
27
366000
28
735000
29
285007
30
142850
31
376368
32
274818
33
210677
34
100000
35
200000
36
1020110
37
1445325
38
150000
39
300000
E
E
E
730
819
447
10
Sl. No
REC Specification
No.
Unit
Rupees
d) LT Single Phase Class 1 accuracy (push fit type box Non push fit type TC)
5-30A
846
1869
b) Three Phase High Quality Meter 10 - 40A (Counter type display without
Box)
2150
6899
6525
11 KV Metering cubicles
6840
E
E
E
4244
3746
3401
10100
E
E
39327
39015
E
E
22977
30609
39015
39015
250
420
1647
HT Meter Box
5731
10
7558
11
2500
12
6750
13
408
418
475
2471
8145
CMRI
30700
11
For hilly and tribal areas, the following EXTRA RATES are allowed over and above
approved cost data of labour.
a. 25% extra is allowed for the works located within the interior Agency / Tribal limits.
(i.e.) for the works located within and upto 16 Kilometers from any all weather route
inside Agency/Tribal.
a. 40% extra is allowed for the works located within the interior Agency / Tribal Area
i.e., for the works located beyond 16 Kilometers from any all weather route inside
Agency/Tribal.
Note:
1 No extra percentage is permissible in respect of Forest produce such as Bamboo,
Rellu grass and all materials obtained from outside the Agency/Tribal.
2
The extra percentage under Agency/Tribal areas allowance may be allowed on the
labour component and on the labour charges in the rates for conveyance of
materials.
12
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
12
3105
Each
37260
10
1418
Each
14180
10
375
Each
3750
Back Clamp
10
172
Each
1720
1076
Each
6456
4158
Set
4158
3.06
49166
K.M.
150448
33
339
Each
11187
860
Set
5160
10
LS
LS
LS
16940
11
Misc. Items like coil earthing, pipe earthing, dangerboards, bolts & nuts, etc.
LS
LS
LS
3300
234319
Total
or say
13
254559
7030
7637
63640
12728
28001
3736
377331
3,77,330
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
14
3105
Each
43470
12
1418
Each
17016
12
375
Each
4500
Back Clamp
12
172
Each
2064
1076
Each
6456
4158
Set
4158
3.06
49166
K.M.
150448
39
339
Each
13221
860
Set
5160
10
LS
LS
LS
16940
11
Misc. Items like coil earthing, pipe earthing, dangerboards, bolts & nuts, etc.
LS
LS
LS
3300
266733
246493
7395
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
14
8002
66683
13337
29341
3915
395405
3,95,410
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
18
1504
Each
27072
16
511
Each
8176
16
214
Each
3424
Back Clamp
16
123
Each
1968
424
Each
2544
3564
Set
3564
3.06
28149
K.M.
86136
51
85
Each
4335
272
Set
1632
10
LS
LS
LS
19556
11
Misc. Items like coil earthing, pipe earthing, dangerboards, bolts & nuts, etc.
LS
LS
LS
4400
162807
138851
4166
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
15
4884
40702
8140
17909
2386
240994
2,40,990
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
17
1844
Each
31348
15
511
Each
7665
15
214
Each
3210
Back Clamp
15
123
Each
1845
424
Each
2544
3564
Set
3564
3.06
28149
K.M.
86136
48
85
Each
4080
272
Set
1632
10
LS
LS
LS
19556
11
Misc. Items like coil earthing, pipe earthing, dangerboards, bolts & nuts, etc.
LS
LS
LS
4400
165980
142024
4261
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
16
4979
41495
8299
18258
2433
245704
2,45,700
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 M PSCC Pole
18
1504
Each
27072
16
511
Each
8176
16
214
Each
3424
Back Clamp
16
123
Each
1968
424
Each
2544
3564
Set
3564
3.06
17870
K.M.
54682
51
85
Each
4335
272
Set
1632
10
LS
LS
LS
19556
11
Misc. Items like coil earthing, pipe earthing, dangerboards, bolts & nuts, etc.
LS
LS
LS
4400
131353
107397
3222
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
17
3941
32838
6568
14449
1924
194294
1,94,290
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 PSCC Pole
17
1844
Each
31348
15
511
Each
7665
15
214
Each
3210
Back Clamp
15
123
Each
1845
424
Each
2544
3564
Set
3564
3.06
17870
K.M.
54682
48
85
Each
4080
272
Set
1632
10
LS
LS
LS
19556
11
Misc. Items like coil earthing, pipe earthing, dangerboards, bolts & nuts, etc.
LS
LS
LS
4400
134526
110570
3317
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
18
4036
33631
6726
14798
1970
199005
1,99,000
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 M PSCC Pole
13
1504
Each
19552
10
214
Each
2140
D clamp
10
132
Each
1320
MS Stay sets
358
Each
2148
2.04
17870
K.M.
36455
11
85
Each
935
272
Set
1088
L.S.
19556
L.S.
2500
85694
63638
1909
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
19
2571
21423
4285
9426
1253
126561
1,26,560
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 M PSCC Pole
13
1844
Each
23972
10
214
Each
2140
D clamp
10
132
Each
1320
MS Stay sets
358
Set
2148
2.04
17870
K.M.
36455
11
85
Each
935
272
Set
1088
L.S.
19556
L.S.
2500
90114
68058
2042
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
20
2703
22528
4506
9913
1318
133124
1,33,120
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 M PSCC Pole
16
1504
Each
24064
18
487
Each
8766
Back Clamp
18
123
Each
2214
Stay sets
394
Each
1576
3.06
28149
K.M.
86136
2.04
17870
K.M.
36455
42
44
Set
1848
48
36
Set
1728
C.I. Knob
16
12
Each
192
10
L.S.
16016
L.S.
3500
11
182495
162979
4889
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
21
5475
45624
9125
20074
2677
270359
2,70,360
10.
R.E.C. - Construction Standard No. B-5/1972
Costdata per Km of LT 3-Ph 5 Wire Line(Horizontal formation ) with
3 x 55 Sq.mm + 2 x 34 Sq.mm AAAC over 8 Mts.
PSCC Poles at 60 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
Sl.
No.
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 M PSCC Pole
18
1844
Each
33192
20
487
Each
9740
Back Clamp
20
123
Each
2460
LT Stay sets
394
Each
1576
3.06
28149
K.M.
86136
2.04
17870
K.M.
36455
42
44
Set
1848
56
36
Set
2016
C.I. Knob
18
12
Each
216
10
L.S.
16016
L.S.
3500
Base concreting
11
193155
173639
5209
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
22
5795
48289
9658
21247
2834
286186
2,86,190
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 M PSCC Pole
16
1504
Each
24064
18
487
Each
8766
Back Clamp
18
123
Each
2214
LT Stay sets
394
Each
1576
5.10
17870
K.M.
91137
42
44
Set
1848
48
36
Set
1728
C.I. Knob
16
12
Each
192
L.S.
16016
L.S.
3500
10
151041
131525
3946
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
23
4531
37760
7552
16615
2214
223659
2,23,660
12.
R.E.C. - Construction Standard No. B-5/1972
Costdata per Km of LT 3-Ph 5 Wire Line(Horizontal formation ) with
5 x 34 Sq.mm AAAC over 8 Mts.
PSCC Poles at 60 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
Sl.
No.
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 M PSCC Pole
18
1844
Each
33192
20
487
Each
9740
Back Clamp
20
123
Each
2460
LT Stay sets
394
Each
1576
5.10
17870
K.M.
91137
42
44
Set
1848
56
36
Set
2016
C.I. Knob
18
12
Each
216
L.S.
16016
L.S.
3500
10
161701
142185
4266
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
24
4851
40425
8085
17787
2371
239486
2,39,490
13.
R.E.C. - Construction Standard No. B-12/1981
Costdata per Km of LT 3-Ph 4 Wire Line(Horizontal formation ) with
3 x 55 Sq.mm + 1 x 34 Sqmm AAAC over 8 Mts.
PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
Sl.
No.
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 M PSCC Pole
16
1504
Each
24064
18
416
Each
7488
Back Clamp
18
123
Each
2214
LT Stay sets
394
Each
1576
3.06
28149
K.M.
86136
1.02
17870
K.M.
18227
32
44
Set
1408
36
36
Set
1296
C.I. Knob
16
12
Each
192
10
L.S.
16016
L.S.
3500
11
162117
142601
4278
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
25
4864
40529
8106
17833
2377
240104
2,40,100
14.
R.E.C. - Construction Standard No. B-12/1981
Costdata per Km of LT 3 Ph 4 Wire Line(Horizontal formation ) with
3 x 55 Sq.mm + 1 x 34 Sqmm AAAC over 8 Mts.
PSCC Poles at 60 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
Sl.
No.
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 M PSCC Pole
15
1844
Each
27660
17
416
Each
7072
Back Clamp
17
123
Each
2091
LT Stay sets
394
Each
1576
3.06
28149
K.M.
86136
1.02
17870
K.M.
18227
32
44
Set
1408
33
36
Set
1188
C.I. Knob
15
12
Each
180
10
L.S.
16016
L.S.
3500
11
165054
145538
4366
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
26
4952
41264
8253
18156
2420
244464
2,44,460
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 M PSCC Pole
16
1504
Each
24064
18
416
Each
7488
Back Clamp
18
123
Each
2214
LT Stay sets
394
Each
1576
4.08
17870
K.M.
72910
32
44
Set
1408
36
36
Set
1296
C.I. Knob
16
12
Each
192
L.S.
16016
L.S.
3500
10
130664
111148
3334
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
27
3920
32666
6533
14373
1915
193406
1,93,410
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 M PSCC Pole
15
1844
Each
27660
17
416
Each
7072
Back Clamp
17
123
Each
2091
LT Stay sets
394
Each
1576
4.08
17870
K.M.
72910
32
44
Set
1408
33
36
Set
1188
C.I. Knob
17
12
Each
204
L.S.
16016
L.S.
3500
10
133625
114109
3423
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
28
4009
33406
6681
14699
1958
197802
1,97,800
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 M PSCC Pole
16
1504
Each
24064
18
319
Each
5742
Back Clamp
18
123
Each
2214
LT Stay sets
394
Each
1576
3.06
17870
K.M.
54682
22
44
Set
968
24
36
Set
864
C.I. Knob
16
12
Each
192
L.S.
16016
L.S.
3500
10
109818
90302
2709
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
3295
27455
5491
12080
1608
162455
1,62,460
Note : Substitute the cost of 8 mts PSCC pole in above data for wind pressure of 100 kgs/Sqmts,
and working load of 200 kgs
29
18.
R.E.C. - Construction Standard No. B-14/1981
Costdata per Km of LT S-Ph 2 Wire Line(Horizontal formation )
with 2 x 34 Sqmm AAAC over 8 Mts.
PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
Sl.
No.
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 M PSCC Pole
16
1504
Each
24064
18
268
Each
4824
Back Clamp
18
123
Each
2214
LT Stay sets
394
Each
1576
2.04
17870
K.M.
36455
12
44
Set
528
12
36
Set
432
C.I. Knob
16
12
Each
192
L.S.
16016
L.S.
3500
10
89801
70285
2109
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
30
2694
22450
4490
9878
1314
132736
1,32,740
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 M PSCC Pole
16
1504
Each
24064
12
175
Each
2100
113
Each
678
LT Stay sets
394
Set
1576
47316
K.M.
47316
56
82
Each
4592
16016
L.S.
3500
Base concreting
8
99842
80326
2410
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
31
2995
24961
4992
10983
1462
147644
1,47,640
20.
R.E.C. - Construction Standard No. B-32/1984
Costdata per Km of LT line with 2 x 16 + 25 Sqmm AB Cable over 8 Mts.
PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
Sl.
No.
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 M PSCC Pole
16
1504
Each
24064
12
175
Each
2100
113
Each
678
LT Stay sets
394
Set
1576
36427
K.M.
36427
56
82
Each
4592
16016
L.S.
3500
Base concreting
8
88953
69437
2083
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
32
2669
22238
4448
9785
1302
131477
1,31,480
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 M PSCC Pole
16
1504
Each
24064
12
175
Each
2100
113
Each
678
LT Stay sets
394
Set
1576
25750
K.M.
25750
56
82
Each
4592
16016
L.S.
3500
Base concreting
8
78276
58760
1763
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
33
2348
19569
3914
8610
1145
115625
1,15,630
22.
R.E.C. - Construction Standard No. B-32/1984
Costdata per Km of LT line with 3 x 16 + 25 Sqmm AB Cable over 8 Mts.
PSCC Poles at 65 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
Sl.
No.
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 M PSCC Pole
16
1844
Each
29504
12
175
Each
2100
113
Each
678
LT Stay sets
394
Set
1576
47316
K.M.
47316
56
82
Each
4592
16016
L.S.
3500
Base concreting
8
105282
85766
2573
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
34
3158
26321
5264
11581
1542
155721
1,55,720
23.
R.E.C. - Construction Standard No. B-32/1984
Costdata per Km of LT line with 2 x 16 + 25 Sqmm AB Cable over 8 Mts.
PSCC Poles at 65 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
Sl.
No.
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 M PSCC Pole
16
1844
Each
29504
12
175
Each
2100
113
Each
678
LT Stay sets
394
Set
1576
36427
K.M.
36427
56
82
Each
4592
16016
L.S.
3500
Base concreting
8
94393
74877
2246
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
35
2832
23598
4720
10383
1382
139554
1,39,550
24.
R.E.C. - Construction Standard No. B-32/1984
Costdata per Km of LT line with 1 x 16 + 25 Sqmm AB Cable over 8 Mts.
PSCC Poles at 65 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
Sl.
No.
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 M PSCC Pole
16
1844
Each
29504
12
175
Each
2100
113
Each
678
LT Stay sets
394
Set
1576
25750
K.M.
25750
56
82
Each
4592
L.S.
16016
L.S.
3500
83716
64200
1926
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
36
2511
20929
4186
9209
1225
123702
1,23,700
Sl. No.
Particulars
Cost of Material
(Rs.)
135423
3,213
7349
909
28810
9,702
1889
388
2626
726
8895
940
7558
162
5172
605
Misc. Items
500
1,98,222
5932
5947
16,645
21804
1% cess
2485
Total Cost in Rs.
or say :
2,51,035
2,51,040
37
16,645
26.
Sl. No.
Particulars
Cost of Material
(Rs.)
103237
3,213
7349
909
28810
9,702
1889
388
2626
726
8895
940
7558
162
5172
605
Misc. Items
420
1,65,956
4,966
3% Contingencies on Materials
4,979
16,645
18255
1% cess
2,108
38
2,12,909
2,12,910
16,645
27.
Cost Data For Erection of 3 Phase 16 KVA-11KV/433V
Conventional Distribution Transformer On Single Pole Structure
Sl. No.
Particulars
Cost of Material
(Rs.)
60485
613
7349
909
13248
3,448
1889
388
12640
253
1650
214
97261
5825
2,868
3% Contingencies on Materials
2,918
5,825
10699
1% cess
1,196
39
1,20,767
1,20,770
28.
Cost Data For Erection of 3 Phase 25 KVA-11KV/433V
Conventional Distribution Transformer On Single Pole Structure
Sl. No.
Particulars
Cost of Material
(Rs.)
70115
673
7349
909
13248
3,448
1889
388
17766
252
1500
196
1,11,866
5,866
3,311
3% Contingencies on Materials
3,356
5,866
12305
1% cess
1,367
40
1,38,072
1,38,070
29.
Cost Data For Erection of 3 Phase 40 KVA-11KV/433V
Conventional Distribution Transformer On Single Pole Structure
Sl. No.
Particulars
Cost of Material
(Rs.)
96748
542
7349
909
13248
3,448
1889
388
21781
238
1500
196
1,42,514
5,721
4,230
3% Contingencies on Materials
4,275
5,721
15677
1% cess
1,724
41
1,74,142
1,74,140
Sl. No.
Particulars
Cost of Material
(Rs.)
3105
994
34595
285
2743
618
3134
431
6401
303
1000
50,978
1,499
3% Contingencies on Materials
1,529
2,631
5608
1% cess
622
42
62,868
62,870
2,631
31.
Sl.No.
Particulars
Qty.
Rate in
Rs.
Per Unit
Amount in
Rs.
1 No.
34,595
Each
34,595
1 Set
2,743
Each
2,743
Pipe earthing
1 No.
808
Each
808
Misc. Items
L.S.
L.S.
L.S.
500
38,646
1,144
3% Contingencies on Materials
1,159
2,592
4,251
1% Cess
Total Cost in Rs.
Or say :
478
48,271
48,270
43
32.
Sl.No.
Particulars
Qty.
Rate in
Rs.
Per Unit
Amount in
Rs.
1 No.
37,522
Each
37,522
1 Set
2,743
Each
2,743
Pipe earthing
1 No.
808
Each
808
Misc. Items
L.S.
L.S.
L.S.
500
41,573
1,232
3% Contingencies on Materials
1,247
2,403
4,573
1% Cess
Total Cost in Rs.
Or say :
510
51,539
51,540
44
Sl.No.
Particulars
Qty.
Rate in
Rs.
Per Unit
Amount
in Rs.
730
Each
730
120
Each
120
20
28
Each
560
250
Each
250
22
Each
22
L.S.
L.S.
L.S.
80
1,762
3% Contingencies
53
1,076
194
1% Cess
Total Cost in Rs.
Or say :
31
3,115
3,120
45
Particulars
Qty.
Rate in
Rs.
Per Unit
Amount
in Rs.
1,869
Each
1,869
729
Each
729
30
28
Each
840
420
Each
420
500
500
L.S.
L.S.
L.S.
80
4,438
3% Contingencies
133
1,739
488
1% Cess
Total Cost in Rs.
Or say :
68
6,866
6,870
46
Sl. No.
Particulars
Rate
Chargable to
Qty .
Amount
Chargable to
Qty.
Amount
Amount in
Rs.
846
846
846
120/E
120
120
20/M
250/E
60/Kg
1 Kg.
60
60
25/M
2M
50
50
5/E
2 Nos.
10
10
Misc.
L.S
85
85
1216
1405
2621
3% Contingencies on Materials
36
42
79
202
430
633
134
155
288
1% Cess
Total Cost in Rs.
Or say :
1589
2032
36
3,657
3,660
Total
Note :
47
60
1
1200
250
1200
250
Sl. No.
Particulars
Rate
Chargable to
DISCOM
Qty .
Amount
Chargable to
Consumer
Qty.
Amount
Amount in
Rs.
447
447
447
115/E
120
120
20/M
250/E
60/Kg
1 Kg.
60
60
25/M
2M
50
50
5/E
2 Nos.
10
10
Misc.
L.S
85
85
1200
250
1200
250
Total
817
1405
2222
3% Contingencies on Materials
25
42
67
202
430
633
90
155
244
1134
2032
32
3,197
3,200
1% Cess
Total Cost in Rs.
Or say :
Note :
60
48
Sl. No.
Particulars
Rate
Chargable to
DISCOM
Qty .
Amount
Chargable to
Consumer
Qty.
Amount
Amount in
Rs.
730
730
730
120/E
120
120
20/M
250/E
60/Kg
1 Kg.
60
60
25/M
2M
50
50
5/E
2 Nos.
10
10
Misc.
L.S
85
85
1100
1405
2505
3% Contingencies on Materials
33
42
75
202
430
633
121
155
276
Total
60
1
1200
250
250
1% Cess
35
1200
1456
49
2032
3,523
3,520
Sl. No.
Particulars
Rate
Chargable to
DISCOM
Qty .
Amount
Chargable to
Consumer
Qty.
Amount
Amount in
Rs.
1869
1869
1869
955/E
955
955
420/E
420
420
28/M
120
3360
3360
60/Kg
1 Kg.
60
60
25/M
2M
50
50
5/E
2 Nos.
10
10
Misc.
L.S
95
95
3244
3575
6819
3% Contingencies on Materials
97
107
205
202
430
633
357
393
750
1% Cess
Total Cost in Rs.
Or say :
3901
4506
84
8,490
8,490
Total
Note :
50
Sl. No.
Particulars
Rate
Chargable to
DISCOM
Qty .
Amount
Chargable to
Consumer
Qty.
Amount
Amount in
Rs.
1869
1869
1869
955/E
955
955
28/M
120 Mts.
3360
3360
60/Kg
1 Kg.
60
60
25/M
2M
50
50
5/E
2 Nos.
10
10
Misc.
L.S
95
95
2824
3575
6399
3% Contingencies on Materials
85
107
192
405
557
961
311
393
704
1% Cess
Total Cost in Rs.
Or say :
3624
4632
83
8,339
8,340
Total
Note :
51
40.
Sl. No.
Particulars
Rate
Chargable to
DISCOM
Qty .
Amount
Chargable to
Consumer
Qty.
Amount
Amount in
Rs.
1869
1869
1869
955/E
955
955
1647/E
1647
1647
43/M
80
3440
3440
60/Kg
1 Kg.
60
60
41.4/M
2M
83
83
22/E
2 Nos.
44
44
L.S
75
125
200
Total
4546
3752
8298
3% Contingencies
136
113
249
405
557
961
500
413
913
1% Cess
Total Cost in Rs.
Or say :
5587
4834
104
10,525
10,530
52
Chargable to
DISCOM
Qty .
Amount
Chargable to
Consumer
Qty.
Amount
Amount in
Rs.
Sl. No.
Particulars
Rate
6525
43/M
80
3440
3440
60/Kg
1 Kg.
60
60
41.4/M
2M
83
83
22/E
2 Nos.
44
44
L.S
75
100
175
Total
6600
3727
10327
3% Contingencies
198
112
310
405
557
961
726
410
1136
6525
6525
1% Cess
127
7929
53
4805
12,861
12,860
42.
Chargable to
DISCOM
Qty.
Amount
Chargable to
Consumer
Qty.
Amount
Amount in
Rs.
Sl. No.
Particulars
Rate
6525
43/M
80
3440
3440
60/Kg
1 Kg.
60
60
41.4/M
2M
83
83
22/E
2 Nos.
44
44
L.S
75
100
175
Total
6600
3727
10327
3% Contingencies
198
112
310
405
557
961
726
410
1136
6525
6525
1% Cess
127
7929
54
4805
12,861
12,860
43.
Sl. No.
1 No.
846
Each
846
1 No.
120
Each
120
1 No.
400
Each
400
15 M
30
Each
450
2 Mts
39.5
Each
79
2 No.
6.0
Each
12
1 No.
250
Each
250
L.S.
L.S.
L.S.
50
Total
2,207
3% Contingenics
66
759
243
1% Cess
33
3,308
3,310
55
Sl.
No
Particulars
Qty.
Rate
(Rs. in lakhs)
LS
As per local
conditions
Unit
Amount
(Rs. in lakhs)
0.000
LS
LS
0.061
LS
LS
5.000
LS
LS
10.000
LS
LS
LS
LS
LS
15
0.562
LS
LS
LS
LS
LS
MT
0.600
0.660
1.500
3.000
1.200
1.080
8.423
1
1
31.695
0.605
Each
Each
31.695
0.605
3
1
2.156
2.342
Each
Each
6.467
2.342
1
1
0.330
0.330
Each
Each
0.330
0.330
0.158
Each
0.158
a) 33KV 10KA
b) 11KV Line Type (NFX3)
0.031
Each
0.185
0.017
Each
0.155
0.017
Each
0.052
0.420
Each
1.260
0.199
Each
0.399
0.137
Each
1.099
0.073
Each
0.073
0.095
Each
0.095
10.000
Each
10.000
0.159
Each
0.636
LS
1.815
89.219
Sub Total
17 Erection and transport and commissioning charges on items 7 to 15 at 10%
6.430
18 Contingencies on items 7 to 15 at 3%
1.929
0.643
9.814
21 1% Cess
1.080
Total Rs. in Lakhs
109.115
109.120
Note : NF = No. of 11 KV Feeders, The number of outgoing feeders at substation limited to the demand in MVA i.e. if substation demand is 5 MVA, the
number of feeders should not exceed five.
56