COST DATA
2013-14

INDEX
Sl.
No.
A
B
C
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44

Description
ABSTRACT of rates of 33 KV / 11 KV / LT Lines
Rates for CENTRALIZED MATERIALS
Cost Data for Hilly and Tribal areas as adopted by Irrigation Department in the State
33 KV Line over 9.1 Mts. PSCC Poles at 105 Mts.Span WL 280 Kgs
33 KV Line over 9.1 Mts. PSCC Poles at 80 Mts.Span WL 280 Kgs
11 KV Line over 8 Mts. PSCC Poles at 60 Mts.Span WL 140 Kgs
11 KV Line over 8 Mts. PSCC Poles at 65 Mts.Span WL 200 Kgs
11 KV Line over 8 Mts. PSCC Poles at 60 Mts.Span WL 140 Kgs
11 KV Line over 8 Mts. PSCC Poles at 65 Mts.Span WL 200 Kgs
6.3 KV Line over 8 Mts. PSCC Poles at 90 Mts.Span WL 140 Kgs
6.3 KV Line over 8 Mts. PSCC Poles at 90 Mts.Span WL 200 Kgs
LT 3 Ph.5 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs
LT 3 Ph.5 Wire line (Horizontal) over 8 Mts. PSCC Poles at 60 Mts.Span WL 200 Kgs
LT 3 Ph.5 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs
LT 3 Ph.5 Wire line (Horizontal) over 8 Mts. PSCC Poles at 60 Mts.Span WL 200 Kgs
LT 3 Ph.4 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs
LT 3 Ph.4 Wire line (Horizontal) over 8 Mts. PSCC Poles at 60 Mts.Span WL 200 Kgs
LT 3 Ph.4 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs
LT 3 Ph.4 Wire line (Horizontal) over 8 Mts. PSCC Poles at 60 Mts.Span WL 200 Kgs
LT 1 Ph. 3 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs
LT 1 Ph. 2 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs
L.T.AB Cable (3x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs
L.T.AB Cable (2x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs
L.T.AB Cable (1x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs
L.T.AB Cable (3x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 200 Kgs
L.T.AB Cable (2x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 200 Kgs
L.T.AB Cable (1x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 200 Kgs
Erection of 100 KVA 11/433 KV Conventional Distribution Transformer
Erection of 16 KVA 11/433 KV Conventional Distribution Transformer on single pole structure
Erection of 63 KVA 11/433 KV Conventional Distribution Transformer
Erection of 25 KVA 11/433 KV Conventional Distribution Transformer on single pole structure
Erection of 40 KVA 11/433 KV Conventional Distribution Transformer on single pole structure
Erection of 15 KVA 6.3/0-240V CSP Transformer(Oil immersed) on 9.1Mtr PSCC Pole
Erection of 15 KVA 6.3/0-240V CSP Transformer(Oil immersed) on 8 Mts PSCC Pole
Erection of 15 KVA 6.3/0-240V Amorphous metal core Transformer(Oil immersed) on 8 Mts PSCC Pole
Release of single phase Agl. Service erected on support
Release of poly phase Agl. Service erected on support
Release of 1 ph ( high quality). Domestic & non-domestic service
Release of 1 ph (electronic). Domestic & non-domestic service
Release of 1 ph Domestic & non-domestic service
Release of 3 ph. ( electronic meter) Domestic & non-domestic service
Release of 3 ph. (electronic meter) Domestic & non-domestic service
Release of poly phase ( high quality) Indl.service upto 15 HP
Release of Industrial service with poly phase CT operated meter upto 15 HP
Release of Industrial service with poly phase CT operated meter above 15 HP
Release of Street light service (1 -ph electonic meter)
Erection of 33/11 KV Sub-station with1 No.Power Transformer & 3 Nos. 11 KV feeders
( with 11 KV 2 MVAR Capacitor Bank)

Page No.

1
2 - 11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
55
55
56

DATA FOR R.E. SCHEMES


Abstract of schedule of rates for 2013-14 with modified rates : Cost Data per Km of 33/11 KV/LT Lines

Sl.
No.

Particulars of items

No. of Span
Wind.pr. W.Load Type of pole
poles/
in
in kg/m2 in kg.
being used
KM Mtrs.

Size of Conductor

Cost in
Rs.

33 KV Line

75

280

9.1 Mtr. PSCC

12

105

100 Sqmm AAAC

377330

33 KV Line

100

280

9.1 Mtr. PSCC

14

80

100 Sqmm AAA

395410

11 KV Line

75

140

8 Mtr PSCC

18

60

55 Sqmm AAAC

240990

11 KV Line

100

200

8 Mtr PSCC

17

65

55 Sqmm AAA

245700

11 KV Line

75

140

8 Mtr PSCC

18

60

34 Sqmm AAA

194290

11 KV Line

100

200

8 Mtr PSCC

17

65

34 Sqmm AAA

199000

6.3 KV Line

75

140

8 Mtr PSCC

13

90

34 Sqmm AAAC

126560

6.3 KV Line

100

200

8 Mtr PSCC

13

90

34 Sqmm AAA

133120

L.T. 3Ph 5 Wire Line(Horizontal)

75

140

8 Mtr PSCC

16

65

3x55+2x34 Sqmm AAA

270360

10

L.T. 3Ph 5 Wire Line(Horizontal)

100

200

8 Mtr PSCC

18

60

3x55+2x34 Sqmm AAA

286190

11

L.T. 3Ph 5 Wire Line(Horizontal)

75

140

8 Mtr PSCC

16

65

5x34 Sqmm AAAC

223660

12

L.T. 3Ph 5 Wire Line(Horizontal)

100

200

8 Mtr PSCC

18

60

5x34 Sqmm AAAC

239490

13

L.T. 3Ph 4 Wire Line(Horizontal)

75

140

8 Mtr PSCC

16

65

3x55+1x34 Sqmm AAA

240100

14

L.T. 3Ph 4 Wire Line(Horizontal)

100

200

8 Mtr PSCC

15

60

3x55+1x34 Sqmm AAA

244460

15

L.T. 3Ph 4 Wire Line(Horizontal)

75

140

8 Mtr PSCC

16

65

4x34 Sqmm AAA

193410

16

L.T. 3Ph 4 Wire Line(Horizontal)

100

200

8 Mtr PSCC

15

60

4x34 Sqmm AAA

197800

17

L.T. 1Ph 3 Wire Line(Horizontal)

75

140

8 Mtr PSCC

16

65

34 Sqmm AAA

162460

18

L.T. 1Ph 2 Wire Line(Horizontal)

75

140

8 Mtr PSCC

16

65

2x34 Sqmm AAA

132740

19

L.T. AB Cable

75

140

8 Mtr PSCC

16

65

3x16+25 Sqmm

147640

20

L.T. AB Cable

75

140

8 Mtr PSCC

16

65

2x16+25 Sqmm

131480

21

L.T. AB Cable

75

140

8 Mtr PSCC

16

65

1x16+25 Sqmm

115630

22

L.T. AB Cable

100

200

8 Mtr PSCC

16

65

3x16+25 Sqmm

155720

23

L.T. AB Cable

100

200

8 Mtr PSCC

16

65

2x16+25 Sqmm

139550

24

L.T. AB Cable

100

200

8 Mtr PSCC

16

65

1x16+25 Sqmm

123700

25

Erection of 100KVA Conventional Distribution transformer

251040

26

Erection of 63 KVA Conventional Distribution transformer

2,12,910

27

Erection of 3-Ph 16KVA Conventional Distribution transformer

120770

28

Erection of 3-Ph 25KVA Conventional Distribution transformer

138070

29

Erection of 3-Ph 40KVA Conventional Distribution transformer

174140

30

Erection of 15 KVA S-Ph 6.3 KV/0-240V CSP Oil Immersed Transformer

62870

31

Erection of 15 KVA S-Ph 6.3 KV/0-240V Amorphous metal core Transformer

48270

32

Erection of S-Ph 15 KVA CSP Transformer 9.1M PSCC Pole

51540

33

Release of Single phase Agl. Service erected on support

3120

34

Release of poly phase Agl. Service erected on support

6870

35

Release of single phase domestic and non domestic service with High Quality meter

3660

36

Release of single phase domestic and non domestic service with High Quality meter

3200

37

Release of single phase domestic and non domestic service with High Quality meter

3520

38

Release of single phase domestic and non domestic service with 3 Phase Energy meter

8490

39

Release of single phase domestic and non domestic service with Electronic meter

8340

40

Release of poly phase Industrial service upto 15 H.P with Energy meter

10530

41

Release of poly phase industrial service upto 15 HP with CT meter

12860

42

Release of poly phase Industrial service upto 15 H.P with C.T. operated meter

12860

43

Release of Single Phase Street light service with Electronic Meter

3310

44

Erection of 33/11 K.V. Substation with 1x5MVA power transformer & 3 Nos. 11KV feeders

10912000

COST DATA OF CENTRALISED MATERIALS FOR


R.E. AND DISTRIBUTION WORKS
2013-14
Sl.
No.

Name of the Material

Unit

Rupees

SUBHEAD-I : SUPPORTS AND FIXTURES, IRON, STEEL AND


CEMENT

RS Joists 150 x 150mm

MT

56155

RS Joists 175 x 85mm

MT

56402

RS Joists 150 x 75mm

MT

55347

11 mts. PSCC poles 365 Kgs

Each

6016

9.1 mts. PSCC poles 280 Kgs.

Each

3105

8 mts. PSCC poles 140 Kgs.

Each

1504

8 mts. PSCC poles 200 Kgs.

Each

1844

8 mts. PSCC poles 300 Kgs.

Each

2006

11 mts. Spun Poles

Each

11000

10

12.5 mts. Spun Poles

Each

12802

11

Rail poles upto 7 Mtrs

MT

84506

12

52 Kg (105 lb) Rails (up to 13 mtrs. length)

MT

46895

13

MS Channel 100 x 50mm

MT

55000

14

MS Channel 75 x 40mm

MT

55000

15

MS Angle 65 x 65 x 6mm

MT

54500

16

MS Angle 50 x 50 x 6mm

MT

54500

17

MS Flat 50 x 6mm

MT

55200

18

MS Flat 75 x 8mm

MT

55200

19

MS Rod 20mm

MT

55536

20

MS Rod 16mm

MT

55250

21

Cement

MT

5800

22

HT Steel wire-4mm

MT

60743

23

GI Stay wire 7/3.15 mm

MT

63738

24

GI Stay wire 7/2.5 mm

MT

65104

25

GI Wire 4 mm

MT

59819

26

GI Bolts and Nuts with Washers full thread(5/8"X6', 7', 9')

MT

80628

27

GI Bolts and Nuts with Washers full thread(5/8" X 2 1/2 ', 3', 4')

MT

80628

28

C R Sheet 1.6mm

MT

42000

29

M S Plate 12mm/6mm

MT

36600

30

Torsteel 10mm/12mm

MT

34200

Sl. No

Name of the Material

REC Specification
No.

Unit

Rupees

13/1979

183

SUBHEAD-II : INSULATORS AND HARDWARE


1

33 KV Pin Insulator

33 KV GI Pin

-do-

156

33 KV Post Insulator Stack

-do-

920

33 KV String Insulator Fittings (B&S)

-do-

188

33 KV polymer disc insulator/string insulator (B&S)

649

11 KV Pin Insulator

3/1971(R-1993)

32

11 KV GI Pin

-do-

53

11 KV Post Insulator

-do-

226

11 KV String Insulator (B&S)

-do-

224

10

11 KV String Insulator (C&T)

-do-

192

11

11 KV String Insulator Fittings (C&T)

3/1991(R-1993)

80

12

11 KV Polymer string insulator (C&T)

137

13

LT Pin Insulator

4/1972 D-1
(R-1979)

10

14

LT GI Pin

-do-

26

15

LT Shackle Insulator

-do-

10

16

LT Shackle Hardware

-do-

34

17

HT Guy Insulator

21/1981

28

18

LT Guy Insulator

-do-

15.75

19

33 KV Solid Core Insulators

-do-

1113

20

11 KV Solid Core Insulators for AB Switches

-do-

216

21

11 KV Solid Core Insulators for 11 KV HG Fuse sets

117

22

1.53 Mts Channel Cross arms without clamp

1418

23

1.07 Mts Channel Cross arms without clamp

511

24

11KV Tapping Cross arm

508

Sl. No

REC Specification
No.

Name of the Material

Unit

Rupees

25

Top clamp with cleat (for 33 KV)

375

26

Top clamp with cleat (for 11 KV)

214

27

Top clamp for LT

208

28

Stay set with clamp (for 33 KV)

1076

29

Stay set with clamp (for 11 KV)

424

30

Stay set with clamp (for 6.3 KV)

358

31

Stay set with clamp (for LT)

394

32

LT 3-Ph Cross arm (for 5 Wire line)

487

33

LT 3-Ph Cross arm (for 4 Wire line)

416

34

LT S-Ph Cross arm (for 3 Wire line)

319

35

LT S-Ph Cross arm (for 2 Wire line)

268

36

Back Clamp for 9.1 Mts PSCC pole

172

37

Back Clamp for 8 Mts PSCC pole

123

38

D Clamp for 8.0 M poles

132

39

Bracing set with double X arms with 9.1 Mts PSCC poles

set

4158

40

Bracing set with double X arms with 8 Mts PSCC poles

set

3564

41

DPC aluminium Winding Wire 1.25 mm

Kg

193

42

DPC aluminium Winding Wire 1.6 mm

Kg

193

Sl. No

REC Specification
No.

Name of the Material

Unit

Rupees

KM

235223

KM

130957

1/1971(R-1993)
33/1984(R-1993)

KM

49166

SUBHEAD - III : CONDUCTORS


ACSR Zebra Conductor

200 Sq.mm Panther Conductor


37/3.0 Sq.mm ACSR

100 Sq.mm AAA Conductor or


7/4.26 AAAC

55 Sq.mm AAA Conductor or


7/3.15 AAAC/RABBIT

-do-

KM

28149

34 Sq.mm AAA Conductor or


7/2.50 AAAC/Weasel

-do-

KM

17870

26/1993(R-1987)

KM

2627

SUBHEAD-IV : CABLES
1

SUBHEAD-IV : (A) LT XLPE SINGLE CORE CABLES


2.50 Sq.mm

4.00 Sq.mm

- do -

KM

4172

6.00 Sq.mm

- do -

KM

5253

10.00 Sq.mm

- do -

KM

8343

25.00 Sq.mm

- do -

KM

23072

50.00 Sq.mm

- do -

KM

38146

70.00 Sq.mm

- do -

KM

49955

95.00 Sq.mm

- do -

KM

61350

120.00 Sq.mm

- do -

KM

73725

10

150.00 Sq.mm

- do -

KM

94500

11

185.00 Sq.mm

- do -

KM

115710

SUBHEAD-IV : (B) LT PVC SINGLE CORE CABLES


25.00 Sq.mm

KM

22104

50.00 Sq.mm

KM

40479

70.00 Sq.mm

KM

52839

120.00 Sq.mm

KM

77250

SUBHEAD-IV : (C) LT CONTROL CABLES


2 X 2.5 Sq.mm (Cu)

KM

36889

4 X 2.5 Sq.mm (Cu)

KM

83997

10 x 2.5 Sq.mm (Cu)

KM

167596

4 x 4.0 Sq.mm (AL)

KM

25000

Sl. No

REC Specification
No.

Name of the Material

Unit

Rupees

SUBHEAD-IV : (D) ) LT XLPE CABLES


1

3 1/2 X 300 sqmm LT XLPE cable

KM

659613

3 1/2 X 185 sqmm LT XLPE cable

KM

448114

3 1/2 X 150 sqmm LT XLPE cable

KM

358432

3 1/2 X 120 sqmm LT XLPE cable

KM

320330

3 1/2 X 95 sqmm LT XLPE cable

KM

242739

3 1/2 X 70 sqmm LT XLPE cable

KM

183620

3 1/2 X 50 sqmm LT XLPE cable

KM

143795

3 1/2 X 25 sqmm LT XLPE cable

KM

87742

SUBHEAD -IV: (E) LT AERIAL BUNCHED CABLES


1 x 16+25 Sq.mm

KM

25750

2 x 16+25 Sq.mm XLPE AB Cable

KM

36427

3 x 16+25 Sq.mm XLPE AB Cable

KM

47316

3 x 70 + 1x16 +1x50 Sqmm XLPE AB, Cable

KM

167000

32/1984

SUBHEAD -IV: (F) LT AERIAL BUNCHED CABLE FITTINGS


1

Suspension Clamp with eye hook

32/1984

175

LT Connector with Insulator Cover

- do -

82

Dead-end Clamp with eye hooks

- do -

113

SUBHEAD -IV: (G) 11 KV XLPE POWER CABLES


1

3 x 35 Sq.mm

63/1993

KM

288226

3 x 95 Sq.mm

- do -

KM

454303

3 x 120 Sq.mm

- do -

KM

576934

3 x 185 Sq.mm

- do -

KM

673986

3 x 300 Sq.mm

- do -

KM

1001492

11 KV 3CX35 Sq.mm Heat shrinkable Cable Termination Kits suitable for


Indoor type.

11 KV 3CX35 Sq.mm Heat shrinkable Cable Termination Kits suitable for


Outdoor type.

5763

9910

Sl. No

REC Specification
No.

Name of the Material

Unit

11 KV 3CX185 Sq.mm Heat shrinkable Cable Termination Kits suitable for


Indoor type.

11 KV 3CX185 Sq.mm Heat shrinkable Cable Termination Kits suitable for


Outdoor type.

10

11KV 3x300 Sqmm Heat shrinkable cable Termination Kits suitable for
Indoor type.

11

11KV 3x300 Sqmm Heat shrinkable cable Termination Kits suitable for
Outdoor type.

12

33KV 3X185Sqmm heat shrinkable cable Termination Kits suitable for


Outdoor type.

13

33KV 3X400Sqmm heat shrinkable cable Termination Kits suitable for


Indoor type.

14

33KV 3X400Sqmm heat shrinkable cable Termination Kits suitable for


Outdoor type.

Rupees

8914

11958

8775

13411

23637

20565

31176

SUBHEAD - IV (H)11 KV AB Cable (Aluminum)


1

3x35+35 Sqmm.

KM

219898

3x70+70 Sqmm.

KM

318653

3x120+70 Sqmm.

KM

476000

3x185+70 Sqmm.

KM

429020

KM

1621767

KM

1156566

2856190

3169500

SUBHEAD -IV: (I) 33 KV XLPE POWER CABLES


1

3 x 400 Sq.mm

3 x 185 Sq.mm

63/1993

SUBHEAD -V: POWER TRANSFORMERS, CAPACITORS AND


TRASFORMER OIL
1

33/11 KV 3.15 MVA Power Transformer

33/11 KV 5 MVA Power Transformer

33/11 KV 8 MVA Power Transformer

4230597

33/11 KV 12.5 MVA Power Transformer

5588956

Transformer Oil

KL

82396

7/1974(R-1993)

SUBHEAD -VI: DISTRIBUTION TRANSFORMERS


1

S-Ph 5 KVA DTR 6.3 KV/0-240 V

23436

1-Phase 10kVA 11kV/250V (CSP) (Aluminium)

27501

S-Ph 15 KVA CSP DTR 6.3 KV/0-240V (Al)

34595

S-Ph 15 KVA CSP DTR 6.3 KV/230-0-230V (Al)

37522

Sl. No

REC Specification
No.

Name of the Material

Unit

Rupees

1-Phase 25 KVA (CSP) (Copper)

43590

3-Ph 16 KVA Amorphous/CRGO core conventional type copper wound DTR


with BEE 5 star rating Conventional DTR (Cu)

60485

3-Ph 25 KVA Amorphous/CRGO core conventional type copper wound DTR


with BEE 5 star ratingConventional DTR (Cu)

70115

3-Ph 40 KVA Amorphous/CRGO core conventional type copper wound DTR


with BEE 5 star rating Conventional DTR (Cu)

96748

3-Ph 63 KVA Amorphous/CRGO core conventional type copper wound DTR


with BEE 5 star ratingConventional DTR (Cu)

103237

10

3-Ph 100 KVA Amorphous/CRGO core conventional type copper wound DTR
with BEE 5 star rating Conventional DTR (Cu)

135423

11

3-Ph 160 KVA Amorphous/CRGO core conventional type copper wound DTR
with BEE 5 star rating Conventional DTR (Cu)

211348

12

250 KVA CSP DTR (Cu)

315618

13

315 KVA CSP DTR (Cu) Conventional

492077

14

500 KVA Conventional (Al)

531833

15

Single Phase 15 KVA Transformer (Amorphous)

37522

418319

SUBHEAD -VII: SWITCH CONTROL AND PROTECTIVE GEAR


(A) 33KV & 11KV VCBs
1

33 KV VCB with CRPs & CTs ratio (400-200-100/1-1-1A)

33KV Feeder VCBs with CTs & CR panels

11 KV VCB with CTs & Panels (Feeder Control)

5
6

12/1979(R-1993)

413788
22/1983

215550

11 KV VCB with CTs & Panels ( LV Control ) without differential protection

234179

11 KV VCB with CTs & Panels ( LV Control ) with differential protection

270430

(B) 33KV & 11KV CTs


1

33 KV CTs 400-200-100/1-1-1A ratio 0.2s class accuracy

23394

33 KV CTs 400-200-100/1-1A ratio 0.2S class accuracy

19839

33 KV CTs (200-100/1-1A) 0.2 class accuracy

23394

33 KV CTs (100-50/1-1A) 0.2S class accuracy

20029

Sl. No

REC Specification
No.

Name of the Material

Unit

Rupees

16758

14640

11 KV feeder CTs (400-200-100/1-1A) (0.2S class)

11 KV CTs (50-25/1-1A)

11 KV CTs 200-100/5-5A

14463

11 KV CTs 400-200/1-1A

13564

11 KV CTs 200-100/1-1A

13125

10

11 KV CTs (600-300/1-1-0.577A)

14758

59/1993

(C) 33KV & 11KV PTs - CTs


1

33 KV PT (Single Phase) class 0.5

18960

33 KV PT (Single Phase) class 0.2

19570

33 KV PT (Three Phase) of 0.5 class accuracy

44263

11 KV PT (3 Phase)

15789

11KV C.T.P.T. set 10/5A

60/1993

28998

(D) AB Switches, LAs, HG Fuse sets, Batteries, Capacitors, RMUs etc.


1

33 KV 800 Amps AB Switch Double break with solid core insulator

42000

11 KV 800 Amps AB Switch Double break with insulators

19949

11 KV 400 Amps AB Switch Double break with insulators

13738

11 KV 200 Amps AB Switch (Tilting)

8250

11 KV 200 Amps AB Switch (Horizontal)

7349

30 KV 10 KA Metal Oxide Lightning Arrester (station type)

3081

33 KV Line type Lighting Arrester

1670

9 KV 10 KA Metal Oxide Lighting Arrester

1724

10

9 KV 5 KA Metal Oxide Lighting Arrester

310

11

33 KV HG Fuse set

Set

9450

12

11 KV HG Fuse Set

Set

1889

13

6.3 KV HG Fuse Set

Set

457

14

LT HG Fuse Set

Set

1313

15

24 Volts 40 AH Battery set including Battery charger

15900

43/1987

16/1981
(R-55/1987)

55/1987

Sl. No

REC Specification
No.

Name of the Material

Unit

Rupees

16

24V, 40 AH Batteries with chargers of conventional type

18770

17

24 Volts 40 AH Battery set without Battery charger

6371

18

12 V, 40 AH SMF Batteries cells

3244

19

12 V, 80 AH SMF Batteries cells

8475

20

220 V, 80 AH SMF Batteries and Chargers & DCDB

194054

21

220 V, 80 AH SMF Batteries

117887

LT Switched capacitors
a 1x9 KVAR
b 1x10 KVAR

E
E

2548
2614

11 KV 2 MVAR Capacitor banks with associated equipment


a Type A
b Type B with 40 Mtrs HT UG cable
c Type C (Indoor Type) with HT UG cable

E
E
E

1000000
895869
1295000

22

23

24

Sectionalizers

588444

25

Auto - Reclosures

925206

26

11 KV 3 Way RMU (Conventional)

171658

27

11 KV 3 Way RMU (SF6)

366000

28

11 KV SF6 5 Way RMU

735000

29

33 KV Indoor twin feeder control panel

285007

30

33KV twin feeder control and relay panel (220V DC)

142850

31

Indoor type VCB with control panel (LV)

376368

32

Indoor type VCB with control panel (feeder)

274818

33

11 VCB for bus coupler

210677

34

11KV switch Fuse unit (SFU)

100000

35

33KV switch Fuse unit (SFU)

200000

36

33KV 3-way RMU without VCB

1020110

37

33KV 3-way RMU with VCB

1445325

38

11KV metering panel with CTS& PTS (Indoor)

150000

39

33KV metering panel with CTS&PTS (Indoor)

300000

E
E
E

730
819
447

SUBHEAD -VIII: ENERGY METERS AND METERING EQUIPMENT


1

a) LT Single Phase High quality Meter Class 1 accuracy ( 5-20A)


b) 1 Ph 5-30 Meter IR port, Sup Capacitor - PP Box
c) LT Single Phase Electronic Energy Meter 2.5 - 10A

10

Sl. No

REC Specification
No.

Name of the Material

Unit

Rupees

d) LT Single Phase Class 1 accuracy (push fit type box Non push fit type TC)
5-30A

846

a) Three Phase Electronic Meter 10 - 40A with P P Box

1869

b) Three Phase High Quality Meter 10 - 40A (Counter type display without
Box)

2150

a) LT 3-Ph Class-0.5 Accuracy CT Operated Electronic TVR Meter 200/5A

6899

b) LT 3-Ph Class-0.5 Accuracy CT Operated Electronic TVR Meter 125/5A

6525

c) LT TVR METER 125/5A CTS IN PP BOX. 0.5S ACCR WITH DLMSDL


4

a) HT Trivector Meter 0.5 class accuracy(10/5A)


b) HT Trivector Meter 0.5 class accuracy (200/1,100/1A)
c) HTTVR3P4W11KV/110V 10/5A 0.5S 30M DLMS-C
d) HTTVR 3P4W 33KV/110V 200/1A 0.2S 30MIN IPDLMS

11 KV Metering cubicles

6840
E
E
E

4244
3746
3401
10100

a) 10/5 A class 0.2S class accuracy


b) 20/5 A/ 0.2S class accuracy

E
E

39327
39015

c) 30/5A 0.5S class accuracy


d) 40/5A 0.5S class accuracy

E
E

22977
30609

e) 75/5 A 0.2S accuracy

39015

f) 60/5 A 0.2S accuracy

39015

Moulded Box for Single Phase service

250

Moulded Box for 3 Phase service

420

Moulded box for CT Meter(Poly phase)

1647

HT Meter Box

5731

10

A Type Distribution type BOX

7558

11

B Type Distribution type BOX

2500

12

SMC Meter Box with fixing clamps (3 phase meters)

6750

13

SMC Meter Box with fixing clamps (S- phase meters)

408

SUBHEAD -IX: EARTHING MATERIALS


1

GI Earth pipe 40 mm , (1.8 mts. Length)

418

GI Earth pipe 40 mm (2.5 mts. Length)

475

CI Earth pipe 80mm dia, (2.5 mts. Length)

2471

SUBHEAD -X: OTHER MATERIALS


1

Hand Held Computers with Printer

8145

CMRI

30700

11

COST DATA FOR HILLY AND TRIBAL AREAS


AS ADOPTED BY IRRIGATION DEPARTMENT IN THE STATE

For hilly and tribal areas, the following EXTRA RATES are allowed over and above
approved cost data of labour.
a. 25% extra is allowed for the works located within the interior Agency / Tribal limits.
(i.e.) for the works located within and upto 16 Kilometers from any all weather route
inside Agency/Tribal.
a. 40% extra is allowed for the works located within the interior Agency / Tribal Area
i.e., for the works located beyond 16 Kilometers from any all weather route inside
Agency/Tribal.
Note:
1 No extra percentage is permissible in respect of Forest produce such as Bamboo,
Rellu grass and all materials obtained from outside the Agency/Tribal.
2

The extra percentage under Agency/Tribal areas allowance may be allowed on the
labour component and on the labour charges in the rates for conveyance of
materials.

The extra percentage on cost of materials in Agency/Tribal areas can be allowed on


the labour component only, if they are manufactured in the Agency/Tribal areas
itself except Forest produce.

12

1. R.E.C. - Construction Standard No. M11/1979 (R-1989)


Costdata per Km of 33 KV Line with 100 Sq.mm AAA Conductor over 9.1 Mts.
PSCC Poles at 105 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 280 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

9.1 M PSCC Pole

12

3105

Each

37260

1.53M Cross Arm (Channel) without clamps

10

1418

Each

14180

Top Clamp with cleat

10

375

Each

3750

Back Clamp

10

172

Each

1720

Stay sets with clamps

1076

Each

6456

Bracing Set with double cross arm

4158

Set

4158

100 Sq.mm AAA Conductor

3.06

49166

K.M.

150448

33 KV Pin - Insulator with Pin

33

339

Each

11187

Strain Insulator set with metal parts( 3x 11 KV B&S


Insulator with 33 KV Hard ware fitting)

860

Set

5160

10

Concreting of Pole, Stay sets & Base concreting

LS

LS

LS

16940

11

Misc. Items like coil earthing, pipe earthing, dangerboards, bolts & nuts, etc.

LS

LS

LS

3300

Total Cost of Material


3% storage & handling charges on items (1) to (9)
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess

234319

Total
or say

13

254559
7030
7637
63640
12728
28001
3736
377331
3,77,330

2. R.E.C. - Construction Standard No. M11/1979 (R-1989)


Costdata per Km of 33 KV Line with 100 Sq.mm AAA Conductor over 9.1 Mts.
PSCC Poles at 80 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 280 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

9.1 M PSCC Pole

14

3105

Each

43470

1.53M Cross Arm (Channel) without clamps

12

1418

Each

17016

Top Clamp with cleat

12

375

Each

4500

Back Clamp

12

172

Each

2064

Stay sets with clamps

1076

Each

6456

Bracing Set with double cross arm

4158

Set

4158

100 Sq.mm AAA Conductor

3.06

49166

K.M.

150448

33 KV Pin - Insulator with Pin

39

339

Each

13221

Strain Insulator set with metal parts

860

Set

5160

10

Concreting of Pole, Stay sets & Base concreting

LS

LS

LS

16940

11

Misc. Items like coil earthing, pipe earthing, dangerboards, bolts & nuts, etc.

LS

LS

LS

3300

Total Cost of Material

266733

3% storage & handling charges on items (1) to (9)

246493

7395

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

14

8002
66683
13337
29341
3915
395405
3,95,410

3. R.E.C. - Construction Standard No. A-5/1972


Costdata per Km of 11 KV Line with 55 Sq.mm AAA Conductor over 8 Mts.
PSCC Poles at 60 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8.0 M PSCC Pole

18

1504

Each

27072

1.07M Cross Arm (Channel) without clamps

16

511

Each

8176

Top Clamp with cleat

16

214

Each

3424

Back Clamp

16

123

Each

1968

Stay sets with clamps

424

Each

2544

Bracing Set with double cross arm

3564

Set

3564

55 Sq.mm AAA Conductor

3.06

28149

K.M.

86136

11 KV Pin - Insulator with Pin

51

85

Each

4335

Strain Insulator set with metal parts

272

Set

1632

10

Concreting of Pole, Stay sets & Base concreting

LS

LS

LS

19556

11

Misc. Items like coil earthing, pipe earthing, dangerboards, bolts & nuts, etc.

LS

LS

LS

4400

Total Cost of Material

162807

3% storage & handling charges on items (1) to (9)

138851

4166

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

15

4884
40702
8140
17909
2386
240994
2,40,990

4. R.E.C. - Construction Standard No. A-5/1972


Costdata per Km of 11 KV Line with 55 Sq.mm AAA Conductor over 8 Mts.
PSCC Poles at 65 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8.0 M PSCC Pole

17

1844

Each

31348

1.07M Cross Arm (Channel) without clamps

15

511

Each

7665

Top Clamp with cleat

15

214

Each

3210

Back Clamp

15

123

Each

1845

Stay sets with clamps

424

Each

2544

Bracing Set with double cross arm

3564

Set

3564

55 Sq.mm AAA Conductor

3.06

28149

K.M.

86136

11 KV Pin - Insulator with Pin

48

85

Each

4080

Strain Insulator set with metal parts

272

Set

1632

10

Concreting of Pole, Stay sets & Base concreting

LS

LS

LS

19556

11

Misc. Items like coil earthing, pipe earthing, dangerboards, bolts & nuts, etc.

LS

LS

LS

4400

Total Cost of Material

165980

3% storage & handling charges on items (1) to (9)

142024

4261

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

16

4979
41495
8299
18258
2433
245704
2,45,700

5. R.E.C. - Construction Standard No. A-5/1972


Costdata per Km of 11 KV Line with 34 Sq.mm AAA Conductor over 8 Mts.
PSCC Poles at 60 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 M PSCC Pole

18

1504

Each

27072

1.07M Cross Arm (Channel) without clamps

16

511

Each

8176

Top Clamp with cleat

16

214

Each

3424

Back Clamp

16

123

Each

1968

Stay sets with clamps

424

Each

2544

Bracing Set with double cross arm

3564

Set

3564

34 Sq.mm AAA Conductor

3.06

17870

K.M.

54682

11 KV Pin - Insulator with Pin

51

85

Each

4335

Strain Insulator set with metal parts

272

Set

1632

10

Concreting of Pole, Stay sets & Base concreting

LS

LS

LS

19556

11

Misc. Items like coil earthing, pipe earthing, dangerboards, bolts & nuts, etc.

LS

LS

LS

4400

Total Cost of Material

131353

3% storage & handling charges on items (1) to (9)

107397

3222

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

17

3941
32838
6568
14449
1924
194294
1,94,290

6. R.E.C. - Construction Standard No. A-5/1972


Costdata per Km of 11 KV Line with 34 Sq.mm AAA Conductor over 8 Mts.
PSCC Poles at 65 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 PSCC Pole

17

1844

Each

31348

1.53M Cross Arm (Channel) without clamps

15

511

Each

7665

Top Clamp with cleat

15

214

Each

3210

Back Clamp

15

123

Each

1845

Stay sets with clamps

424

Each

2544

Bracing Set with double cross arm

3564

Set

3564

34 Sq.mm AAA Conductor

3.06

17870

K.M.

54682

11 KV Pin - Insulator with Pin

48

85

Each

4080

Strain Insulator set with metal parts

272

Set

1632

10

Concreting of Pole, Stay sets & Base concreting

LS

LS

LS

19556

11

Misc. Items like coil earthing, pipe earthing, dangerboards, bolts & nuts, etc.

LS

LS

LS

4400

Total Cost of Material

134526

3% storage & handling charges on items (1) to (9)

110570

3317

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

18

4036
33631
6726
14798
1970
199005
1,99,000

7. R.E.C. - Construction Standard No. A-17/1972


Costdata per Km of 6.3 KV S-ph Line with 34 Sq.mm AAA Conductor over 8 Mts.
PSCC Poles at 90 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 M PSCC Pole

13

1504

Each

19552

Top Clamp with cleat

10

214

Each

2140

D clamp

10

132

Each

1320

MS Stay sets

358

Each

2148

34 Sq.mm AAA Conductor

2.04

17870

K.M.

36455

11 K.V.Pin-Insulator with Pin

11

85

Each

935

Strain Insulator set

272

Set

1088

Concreting of Pole,Stay sets & Base concreting

L.S.

19556

Misc. Items like coil earthing,


pipe earthings, danger-boards, bolts
& nuts, etc.

L.S.

2500

Total Cost of Material

85694

3% storage & handling charges on items (1) to (7)

63638

1909

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

19

2571
21423
4285
9426
1253
126561
1,26,560

8. R.E.C. - Construction Standard No. A-17/1972


Costdata per Km of 6.3 KV S-ph Line with 34 Sq.mm AAA Conductor over 8 Mts.
PSCC Poles at 90 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 M PSCC Pole

13

1844

Each

23972

Top Clamp with cleat

10

214

Each

2140

D clamp

10

132

Each

1320

MS Stay sets

358

Set

2148

34 Sq.mm AAA Conductor

2.04

17870

K.M.

36455

11 K.V.Pin-Insulator with Pin

11

85

Each

935

Strain Insulator set

272

Set

1088

Concreting of Pole,Stay sets &


Base concreting

L.S.

19556

Misc. Items like coil earthing,


pipe earthings, danger-boards, bolts
& nuts, etc.

L.S.

2500

Total Cost of Material

90114

3% storage & handling charges on items (1) to (7)

68058

2042

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

20

2703
22528
4506
9913
1318
133124
1,33,120

9. R.E.C. - Construction Standard No. B-5/1972


Costdata per Km of LT 3-Ph 5 Wire Line(Horizontal formation ) with
3 x 55 Sq.mm + 2 x 34 Sq.mm AAAC over 8 Mts.
PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 M PSCC Pole

16

1504

Each

24064

L.T. 3 Phase cross arms

18

487

Each

8766

Back Clamp

18

123

Each

2214

Stay sets

394

Each

1576

55 Sq.mm AAA Conductor

3.06

28149

K.M.

86136

34 Sq.mm AAA Conductor

2.04

17870

K.M.

36455

Shakle Insulator set

42

44

Set

1848

L.T.pin insulator with pin

48

36

Set

1728

C.I. Knob

16

12

Each

192

10

Concreting of Pole,Stay sets &


Base concreting

L.S.

16016

Misc. Items like coil earthing,


pipe earthings, danger-boards, bolts
& nuts, etc.

L.S.

3500

11

Total Cost of Material

182495

3% storage & handling charges on items (1) to (9)

162979

4889

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

21

5475
45624
9125
20074
2677
270359
2,70,360

10.
R.E.C. - Construction Standard No. B-5/1972
Costdata per Km of LT 3-Ph 5 Wire Line(Horizontal formation ) with
3 x 55 Sq.mm + 2 x 34 Sq.mm AAAC over 8 Mts.
PSCC Poles at 60 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 M PSCC Pole

18

1844

Each

33192

L.T. 3 Phase cross arms

20

487

Each

9740

Back Clamp

20

123

Each

2460

LT Stay sets

394

Each

1576

55 Sq.mm AAA Conductor

3.06

28149

K.M.

86136

34 Sq.mm AAA Conductor

2.04

17870

K.M.

36455

Shakle Insulator set

42

44

Set

1848

L.T.pin insulator with pin

56

36

Set

2016

C.I. Knob

18

12

Each

216

10

Concreting of Pole,Stay sets &

L.S.

16016

L.S.

3500

Base concreting
11

Misc. Items like coil earthing,


pipe earthings, danger-boards, bolts
& nuts, etc.
Total Cost of Material

193155

3% storage & handling charges on items (1) to (9)

173639

5209

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

22

5795
48289
9658
21247
2834
286186
2,86,190

11. R.E.C. - Construction Standard No. B-5/1972


Costdata per Km of LT 3-Ph 5 Wire Line(Horizontal formation ) with
5 x 34 Sq.mm AAAC over 8 Mts.
PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 M PSCC Pole

16

1504

Each

24064

L.T. 3 Phase cross arms

18

487

Each

8766

Back Clamp

18

123

Each

2214

LT Stay sets

394

Each

1576

34 Sq.mm AAA Conductor

5.10

17870

K.M.

91137

Shakle Insulator set

42

44

Set

1848

L.T.pin insulator with pin

48

36

Set

1728

C.I. Knob

16

12

Each

192

Concreting of Pole,Stay sets &


Base concreting

L.S.

16016

Misc. Items like coil earthing,


pipe earthings, danger-boards, bolts
& nuts, etc.

L.S.

3500

10

Total Cost of Material

151041

3% storage & handling charges on items (1) to (8)

131525

3946

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

23

4531
37760
7552
16615
2214
223659
2,23,660

12.
R.E.C. - Construction Standard No. B-5/1972
Costdata per Km of LT 3-Ph 5 Wire Line(Horizontal formation ) with
5 x 34 Sq.mm AAAC over 8 Mts.
PSCC Poles at 60 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 M PSCC Pole

18

1844

Each

33192

L.T. 3 Phase cross arms

20

487

Each

9740

Back Clamp

20

123

Each

2460

LT Stay sets

394

Each

1576

34 Sq.mm AAA Conductor

5.10

17870

K.M.

91137

Shakle Insulator set

42

44

Set

1848

L.T.pin insulator with pin

56

36

Set

2016

C.I. Knob

18

12

Each

216

Concreting of Pole,Stay sets &


Base concreting

L.S.

16016

Misc. Items like coil earthing,


pipe earthings, danger-boards, bolts
& nuts, etc.

L.S.

3500

10

Total Cost of Material

161701

3% storage & handling charges on items (1) to (8)

142185

4266

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

24

4851
40425
8085
17787
2371
239486
2,39,490

13.
R.E.C. - Construction Standard No. B-12/1981
Costdata per Km of LT 3-Ph 4 Wire Line(Horizontal formation ) with
3 x 55 Sq.mm + 1 x 34 Sqmm AAAC over 8 Mts.
PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 M PSCC Pole

16

1504

Each

24064

L.T. 3 Phase cross arms

18

416

Each

7488

Back Clamp

18

123

Each

2214

LT Stay sets

394

Each

1576

55 Sqmm AAA Conductor

3.06

28149

K.M.

86136

34 Sq.mm AAA Conductor

1.02

17870

K.M.

18227

Shakle Insulator set

32

44

Set

1408

L.T.pin insulator with pin

36

36

Set

1296

C.I. Knob

16

12

Each

192

10

Concreting of Pole,Stay sets &


Base concreting

L.S.

16016

Misc. Items like coil earthing,


pipe earthings, danger-boards, bolts
& nuts, etc.

L.S.

3500

11

Total Cost of Material

162117

3% storage & handling charges on items (1) to (9)

142601

4278

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

25

4864
40529
8106
17833
2377
240104
2,40,100

14.
R.E.C. - Construction Standard No. B-12/1981
Costdata per Km of LT 3 Ph 4 Wire Line(Horizontal formation ) with
3 x 55 Sq.mm + 1 x 34 Sqmm AAAC over 8 Mts.
PSCC Poles at 60 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 M PSCC Pole

15

1844

Each

27660

L.T. 3 Phase cross arms

17

416

Each

7072

Back Clamp

17

123

Each

2091

LT Stay sets

394

Each

1576

55 Sqmm AAA Conductor

3.06

28149

K.M.

86136

34 Sq.mm AAA Conductor

1.02

17870

K.M.

18227

Shakle Insulator set

32

44

Set

1408

L.T.pin insulator with pin

33

36

Set

1188

C.I. Knob

15

12

Each

180

10

Concreting of Pole,Stay sets &


Base concreting

L.S.

16016

Misc. Items like coil earthing,


pipe earthings, danger-boards, bolts
& nuts, etc.

L.S.

3500

11

Total Cost of Material

165054

3% storage & handling charges on items (1) to (9)

145538

4366

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

26

4952
41264
8253
18156
2420
244464
2,44,460

15. R.E.C. - Construction Standard No. B-12/1981


Costdata per Km of LT 3-Ph 4 Wire Line(Horizontal formation )
with 4 x 34 Sqmm AAAC over 8 Mts.
PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 M PSCC Pole

16

1504

Each

24064

L.T. 3 Phase cross arms

18

416

Each

7488

Back Clamp

18

123

Each

2214

LT Stay sets

394

Each

1576

34 Sq.mm AAA Conductor

4.08

17870

K.M.

72910

Shakle Insulator set

32

44

Set

1408

L.T.pin insulator with pin

36

36

Set

1296

C.I. Knob

16

12

Each

192

Concreting of Pole,Stay sets &


Base concreting

L.S.

16016

Misc. Items like coil earthing,


pipe earthings, danger-boards, bolts
& nuts, etc.

L.S.

3500

10

Total Cost of Material

130664

3% storage & handling charges on items (1) to (8)

111148

3334

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

27

3920
32666
6533
14373
1915
193406
1,93,410

16. R.E.C. - Construction Standard No. B-12/1981


Costdata per Km of LT 3-Ph 4 Wire Line(Horizontal formation )
with 4 x 34 Sqmm AAAC over 8 Mts.
PSCC Poles at 60 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 M PSCC Pole

15

1844

Each

27660

L.T. 3 Phase cross arms

17

416

Each

7072

Back Clamp

17

123

Each

2091

LT Stay sets

394

Each

1576

34 Sq.mm AAA Conductor

4.08

17870

K.M.

72910

Shakle Insulator set

32

44

Set

1408

L.T.pin insulator with pin

33

36

Set

1188

C.I. Knob

17

12

Each

204

Concreting of Pole,Stay sets &


Base concreting

L.S.

16016

Misc. Items like coil earthing,


pipe earthings, danger-boards, bolts
& nuts, etc.

L.S.

3500

10

Total Cost of Material

133625

3% storage & handling charges on items (1) to (8)

114109

3423

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

28

4009
33406
6681
14699
1958
197802
1,97,800

17. R.E.C. - Construction Standard No. B-14/1981


Costdata per Km of LT S-Ph 3 Wire Line(Horizontal formation )
with 34 Sqmm AAAC over 8 Mts.
PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 M PSCC Pole

16

1504

Each

24064

L.T. 1 Phase cross arms

18

319

Each

5742

Back Clamp

18

123

Each

2214

LT Stay sets

394

Each

1576

34 Sq.mm AAA Conductor

3.06

17870

K.M.

54682

Shakle Insulator set

22

44

Set

968

L.T.pin insulator with pin

24

36

Set

864

C.I. Knob

16

12

Each

192

Concreting of Pole,Stay sets &


Base concreting

L.S.

16016

Misc. Items like coil earthing,


pipe earthings, danger-boards, bolts
& nuts, etc.

L.S.

3500

10

Total Cost of Material

109818

3% storage & handling charges on items (1) to (8)

90302

2709

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

3295
27455
5491
12080
1608
162455
1,62,460

Note : Substitute the cost of 8 mts PSCC pole in above data for wind pressure of 100 kgs/Sqmts,
and working load of 200 kgs

29

18.
R.E.C. - Construction Standard No. B-14/1981
Costdata per Km of LT S-Ph 2 Wire Line(Horizontal formation )
with 2 x 34 Sqmm AAAC over 8 Mts.
PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 M PSCC Pole

16

1504

Each

24064

L.T. 1 Phase cross arms

18

268

Each

4824

Back Clamp

18

123

Each

2214

LT Stay sets

394

Each

1576

34 Sq.mm AAA Conductor

2.04

17870

K.M.

36455

Shakle Insulator set

12

44

Set

528

L.T.pin insulator with pin

12

36

Set

432

C.I. Knob

16

12

Each

192

Concreting of Pole,Stay sets &


Base concreting

L.S.

16016

Misc. Items like coil earthing,


pipe earthings, danger-boards, bolts
& nuts, etc.

L.S.

3500

10

Total Cost of Material

89801

3% storage & handling charges on items (1) to (8)

70285

2109

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

30

2694
22450
4490
9878
1314
132736
1,32,740

19. R.E.C. - Construction Standard No. B-32/1984


Costdata per Km of LT line with 3 x 16 + 25 Sqmm AB Cable over 8 Mts.
PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 M PSCC Pole

16

1504

Each

24064

Suspension clamp assembly with eye hook

12

175

Each

2100

Dead end clamp assembly with eye hook

113

Each

678

LT Stay sets

394

Set

1576

L.T. A.B. Cable 3 x 16 + 25 Sqmm

47316

K.M.

47316

Insulated connectors with covers

56

82

Each

4592

Concreting of Pole,Stay concreting &


L.S.

16016

L.S.

3500

Base concreting
8

Misc. Items like coil earthing,


bolts & nuts, etc.
Total Cost of Material

99842

3% storage & handling charges on items (1) to (6)

80326

2410

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

31

2995
24961
4992
10983
1462
147644
1,47,640

20.
R.E.C. - Construction Standard No. B-32/1984
Costdata per Km of LT line with 2 x 16 + 25 Sqmm AB Cable over 8 Mts.
PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 M PSCC Pole

16

1504

Each

24064

Suspension clamp assembly with eye hook

12

175

Each

2100

Dead end clamp assembly with eye hook

113

Each

678

LT Stay sets

394

Set

1576

L.T. A.B. Cable 2 x 16 + 25 Sqmm

36427

K.M.

36427

Insulated connectors with covers

56

82

Each

4592

Concreting of Pole,Stay concreting &


L.S.

16016

L.S.

3500

Base concreting
8

Misc. Items like coil earthing,


bolts & nuts, etc.

Total Cost of Material

88953

3% storage & handling charges on items (1) to (6)

69437

2083

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

32

2669
22238
4448
9785
1302
131477
1,31,480

21. R.E.C. - Construction Standard No. B-32/1984


Costdata per Km of LT line with 1 x 16 + 25 Sqmm AB Cable over 8 Mts.
PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 M PSCC Pole

16

1504

Each

24064

Suspension clamp assembly with eye hook

12

175

Each

2100

Dead end clamp assembly with eye hook

113

Each

678

LT Stay sets

394

Set

1576

L.T. A.B. Cable 1 x 16 + 25 Sqmm

25750

K.M.

25750

Insulated connectors with covers

56

82

Each

4592

Concreting of Pole,Stay concreting &


L.S.

16016

L.S.

3500

Base concreting
8

Misc. Items like coil earthing,


bolts & nuts, etc.

Total Cost of Material

78276

3% storage & handling charges on items (1) to (6)

58760

1763

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

33

2348
19569
3914
8610
1145
115625
1,15,630

22.
R.E.C. - Construction Standard No. B-32/1984
Costdata per Km of LT line with 3 x 16 + 25 Sqmm AB Cable over 8 Mts.
PSCC Poles at 65 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 M PSCC Pole

16

1844

Each

29504

Suspension clamp assembly with eye hook

12

175

Each

2100

Dead end clamp assembly with eye hook

113

Each

678

LT Stay sets

394

Set

1576

L.T. A.B. Cable 3 x 16 + 25 Sqmm

47316

K.M.

47316

Insulated connectors with covers

56

82

Each

4592

Concreting of Pole,Stay concreting &


L.S.

16016

L.S.

3500

Base concreting
8

Misc. Items like coil earthing,


bolts & nuts, etc.
Total Cost of Material

105282

3% storage & handling charges on items (1) to (6)

85766

2573

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

34

3158
26321
5264
11581
1542
155721
1,55,720

23.
R.E.C. - Construction Standard No. B-32/1984
Costdata per Km of LT line with 2 x 16 + 25 Sqmm AB Cable over 8 Mts.
PSCC Poles at 65 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 M PSCC Pole

16

1844

Each

29504

Suspension clamp assembly with eye hook

12

175

Each

2100

Dead end clamp assembly with eye hook

113

Each

678

LT Stay sets

394

Set

1576

L.T. A.B. Cable 2 x 16 + 25 Sqmm

36427

K.M.

36427

Insulated connectors with covers

56

82

Each

4592

Concreting of Pole,Stay concreting &


L.S.

16016

L.S.

3500

Base concreting
8

Misc. Items like coil earthing,


bolts & nuts, etc.

Total Cost of Material

94393

3% storage & handling charges on items (1) to (6)

74877

2246

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

35

2832
23598
4720
10383
1382
139554
1,39,550

24.
R.E.C. - Construction Standard No. B-32/1984
Costdata per Km of LT line with 1 x 16 + 25 Sqmm AB Cable over 8 Mts.
PSCC Poles at 65 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 M PSCC Pole

16

1844

Each

29504

Suspension clamp assembly with eye hook

12

175

Each

2100

Dead end clamp assembly with eye hook

113

Each

678

LT Stay sets

394

Set

1576

L.T. A.B. Cable 1 x 16 + 25 Sqmm

25750

K.M.

25750

Insulated connectors with covers

56

82

Each

4592

Concreting of Pole,Stay concreting & Base


concreting

L.S.

16016

Misc. Items like coil earthing, bolts & nuts, etc.

L.S.

3500

Total Cost of Material

83716

3% storage & handling charges on items (1) to (6)

64200

1926

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

36

2511
20929
4186
9209
1225
123702
1,23,700

25. R.E.C. - CONSTRUCTION STANDARD SPECIFICATION NO. F3&F4/1981


COST DATA FOR ERECTION OF 100KVA-11KV/433V CONVENTIONAL TRANSFORMER

Sl. No.

Particulars

Cost of Material
(Rs.)

Labour & Transport


(Rs.)

135423

3,213

11 KV/433V 100KVA Conventional Transformer

Erection of 11 KV AB Switch (200A)

7349

909

D.P.Structure (Including all Earthing)

28810

9,702

Erection of 11 KV H.G. Fuse set

1889

388

Installation of L.T.H.G. Fuse sets (2 Nos.) including


connections

2626

726

LT Metering arrangements with CTs including cable


connections and cleat arrangement

8895

940

Installation of A type distribuion box

7558

162

Installation of HT Lightening Arrestors

5172

605

Misc. Items

500

Total Cost of Material


3% storage & handling charges on items (1) to (8)
3% Contingencies on Materials

1,98,222
5932
5947

Labour & Transport

16,645

11% Estt. & Genl. Charges on Materials

21804

1% cess

2485
Total Cost in Rs.
or say :

2,51,035
2,51,040

37

16,645

26.

COST DATA FOR ERECTION OF 63KVA-11KV/433V CONVENTIONAL TRANSFORMER

Sl. No.

Particulars

Cost of Material
(Rs.)

Labour & Transport


(Rs.)

103237

3,213

11 KV/433V 63KVA Conventional Distribution


Transformer

Erection of 11 KV AB Switch (200A)

7349

909

D.P.Structure (Including all Earthing)

28810

9,702

Erection of 11 KV H.G. Fuse set

1889

388

Installation of L.T.H.G. Fuse sets (2 Nos.) including


connections

2626

726

LT Metering arrangements with CTs including cable


connections and cleat arrangement

8895

940

Installation of A type distribuion box

7558

162

Installation of HT Lightning Arrestors with earth


connection

5172

605

Misc. Items

420

Total Cost of Material

1,65,956

3% storage & handling charges on items 1 to 8

4,966

3% Contingencies on Materials

4,979

Labour & Transport

16,645

11% Estt. & Genl. Charges on Materials

18255

1% cess

2,108

Total Cost in Rs.


or say :

38

2,12,909
2,12,910

16,645

27.
Cost Data For Erection of 3 Phase 16 KVA-11KV/433V
Conventional Distribution Transformer On Single Pole Structure

Sl. No.

Particulars

Cost of Material
(Rs.)

Labour & Transport


(Rs.)

11 KV/433V 16KVA Conventional Distribution


Transformer

60485

613

Erection of 11 KV AB Switch (200A)

7349

909

Single Pole.Structure with 9.1Mtr PSCC Pole


(Including Earthing)

13248

3,448

Erection of 11 KV H.G. Fuse set

1889

388

CT Distribution box including CT wiring with 1x25


sqmm XLPE cable and cleat wiring

12640

253

Misc. Items(Danger boards,Bolts &Nuts,Concreting


etc.)

1650

214

Total Cost of Material

97261

5825

3% storage & handling charges on items (1) to (5)

2,868

3% Contingencies on Materials

2,918

Labour & Transport

5,825

11% Estt. & Genl. Charges on Materials

10699

1% cess

1,196

Total Cost in Rs.


or say :

39

1,20,767
1,20,770

28.
Cost Data For Erection of 3 Phase 25 KVA-11KV/433V
Conventional Distribution Transformer On Single Pole Structure

Sl. No.

Particulars

Cost of Material
(Rs.)

Labour & Transport


(Rs.)

11 KV/433V 25KVA Conventional Distribution


Transformer

70115

673

Erection of 11 KV AB Switch (200A)

7349

909

Single Pole.Structure with 9.1Mtr PSCC Pole


(Including Earthing)

13248

3,448

Erection of 11 KV H.G. Fuse set

1889

388

CT Distribution box including CT wiring with 1x50


sqmm XLPE cable and cleat wiring

17766

252

Misc. Items(Danger boards,Bolts &Nuts,Concreting


etc.)

1500

196

1,11,866

5,866

Total Cost of Material

3% storage & handling charges on items (1) to (5)

3,311

3% Contingencies on Materials

3,356

Labour & Transport

5,866

11% Estt. & Genl. Charges on Materials

12305

1% cess

1,367

Total Cost in Rs.


or say :

40

1,38,072
1,38,070

29.
Cost Data For Erection of 3 Phase 40 KVA-11KV/433V
Conventional Distribution Transformer On Single Pole Structure

Sl. No.

Particulars

Cost of Material
(Rs.)

Labour & Transport


(Rs.)

11 KV/433V 40KVA Conventional Distribution


Transformer

96748

542

Erection of 11 KV AB Switch (200A)

7349

909

Single Pole.Structure with 9.1Mtr PSCC Pole


(Including Earthing)

13248

3,448

Erection of 11 KV H.G. Fuse set

1889

388

CT Distribution box including CT wiring with 1x70


sqmm XLPE cable and cleat wiring

21781

238

Misc. Items(Danger boards,Bolts &Nuts,Concreting


etc.)

1500

196

1,42,514

5,721

Total Cost of Material

3% storage & handling charges on items (1) to (5)

4,230

3% Contingencies on Materials

4,275

Labour & Transport

5,721

11% Estt. & Genl. Charges on Materials

15677

1% cess

1,724

Total Cost in Rs.


or say :

41

1,74,142
1,74,140

30. Cost Data For Erection of Single Phase 15 KVA-6.3KV/0-240V


CSP Transformer(Oil immersed) On 9.1Mtr PSCC Pole Support

Sl. No.

Particulars

Cost of Material
(Rs.)

Labour & Transport


(Rs.)

9.1 Mtr PSCC Pole

3105

994

15KVA Single Phase CSP Distribution Transformer

34595

285

Mounting arrangements for transformer

2743

618

Earthing with 1No 2.5 Mts Long 75 mm CI earth


pipe

3134

431

Distribution box with 1 No 100A Fuse unit and cleat


wiring with 50 sqmm XLPE cable & LT side arm
with strut

6401

303

Misc. Items(Danger boards,Bolts &Nuts,Concreting


etc.)

1000

Total Cost of Material

50,978

3% storage & handling charges on items (1) to (5)

1,499

3% Contingencies on Materials

1,529

Labour & Transport

2,631

11% Estt. & Genl. Charges on Materials

5608

1% cess

622

Total Cost in Rs.


or say :

42

62,868
62,870

2,631

31.

R.E.C. - CONSTRUCTION STANDARD SPECIFICATION NO. F3&F4/1981


COST DATA FOR ERECTION OF 15KVA SINGLE PHASE 6.3KV/0-240V
C.S.P TRANSFORMER (OIL IMMERSED) ON EXISTING 8M PSCC SUPPORT

Sl.No.

Particulars

Qty.

Rate in
Rs.

Per Unit

Amount in
Rs.

15KVA Single Phase CSP Distribution Transformer

1 No.

34,595

Each

34,595

Mounting arrangements for Transformer

1 Set

2,743

Each

2,743

Pipe earthing

1 No.

808

Each

808

Misc. Items

L.S.

L.S.

L.S.

500

Total Cost of Material

38,646

3% storage & handling charges on items (1) to (3)

1,144

3% Contingencies on Materials

1,159

Labour & Transport

2,592

11% Estt. & Genl. Charges On Materials

4,251

1% Cess
Total Cost in Rs.
Or say :

478
48,271
48,270

43

32.

R.E.C. - CONSTRUCTION STANDARD SPECIFICATION NO. F3&F4/1981


COST DATA FOR ERECTION OF 15KVA SINGLE PHASE 6.3KV/0-240V
AMORPHOUS METAL CORE C.S.P TRANSFORMER (OIL IMMERSED)
ON EXISTING 8M PSCC SUPPORT

Sl.No.

Particulars

Qty.

Rate in
Rs.

Per Unit

Amount in
Rs.

15 KVA Oil Immersed Single Phase 6.3KV/0-240V


Amorphous Metal Core Transformer

1 No.

37,522

Each

37,522

Mounting arrangements for Transformer

1 Set

2,743

Each

2,743

Pipe earthing

1 No.

808

Each

808

Misc. Items

L.S.

L.S.

L.S.

500

Total Cost of Material

41,573

3% storage & handling charges on items (1) to (3)

1,232

3% Contingencies on Materials

1,247

Labour & Transport

2,403

11% Estt. & Genl. Charges On Materials

4,573

1% Cess
Total Cost in Rs.
Or say :

510
51,539
51,540

44

33. R.E.C. - CONSTRUCTION STANDARD SPECIFICATION NO. H1&H3/1981


COST DATA FOR SINGLE PHASE AGRICULTURE SERVICE ERECTED ON SUPPORT

Sl.No.

Particulars

Qty.

Rate in
Rs.

Per Unit

Amount
in Rs.

1 Phase (5-20A) Energy meter

730

Each

730

1 Phase 15A M.C.B./Fuse Unit

120

Each

120

P.V.C. Cable 6 Sq.mm Single Core

20

28

Each

560

Moulded Distribution Box

250

Each

250

P.V.C. Bends 38mm

22

Each

22

Bolts, Nuts etc.

L.S.

L.S.

L.S.

80

Total Cost of Material

1,762

3% Contingencies

53

Labour & Transport

1,076

11% Estt. & Genl. Charges

194

1% Cess
Total Cost in Rs.
Or say :

31
3,115
3,120

45

34. R.E.C. - CONSTRUCTION STANDARD SPECIFICATION NO. H6&H8/1981


COST DATA FOR RELEASE OF POLY PHASE AGRICULTURE SERVICE ERECTED ON
SUPPORT
Sl.No.

Particulars

Qty.

Rate in
Rs.

Per Unit

Amount
in Rs.

3 Phase (10A-40A ) Energy meter

1,869

Each

1,869

3 Phase 40A M.C.B./Fuse Unit (3 Nos.)

729

Each

729

P.V.C. Cable 6 Sq.mm Single Core

30

28

Each

840

Moulded Distribution Box

420

Each

420

Installation of 2KVAR Capacitor

500

500

Misc. items such as Bolts, Nuts & Board


etc.

L.S.

L.S.

L.S.

80

Total Cost of Material

4,438

3% Contingencies

133

Labour & Transport

1,739

11% Estt. & Genl. Charges

488

1% Cess
Total Cost in Rs.
Or say :

68
6,866
6,870

46

35. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H1 TO H3/1981


COST DATA FOR DOMESTIC AND NON-DOMESTIC SERVICE CONNECTION (SINGLE PHASE)
WITH QUALITY METER

Sl. No.

Particulars

Single Phase electronic Energy Meter


5-30A

Rate

Chargable to
Qty .
Amount

Chargable to
Qty.
Amount

Amount in
Rs.

846

846

846

15A M.C.B./Fuse Unit

120/E

120

120

P.V.C. Cable single core 2.5 Sq.mm

20/M

Moulded Distribution Box

250/E

G.I. Wire No.8

60/Kg

1 Kg.

60

60

P.V.C. Pipe 20mm

25/M

2M

50

50

P.V.C. Bends 20mm

5/E

2 Nos.

10

10

Misc.

L.S

85

85

1216

1405

2621

3% Contingencies on Materials

36

42

79

Labour & Transport

202

430

633

11% Estt. & Genl. Charges

134

155

288

1% Cess
Total Cost in Rs.
Or say :

1589

2032

36
3,657
3,660

Total

Note :

Item Nos. 4 to 7 are to be borne &


arranged by the Consumer.

47

60
1

1200

250

1200
250

36. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H1 TO H3/1981


COST DATA FOR DOMESTIC AND NON-DOMESTIC SERVICE CONNECTION (SINGLE PHASE)
WITH ELECTRONIC METER

Sl. No.

Particulars

Single Phase electronic Energy Meter


2.5-10A

Rate

Chargable to
DISCOM
Qty .
Amount

Chargable to
Consumer
Qty.
Amount

Amount in
Rs.

447

447

447

15A M.C.B./Fuse Unit

115/E

120

120

P.V.C. Cable single core 2.5 Sq.mm

20/M

Moulded Distribution Box

250/E

G.I. Wire No.8

60/Kg

1 Kg.

60

60

P.V.C. Pipe 20mm

25/M

2M

50

50

P.V.C. Bends 20mm

5/E

2 Nos.

10

10

Misc.

L.S

85

85

1200

250

1200
250

Total

817

1405

2222

3% Contingencies on Materials

25

42

67

Labour & Transport

202

430

633

11% Estt. & Genl. Charges

90

155

244

1134

2032

32
3,197
3,200

1% Cess
Total Cost in Rs.
Or say :
Note :

60

Item Nos. 4 to 7 are to be borne &


arranged by the Consumer.

48

37. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H1 TO H3/1981


COST DATA FOR DOMESTIC AND NON-DOMESTIC SERVICE CONNECTION (SINGLE PHASE)
WITH QUALITY METER

Sl. No.

Particulars

Single Phase Quality Energy Meter


5-20A

Rate

Chargable to
DISCOM
Qty .
Amount

Chargable to
Consumer
Qty.
Amount

Amount in
Rs.

730

730

730

15A M.C.B./Fuse Unit

120/E

120

120

P.V.C. Cable single core 2.5 Sq.mm

20/M

Moulded Distribution Box

250/E

G.I. Wire No.8

60/Kg

1 Kg.

60

60

P.V.C. Pipe 20mm

25/M

2M

50

50

P.V.C. Bends 20mm

5/E

2 Nos.

10

10

Misc.

L.S

85

85

1100

1405

2505

3% Contingencies on Materials

33

42

75

Labour & Transport

202

430

633

11% Estt. & Genl. Charges

121

155

276

Total

60
1

1200

250

250

1% Cess

35

Total Cost in Rs.


Or say :
Note :

1200

1456

Item Nos. 4 to 7 are to be borne &


arranged by the Consumer.

49

2032

3,523
3,520

38. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H1 TO H3/1981


COST DATA FOR DOMESTIC AND NON-DOMESTIC SERVICE CONNECTION (THREE PHASE)

Sl. No.

Particulars

Rate

Chargable to
DISCOM
Qty .
Amount

Chargable to
Consumer
Qty.
Amount

Amount in
Rs.

Three Phase electronic Energy Meter 1040A

1869

1869

1869

3 Phase 60A M.C.B./Fuse Unit

955/E

955

955

Moulded Distribution Box

420/E

420

420

P.V.C. Cable single core 6 Sq.mm

28/M

120

3360

3360

G.I. Wire No.8

60/Kg

1 Kg.

60

60

P.V.C. Pipe 20mm

25/M

2M

50

50

P.V.C. Bends 20mm

5/E

2 Nos.

10

10

Misc.

L.S

95

95

3244

3575

6819

3% Contingencies on Materials

97

107

205

Labour & Transport

202

430

633

11% Estt. & Genl. Charges

357

393

750

1% Cess
Total Cost in Rs.
Or say :

3901

4506

84
8,490
8,490

Total

Note :

Item Nos. 4 to 7 are to be borne &


arranged by the Consumer.

50

39. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H1 TO H3/1981


COST DATA FOR DOMESTIC AND NON-DOMESTIC SERVICE CONNECTION (THREE PHASE)
WITH ELECTRONIC METER

Sl. No.

Particulars

Rate

Chargable to
DISCOM
Qty .
Amount

Chargable to
Consumer
Qty.
Amount

Amount in
Rs.

3 Phase Electronic Energy Meter Housed


in box 10-40A

1869

1869

1869

3 phase 60A M.C.B./Fuse Unit

955/E

955

955

P.V.C. Cable single core 6 Sq.mm

28/M

120 Mts.

3360

3360

G.I. Wire No.8

60/Kg

1 Kg.

60

60

P.V.C. Pipe 20mm

25/M

2M

50

50

P.V.C. Bends 20mm

5/E

2 Nos.

10

10

Misc.

L.S

95

95

2824

3575

6399

3% Contingencies on Materials

85

107

192

Labour & Transport

405

557

961

11% Estt. & Genl. Charges

311

393

704

1% Cess
Total Cost in Rs.
Or say :

3624

4632

83
8,339
8,340

Total

Note :

Item Nos. 4 to 7 are to be borne &


arranged by the Consumer.

51

40.

Sl. No.

R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H-5/1981


POLY PHASE SERVICE CONNECTION CHARGES FOR
ERECTION OF 1 NO. INDUSTRIAL SERVICE (UPTO 15 H.P.)

Particulars

Rate

Chargable to
DISCOM
Qty .
Amount

Chargable to
Consumer
Qty.
Amount

Amount in
Rs.

Poly Phase Energy Meter housed 10 40A

1869

1869

1869

3 phase 60A M.C.B./Fuse unit

955/E

955

955

Moulded Box for CT Meter

1647/E

1647

1647

P.V.C. Cable single core 10 Sq.mm

43/M

80

3440

3440

G.I. Wire No.8

60/Kg

1 Kg.

60

60

P.V.C. Pipe 38mm

41.4/M

2M

83

83

P.V.C. Bends 38mm

22/E

2 Nos.

44

44

Misc. items viz. link clips, wooden box,


Bolts & Nuts.

L.S

75

125

200

Total

4546

3752

8298

3% Contingencies

136

113

249

Labour & Transport

405

557

961

11% Estt. & Genl. Charges

500

413

913

1% Cess
Total Cost in Rs.
Or say :

5587

4834

104
10,525
10,530

52

41. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H-5/1981


COST DATA FOR POLY PHASE SERVICE CONNECTION CHARGES FOR
ERECTION OF 1 NO. INDUSTRIAL SERVICE (UPTO 15 H.P.) (C T METER)

Chargable to
DISCOM
Qty .
Amount

Chargable to
Consumer
Qty.
Amount

Amount in
Rs.

Sl. No.

Particulars

Rate

L.T. 3-Phase class-0.5 Accuracy CT


Operated Electronic TVR Meter Housed in
a box

6525

P.V.C. Cable single core 10 Sq.mm

43/M

80

3440

3440

G.I. Wire No.8

60/Kg

1 Kg.

60

60

P.V.C. Pipe 38mm

41.4/M

2M

83

83

P.V.C. Bends 38mm

22/E

2 Nos.

44

44

Misc. items viz. link clips, wooden box,


Bolts & Nuts.

L.S

75

100

175

Total

6600

3727

10327

3% Contingencies

198

112

310

Labour & Transport

405

557

961

11% Estt. & Genl. Charges

726

410

1136

6525

6525

1% Cess

127

Total Cost in Rs.


Or say :

7929

53

4805

12,861
12,860

42.

R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H-5/1981


COST DATA FOR POLY PHASE SERVICE CONNECTION FOR
ERECTION OF 1 NO. INDUSTRIAL SERVICE (ABOVE 15 H.P.) (C.T. METER)

Chargable to
DISCOM
Qty.
Amount

Chargable to
Consumer
Qty.
Amount

Amount in
Rs.

Sl. No.

Particulars

Rate

L.T. 3-Phase class-0.5 Accuracy CT


Operated Electronic TVR Meter Housed in
a box

6525

P.V.C. Cable single core 10 Sq.mm

43/M

80

3440

3440

G.I. Wire No.8

60/Kg

1 Kg.

60

60

P.V.C. Pipe 38mm

41.4/M

2M

83

83

P.V.C. Bends 38mm

22/E

2 Nos.

44

44

Misc. items viz. link clips, wooden box,


Bolts & Nuts.

L.S

75

100

175

Total

6600

3727

10327

3% Contingencies

198

112

310

Labour & Transport

405

557

961

11% Estt. & Genl. Charges

726

410

1136

6525

6525

1% Cess

127

Total Cost in Rs.


Or say :

7929

54

4805

12,861
12,860

43.
Sl. No.

COST DATA FOR STREET LIGHT SERVICE CONNECTION (SINGLE PHASE)


Rate
Amount
Particulars
Qty.
Per Unit
in Rs.
in Rs.

LT 1 phase Electronic Meter 5-30A

1 No.

846

Each

846

1 phase 15A M.C.B./Fuse Unit

1 No.

120

Each

120

Light sensitive switch

1 No.

400

Each

400

P.V.C. Cable 4 Sq.mm Single Core

15 M

30

Each

450

P.V.C. Pipe 25mm

2 Mts

39.5

Each

79

P.V.C. Bends 25mm

2 No.

6.0

Each

12

Moulded Distribution Box

1 No.

250

Each

250

Wooden, plugs, clamps, bolts,


nuts link clips etc

L.S.

L.S.

L.S.

50

Total

2,207

3% Contingenics

66

Labour & Transport

759

11% Estt. & Genl. Charges

243

1% Cess

33

Total Cost in Rs.


Or say :

3,308
3,310

55

44. DETAILED ESTIMATE FOR ERECTION OF 1No. 33/11 KV SUBSTATION


WITH (NT) X 5 MVA POWER TRANSFORMERS AND NF = 3 NO. 11 KV FEEDERS

Sl.
No

Particulars

1 (a) Lands and Rights


(b) Plantation of Trees
Control Room and Consumer service centre
2
(including furniture)
3 Station Auxillaries
Peripheral, Security Fencing, Approach road, retaing wall around switchward with gravel
a)
filling, gate and bore well
b) Yard lighting
c) Fire fighting Equipment
d) P&T Phone and wireless set
4 Foundations for structures, PTRs & breakers
5 Bus bars, Jumpers, Connectors claps etc.
6 Control Cables
7 Structural Steel
8 Transformers
a) 33/11KV, 5 MVA Power Transformer
b) 11KV/ 415V 16KVA Stn. Transformer
9 Circiut Breakres (including trivector meters)
a) 20 KA 11 kv feeder VCB including Control panel and CTs (NF=3)
b) 20 KA 11 kv LV VCB including Control panel and CTs
10 Control Circiut Panels
a) AC Supply Panel
b) DC Aunnciation Panel
11 Instrument Transformers
a) 11kv P.T (3 Phase)
12 Lightning Arrestors

Qty.

Rate
(Rs. in lakhs)

LS

As per local
conditions

Unit

Amount
(Rs. in lakhs)
0.000

LS

LS

0.061

LS

LS

5.000

LS

LS

10.000

LS
LS
LS
LS
LS
15

0.562

LS
LS
LS
LS
LS
MT

0.600
0.660
1.500
3.000
1.200
1.080
8.423

1
1

31.695
0.605

Each
Each

31.695
0.605

3
1

2.156
2.342

Each
Each

6.467
2.342

1
1

0.330
0.330

Each
Each

0.330
0.330

0.158

Each

0.158

a) 33KV 10KA
b) 11KV Line Type (NFX3)

0.031

Each

0.185

0.017

Each

0.155

c) 11KV Station Type 10 KA


13 Isolating Switches

0.017

Each

0.052

a) 33KV 800A double break centrally operated Horizantal AB Switch


b) 11KV 800A double break centrally operated Horizantal AB Switch (NT X 1+1)

0.420

Each

1.260

0.199

Each

0.399

c) 11KV 400A Horizantal AB Switch (NF X 2+2)


d) 11KV 200A Horizantal AB Switch for station transformer

0.137

Each

1.099

0.073

Each

0.073

e) 33KV Horn Gap Fuse Set (1XNT)

0.095

Each

0.095

14 2MVAR 11KV Capacitor Bank along with Associated Equipment


15 24V, 40 AH Battery Set including Battery Charger

10.000

Each

10.000

0.159

Each

0.636

LS

1.815
89.219

16 Earthing of PTR, VCBs, AB Swicthes, Strucutres with 75x8mm GI Flat

Sub Total
17 Erection and transport and commissioning charges on items 7 to 15 at 10%

6.430

18 Contingencies on items 7 to 15 at 3%

1.929

19 T&P Charges on items No. 7 to 15 at 1%

0.643

20 Establishment and General Charges at 11%

9.814

21 1% Cess

1.080
Total Rs. in Lakhs

109.115

Or say (Rs. lakhs)

109.120

Note : NF = No. of 11 KV Feeders, The number of outgoing feeders at substation limited to the demand in MVA i.e. if substation demand is 5 MVA, the
number of feeders should not exceed five.

56