QCS 2010

Section 24

Part 1

General

Page 1

1.

GENERAL ...................................................................................................... 2

1.1

INTRODUCTION ........................................................................................... 2

1.1.1
1.1.2
1.1.3
1.1.4

Scope
References
Workmanship
Scaffolding

1.2

SAMPLE PANELS AND CONTROL SAMPLES ............................................ 3

1.2.1

Samples

2
2
3
3
3
BURHAN INTERNATIONAL

QCS 2010

QCS 2010

Section 24

Part 1

General

Page 2

1.

GENERAL

1.1

INTRODUCTION

1.1.1

Scope

This Section specifies the general requirements for various methods and types of interior
finishes within buildings for walls, floors, and ceilings.

Related Sections are as follows:


General
Concrete
Thermal Insulation
Metalwork
Carpentry, Joinery and Ironmongery
Painting and Decorating

1.1.2

References

The following standards are referred to in this Section:


EN 197-1
BS 476
BS 812
BS 882
BS 890
BS 1006
BS 1014
BS 1202
BS 1230
BS 1494
BS 1706
BS 1199
BS 1200
BS 2592
BS 2874
BS 3260
BS 3261
BS 3416
BS 4131
BS 4223
BS 4682
BS 5212
BS 5224
BS 5229
BS 5262
BS 5390
BS 5808
BS 5980
BS 5975
BS 6073
BS 6431
BS 8000
BS 8203
BS 8204

QCS 2010

Portland cement
Fire tests on building materials and structures
Testing aggregates
Aggregates from natural sources for concrete
Building limes
Methods of test for colour fastness of textiles
Pigments for Portland cement and Portland and cement products
Nails
Gypsum plasterboard
Fixing accessories for building purposes
Electroplated coatings of cadmium and zinc on iron and steel
Building sands from natural sources
Building sands from natural sources
Thermoplastic flooring tiles
Copper and copper alloys rod and sections (other than forging stock)
Semi-flexible PVC floor tiles
Unbacked flexible PVC flooring
Bitumen based coating for cold application, suitable for use in contact with
potable water
Terrazzo tiles
Determination of constructional details of textile floor coverings with yarn pile
Methods of test for dimensional stability of textile floor coverings
Code applied joint sealant systems for concrete pavements
Masonry cement
Code of practice for the installation of textile floor coverings
Code of practice for external rendering
Code of practice for stone masonry
Underlays for textile floor coverings
Adhesive for use with ceramic tiles and mosaics
Code of practice for false work
Precast concrete masonry units
Ceramic floor and wall tiles
Workmanship on building sites
Code of practice for installation of sheet and tile flooring
In-situ flooring

BURHAN INTERNATIONAL

Section 1
Section 5
Section 15
Section 17
Section 18
Section 26

QCS 2010

Section 24

BS EN 10142
BS EN 10143

Part 1

General

Page 3

Continuously hot-dip zinc coated low carbon steel sheet and strip for cold
forming: technical delivery conditions.
Continuously hot-dip metal coated steel sheet and strip Tolerances and
dimensions and shape

Workmanship

All work is to be performed by experienced and trained specialists or under supervision by


specialists or trained personnel.

1.1.4

Scaffolding

Scaffolding is to be erected to external facades and any other areas where it is required
before any work is commenced, so that good access is obtained to the whole of the working
area

Scaffolding is to be supported independently of the working area and is to provide


platforms at about 2 metre intervals. A gap of at least 250mm should be left between
the work face and the scaffolding to allow sufficient clearance for working.

Scaffolding to be designed and erected in accordance with BS 5975.

1.2

SAMPLE PANELS AND CONTROL SAMPLES

1.2.1

Samples

Sample panels minimum size 600 x 600mm are to be prepared for all textured coatings to be
used in the Works.

If the Engineer so requires, a control samples of a finishing materials shall be prepared in an


agreed location within the Works (e.g. the floor tiling to a complete room). The area to be
used as a control is to be completed and approved to the standard of workmanship and
appearance obtained before the application of the material is proceeded with elsewhere in
the Works.
END OF PART