GENERAL NOTES:
Inspection and Test Plan(ITP) given herein is indicative only. The Contractor
shall prepare and submit ITP for all activities The provisions indicated herein for
stage wise inspection are minimum and the Engineer-in-Charge may decide to
increase the Hold Point / Witness Point. Contractor has to prepare ITPs for any
of the activities not covered herein, submit the same to HPCL and obtain their
approval.
Contractor to prepare required reporting formats and job procedures for each
activity i.e. Setting out of work, levels at 5x5m grid co-ordinate wise, submission
of min. 5 no. murrum samples meeting tender specifications along with soil lab.
test report, watering, OMC, Rolling , carting away earth etc to HPCL for
approval well in advance prior to commencement of activity. Any deviation to
ITP shall be subjected to HPCLs written approval. Contractor to carry out 100%
examination of all activities and proper records shall be maintained and made
available to HPCL Officers requirement at any time of inspection the contract
period.
2.0
LEGEND :
2.1
2.2
W:
Witness Point
An Activity which requires witness by HPCL when activity is performed.
2.3
2.4
2.5
CHAPTER:
STANDARD INSPECTION & TEST PLAN
PAGE:
2 of 6
3.0
Sr.
No.
1
1.1
1.2
1.3
1.4
1.5
1.6
ACTIVITY
CONTRACTOR
HPCL
CHAPTER:
STANDARD INSPECTION & TEST PLAN
WC
HP
WC
WC
HP
HP
WC
WC
WC
HP
WC
WC
WC
WC
PAGE:
3 of 6
1.8
1.9
CHAPTER:
STANDARD INSPECTION & TEST PLAN
HP
WC
W/ HP
WC
WC
W/HP
WC
W/HP
WC
WC
WC
W
W/HP
W/HP
WC
WC
W/HP
W/HP
WC
WC
W
W/HP
WC
WC
WC
WC
W
W
W
W
PAGE:
4 of 6
2.0
CHAPTER:
STANDARD INSPECTION & TEST PLAN
WC
WC
W/HP
WC
W/HP
WC
W/HP
WC
W/HP
WC
WC
WC
WC
WC
WC
W/HP
W
W
W
W
PAGE: