Index of worksheets
Cost
Utility Matrix
Distribution Matrix
Definitions
Factors
Operational Issues
Reliability
Availability for
Maintenance and
Expansion
Criteria to be used
How easy is it to operate the system?
How reliable is the system?
Must any part of the process be shut
down for maintenance work or
construction on the system?
Economy/Cost
readsheet - IEEE/PCIC
Metric to be used
A relative ranking of complexity of operation.
Quantified reliability from statistical study.
A matrix showing how much of the process must
be shutdown for maintenance work, for each
zone of the system.
A relative ranking of switching flexibility when
recovering from a problem.
Quantified capital estimate for a comparable
system.
Equipment Required
Main Transformer w/ Prot.
Bus Duct - Util to Swgr - 50'
MV Metering Section
MV Main Breaker Section
MV Tie Breaker Section
MV Feeder Breaker Sections
Crossover Bus - 20'
MV Switch Sections
500mcm MV Cable - 750'
Sub Primary Switches
Unit Transformers
Total, K$
Cost, K$,
each
595.0
76.5
31.2
33.8
42.0
34.4
13.2
31.0
41.3
31.2
31.0
Simple
Radial
1
1
1
1
6
6
18
18
$2,310
6
18
18
$3,047
6
18
18
$3,089
Equipment Required
High Side Bus - Util - 50'
HV Metering Section
HV Breaker Section
Air Break Switches
Main Transformer w/ Prot.
Total, K$
10/4/1999
Cost, K$,
each
40.0
50.0
150.0
45.0
595.0
Single
Source,
Single Source, Dual Source,
Single
Dual
Single
Transformer Transformer
Transformer
1
1
1
1
1
$880
2
1
2
3
2
$1,755
2
2
2
4
1
$1,255
Dual Source,
Dual Source,
Dual
Dual
Transformer with
Transformer
Tie Breaker
2
2
2
2
2
$1,760
3
2
1
6
2
$1,830
Dual Source,
Dual
Transformer
with Three
Breakers
4
2
3
8
2
$2,260
Dual Source,
Dual
Transformer
with Ring Bus
6
2
4
12
2
$2,670
Double Bus
- Double
Breaker
Primary
Selective
2
2
2
12
6
12
36
18
$4,074
Dual Source,
Dual
Transformer
with Ring Bus
Value
Dual Source,
Dual
Transformer
with Three
Breakers
Value
Dual Source,
Dual
Transformer
with Tie
Breaker
Value
Dual Source,
Dual
Transformer
Value
Dual Source,
Single
Transformer
Value
Single Source,
Dual
Transformer
Value
Single Source,
Single
Transformer
Value
Weights %
System Feature
Metric
Operational Issues
Switching and
Lockout
Complexity
20
Simple
(2 switches)
Simple
(5 switches)
Slightly
Complex
(6 switches)
Slightly
Complex
(4 switches)
Slightly
Complex
(9 switches)
Complex
(11 switches)
Complex
(16 switches)
Reliability
Probability of
Failure in a year
30
96.8%
96.8%
30.3%
29.9%
40.4%
41.4%
40.5%
3.980
0.005
0.011
0.060
< 0.001
< 0.001
< 0.001
Shutdown All
Shutdown All
No Shutdown
Required
No Shutdown
Required
No Shutdown
Required
No Shutdown
Required
No Shutdown
Required
Shutdown All
Shutdown All
No Shutdown
Required
No Shutdown
Required
No Shutdown
Required *
No Shutdown
Required *
No Shutdown
Required
Shutdown All
No Shutdown
Required
Shutdown All
No Shutdown
Required
No Shutdown
Required
No Shutdown
Required
No Shutdown
Required
None
None
Transfer to
Second Source
Transfer to
Second Source
Transfer to
Second Source
Transfer to
Second Source
Transfer to
Second Source
Recover from
primary
equipment and
bus faults
None
None
None on faults
on common
bus
Transfer to
Second Source
Transfer to
Second Source
Transfer to
Second Source
Transfer to
Second Source
Recover from
transformer
faults
None
Transfer to
second
transformer
None
Transfer to
second
transformer
Transfer to
second
transformer
Transfer to
second
transformer
Transfer to
second
transformer
Recover from
breaker failure
(failure to open)
Shutdown
until repaired
Shutdown
until isolated
Shutdown
until isolated
Shutdown
until isolated
Shutdown
until isolated
(tie breaker
only)
Shutdown
until isolated
(tie breaker
only)
No Shutdown
$880
$1,755
$1,255
$1,760
$1,830
$2,260
$2,670
Mean Time to
Repair
10
Bus
Main
Transformer
Recovery Capability
Economy/Cost
Isolate from
supply line
faults
Capital
Estimate ($M)
Ranking
20
20
260
Dual Source-Dual
Transformer
Dual Source-Dual
Transformer with Tie
Breaker
400
367
Dual Source-Single
Transformer
352
Dual Source-Dual
Transformer with 3
Breakers
327
Dual Source-Dual
Transformer with Ring Bus
320
Single Source-Dual
Transformer
Single Source-Single
Transformer
263
260
263
352
400
367
327
320
20
Simple
Operation
Slightly
Complex
Slightly
Complex
Moderately
Complex
Complex
Complex
Complex
Quite
Complex
Reliability
Probability of
Failure in a year
30
97.0%
35.3%
35.1%
34.9%
33.8%
34.4%
33.9%
33.2%
4.37
3.16
3.19
3.45
0.01
1.28
2.42
0.01
All
No Shutdown
Required
No Shutdown
Required
No Shutdown
Required
No Shutdown
Required
No Shutdown
Required
No Shutdown
Required
No Shutdown
Required
Main Bus
All
All
Half of Plant
Shutdown All
for Tie
Breaker Work
Shutdown All
for Tie
Breaker Work
No Shutdown
Required
No Shutdown
Required
No Shutdown
Required
Distribution
Feeders and
Switch Centers
Connected
Load
Connected
Load
Connected
Load
Connected
Load for
Switch Center
Work
No Shutdown
Required
Connected
Load
Connected
Load for
Switch Center
Work
No Shutdown
Required
None
Transfer to
Second Source
Transfer to
Second Source
Transfer to
Second Source
Transfer to
Second Source
Transfer to
Second Source
Transfer to
Second Source
Transfer to
Second Source
None
None
Half of Plant
Isolate failed
bus
Isolate failed
bus
Transfer to
Second Bus
Transfer to
Second Bus
Transfer to
Second Bus
Isolate failed
feeder
None
Isolate failed
feeder; switch
center fault
shuts down
loads
Isolate failed
feeder
$3,898
$3,265
$3,761
$4,074
Mean Time to
Repair (hrs)
Process that
Utility System
must be
and Main
Shutdown for
Transformer(s)
Maintenance
or Expansion
Recovery
Capability
Isolate from
Utility Faults
10
20
Isolate from
Main Bus Faults
Isolate from
Feeder or Switch
Center Faults
Cost
Capital Estimate
($M)
Ranking
20
Simple Radial
None
None
None
Isolate failed
feeder; switch
center fault
shuts down
loads
$2,310
$3,047
$3,089
$3,585
244
309
Dual Supply
Radial with Tie
Breaker
292
Dual Supply
Radial - Single
Bus
288
Dual Supply
Primary Selective
with Tie Breaker
281
268
Double Bus /
Double Breaker
Primary Selective
260
Simple Radial
Double Bus /
Double Breaker
Loop
244
227
288
292
268
281
309
227
260
Value
Switching and
Lockout
Complexity
Dual Supply
Loop with Tie
Breaker
Value
Value
Operational
Issues
Dual Supply
Radial with
Tie Breaker
Value
Dual Supply
Radial - Single
Bus
Value
Metric
Value
System
Feature
Dual Supply
Primary
Selective with
Tie Breaker
Value
Value
Weights %