Вы находитесь на странице: 1из 1

PTTEP Arthit Field Development

Central Facilities
Piping Stress Analysis Specification

Doc. No. A-1-PP-PI-SP-0003

Rev. B1
Page 17 of 23

NORMAL CASES
1
2
3
4
5
6
8
9
10
11
12
13

ASME B31.3 Stresses, Nozzle Loads , Restraint Loads & Hydro-test Restraint loads
Simple System
System with added PSV Forces
System with Spring Hangers
W+D4+T1+P1 (OPE)
1 W+D4+T1+P1+F1 (OPE)
1 W (HGR)
W+P1 (SUS) B31.3 Stresses
2 W+P1+F1 (OPE)
2 W+D4+T1+P1 (HGR)
WIN1 (OPE)
3 W+P1 (SUS) B31.3 Stresses
3 W+D4+T1+P1+H (OPE)
WIN2 (OPE)
4 WIN1 (OPE)
4 W+P1+H (SUS) B31.3 Stresses
WW+HP (HYD) Hydro-test Loads 5 WIN2 (OPE)
5 WIN1 (OPE)
L2+L3 (OCC) B31.3 Stresses
6 WW+HP (HYD) Hydro-test Loads 6 WIN2 (OPE)
L2+L4 (OCC)
7 L2+L4 (OCC) B31.3 Stresses
7 WW+HP (HYD) Hydro-test Loads
L1+L3 (OPE) Nozzle &
9 L2+L5 (OCC)
8 L4+L5 (OCC) B31.3 Stresses
L1-L3 (OPE) Restraint
10 L1+L4 (OPE) Nozzle &
9 L4+L6 (OCC)
L1+L4 (OPE) Loads
11 L1-L4 (OPE) Restraint
10 L3+L5 (OPE) Nozzle &
L1-L4 (OPE)
12 L1+L5 (OPE) Loads
11 L3-L5 (OPE) Restraint
L1-L2 (EXP) B31.3 Stresses
13 L1-L5 (OPE)
12 L3+L6 (OPE) Loads
14 L1-L2 (EXP) B31.3 Stresses
13 L3-L6 (OPE)
14 L3-L4 (EXP) B31.3 Stresses
Hydro-test load case shall be run
separately with Springs replaced by
Rigid hangers.

BLAST CASE
Stresses & Restraint Loads

1 W+D4+T1+P1 (OPE)
2 W+P1 (SUS)
3 BLAST X (OCC)
4 BLAST Y (OCC)
5 BLAST Z (OCC)
6 L1+L3 (OPE)
7 L1-L3
(OPE) Restraint
8 L1+L4 (OPE) Loads
9 L1-L4
(OPE) only
10 L1+L5 (OPE)
11 L1-L5
(OPE)
12 L2+L3 (OCC)
13 L2-L3
(OCC) Stress Check,
14 L2+L4 (OCC) Allowable =
15 L2-L4
(OCC) Yield
16 L2+L5 (OCC)
17 L2-L5
(OCC)

TRANSPORTATION CASE
B31.3 Stresses, Nozzle & Restraint Loads

WNC+D1+D2+D3+U1+U2+U3(SUS)

SLUG CASE
This case is similar to Normal case
with added forces. The added forces
are Slug forces at pipe elbows.

SURGE CASE
This case is also similar to Normal
case with added forces. The added
forces are Surge forces at pipe elbows.
If the system has to be designed for
the effect of surge at one elbow at a
time, then as many number of cases as
the number of elbows in the system
have to be analysed to determine the
worst loads.

W-

Pipe Weight, Insulation Wt,


Fluid Wt, Rigid Wt
WW - Pipe Weight, Insulation Wt,
Water-filled Wt, Rigid Wt
WNC - Pipe Weight, Insulation Wt,
Rigid Wt
P1 Design or Operating Press.
HP Hydrostatic Test Pressure
T1 Design or Operating Temp.
D1,D2 - Deck deflections during
& D3
transportation
D4 Anchor Thermal Movement
F1 Applied Forces or Moments
H Hanger Load
WIN1 - X direction Wind Pressure
WIN2 - Z direction Wind Pressure
BLAST - Blast Forces in X,Y,Z
- X,Y,Z Directions
U1,U2 - Acceleration during
& U3
transportation
OPE
SUS
OCC
EXP
HYD
HGR

- Operating (No code stress


check)
- Sustained case
- Occasional case
- Expansion case
- Hydro-test case
- Hanger Load case