CONTENTS
Experience- CTs
Experience- CTs
Learnings
Tan
Delta
(%)
Cap
(pF)
1
2
3
4
5
6
7
8
9
10
7
5
54.17
11
96.44
97.65
72.35
91.67
94.61
97.83
41
41.5
55.9
46.2
219.4
130.8
57.2
61.5
88.3
100.9
222 G
200 G
186 M
10.5 G
2.94 M
9.75 M
72.6 M
137 G
167 G
189 M
9.3 G
5.4 M
10.1 M
69.5 M
29.4 M
17 M
9 M
6.09
4.48
51.29
9.76
98.85
97.93
69.92
40.5
41.3
54.7
45.7
192.8
128.3
55.9
Tan
Delta
(%)
Cap
(pF)
11
3.72 M
98.81
161.9
12
61 M
76.36
47.4
13
4.4 M
98.72
153
14
4.2 G
HEALTHY INSULATOR
1
264 G
38.3
183 G
2.93
38.3
214 G
2.74
36.4
236 G
2.42
36.2
224 G
2.51
36.1
264 G
2.18
35.9
36 G
29.63
194.3
10.9 G
29.7
193.9
650 M
53.95
195.1
404 M
55.45
175.7
VSTPP: Learnings
LEARNINGS
RIHAND- CT Failures.
LEARNINGS
Test results at site to be critically examined for
any deviations from previous/factory test results.
Measurement of C1 and C2 both.
Ensure OIL level when commissioning a New
CT.
(a) If Gauge Glass is available, level can be seen.
(b) If Dial Gauge is there then level must be
ensured by other means.
JHAJJAR-PT
LEARNINGS
PTW system must be followed in true
spirit.
Protection system should be reliable.
Option of charging of Bus from remote
end line breaker of lesser importance.
JHAJJAR DC FAILURE
JHAJJAR DC FAILURE
LEARNINGS
OFFLINE TESTING
PRACTICES