1.0

PARTICULAR SPECIFICATION FOR CIVIL WORKS

PARTICULAR CIVIL REQUIREMENTS*


* The information given in this section shall only be a guideline to the
Contract. Contractor shall be fully aware and responsible for the actual
requirement of the Contract.

Scope of Works
In general the scope of civil work for the supply and services to be provided by
the Contractor shall include procurement, construction and put to use of all
necessary facilities required for the proper performance of the Works or as
specified but shall not be limited to the following:A. Astana 132kV Substation Establishment

Engage licensed surveyor for survey and setting out works


Temporary works
Site preparation
Site clearing, excavation, leveling, benching and earth filling to
required level.
To fill 200mm thick gravel topping for substations compound
surface.
Demolition and removal of all existing building, structures,
sub-structures and infrastructures as per E.R. instruction.
To indicate and inform the E.R. the exact locations of all
existing pile points of the demolished building, structures, substructures and infrastructures on the layout plan. The Contractor
to appoint a licensed surveyor to do such works. Should the
existing piles affect the Works in any way, the E.R. will amend the
design to suit the actual site condition. The Contractor to allow
time in their work program for E.R. to amend the design.
Piling Works for 132kV GIS Control Buildings, all outdoor
equipment foundation (Tranformers, PI/SA, PI, NCT, NI, NER and
Earth Mast), cable trenches, oil interceptors and all other
infrastructure works as shown in drawings.
Foundations for 132kV GIS Control Buildings and all outdoor
equipment foundation (Tranformers, PI/SA, PI, NCT, NI, NER and
Earth Mast).
R.C. Cable Trenches to support 132kV Cables
132kV Control Buildings
Transformer bases cum bund walls
Outdoors switchgear bases
Oil interceptors
Cable trenches and cable ducting
The upgrading and improvement of existing road and drainage
outside of site boundary
Internal Access and Service Roads (within site boundary)
Gravel topping for substation compound surface
Water reticulation system
Wastewater system

PLS-120064

PSCW/1

SARAWAK ENERGY BERHAD


DRAFT
ASTANA 132kV SUBSTATION ESTABLISHMENT AND SEJINGKAT 132kV SUBSTATION EXTENSION
PROJECT
VOLUME 2 PART E: PARTICULAR SPECIFICATION FOR BUILDING AND CIVIL WORKS

Surface and sub-surface drainage system


Fencing and gates
Street, perimeter and other lightings
Finishes and painting
Building M&E services including lighting, ventilation, air
conditioning and fire detection and protection system
Planning and coordination for protection and relocation of
affected existing utility services, i.e. electricity pole, water main,
telephone pole and its appurtenances

B. Sejingkat 132kV Substation Extension

Engage licensed surveyor for survey and setting out works


To Survey the existing levels on site as per instructed by E.R.
Temporary works
Site preparation
Site clearing, excavation, leveling, benching and earth filling to
required level
Piling Works for all outdoor switchyard equipment (CSE, SA,
CVT, Gantry, CT, PI, Circuit Breaker and Disconnector Switch),
cable trenches and all other infrastructure works as shown in
drawings.
Foundations for all switchyard equipment foundation (CSE, SA,
CVT, Gantry, CT, PI, Circuit Breaker and Disconnector Switch),
cable trenches and all other infrastructure works as shown in
drawings.
Outdoors switchgear bases
Cable trenches and cable ducting
Service Roads
Gravel Topping for Substation Compound Surface
Drainage system
Provide for hacking works of the existing control buildings for
new panels including making good of affected areas in the
existing Control Building.
Finishes and painting
Planning and coordination for protection and relocation of
affected existing utility services, i.e. electricity pole, water main,
telephone pole and its appurtenances

Works To Be Completed
The Specification has been drawn up with all possible care and is intended to
cover the supply of all materials and the execution of all works necessary for
the completion of the works. In case where there is any detail of construction
or of materials which have not been referred to in this Specification or
Summary of Tender or Tender Drawings, but the necessity for which may be
implied or inferred from the Specification, Summary of Tender, or Tender
Drawings, or which are usual or essential to the completion of all works in all
trades, the same shall be deemed to be included in the rates and prices
named by the Contractor in the priced Bill of Quantities.
PLS-120064

PSCW/2

SARAWAK ENERGY BERHAD


DRAFT
ASTANA 132kV SUBSTATION ESTABLISHMENT AND SEJINGKAT 132kV SUBSTATION EXTENSION
PROJECT
VOLUME 2 PART E: PARTICULAR SPECIFICATION FOR BUILDING AND CIVIL WORKS

Site Conditions
For the purpose of tendering, Tenderer may request for available geotechnical
information for the areas near the Site. Tenderer is to obtain information
through its own direct investigation rather than depend on secondary
information or source. The interpretation of any existing information shall be
the sole responsibility of the Tenderer.
The Tenderer shall visit the existing Sejingkat & Astana substation sites and
satisfy himself with regards to the site conditions, prior to submitting his
tender, as no claims will later be entertained on grounds of ignorance due to
the nature of work involved.

A. Astana 132kV Substation Establishment


Since Astana 132kV Substation Establishment site is an abandoned existing
Substation site, the Contractor demolish all of the obstructions including the
existing Buildings, all switchyard equipment foundations and all
infrastructures. The existing concrete piles found on site to be left intact. The
E.R. must be informed of the existing piles found on site affecting the
execution of the works. The Contractor should take into account the time
taken for the E.R. to issue instructions (if needed) into their work programme if
the Works are affected by the existing concrete piles.
B. Sejingkat 132kV Substation Extension
The Sejingkat 132kV Site is an extension works of the existing switchyard. Due
to this nature of the Works, the Contractor should include the costing of
interfacing, coordination and where necessary, integration with existing
installed and commissioned systems, facilities, utilities and associated
infrastructure. All of the existing infrastructures and facilities within the
existing sub-station boundary affected by the Works to be make good by the
Contractor under his/her own expenses.
Survey & Setting-Out
The Contractor shall be solely responsible for all necessary boundary peg
survey, setting-out, establishment of recovery pegs, additional reference pegs
where necessary and leveling on site; and shall employ experienced and
qualified surveyors and/or planners acceptable to the Engineer for this
purpose.
Any error in setting-out is to be rectified by the Contractor at his own
expenses. Reference pegs indicating the top of earthworks cut or the toe of fill
shall be provided and clearly marked. All structural levels shall be referred to
an established bench mark not subjected to subsidence or interference. The
Contractor shall give the Engineer at least 24 hours prior notice in writing that
he intend to set out or fix levels for any part of the Works, to enable the
PLS-120064

PSCW/3

SARAWAK ENERGY BERHAD


DRAFT
ASTANA 132kV SUBSTATION ESTABLISHMENT AND SEJINGKAT 132kV SUBSTATION EXTENSION
PROJECT
VOLUME 2 PART E: PARTICULAR SPECIFICATION FOR BUILDING AND CIVIL WORKS

Engineer to arrange for checking the name. Works shall be suspended during
the checking and the Contractor shall carefully preserve any works made by
the Engineer.
The Contractor shall, as soon as practical, supply the Engineer with records in
approved form related to all reference pegs and bench marks, and keep such
records updated by formal notice to the Engineer.
A. Astana 132kV Substation Establishment
Since Astana 132kV Substation Establishment site is an abandoned existing
Substation site, the Contractor is required to do survey of the accurate
location of the existing concrete piles supporting all of the existing structures,
substructures and infrastructures to be demolished. Any existing concrete
piles found on site in which affecting the Works should be informed to the E.R.
immediately so that E.R. could amend the design to suit the actual condition
on site. The Contractor should take into account the time taken and any cost
impact if any for the E.R. to issue instructions regarding the Works affected by
the existing concrete piles into their work programme.

B. Sejingkat 132kV Substation Extension


For the Sejingkat 132kV Substation Extension, the extend of survey works
should also include providing levels of existing service roads connecting to the
new service roads, existing invert levels of drains which will connect to the
proposed new drains, existing ground levels of site where the proposed new
service road to be laid, the existing levels of new switchyard site (all points
where the switchgear bases to be constructed) and the invert levels of
existing trench. Currently the Engineer assumes the Existing Ground Level =
4.0m.
Existing Utilities
The Contractor shall take all necessary measures to protect the existing
finishes, structures, foundations, utility services, etc., from damage due to
excavation, subsidence, general construction works, fire, etc, arising from the
Contract Works. Any damages imposed onto the existing utilities due to
construction works shall be rectified by the tenderer at their own expense.
The cost of shifting of the existing utilities (i.e. Street lightings,
water main, SESCO cables etc) or plants which interrupt the
proposed construction works shall be borne by the tenderer at their
own expense and deemed to have been included in Tender Sum.
Tenderer shall obtain the permission from the relevant local
authorities in the case of shifting the existing utility services.
Safety Barricade
A. Astana 132kV Substation Establishment
Temporary barricades of timber/non-conductive materials shall be erected
along the site boundary to separate the work area from live sections (the
existing Astana 33kV Substation and other areas. Minimum 1.8 m high
PLS-120064

PSCW/4

SARAWAK ENERGY BERHAD


DRAFT
ASTANA 132kV SUBSTATION ESTABLISHMENT AND SEJINGKAT 132kV SUBSTATION EXTENSION
PROJECT
VOLUME 2 PART E: PARTICULAR SPECIFICATION FOR BUILDING AND CIVIL WORKS

barricade complete with hardwood posts and 100mm wide 20mm thk. timber
plank to Engineers approval, shall be provided. Height restriction bars to
Engineers approval shall be erected in parallel on both sides of overhead live
conductor, at locations approved by the Engineer. Barricade and height
restriction bars shall be erected during construction period.
B. Sejingkat 132kV Substation Extension
The Tenderer is to take note of the surrounding area (still in operation) and the
contractor is to ensure that precautions and protections are taken to minimize
the disruption/disturbance or damage to the substation plants, equipments,
power lines etc. during the construction period. Temporary security measures
shall be taken to fence/board up on restricted areas (as per Tender
Drawing:
PLS120064/SEJINGKAT/C/G/CR/P/01)
or
others
deemed
necessary by the Employer. These measures shall be deemed to be included
in the tender price.
Temporary barricades of timber/ non conductive materials shall be erected to
separate the work area from live sections. Minimum 1.8 m high barricade
complete with hardwood posts and 100mm wide 20mm thk. timber plank to
Engineers approval, shall be provided. Height restriction bars to Engineers
approval shall be erected in parallel on both sides of overhead live conductor,
at locations approved by the Engineer. Barricade and height restriction bars
shall be erected during construction period.
Demolition Works
A. Astana 132kV Substation Establishment
Within the Sub-station Compound
All existing buildings, sub-structure and infrastructure (including M&E
infrastructures) works within site to be demolished by the Contractor and to
be dump into Contractors own dumping area in which its location to be
approved by the E.R. The existing r.c. piles are to be left intact. After
demolition works, the Contractor is required to do survey of the actual location
of the existing concrete piles supporting all of the existing structures,
substructures and infrastructures to be demolished. These accurate locations
are to be marked on site and in the layout plan. Should the existing piles affect
the Works in any way, the E.R. will amend the design to suit the actual site
condition. The Tenderer shall submit method statements describing
ways in executing the demolition works at the time of tender
submission.
Outside of the Sub-station Compound
All existing structures, sub-structures and infrastructures to be demolished as
per instructed in the drawing: PLS120064/AST/C/G/CE/P/01. If existing piles
found on site obstructs the earthworks in any way, the piles to be cut to
the required excavation levels. Existing utilities, if affected to be
relocated by the Contractor. Contractor shall obtain the permission
from the relevant local authorities in the case of shifting the existing
utility services.

PLS-120064

PSCW/5

SARAWAK ENERGY BERHAD


DRAFT
ASTANA 132kV SUBSTATION ESTABLISHMENT AND SEJINGKAT 132kV SUBSTATION EXTENSION
PROJECT
VOLUME 2 PART E: PARTICULAR SPECIFICATION FOR BUILDING AND CIVIL WORKS

Site Clearing and Earthworks


A. Astana 132kV Substation Establishment
Within Sub-Station Compound
The site clearing work for new Astana 132kV Substation shall consist of
dismantling work of the existing building and structures, sub-structures,
infrastructures, clearing, grubbing and stripping of topsoil/ gravel topping/
pavement inside the built up area. The platform level (subgrade level) of
Stakan 132/33/11kV Substation shall be leveled to PPL 16.44m as indicated in
Tender Drawings. Site will be available upon award of tender.
The Tenderer must visit the site and satisfy himself with regard to the site
conditions, prior to submitting his tender, as no claims will later be
entertained on the grounds of ignorance of the nature of the work involved.
The Contractor shall be responsible to dispose any excess soil, unsuitable soil
as well as any excavated hard materials/rock outside the site at an approved
dumping site, if required. The location of the dumping site to be proposed by
the Contractor and to be approved by the E.R.
The Tenderer is to note that only suitable material approved by the Engineer
shall be used as fill material and as such the costs shall include the import of
suitable materials, if required. Earth moving plants are not accepted as
compaction equipment. The submitted cost is deemed to have included all
these. The Contractor to allow imported approved earth fill for the formation
of substation platform.
The Contractor must keep whole construction site well drained at all times
during construction period, and shall ensure that as far as is practicable in the
opinion of the Engineer, all work is carried out in the dry. To satisfy the
foregoing requirement, the Contractor shall make all arrangement to construct
and maintain all temporary drains, sumps, water courses and other works.
Water must be removed from work site by means of pumping or the like when
construction is in progress. All such temporary measures shall be removed at
a time as approved by the Engineer, after works are completed. All costs
associated to such works shall be deemed to have been included in the
Contract Rates.
The Tenderer shall submit method statements describing ways in executing
earthworks, at the time of tender submission. The method statement should
at least comply with JKR Standard Specifications for Roadworks (JKR/SPJ/1988).
The Contractor shall provide necessary protection to all existing utility
services or facilities e.g. water pipeline and appurtenances, ducts, sewers,
overhead or underground cables etc., unless the foregoing are to be removed
or diverted, during the execution of the Works.
If existing piles found on site obstructs the earthworks in any way,
the piles to be cut to the required excavation levels.
The Contractor shall make good any damage under this Clause, due to any
cause within his control, or pay any costs and charges in connection
therewith. In cases where the services are to be temporarily terminated or
diverted, the Contractor shall give necessary notices to appropriate
Authorities, arrange for the work to be carried out and pay all charges in
PLS-120064

PSCW/6

SARAWAK ENERGY BERHAD


DRAFT
ASTANA 132kV SUBSTATION ESTABLISHMENT AND SEJINGKAT 132kV SUBSTATION EXTENSION
PROJECT
VOLUME 2 PART E: PARTICULAR SPECIFICATION FOR BUILDING AND CIVIL WORKS

connection therewith. All costs associated to such works shall be deemed to


have been included in the Contract Sum. Charges for relocation of utility
services shall be borne by Employer.
Outside of Sub-Station Compound
The Site Clearing outside of the sub-station compound involves in demolishing
the existing drainage system and to remove the existing access road
pavement to subgrade level. Drainage at locations as per drawing:
PLS120064-AST-C-G-CR-P-01 to be demolished and filled to match existing
ground levels prior to the construction of road embankment.
The earthworks outside of Sub-station compound involves in the construction
of embankment for the new Access Road to the Astana 132kV Substation
Establishment. The Contractor to allow imported approved earth fill for the
formation of Access Road embankment. All embankment slopes shall be
constructed to 1:2 gradient. Spot turfing to be planted on the embankment
slopes immediately after the embankment slopes construction is complete.
B. Sejingkat 132kV Substation Extension
The extension works shall be within the existing Sejingkat 132kV Substation
compound and the construction area is as indicated in the Sejingkat 132kV
Substation Site Layout Plan. Site will be available upon award of tender. The
earthwork for the extension work for Sejingkat 132kV Substation shall consist
of stripping off the existing gravel topping and excavation works for affected
area of foundation and cable trench to a temporary storage area agreed by
the ER and topping up with suitable earth fill where necessary. New gravel
topping shall be laid over the disturbed switchyard area. The existing platform
level of the Sejingkat 132kV substation site will be maintained for the project.
No temporary structures (site office, storage yard, fabrication yard, etc) shall
be erected within the compound of the existing live substation except for
structures used for barricading and elevation platforms. All temporary
structures shall be erected outside the fence of the existing substation with a
single point of temporary access into the construction area within the existing
live substation.
Drawings
All drawings submitted shall be prepared to relevant ISO standards using CAD
software suitable for ultimate archiving in the specified file format.
All drawings shall be drawn to scale, fully detailed, dimensioned, maximum
size A1, in English language and to SI units.
All drawings prepared by the Contractor shall be provided with a title block
which includes Contract reference, project tile, drawing title, serial number,
date submitted for approval, date returned for correction, date received for
construction, date of final drawings submitted, scale, revision no., revision
remarks and the particulars of Employer, Employers Representative and the
Contractor. In addition, an employers numbering may be included. The title
block and system of serial numbering shall be approved by Engineer. All
construction drawings shall be endorsed by Contractor and Professional
Engineers.
PLS-120064

PSCW/7

SARAWAK ENERGY BERHAD


DRAFT
ASTANA 132kV SUBSTATION ESTABLISHMENT AND SEJINGKAT 132kV SUBSTATION EXTENSION
PROJECT
VOLUME 2 PART E: PARTICULAR SPECIFICATION FOR BUILDING AND CIVIL WORKS

Each architectural, civil and structural, building M&E drawings shall be clearly
stamped to indicate the applicable status; i.e. For Proposal,For
Information, Submission, and As-Built.
The Contractor is required to submit five (5) sets of As-Built drawings and its
softcopy in AutoCAD 2000 format at the end of project. Employer shall review
and approve before the issuance of Certificate of Provisional Taking Over.
Piling and Substructure
A. Astana 132kV Substation Establishment
The piling works for Astana 132kV Substation shall cover the following:
1.
2.
3.
4.

132kV GIS cum Control Building;


132kV switchyard (outdoor foundations, cable trenches,etc);
RC drains, culvert, crossover, Fencings & Gates, sumps and
Other structures deem necessary inside the 132kV Substation compound.

Piling is required for all structures, sub-structures and infrastructure works in


Sejingkat 132 kV and Astana 132kV Substation. The Contractor shall be
responsible for the construction of the entire foundation system which shall
ensure the proper and due performance of the substation, and protect against
the effects of any long-term settlement and differential settlement between
parts of a structure. For outdoor equipment foundations, termination
depth of the working piles is to be use for decision as to whether
footing should be pad footing design or otherwise. The pad footing
will be required where the penetrated pile length after cut off is less
than 1.20m.
The contractor should inform the E.R. if any existing piles affects the piling
works. Should any existing piles found on site affects the Works in any way,
the E.R. will amend the design to suit the actual site condition. The Contractor
to allow time in their work program for E.R. to amend the design. The existing
piles is also required to be cut to the soffit pilecap level.
Static Load Test shall be carried out up to twice the specified working loads
(60 tons). The loading records shall be jointly taken by the Engineer and the
Contractor. The Contractor shall submit full records including graphs (Loadtime-settlement, load-settlement curve, records etc) in duplicate to the
Engineer within three (3) days after completion of the test. This test pile(s)
shall not be used as actual working pile.
Dynamic Load Tests shall include mobilization, testing, preparation of test
report by Professional Engineer; and shall be carried out under Engineers
instruction.
The Contractor also to allow for test piles at two locations instructed by the
E.R. These two test piles will also be used for Dynamic Load Test. If the test
piles failed the load test, the Contractor to amend the design of the affected
foundation and to be approved by E.R.

PLS-120064

PSCW/8

SARAWAK ENERGY BERHAD


DRAFT
ASTANA 132kV SUBSTATION ESTABLISHMENT AND SEJINGKAT 132kV SUBSTATION EXTENSION
PROJECT
VOLUME 2 PART E: PARTICULAR SPECIFICATION FOR BUILDING AND CIVIL WORKS

The maximum allowable working load for R.C. pile size 200mm x 200mm shall
be 30 tons. Cost for monitoring the capacity of working piles shall be allowed
in the Tender Sum. Test pile shall be conducted prior to start of piling activity.
Location of test pile are subjected to ERs approval.
The estimated depth of pile driving is 3 length of 6m each including the initial
pile. The piling length quantity is provisional and subjected to final remeasurement.
The Contractor to submit the method statement for piling works prior to the
commencement of the Works for E.R.s approval.
B. Sejingkat 132kV Substation Extension
The piling works for Sejingkat 132kV Substation shall cover the following:
1. 132kV switchyard (outdoor foundations, cable trenches,etc);
2. R.C. drains, sumps, and culverts
3. Other structures deem necessary inside the Sejingkat 132kV Substation
compound
Static Load Test shall be carried out up to twice the specified working loads
(50 tons). The loading records shall be jointly taken by the Engineer and the
Contractor. The Contractor shall submit full records including graphs (Loadtime-settlement, load-settlement curve, records etc) in duplicate to the
Engineer within three (3) days after completion of the test. This test pile(s)
shall not be used as actual working pile.
Dynamic Load Tests shall include mobilization, testing, preparation of test
report by Professional Engineer; and shall be carried out under Engineers
instruction.
The Contractor also to allow for test piles at a location instructed by the E.R.
These test pile will also be used for Dynamic Load Test. If the test piles failed
the load test, the Contractor to amend the design of the affected foundation
and to be approved by E.R.
The maximum allowable working load for R.C. pile size 200mm x 200mm shall
be 25 tons. Cost for monitoring the capacity of working piles shall be allowed
in the Tender Sum. Test pile shall be conducted prior to start of piling activity.
Location of test pile are subjected to ERs approval.
The estimated depth of pile driving is 6 length of 6m each including the initial
pile. The piling length quantity is provisional and subjected to final remeasurement.
The Contractor to submit the method statement for piling works prior to the
commencement of the Works for E.R.s approval.

PLS-120064

PSCW/9

SARAWAK ENERGY BERHAD


DRAFT
ASTANA 132kV SUBSTATION ESTABLISHMENT AND SEJINGKAT 132kV SUBSTATION EXTENSION
PROJECT
VOLUME 2 PART E: PARTICULAR SPECIFICATION FOR BUILDING AND CIVIL WORKS

Miscellaneous Structures
A. Astana 132kV Substation Establishment
All structural steel structures shall be designed to requirements of BS5493 for
exterior exposed polluted coastal. Structural steel members shall be sand
blasted (to SA 2) before carrying out painting as below:2-component inorganic zinc silicate primer 75 micron DFT
2-component polyamide cured epoxy with natural micaceous iron oxide 100
micron DFT
2-componenet polyamide epoxy enamel paint 40 micron DFT
Roof, gutter, fascia and flashing materials shall be of Bluescope Clean
Colorbond steel or its equivalent with same material as roofing material.
Gutters (supports to be hot-dipped galvanised iron) shall be exposed for all
buildings. Eaves ceiling shall be of Colourbond metal cladding. Down Pipes
shall be of uPVC material.
External SESCO signage (size of 1000x1000mm) and naming of buildings
(minimum plate height of 500mm) and all rooms (minimum size of plate is
125mm x 600mm) shall be provided for all the new buildings/rooms. Signage
and naming plates shall be made of stainless steel material.
132kV GIS cum Control Building
A. Astana 132kV Substation Establishment
The 132kV Control and GIS Building shall be a two storey structure of size
minimum (walled up) plan dimension of minimum 23.0m x 11.0m and 18.4m x
13.0m respectively as indicated in the tender drawing but including the
loading bay.
The 132kV Control Building shall be designed and constructed (ground and
first floors) sufficiently to accommodate the Scada, Communication, Control &
Relay panels, Battery room, AC/DC room, toilets and Cable Compartment (Min.
clear height to soffit of beam is 2m) and 1 st floor height is a minimum of 4.5 m
to ceiling and roof beams for the control building and a minimum of 11.5m
from first floor to the soffit of the roof eave at 132kV GIS room. Number and
size of glass windows for ground and 1 st floor will be provided is subject to ER
agreement & relevant Local Authorities approval. Ground floor is to be
provided with fixed glass window and glass blocks as indicated in the tender
drawing. All openings (inclusive of windows, ventilation & exhaust fans)
greater than 250mm2 to be provided with galvanised steel grills. Cable
compartment should be sufficient size to accommodate the full substation
requirement. Sketches provided are indicative only, final arrangement
proposed by Tenderer shall be subject to ERs approval.
Unloading balconies of 1.8 m wide as indicated in drawings and to Bomba
requirement shall be provided at the first floor of all the Control and GIS
Buildings. Railings shall be provided for all balconies and main entrance
platform and fabricated with 50mm dia. stainless steel (min. 3 horizontal
rows). Roller shutter doors with minimum dimension of 2.5 m x 3 m at Control
building and for equipment access shall be provided. Reinforced concrete
perimeter drains (with piles support) and fully covered with hot-dipped
PLS-120064

PSCW/10

SARAWAK ENERGY BERHAD


DRAFT
ASTANA 132kV SUBSTATION ESTABLISHMENT AND SEJINGKAT 132kV SUBSTATION EXTENSION
PROJECT
VOLUME 2 PART E: PARTICULAR SPECIFICATION FOR BUILDING AND CIVIL WORKS

galvanised steel grating shall be provided. Polysept septic tank with


connection to outlet, RC sump shall be provided.
Suitable safe access shall be provided to enable operation and maintenance
to be carried out without any restriction.
Toilet with wash hand basin and shower shall be provided at Ground Floor of
the 132kV Control Building and a wash hand basin and floor trap shall be
provided in the Battery room.
The GIS Building shall be designed & constructed to accommodate the
proposed GIS Electrical Equipments, and its functional accessories & parts.
Typical section & design of the GIS Building shall be as per Tender Drawings
and to the minimum GIS Building requirements.
The ground floor of the GIS building shall be a cable compartment with
minimum clear height of 2m and of reinforced concrete structure. First floor is
to accommodate the GIS equipments whereby the superstructure consisting of
columns, tie beams, roof rafter shall be of steel structures members. First floor
wall shall be of minimum 115mm thick brick wall with aluminium louvers,
windows and glass blocks (all with r.c. ledge) for ventilation and natural light
inlet purposes. Meanwhile, wall between GIS room and Control & relay room
shall be of 230 mm thick brick wall plastered and paint finishes. The height
clearance from the bottom of cranes hook to the top of the highest GIS
equipment shall be of the height of that equipment plus a clearance of 1m,
and subjected to a minimum 3.50m. The minimum clearance for the floor
maintenance access inside the GIS room shall be minimum of 3m wide x 2m
height for both front and rear side and 3m wide at both end of the building as
indicated in the first floor plan drawing. A loading/unloading bay of 6m wide
and with double leaf rollers shutters of minimum size of 4000mmx5000mm to
accommodate for truck access shall be provided as indicated in the drawing.
A new full standard set of motorized 10-ton (or minimum 1.2 times the
maximum weight of the switchgear equipment, whichever larger)
travelling Overhead Crane shall be provided and installed inside the GIS
building for lifting of GIS electrical equipments. Hot dipped galvanized steel
cat ladder access with safety loop, 1m wide walking platform and stainless
steel handrails on both side of the crane girder shall be provided for
maintenance purposes. The propose type of Overhead Crane set is subjected
to ERs agreement. Contractor shall be responsible to obtain necessary permit
from authorities (DOSH) for the installed overhead crane.

PLS-120064

PSCW/11

SARAWAK ENERGY BERHAD


DRAFT
ASTANA 132kV SUBSTATION ESTABLISHMENT AND SEJINGKAT 132kV SUBSTATION EXTENSION
PROJECT
VOLUME 2 PART E: PARTICULAR SPECIFICATION FOR BUILDING AND CIVIL WORKS

1.1

General requirements for Buildings Finishes


A. Astana 132kV Substation Establishment
The Tenderer shall submit details of his intended architectural finishes for the
132 kV Control Building/GIS with its proposal as equivalent or better than the
following and as specified in the tender drawings:Description

Remarks

General requirements for Buildings Finishes (for 132 Control and GIS building)

Conduit pipes for U/G cables to be min. 150 mm dia.


HPDE pipes

Ironmongery to be Union, Yale or equiv. Door


closers to be provided for all doors. Panic latch to be
provided for all escape doors. Nosing tiles
(matching) for RC staircase and where there is a
drop in level.

125x88x3 mm Stainless steel hinges for all the


doors and 200x100x4 mm hasp & staple for all the
access doors to the building.

Walls between switchgear room and others shall be


plastered 230mm thick. 125mm thick brickwalls (for
switchgear room, battery, staircase for fire exit and
all the external walls) shall be extended to the soffit
of roofing sheet.

Standard door frames to be Belian type, door


(inclusive of replacement doors for Fire Rated Doors
to building exterior) to be minimum 33mm thick
solid hardwood (grade A) with waterproof plywood
surfacing on both side.

Unless otherwise stated, handrails to be stainless


steel railings of 3 rows 50 mm dia. pipes to be
provided for all staircases, loading bays, first floor
external walkway, platform. Removable type of
railings shall be adequately provided at the loading
& unloading areas.

PLS-120064

PSCW/12

SARAWAK ENERGY BERHAD


DRAFT
ASTANA 132kV SUBSTATION ESTABLISHMENT AND SEJINGKAT 132kV SUBSTATION EXTENSION
PROJECT
VOLUME 2 PART E: PARTICULAR SPECIFICATION FOR BUILDING AND CIVIL WORKS

Unless otherwise stated, all electrical and fire


fighting equipments wirings shall be in concealed GI
metal conduits.
Roof, Gutter, Fascia & Flashings

Metal Roofing Profile - Klip-Lok , Unilok or approved


equivalent with fasteners conforming to AS 3566
class 4

Minimum Slope 11 degree

Base Material - G550

Base Material Thickness min. 0.48 mm

Total coated thickness - 0.53 mm

Material Coating - AZ 150

AS/NZS
1997

Bluescope Clean Colorbond steel

*equivalent
better

Roofing Color - Torres Blue

Purlin cold roll-form high strength zinc coated steel


(150g/m2), min. 2 mm thickness

AS13972001
G550, AZ200

2728or

AS 1538

Structure

Roof Structure

Steel rafter and truss (light weight cold formed steel


truss system is not allow for clear span more than
10.0m) with galvanised steel purlin. Single member
(purlin etc.) spanning more than 2m at eave overhang
is not allowed. Eaves overhang inclusive of gutter shall
be min. 2.15m. Timber roof truss and rafter system is
not allowed.
Insulation: Resilient thermal insulating air-bubble layer
(minimum 8 mm thick) faced with double sided
approved fire rated aluminium foil c/w reinforced net
and under lay with a layer of 50mm x 50mm x 2mm
dia. galvanised steel wire mesh.

Superstructure

Two-storey building with suspended ground floor c/w


polythene sheet as cable floor.
Steel/Reinforced
concrete frame and slab with brick wall partition and
aluminium frame windows.

Foundation

Reinforced concrete structure.

Piling

R.C. pile with minimum of 200 mm x 200 mm.

PLS-120064

PSCW/13

SARAWAK ENERGY BERHAD


DRAFT
ASTANA 132kV SUBSTATION ESTABLISHMENT AND SEJINGKAT 132kV SUBSTATION EXTENSION
PROJECT
VOLUME 2 PART E: PARTICULAR SPECIFICATION FOR BUILDING AND CIVIL WORKS

PLS-120064

PSCW/14

SARAWAK ENERGY BERHAD


DRAFT
ASTANA 132kV SUBSTATION ESTABLISHMENT AND SEJINGKAT 132kV SUBSTATION EXTENSION
PROJECT
VOLUME 2 PART E: PARTICULAR SPECIFICATION FOR BUILDING AND CIVIL WORKS

1.2

Particular Requirements for Schedule of Building Finishes (for 132kV


Control/GIS Building)
Below schedule of finishes shall be read together with the attached drawings.
Minimum number and size of doors, windows, louvers, glass blocks etc shall
be provided based on the attached drawings.

Item

Type/materials

Location used

1. Ceiling

a.

Toilet, and area which is expose to wet


and weather
All rooms on first floor except for toilet.

b.

c.
d.
2. Floor
a.

b.

c.
d.
e.

f.

3. Wall

a.
b.

PLS-120064

3.2mm thk. UAC


superflex
Gypsum board
suspended with turn
bucket steel rod of min
6mm dia.
(9.5mm thickness x
600mm x 1200mm
gypsum board)
1 coat acrylic wall
sealer with 2 coats
satin glo luxury finish
Clean Colorbond metal

Ground floor
Roof eaves, entrance and canopy/awning.

50 mm cement screed (with mixture of stone chipping) shall be


provided for all R.C. floor where earthing tap is embedded.
Armstrong or equiv. 2
All the floor area at 1st floor except Battery
mm polyvinyl tile (wall room/ switchgear room / toilet
skirt of same materials
shall be provided)
300mm x 300mm
1.8m wide Main Entrance Staircase and
homogenous tiles
walkway in front of 132kV Control
(nosing tiles of same
building.
materials and wall skirt
shall be provided)
Heavy duty
Battery rooms/toilet
homogenous tile,
matching nosing tiles
Cement screed with
All other staircase and entrance/ exit from
nosing tiles & drop
buildings/to mess room & toilet.
level
33/11kV Control and
2 coats of amine adduct cured epoxy paint
Switchgear room and
finish.
132 kV GIS room
inclusive of loading
bay (CO2 room, as
applicable)
Cement screed
Cable compartment, building apron slab,
and all other areas which are not specified
above.
Ceramic tile (up to
ceiling height)
Heavy Duty
Homogenous tile (up
to ceiling height)

PSCW/15

Toilets/ mess room


Battery room

SARAWAK ENERGY BERHAD


DRAFT
ASTANA 132kV SUBSTATION ESTABLISHMENT AND SEJINGKAT 132kV SUBSTATION EXTENSION
PROJECT
VOLUME 2 PART E: PARTICULAR SPECIFICATION FOR BUILDING AND CIVIL WORKS

c.

Emulsion paint (1 coat


of wall sealer and 2
coats of Satin gloss or
equivalent)
1 coat of wall sealer
and 2 coats of Weather
bond or equivalent

Interior brick wall and concrete structure

To comply with BOMBA requirements.


All the doors (inclusive of the replacement
of all external fire rated doors after the
Bombas inspection) which are expose to
weather and wet areas.

d.

Fire rated door


Solid
(Grade
A
Hardwood
with
Weather-proof plywood
surface on both sides)
door & Belian door
frame.
Minimum
thickness for door leaf
shall be 45mm.
Aluminium Roller
shutter door (minimum
slat thickness =
1.2mm) manually
operate
Belian doors & frames

e.

Paint system

f.

Sliding Doors

1 coat of aluminium wood primer


1 coat of undercoat
2 coats of Gloss finish
At 132kV GIS room, 4000mm x 5000mm
(ht) color bond profile sheets on epoxy
treated steel frames w/ Hillaldam Coburn
Top Hung gears

a.

Min. 5mm thk Dark


Green tinted glass
with aluminium frame
and concrete hood

Applicable to all rooms. To be provided


with insect screen (non fixed windows
only) and 10mm dia. HY bars w/ 20mm
angles all round hot dipped galvanized
grilles.

b.

Aluminium louver and


concrete hood

To be provided with insect screen & 10mm


dia. Hot dip galvanized grills & 12x12mm
galvanized netting and installed at the
room/house where ventilation is essential.

c.

Exhaust fan opening

10mm dia. Hot dipped galvanized grille


similar to window grille.

d.

4. Door

a.
b.

c.

5.Window

PLS-120064

PSCW/16

Exterior brick wall and concrete structure

At First floor of control buildings and


dimension is:- at 132kV is 2500x 3000mm (ht)
- at 33/11kV is 2000 x 3300mm (ht)
Toilet & shower doors

SARAWAK ENERGY BERHAD


DRAFT
ASTANA 132kV SUBSTATION ESTABLISHMENT AND SEJINGKAT 132kV SUBSTATION EXTENSION
PROJECT
VOLUME 2 PART E: PARTICULAR SPECIFICATION FOR BUILDING AND CIVIL WORKS

1.14

Outdoor Foundations / Cable Trenches / Ducts / Transformer Bund


Walls / Oil Interceptors
A. Astana 132kV Substation Establishment
The Contractor to construct Outdoor Foundations for Tranformers, PI/SA,
PI, NCT, NI, NER and Earth Mast and Sub-Structures such as oil
interceptor, oil interceptor sumps, 800mm width cable trenches and
1300mm width cable trenches. The final Outdoor Foundation sizes is
subjected to the specifications of the Outdoor Equipment supplied by the
Contractor. The Contractor to submit their proposed Outdoor Equipment
Specifications to the E.R. and E.R. will amend the design to suit the proposed
Outdoor Equipment Specifications if necessary. The Employer also may
request additional Outdoor Equipment for the Switchyard. The Contractor to
consider these circumstances in the Work Programme. The material quantities
for the Outdoor Foundations, oil interceptor, oil interceptor sumps and cable
trenches are all provisional. Therefore, the final quantities of these works
are subjected to final remeasurement.
In general, the outdoor foundation and cable trenches network shall be
provided generally as indicated in the Site Layout drawing. The outdoor
foundations for the 132 kV Transformer & Switchyard area shall include
foundations works. Outdoor foundations shall be supported by R.C. piles &
piled to set. Dimension of R.C. Structures and size of rebars as specified in the
drawing are the minimum requirements for the said works.
Complete cable trenches suitable for full 132 kV feeder and outgoing bays
shall be provided. For 132kV equipments, reinforced concrete cable trenches
shall be provided for all the control and power cables inside the substation
compound. The complete layout of the Cable Trenches shall be provided as
per tender drawings and to ERs agreement.
Cable trenches shall not be used as drainage channels. Cable trenches shall
be fitted with covers. This tender shall include the replacement of any covers
lost, missing or damage from the existing cable trenches.
Cable trench shall be of concrete with high yield steel reinforced bars
construction with bottoms laid to falls and drained at regular points along their
whole lengths. Cable trenches shall be fitted with covers. Cable sumps (inside
the building) shall be covered up (after laying of cables) or barricade with GI
handrail.
Trench covers shall be galvanised steel lined sides reinforced light weight
chamfers concrete slabs suitable for the general area loading (Design to
minimum 120kg point load at centre of slab). The RC covers shall be provided
with lifting points.
Removable RC road crossing trench covers shall be cast with hot-dipped
galvanised angle member frame to protect the edges. These RC covers shall
be provided with lifting points. Edges of trenches recess at road crossing
should be protected with galvanised angles.
Adequate 160 mm minimum diameter HDPE ducting (encased in reinforced
concrete) for 132kV cable at road/fencing/cable trenches crossings and entry
into/from buildings shall be provided as shown in the drawings.

PLS-120064

PSCW/17

SARAWAK ENERGY BERHAD


DRAFT
ASTANA 132kV SUBSTATION ESTABLISHMENT AND SEJINGKAT 132kV SUBSTATION EXTENSION
PROJECT
VOLUME 2 PART E: PARTICULAR SPECIFICATION FOR BUILDING AND CIVIL WORKS

Reinforced concrete Transformer bases and bund wall with 16-40 mm single
size of limestone filling shall be laid within the bund wall area. Reinforced
concrete Oil Interceptor, R.C. sumps (at every 6m interval and junction) and
discharged pipes (HDPE pipe of minimum diameter of 150mm) shall be
provided for Transformers compounds as per detail in the tender drawing.
B. Sejingkat 132kV Substation Extension
The Contractor to construct Outdoor Foundations for CSE, SA, CVT,
Gantry, CT, PI, Circuit Breaker, Disconnector Switch, 800mm width
cable trenches. The final Outdoor Foundation sizes is subjected to the
specifications of the Outdoor Equipment supplied by the Contractor. The
Contractor to submit their proposed Outdoor Equipment Specifications to the
E.R. and E.R. will amend the design to suit the proposed Outdoor Equipment
Specifications if necessary. The Employer also may request additional Outdoor
Equipment for the Switchyard. The Contractor to consider these circumstances
in the Work Programme. The material quantities for the Outdoor Foundations,
and cable trenches are all provisional. Therefore, the final quantities of
these works are subjected to final remeasurement.
In general, the outdoor foundation and cable trenches network shall be
provided generally as indicated in the Site Layout drawing. The outdoor
foundations for the 132 kV Transformer & Switchyard area shall include
foundations works. Outdoor foundations shall be supported by R.C. piles &
piled to set. Dimension of R.C. Structures and size of rebars as specified in the
drawing are the minimum requirements for the said works.
Complete cable trenches suitable for full 132 kV feeder and outgoing bays
shall be provided. For 132kV equipments, reinforced concrete cable trenches
shall be provided for all the control and power cables inside the substation
compound. The complete layout of the Cable Trenches shall be provided as
per tender drawings and to ERs agreement.
Cable trenches shall not be used as drainage channels. Cable trenches shall
be fitted with covers. This tender shall include the replacement of any covers
lost, missing or damage from the existing cable trenches.
Cable trench shall be of concrete with high yield steel reinforced bars
construction with bottoms laid to falls and drained at regular points along their
whole lengths.
Trench covers shall be galvanised steel lined sides reinforced light weight
chamfers concrete slabs suitable for the general area loading (Design to
minimum 120kg point load at centre of slab). The RC covers shall be provided
with lifting points.
Removable RC road crossing trench covers shall be cast with hot-dipped
galvanised angle member frame to protect the edges. These RC covers shall
be provided with lifting points. Edges of trenches recess at road crossing
should be protected with galvanised angles.
Adequate 160 mm minimum diameter HDPE ducting (encased in reinforced
concrete) for 132kV cable at road/fencing/cable trenches crossings and entry
into/from buildings shall be provided as shown in the drawings.

PLS-120064

PSCW/18

SARAWAK ENERGY BERHAD


DRAFT
ASTANA 132kV SUBSTATION ESTABLISHMENT AND SEJINGKAT 132kV SUBSTATION EXTENSION
PROJECT
VOLUME 2 PART E: PARTICULAR SPECIFICATION FOR BUILDING AND CIVIL WORKS

1.15

Roads
A. Astana 132kV Substation Establishment
Within the Sub-station Compound
The Service and Maintenance Road network is as shown in Tender Drawings.
All Service Roads shall be premix road and the maintenance road shall be
gravel road.
All premix roads shall be minimum width of 6 meter with precast concrete
road kerbs and r.c drains on both sides of road and with 100 mm thick
(compacted) premix bitumen surfaces. The compacted sub-grade shall be laid
with a layer of geotextile (TS20). Typical section and detail of the Access Road
and it drainage system are as shown in the tender drawings.
All gravel roads surface shall be minimum width of 4m and consists of 150mm
thick 38mm DCR Gravel with crushed rock chippings.
Any existing roads damaged by construction activities under this Contract
shall be made good to specifications and ER requirements. Contractor shall
reinstate and maintain any damages imposed onto the existing road used for
construction work. All finished road levels for any reinstatement of roadwork
are to match the existing access roads finished road level.
Contractor shall be responsible for the provision of temporary access for
construction purposes only. Usage of existing roads and facilities for
construction access shall not be permitted without prior written approval from
the ER, Contractor shall also make good to the satisfaction of the ER any
existing facilities affected by works under this Contract.
Outside of Sub-station Compound
Access Road to the Substation connecting from the existing road to be
constructed strictly following the geometric design shown in the Tender
Drawings.
All premix roads shall be minimum width of 6 meter with r.c cascading drains
on both sides of road and with 100 mm thick (compacted) premix bitumen
surfaces. The compacted sub-grade shall be laid with a layer of geotextile
(TS20). Typical section and detail of the Access Road and its drainage system
are as shown in the tender drawings.

Substation Compound Surfacing


The substation compound areas as indicated in Tender Drawings shall be
leveled, compacted and laid with 16mm-40mm gauge crushed quarry stone in
200mm thick to Finished Ground Level.
The stone for surfacing shall comply with electrical requirements and the
following:
i)

Type

: Limestone, granite or other igneous rocks.

ii)

Size

: 40mm - 16mm gauge

iii) Thickness

: 200mm

iv) Description

: Clean, dense and hard crushed stones

PLS-120064

PSCW/19

SARAWAK ENERGY BERHAD


DRAFT
ASTANA 132kV SUBSTATION ESTABLISHMENT AND SEJINGKAT 132kV SUBSTATION EXTENSION
PROJECT
VOLUME 2 PART E: PARTICULAR SPECIFICATION FOR BUILDING AND CIVIL WORKS

v)

Final stone finishing : Lightly rolled to final level & grading

Water Supply
A. Astana 132kV Substation Establishment
The Water Supply Network is as per drawing:PLS120064-AST-C-G-CE-P-02.
Other than pipes, fittings and its ancillary works, the Contractor is required to
supply approved 450L Water Supply PE Tank and construct its r.c. platform as
per drawings.
The Tenderer shall include in his Tender Sum the cost for water supply which
include application, connection, testing, jointing and complete laying of
approved water pipes and appurtenances from the nearest Kuching Water
Boards water main to proposed building. Capital contribution, collateral and
meter fees will be payable by the Employer.
The Contractor is required to execute the connection works using methods
which will not disrupt the water supply at the surrounding area. The method
statement for connection works to be submitted at the same time of tender
submission.
Wastewater
A. Astana 132kV Substation Establishment
A wastewater system is to be constructed for the Substation Outdoor
Switchyard and GIS/Control Building. The Ecosept septic tank with connection
to outlet, R.C. sump if required, shall be provided for Control Buildings.
Reinforced Concrete sumps connected to the Oil Interceptor with 160mm
HDPE pipes to be provided for the 132kV Transformer. Treatment and
discharge facilities for oily wastewater shall be provided by the Contractor.
Surface and Sub-surface Drainage
A. Astana 132kV Substation Establishment
Within Sub-station Compound
The overall drainage system consists of 450mm covered drain, 450mm box
culvert, 600 mm r.c. open drain, r.c. sumps, sub-surface drainage for Outdoor
Switchyard and 150mm D.I. pipe for runoff discharge of the cable trenches.
The proposed invert level and gradient of the drainage as stated in the
drawings shall be strictly followed unless instructed otherwise by the E.R.
Covered R.C. drains shall be provided around perimeter of Control Buildings
and substation compound as indicated and other location deemed necessary
for proper discharge of runoff. Discharge of UPVC rain water down pipes from
Control Buildings shall be channeled to perimeter R.C. drain.
The Contractor shall maintain, and keep all drains, streams and waterways
free from mud, silt and any other obstructions and make good where
necessary. All existing streams, rivers and waterways are not to be polluted in
any way during the carrying out of the works and the Contractor will be held
solely responsible for any compliant, damage or claim (inclusive of making
good) in this connection. The Contractor shall construct (as required) and
maintain suitable silt traps to contained mud, silt and any other debris arising

PLS-120064

PSCW/20

SARAWAK ENERGY BERHAD


DRAFT
ASTANA 132kV SUBSTATION ESTABLISHMENT AND SEJINGKAT 132kV SUBSTATION EXTENSION
PROJECT
VOLUME 2 PART E: PARTICULAR SPECIFICATION FOR BUILDING AND CIVIL WORKS

from the construction works. Silt trap location shall be approved by the
Engineer.
Unless otherwise specified, all R.C. open drains within the fenced area of
substation compound shall be provided with continuous hot-dipped galvanized
steel grating covers (designed to support 200kg axle load) adequately fixed to
the sides of the drain. Minimum main reinforcement bars for the covered R.C.
drains are as per tender drawings.
R.C. crossover shall be provided at the loading bay entrance of the GIS/Control
Building or where deem necessary as indicated in the tender drawing. The
actual size and length required for drains, r.c crossover and culverts may vary.
Drains, r.c crossover and culverts shall be constructed as per approved
Engineering Plan.
R.C sumps with grating shall be provided at locations as per drawing:
PLS120064-AST-C-G-CR-P-01. R.C. sumps located at the entrance gate of the
substation to be provided with anti-intrusion security grill.
Outside of Sub-station Compound
Drainage system at locations as per indicated in the drawings shall be
demolished and rebuild to suit the new sub-station infrastructure
requirements. Existing Drain affected by the Access Road Construction shall
be demolished and filled and diverted with new drains. All of the run-off from
the new drainage to be discharged to the existing discharge point. Rip-rap is
required as a transition between the concrete drain and the existing earth
drain. Minimum main reinforcement bars for the covered R.C. drains are as per
tender drawings.
B. Sejingkat 132kV Substation Extension
The Contractor is required to construct 450mm covered roadside drain,
450mm box culvert and r.c sumps and to be connected to the existing
drainage system. The final invert levels of the proposed drainage to suit the
existing site drainage invert levels.
Unless otherwise specified, all R.C. open drains within the fenced area of
substation compound shall be provided with continuous hot-dipped galvanized
steel grating covers (designed to support 200kg axle load) adequately fixed to
the sides of the drain.
Fencing and Gates
A. Astana 132kV Substation Establishment
The permanent security brick wall fencing and chainlink fencing shall be
provided around the perimeter of the substation at as shown in the drawing or
to ER instruction. The existing barb wire on the existing brick fencing to be
removed. The fencing shall be on 115 mm thick brickwall cement plaster and
paint finish on bothside. The permanent security brick wall fencing shall be
complete with necessary R.C. stumps, beam, retaining walls and footings and
mounted with steel bar at the top of the brick wall as shown in Tender
Drawings.

PLS-120064

PSCW/21

SARAWAK ENERGY BERHAD


DRAFT
ASTANA 132kV SUBSTATION ESTABLISHMENT AND SEJINGKAT 132kV SUBSTATION EXTENSION
PROJECT
VOLUME 2 PART E: PARTICULAR SPECIFICATION FOR BUILDING AND CIVIL WORKS

The stainless steel sliding gate with reinforced concrete pillar and brick wall
for the substation entrances shall be provided as shown in the tender drawing.
Adequate size of signage (SEB logo and substation name of 600 mm height)
shall be printed on these brickwall fencing at the proposed entrance.
Painting for Building and Main Entrance Structure
A warranty of the paint quality from paint manufacturer (Nippon, Kansai or
equivalent) shall be provided.
Standards of surface preparation and painting for building exterior shall
provide service life of minimum five (5) years, with only the need for minor
remedial work during the intervening period. Building interior shall be coated
with mid sheen washable acrylic based paint.
Infrastructure Works Outside Project Boundary
The Tender Sum shall include all infrastructure works outside project boundary
which includes but not limited to drainage, r.c cross over, pavement,
pavement markings, traffics signage, road furniture, footpath, top soil and
turf, landscaping, making good of existing facilities and others deemed
required to comply with requirements, satisfaction and approval of authorities.
All permanent traffics signage shall be of high intensity retro-reflective
including posts with concrete infill, painting, concrete footings and etc.,
excluding those temporary signs used for temporary traffic diversion.
Thermoplastic road marking and lane delineation marking shall be used.
Relocation of Affected Existing Utility and Services
Contractor is responsible to make his own enquiry and coordinate with
relevant utility provider for relocation of affected existing utilities and services,
either overhead or underground or both or on the surface, and private
properties. All cost incurred in the process including damage and claim in this
connection except shifting fee, shall be borne by Contractor and is deemed to
have been included in Tender Sum.
Survey Technician and Main Equipment Supervisor
The Contractor is to note that it is mandatory that setting-out of main grid
lines of outdoor foundations reference and control pegs shall be carried out by
an experience and qualified survey technician; and checking of anchor bolts
setting-out shall be carried out by Main Equipments supervisor by using
survey theodolite.