Вы находитесь на странице: 1из 24

GRAPHENE XT SPEED MP

For optimum
performance use:

HEAD Hawk

Total String Length: 12 m / 39,5 ft


String Pattern:

16 Main (6,5 m / 21,5 ft)


19 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 22-26 kg / 48-57 lbs

Main Strings
Start at the bottom with the center holes L1 + R1. For the left and the right side
of the main strings clamp 3,25m (10,75ft) each at hole L1 + R1 respectively.
Tighten 2 main strings left, two main strings right and so on. Tie off at holes
L6 + R6.
Cross Strings
For the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at
hole L26 + R26 and lace string through hole L25 + R25. Tighten all 19 cross
strings in direction of racquet throat. Tie off at hole R9 + L9.
Please note that grommets L7 + R7, L8 + R8, L24 + R24, L25 + R25
share both main and cross strings.

GRAPHENE XT SPEED MP A 16/16

For optimum
performance use:

HEAD Gravity

Total String Length: 12 m / 39,5 ft


String Pattern:

16 Main (6,5 m / 21,5 ft)


16 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 22-26 kg / 48-57 lbs


NOTE:

Use NEON 16/16 ASP insert

Main Strings
Start at the top with the center holes L1 + R1. For the left and the right side of the
main strings clamp 3,25m (10,75ft) each at hole L1 + R1 respectively. Tighten 2
main strings left, two main strings right and so on, skipping holes
L8 + R8 as well as L25 + R25. Tie off at holes L6 + R6.
Cross Strings
For the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at
hole L28 + R28 and lace string through hole L25 + R25. Tighten all 16 cross
strings in direction of racquet throat. Tie off at hole L11 + R11.

GRAPHENE XT SPEED MP A 16/19

For optimum
performance use:

HEAD Gravity

Total String Length: 12 m / 39,5 ft


String Pattern:

16 Main (6,5 m / 21,5 ft)


19 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 22-26 kg / 48-57 lbs


NOTE:

Use BLACK 16/19 ASP insert

Main Strings
Start at the bottom with the center holes L1 + R1. For the left and the right side
of the main strings clamp 3,25m (10,75ft) each at hole L1 + R1 respectively.
Tighten 2 main strings left, two main strings right and so on, skipping holes
L8 + R8, as well as L28 + R28. Tie off at holes L6 + R6
Cross Strings
For the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at
hole L31 + R31 and lace string through hole L28 + R28. Tighten all 19 cross
strings in direction of racquet throat. Tie off at hole R11 + L11.

GRAPHENE XT SPEED REV PRO 16/16

For optimum
performance use:

HEAD Gravity

Total String Length: 12 m / 39,5 ft


String Pattern:

16 Main (6,5 m / 21,5 ft)


16 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 22-26 kg / 48-57 lbs


NOTE:

Use NEON 16/16 ASP insert

Main Strings
Start at the top with the center holes L32 + R32. For the left and the right side
of the main strings clamp 3,25m (10,75ft) each at hole L32 + R32 respectively.
Tighten 2 main strings left, two main strings right and so on, skipping holes
L8 + R8, as well as L25 + R25. Tie off at holes L26 + R26.
Cross Strings
For the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at
hole L27 + R27 and lace string through hole L25 + R25. Tighten all 16 cross
strings in direction of racquet throat. Tie off at hole R7 + L7.

GRAPHENE XT SPEED REV PRO 16/19

For optimum
performance use:

HEAD Gravity

Total String Length: 12 m / 39,5 ft


String Pattern:

16 Main (6,5 m / 21,5 ft)


19 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 22-26 kg / 48-57 lbs


NOTE:

Use BLACK 16/19 ASP insert

Main Strings
Start at the top with the center holes L35 + R35. For the left and the right side
of the main strings clamp 3,25m (10,75ft) each at hole L35 + R35 respectively.
Tighten 2 main strings left, two main strings right and so on, skipping holes
L8 + R8, as well as L28 + R28. Tie off at holes L29 + R29.
Cross Strings
For the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at
hole L30 + R30 and lace string through hole L28 + R28. Tighten all 19 cross
strings in direction of racquet throat. Tie off at hole R7 + L7.

YOUTEKTM GRAPHENE SPEED PRO

For optimum
performance use:

HEAD Sonic Pro

Total String Length: 12 m / 39,5 ft


String Pattern:

18 Main (6,5 m / 21,5 ft)


20 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 22-26 kg / 48-57 lbs


Main Strings
Start at the top with the center holes L34 + R34. For the left and the right side
of the main strings clamp 3,25m (10,75ft) each at hole L34 + R34 respectively.
Tighten 2 main strings left, two main strings right and so on. Tie off at holes
L7 + R7. For best results, while tensioning the outer main strings, ensure that
the grommet barrels are not lifted out of position. If barrels lift, then please push
these back into position before continuing.
Cross Strings
or the cross string measure 5,5m (18,0 ft) string. Tie on the cross strings at hole
L28 + R28 and lace string through hole L27 + R27. Tighten all 20 cross strings in
direction of racquet throat. Tie off at hole L10 + R10. Please note that grommets
L8 + R8, L9 + R9, L26 + R26, L27 + R27 share both main and cross strings.

YOUTEKTM GRAPHENE SPEED S

For optimum
performance use:

HEAD Sonic Pro

Total String Length: 12 m / 39,5 ft


String Pattern:

16 Main (6,5 m / 21,5 ft)


19 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 23-27 kg / 48-57 lbs


Main Strings
Start at the bottom with the center holes L1 + R1. For the left and the right side
of the main strings clamp 3,25m (10,75ft) each at hole L1 + R1 respectively.
Tighten 2 main strings left, two main strings right and so on. Tie off at holes
L6 + R6. For best results, while tensioning the outer main strings, ensure that
the grommet barrels are not lifted out of position. If barrels lift, then please push
these back into position before continuing.
Cross Strings
For the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at
hole L26 + R26 and lace string through hole L25 + R25. Tighten all 19 cross
strings in direction of racquet throat. Tie off at hole R9 + L9. Please note that
grommets L7 + R7, L8 + R8, L24 + R24, L25 + R25 share both main and
cross strings.

YOUTEKTM GRAPHENE SPEED PWR

For optimum
performance use:

HEAD PWR Fusion

Total String Length: 12 m / 39,5 ft


String Pattern:

16 Main (6,5 m / 21,5 ft)


19 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 24-28 kg / 52-62 lbs


Main Strings
Start at the bottom with the centre holes L1 + R1. For the left and the right side
of the main strings clamp 3,25 m (10,75 ft) each at hole L1 + R1 respectively.
Tighten 2 main strings left, two main strings right and so on, skipping holes
L7 + R7, L9 + R9, L10 + R10 as well as L27 + R27 and L29 + R29.
Tie off at holes L8 + R8.
Cross Strings
For the cross string measure 5,5 m (18 ft) string. Tie on the cross strings at hole
L31 + R31 and lace string through hole L29 + R29. Tighten all 19 cross strings
in direction of racquet throat. Tie off at hole L6 + R6.

YOUTEKTM GRAPHENE PRESTIGE PRO

For optimum
performance use:

HEAD Hawk

Total String Length: 12 m / 39,5 ft


String Pattern:

16 Main (6,5 m / 21,5 ft)


19 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 22-26 kg / 48-57 lbs


Main Strings
Start at the top with the center holes L35 + R35. For the left side of the main
strings clamp 3 m (10 ft) at hole L35 + R35. Tighten 2 main strings right, two
main strings left and so on, skipping holes L8 + R8 and L28 + R28. Tie off at
holes L29 + R29.
Cross Strings
For the cross string measure 5 m (16,5 ft) string. Tie on the cross strings at hole
L30 and lace string through hole L28. Tighten all 19 cross strings in direction of
racquet throat. Tie off at hole R7.

YOUTEKTM GRAPHENE PRESTIGE REV PRO

For optimum
performance use:

HEAD Hawk

Total String Length: 11 m / 36,5 ft


String Pattern:

16 Main (6 m / 20 ft)
19 Cross (5 m / 16,5 ft)

Rec. String Tension: 24-28 kg / 52-62 lbs


Main Strings
Start at the top with the center holes L35 + R35. For the left side of the main
strings clamp 3 m (10 ft) at hole L35 + R35. Tighten 2 main strings right, two
main strings left and so on, skipping holes L8 + R8 and L28 + R28. Tie off at
holes L29 + R29.
Cross Strings
For the cross string measure 5 m (16,5 ft) string. Tie on the cross strings at hole
L30 and lace string through hole L28. Tighten all 19 cross strings in direction of
racquet throat. Tie off at hole R7.

YOUTEKTM GRAPHENE PRESTIGE MP

For optimum
performance use:

HEAD Hawk

Total String Length: 11 m / 36,5 ft


String Pattern:

18 Main (6 m / 20 ft)
20 Cross (5 m / 16,5 ft)

Rec. String Tension: 24-28 kg / 52-62 lbs


Main Strings
Start at the top with the center holes L38 + R38. For the left side of the main
strings clamp 3m (10ft) at hole L38 + R38. Tighten 2 main strings right, two
main strings left and so on, skipping holes L31 + R31, L29 + R29 as well as
L9 + R9. Tie off at holes L7 + R7.
Cross Strings
For the cross string measure 5 m (16,5 ft) string. Tie on the cross strings at hole
R 33 and lace string through hole R31. Tighten all 20 cross strings in direction of
racquet throat. Tie off at hole R12.

YOUTEKTM GRAPHENE PRESTIGE S

For optimum
performance use:

HEAD Sonic Pro

Total String Length: 11 m / 36,5 ft


String Pattern:

16 Main (6 m / 20 ft)
19 Cross (5 m / 16,5 ft)

Rec. String Tension: 24-28 kg / 52-62 lbs


Main Strings
Start at the top with the center holes L35 + R35. For the left side of the main
strings clamp 3 m (10 ft) at hole L35 + R35. Tighten 2 main strings right, two
main strings left and so on, skipping holes L8 + R8 and L28 + R28. Tie off at
holes L29 + R29.
Cross Strings
For the cross string measure 5 m (16,5 ft) string. Tie on the cross strings at hole
L30 and lace string through hole L28. Tighten all 19 cross strings in direction of
racquet throat. Tie off at hole R7.

YOUTEKTM GRAPHENE PRESTIGE PWR

For optimum
performance use:

HEAD PWR Fusion

Total String Length: 12 m / 39,5 ft


String Pattern:

16 Main (6,5 m / 21,5 ft)


19 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 24-28 kg / 52-62 lbs


Main Strings
Start at the bottom with the centre holes L1 + R1. For the left and the right side
of the main strings clamp 3,25 m (10,75 ft) each at hole L1 + R1 respectively.
Tighten 2 main strings left, two main strings right and so on, skipping holes L7 +
R7 and L9 + R9. Tie off at holes L6 + R6.
Cross Strings
For the cross string measure 5,5 m (18 ft) string. Tie on the cross strings at hole
R28 + L28 and lace string through hole L26 + R26. Tighten all 19 cross strings
in direction of racquet throat. Tie off at hole L4 + R4. Please note that grommets
L10 + R10, L25 + R25, L26 + R26 share both main and cross strings.

YOUTEKTM GRAPHENE RADICAL PRO

For optimum
performance use:

HEAD Hawk

Total String Length: 12 m / 39,5 ft


String Pattern:

16 Main (6,5 m / 21,5 ft)


19 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 22-26 kg / 48-57 lbs


Main Strings
Start at the top with the center holes L35 + R35. For the left and the right side
of the main strings clamp 3,25 m (10,75 ft) at hole L35 and R35 respectively.
Tighten 2 main strings left, two main strings right and so on, skipping holes L8 +
R8 and L28 + R28. Tie off at holes L29 + R29.
Cross Strings
For the cross string measure 5,5 m (168 ft) string. Tie on the cross strings at hole
L30 and lace string through hole L28 + R28. Tighten all 19 cross strings in direction of racquet throat. Tie off at hole R7.

YOUTEKTM GRAPHENE RADICAL MP

For optimum
performance use:

HEAD Hawk

Total String Length: 12 m / 39,5 ft


String Pattern:

16 Main (6,5 m / 21,5 ft)


19 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 22-26 kg / 48-57 lbs


Main Strings
Start at the top with the center holes L35 + R35. For the left and the right side
of the main strings clamp 3,25 m (10,75 ft) at hole L35 and R35 respectively.
Tighten 2 main strings left, two main strings right and so on, skipping holes L8 +
R8 and L28 + R28. Tie off at holes L29 + R29.
Cross Strings
For the cross string measure 5,5 m (168 ft) string. Tie on the cross strings at hole
L30 and lace string through hole L28 + R28. Tighten all 19 cross strings in direction of racquet throat. Tie off at hole R7.

YOUTEKTM GRAPHENE RADICAL S

For optimum
performance use:

HEAD Sonic Pro

Total String Length: 12 m / 39,5 ft


String Pattern:

16 Main (6,5 m / 21,5 ft)


19 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 22-26 kg / 48-57 lbs


Main Strings
Start at the top with the center holes L35 + R35. For the left and the right side
of the main strings clamp 3,25 m (10,75 ft) at hole L35 and R35 respectively.
Tighten 2 main strings left, two main strings right and so on, skipping holes L8 +
R8 and L28 + R28. Tie off at holes L29 + R29.
Cross Strings
For the cross string measure 5,5 m (168 ft) string. Tie on the cross strings at hole
L30 and lace string through hole L28 + R28. Tighten all 19 cross strings in direction of racquet throat. Tie off at hole R7.

YOUTEKTM GRAPHENE RADICAL REV

For optimum
performance use:

HEAD Sonic Pro

Total String Length: 12 m / 39,5 ft


String Pattern:

16 Main (6,5 m / 21,5 ft)


19 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 22-26 kg / 48-57 lbs


Main Strings
Start at the top with the center holes L35 + R35. For the left and the right side
of the main strings clamp 3,25 m (10,75 ft) at hole L35 and R35 respectively.
Tighten 2 main strings left, two main strings right and so on, skipping holes L8 +
R8 and L28 + R28. Tie off at holes L29 + R29.
Cross Strings
For the cross string measure 5,5 m (168 ft) string. Tie on the cross strings at hole
L30 and lace string through hole L28 + R28. Tighten all 19 cross strings in direction of racquet throat. Tie off at hole R7.

YOUTEKTM GRAPHENE INSTINCT MP

For optimum
performance use:

HEAD Hawk

Total String Length: 12 m / 39,5 ft


String Pattern:

16 Main (6,5 m / 21,5 ft)


19 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 22-26 kg / 48-57 lbs


Main Strings
Start at the bottom with the center holes L1 + R1. For the left and the right side
of the main strings clamp 3,25m (10,75ft) each at hole L1 + R1 respectively.
Tighten 2 main strings left, two main strings right and so on. Tie off at
holes L6 + R6.
Cross Strings
For the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at
hole L27 + R27 and lace string through hole L25 + R25. Tighten all 19 cross
strings in direction of racquet throat. Tie off at hole R9 + L9. Please note that
grommets L7 + R7, L8 + R8, L24 + R24, L25 + R25 share both main and
cross strings.

YOUTEKTM GRAPHENE INSTINCT S

For optimum
performance use:

HEAD Sonic Pro

Total String Length: 12 m / 39,5 ft


String Pattern:

16 Main (6,5 m / 21,5 ft)


19 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 23-27 kg / 50-60 lbs


Main Strings
Start at the bottom with the center holes L1 + R1. For the left and the right side
of the main strings clamp 3,25m (10,75ft) each at hole L1 + R1 respectively.
Tighten 2 main strings left, two main strings right and so on. Tie off at
holes L6 + R6.
Cross Strings
For the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at
hole L27 + R27 and lace string through hole L25 + R25. Tighten all 19 cross
strings in direction of racquet throat. Tie off at hole R9 + L9. Please note that
grommets L7 + R7, L8 + R8, L24 + R24, L25 + R25 share both main and
cross strings.

YOUTEKTM GRAPHENE INSTINCT REV

For optimum
performance use:

HEAD Sonic Pro

Total String Length: 12 m / 39,5 ft


String Pattern:

16 Main (6,5 m / 21,5 ft)


19 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 22-26 kg / 48-57 lbs


Main Strings
Start at the bottom with the center holes L1 + R1. For the left and the right side
of the main strings clamp 3,25m (10,75ft) each at hole L1 + R1 respectively.
Tighten 2 main strings left, two main strings right and so on. Tie off at
holes L6 + R6.
Cross Strings
For the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at
hole L27 + R27 and lace string through hole L25 + R25. Tighten all 19 cross
strings in direction of racquet throat. Tie off at hole R9 + L9. Please note that
grommets L7 + R7, L8 + R8, L24 + R24, L25 + R25 share both main and
cross strings.

YOUTEKTM GRAPHENE INSTINCT PWR

For optimum
performance use:

HEAD PWR Fusion

Total String Length: 12 m / 39,5 ft


String Pattern:

16 Main (6,5 m / 21,5 ft)


19 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 24-28 kg / 52-62 lbs


Main Strings
Start at the top with the centre holes L35 + R35. For the left and the right side of
the main strings clamp 3,25 m (10,75 ft) each at hole L35 + R35 respectively.
Tighten 2 main strings left, two main strings right and so on, skipping holes
L8 + R8, L27 + R27 and L29 + R29. Tie off at holes L28 + R28.
Cross Strings
For the cross string measure 5,5 m (18 ft) string. Tie on the cross strings at hole
R30 + L30 and lace string through hole L29 + R29. Tighten all 19 cross strings
in direction of racquet throat. Tie off at hole L7 + R7.

YOUTEKTM GRAPHENE EXTREME PRO

For optimum
performance use:

HEAD Hawk

Total String Length: 12 m / 39,5 ft


String Pattern:

16 Main (6,5 m / 21,5 ft)


19 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 22-26 kg / 48-57 lbs


Main Strings
Start at the bottom with the center holes L1 + R1. For the left and the right side
of the main strings clamp 3,25m (10,75 ft) each at hole L1 + R1 respectively.
Tighten one main string left followed by one main strings right and so on, skipping
holes L 8 + R8 as well as L28 + R28. Tie off at holes L6 + R6.
Cross Strings
For the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at
hole L29 + R29 and lace string through hole L28 + R28. Tighten all 19 cross
strings in direction of racquet throat. Tie off at hole L11 + R11.

YOUTEKTM GRAPHENE EXTREME MP

For optimum
performance use:

HEAD Hawk

Total String Length: 12 m / 39,5 ft


String Pattern:

16 Main (6,5 m / 21,5 ft)


19 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 22-26 kg / 48-57 lbs


Main Strings
Start at the bottom with the center holes L1 + R1. For the left and the right side
of the main strings clamp 3,25m (10,75 ft) each at hole L1 + R1 respectively.
Tighten one main string left followed by one main strings right and so on, skipping
holes L 8 + R8 as well as L28 + R28. Tie off at holes L6 + R6.
Cross Strings
For the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at
hole L29 + R29 and lace string through hole L28 + R28. Tighten all 19 cross
strings in direction of racquet throat. Tie off at hole L11 + R11.

YOUTEKTM GRAPHENE EXTREME LITE

For optimum
performance use:

HEAD Hydrosorb Pro

Total String Length: 12 m / 39,5 ft


String Pattern:

16 Main (6,5 m / 21,5 ft)


19 Cross (5,5 m / 18,0 ft)

Rec. String Tension: 22-26 kg / 48-57 lbs


Main Strings
Start at the bottom with the center holes L1 + R1. For the left and the right side
of the main strings clamp 3,25m (10,75 ft) each at hole L1 + R1 respectively.
Tighten one main string left followed by one main strings right and so on, skipping
holes L 8 + R8 as well as L28 + R28. Tie off at holes L6 + R6.
Cross Strings
For the cross string measure 5,5 m (18,0 ft) string. Tie on the cross strings at
hole L29 + R29 and lace string through hole L28 + R28. Tighten all 19 cross
strings in direction of racquet throat. Tie off at hole L11 + R11.

Вам также может понравиться