Name of Work
1.
Name of Work
No.
1.
Construction of
Estimated
EMD Cost
Length of
Cost
in Rs.
Fencing
14,69,900/-
37,000/-
2160 r. m.
Barbed wire
around 14
Fencing at padve
Ha area
Time limit
45 days
Mazgav Research
Centre
OFFICE ADDRESS
Office of. Chief Conservator of Forests and Silviculturist, Pune
New P.M.T. Building , 4 th Floor , Shankar Sheth Road, PUNE 411 0 42
Signature of Contractor
No. Of Corrections
02/2013
/02/2013
Name of Contractor :-
PAN No.:Occupation :-
Age :-
Address :-
Phone No:-
Mobile No:-
E. mail I.D.
Registration Number :-
I shall comply the orders mentioned in the tender notice and insure timely
completion of work of CONSTRUCTION OF BARBED WIRE FENCING AT
PADVE MAZGAV RESEARCH CENTRE. I am aware that the work will be
checked by Chief Conservator of Forests and Silviculturist, Pune. Or by the
Officer instructed by him on his behalf.
The rate quoted for CONSTRUCTION OF BARBED WIRE FENCING AT
PADVE MAZGAV RESEARCH CENTRE is (consolided cost) Rs.
__________________/(In words Rs. ______________________________________________________)
The cost is inclusive of all charges. I undertake not to charge any other extra cost
forthr above said fencing work.
The required amount of Royalty on the material / materials used , if any will be
paid by me. i.e. contractor
The treasury Challan/ demand draft number ________ dated __________ drawn
on ____________________________
for Rs. 37,000/- in favor of Chief
Conservator of Forests and Silviculturist Pune payable at Pune is enclosed
herewith towards EMD.
*Since I have downloaded form from internet, the cost of tender form is enclosed herewith by
demand
draft
number
________
dated
__________
drawn
on
____________________________
for Rs. 500/- in favor of Chief Conservator of
Forests and Silviculturist Pune payable at Pune.
( Signature of Tenderer )
9. The tenders shall be open on 27/02/2012 at 1.30 PM before present bidders. The
successful bidder shall execute a bond of final tendered amount. He should also
complete work within the time period prescribed by Chief Conservator of Forests
and Silviculturist Pune. It should also comply the prescribed specifications.
10. The contractor will have to follow the preseibed items of works in detail and to the
design and specifications of work supplied regarding the construction of Barbed
Wire Fencing. The material should also qualify the standard tests.
11. The rate quoted of all taxes. No claim towards extra amount of Taxes will be
entertained .
12. After completion of Construction Work, it will be inspected by the representative
of this office.
13. The work advance of 40% shall be paid after delivery of materials on site. Only
after receipt of report by the representative of the office of CCF & Silviculurist,
Pune, the remaining 50% work charge amount will be paid after successful
completion of work and 10% amount 30 days thereafter.
14. The contractor have to sign the prescribed Form of Cotract as prescribed by The
Chief Conservator of Forests and Silviculturist Pune
15. Contractor should also provide 1 year free maintenance.
16. The Chief Conservator of Forests and Silviculturist Pune reserve right to accept or
reject any tender at any time without any reason. In case of dispute, the decision of
Chief Conservator of Forests and Silviculturist Pune.shall be final.
Sd/Chief Conservator of Forests and
Silviculturist, Pune
Email: cfandsilvapune@gmail.com
Phone: 020-24491610
Work specifications for Providing and fixing barbed wire RCC post fencing
around forest Reasearch Centre at PADVE MAZGAV
Name of Work
:-
Location-
Qty.
1
Unit
2
Item
3
Item No-1
228.78
Cu.M.
228.78
Cu.M.
Item No-2
Providing and laying in situ cement concrete in proporation __1:3:6__ of
trap metal for foundation and bedding, including bailing out water manually
plywood/ steel formwork, compacting and curing complete.
Item No-3
1.50
0.09
SQMT
M.T.
Providing and fixing mild steel grill gate with angle iron frame 65 x 65 x 10
mm with iron bars at 150 mm etc. centre to centre and diagonal flats as per
the detailed drawing, including hinges, pivot blocks, locking arrangement,
welding, reveting with oil painting in three coats of approved colour shade.
(Weight of gate 35 kg /sq.m.)
DSR I/P -2/114
Providing and fabricating structural steel work in rolled sections like joist,
channels, angles, tees etc. as per detailed design and drawings or As directed
by Engineer-In-Charge. including cutting, fabricating, hoisting, erecting,
fixing in position making riveted/bolted/welded connections with connecting
plates, braces etc. and includng one coat of anticorrosive paint and over it
two coats of painting of approved quality and shade complete.
DSR I/P -1/13
1902.31
Kg
957.00
No
Item No-5
Providing Galvanised iron Barbed Wire and fitting (weight 6.80 RMT/KG)
etc.complete.
Item No-6
Providing and casting in situ cement concrete ____ of trap metal for R.C.C.
columns as per detailed designs and drawings or As directed by Engineer-InCharge., including centering, plywood/steel form work compacting,
roughening the surface if special finish is to be provided and curing
complete. (Excluding steel reinforcement)
SPECIFICATONS