Killian Court Archery Range

MEMORIAL dRIVE

M1 A1

G1 S1

Archery
V1 F1 A1

Status:
Venue Location:

Temporary

CHARLES
RIVER

C1

Killian Court (MIT)

Venue + Support Acreage:

11.6 ac

Land Owner:

MIT

M1

MIT

MAS SACH USE TTS AVEN

UE

Venue Access/Use:
Preliminary venue access and use of Killian Court has been
reviewed with MIT.
Construction Timeline:

May 2024 - July 2024

Anticipated Hurdles:
No specific permitting hurdles are anticipated.
Test Event Construction:
We anticipate temporary construction for a test event.

G1 V1 A1

Accessibility Options:
Situated in front of the iconic MIT Dome, Killian Court boasts
stunning views of the MIT campus, the Charles River and the
Boston skyline. Olympic athletes and spectators visiting this
venue will be able to visit the pedestrian walkways along the
Charles River to take in the famous view of Bostons Esplanade.
This venues site within the University Cluster will be served by
the Olympic Route Network via Massachusetts Avenue to Vassar
Street. The venue will be within walking distance of the Red Line,
the Green Line and a planned BRT along Massachusetts Avenue.
Planned Seating Capacity:

C1
0

200

400

600ft

100

200m

above
MIT
Overall Plan
left
Locus Map

10km

below
Archery Plan
opposite page
Archery Plan

3,000

ATHLETES VILLAGE
MASSACHUSET TS INSTITUTE OF TECHNOLOGY

S2
F3
F2

C1

F3
S2
Archery Range
Upper Level
Block Plan

78

0
0

67

133
30

200ft
60m

F E A S I B I L I T Y S T U d I E S + P L A N S N U M B E R 4: S P O R T S + V E N U E S 1 D E C E M B E R 2014

A1 M1
M5

C2

MEMORIAL dRIVE

G1 S1

S3
S3
S3
F4

S2
A5

G4
V2

MIT

C1

A2

CHARLES
RIVER

V1 F1 A1

M4
S2

A7

M1

M3

MAS SAC HUS ETT S AVE


Archery Range
Ground Level
Block Plan

0
0

C1 FIELD OF PLAY
C2 WARM-UP AREA
C3 RESIDENT CENTER

V1 INTERNATIONAL FEDERATION /
OFFICIAL ENTRANCE
V2 IF/OFFICIAL OFFICE/AREA

A1
A2
A3
A4
A5
A6
A7

F1
F2
F3
F4

ATHLETE ENTRANCE
ATHLETE SEATING
ATHLETE CHANGING ROOMS
SPORT EQUIPMENT
ATHLETE LOUNGE
MEDICAL/MASSAGE
DOPING CONTROL

OLYMPIC FAMILY / VIP ENTRANCE


OF/VIP SEATING
OF/VIP LOUNGE
OF/VIP PARKING

B1 SCOREBOARD / VIDEOBOARD

M1
M2
M3
M4

MEDIA ENTRANCE
MEDIA SEATING
MEDIA OPERATION
MIXED ZONE (INTERVIEW)

M5 BROADCAST AREA
S1 SPECTATOR ENTRANCE
S2 SPECTATOR SEATING
S3 SPECTATOR SERVICES

R1 REMAINING OVERLAY STRUCTURES

1 D E C E M B E R 2014 N U M B E R 4: S P O R T S + V E N U E S F E A S I B I L I T Y S T U d I E S + P L A N S

67

133
30

NUE

200ft
60m

G1 STAFF/OPERATIONS ENTRANCE
G2 STAFF/VOLUNTEERS
G3 BACK OF HOUSE OPERATIONS
G4 CEREMONY
G5 SHARED STRUCTURES
SECURE PERIMETER/FENCE LINE
ATHLETE ARRIVAL
FOH/BOH BOUNDARY
ZONE SEPARATION
MBTA RAIL STATION

79

Вам также может понравиться