A.P. REVISED
REVISED STANDARD
STANDARD DATA
DATA
PART-III
PART-III
BUILDINGS
BUILDINGS
Basic approach and General conditions and assumptions for the
preparation of
Standard Data Book for Building Works.
The Basic approach for the preparation of Standard Data for Building works is
indicated as under.
Description of Items : The description of items is given briefly and linked with the
relevant specifications in AP Standard Specifications.
Use of Machinery : For concrete work mixing is proposed with machinery as well as
manually. For laying concrete, lifting is proposed with either by winches or
machinery. Manual means have been proposed for all other items.
Working Conditions : The inputs for the Data have been analysed for the average
working conditions prevailing in the state.
Over Heads : This is assumed to include interalia the following elements:
Site accommodation, setting up plant, access road, water supply, electricity and
general site arrangements
Office furniture, equipment and communications
Provision towards expenditure on:
Corporate office of contractor
Site supervision
Documentation and "as built" drawings
Mobilisation / de-mobilisation of resources .
Labour camps with minimum amenities required as per labour laws and
transportation to work sites
Light vehicles for site supervision including administrative and managerial
requirements
Setting up of Laboratories for quality control, field and laboratory testing for control
of quality of various items of work and documentation of test results as per
requirement of the Specifications.
Minor T&P including vibrators for concrete work and survey instruments and setting
outworks, including verification of line, dimensions, taking trial pits and bore holes,
where required.
Watch and ward
Arraignment for Traffic and Traffic Management during construction.
Provision towards safeguarding environment
Sundries
Financing expenditure of the Contractor
Work Insurance / compensation.
4.1 Sales/Turnover Tax / VAT: Allow 4% and which should be exhibited
separately. In agreements it should be mentioned that it will be reimbursed as per
actuals.
Contractors Profit : It is considered to allow 14% towards over head charges (Item
4) and Contractor Profits put together.
General :
The AP Standard Specifications shall be followed with relevant BIS Specifications of
various materials and construction work.
The sources of all materials and samples of materials are required to be approved by
the Engineer-in- Charge before starting of the work.
For reinforced steel both HYSD and TMT bars continuing to IS 1786 and MS bars upto
36 mm dia as per IS 432 Part 1 have been considered.
The Data includes inputs for testing of soil, materials and works.
The contractor shall arrange and to provide and maintain an adequate equipped field
General :
The AP Standard Specifications shall be followed with relevant BIS Specifications of
various materials and construction work.
The sources of all materials and samples of materials are required to be approved by
the Engineer-in- Charge before starting of the work.
For reinforced steel both HYSD and TMT bars continuing to IS 1786 and MS bars upto
36 mm dia as per IS 432 Part 1 have been considered.
The Data includes inputs for testing of soil, materials and works.
The contractor shall arrange and to provide and maintain an adequate equipped field
laboratory.
Quality Control of Works shall be governed by relevant AP Standard Specifications
read with BIS Specifications.
Sundries to cater for unforeseen contingency and miscellaneous items have been
added in the overheads.
The various activities of works shall also be documented in photographs and video
cassettes.
The Data for various Earth Work Excavation Items including classification of soils
shall be as in Standard Data for Roads and Bridges.
The course and fine aggregates shall conform to IS : 383
Basic Inputs :
The Standard Data Book is based on the requirements of basic inputs of materials,
labour and machineries for various items.
The rates for labour, material and usage charges of machinery for the area where
the project is located are to be ascertained from local authorities/enquiries to
prepare Schedule of Rates for the area.
The basic rates of materials, such as, stone boulders, stone for masonry, stone
ballast, stone dust, moorum, gravel, lime, manure, sludge, quarry sweep, kankar,
bricks, brick ballast, crushed slag, etc. at quarry / crusher sites shall be fixed by the
Board of Chief Engineers yearly (effective from 1st June to 31st May). However, the
basic rate of materials hand broken / machine broken, crushed aggregates shall be
based on Analysis in Chapter 1 of Roads & Bridges.
The cost of materials should include the cost at source and the cost of their carriage
(as per Schedule of rates arrived in Chapter 1 of Roads & Bridges for conveyance,
loading and unloading charges) upto the work site.
Labour
The labour wages should be as per rates fixed by the Board of Chief Engineers
keeping the minimum wages fixed as per Minimum Wages Act.
Skilled labour include mason, carpenter, blacksmith, mechanics and other trades.
Materials :
Quantities of materials considered in the rate analysis are approximate for the
purpose of estimation and include normal wastages. Actual consumption would
depend on mix design.
The rates of material should include basic cost at locations of stone
crushers/factory/rail head and cost of its carriage to the site of work/plant including
loading, unloading and stacking.
Credit for Dismantled Material: The dismantled materials should be examined and a
realistic assessment made for credit for such materials, which can be utilized for
works or auctioned.
The basic rates should include all octroi charges, toll tax, sale tax, VAT, municipal
taxes and other local taxes, etc.
The Data for the following items of work shall be as per Data Items covered in AP
Standard Data for Roads & Bridges
Loading, Unloading, Carriage, Crushing of Materials
Site Clearance
Earth Work Items including classification of Excavated Material.
Horticulture
Concrete Items :
For Concrete Work, the Grades of Concrete covered by Data Book is in accordance to
IS 456 : 2000. The nominal mix of concrete shall be used upto M 20 Grade only. For
RCC Work, M 20 Grade nominal mix may be used in exceptional cases of
BLD-CSTN
S No
Description
Unit
Quantity
BLD-CSTN-1
BLD-CSTN-1-1
BLD-CSTN-1-4
BLD-CSTN-1-5
Remarks
7
Cement Mortar (1 : 1)
kg.
1440.00
cum
1.05
cum
1.05
day
0.20
BLD-CSTN-1-3
Amount
Rs.
6
MORTARS
Unit : 1cum
A. MATERIALS:
Cement
Sand (including 5% wastage)
Seigniorage charges for sand
B. MACHINERY
- Nil C. LABOUR:
Man mazdoor for mixing mortar
Grand Total
BLD-CSTN-1-2
Rate
Rs.
5
Grand Total
Cement Mortar (1 : 2)
Unit : 1cum
A. MATERIALS:
Cement
Sand (including 5% wastage)
Seigniorage charges for sand
B. MACHINERY
- Nil C. LABOUR:
Man mazdoor for mixing mortar
Grand Total
Cement Mortar (1 : 3)
Unit : 1cum
A. MATERIALS:
Cement
Sand (including 5% wastage)
Seigniorage charges for sand
B. MACHINERY
- Nil C. LABOUR:
Man mazdoor for mixing mortar
Grand Total
Cement Mortar (1 : 4)
Unit : 1cum
A. MATERIALS:
Cement
Sand (including 5% wastage)
Seigniorage charges for sand
B. MACHINERY
- Nil C. LABOUR:
Man mazdoor for mixing mortar
kg.
960.00
cum
1.05
cum
1.05
day
0.20
kg.
720.00
cum
1.05
cum
day
0.20
kg.
480.00
cum
1.05
cum
1.05
day
0.20
kg.
360.00
cum
1.05
cum
1.05
day
0.20
Grand Total
659
BLD-CSTN
Index-code
S No
1
BLD-CSTN-1-6
Description
Unit
Quantity
Cement Mortar (1 : 5)
Unit : 1cum
A. MATERIALS:
Cement
Sand (including 5% wastage)
Seigniorage charges for sand
B. MACHINERY
- Nil C. LABOUR:
Man mazdoor for mixing mortar
kg.
288.00
cum
1.05
cum
1.05
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
day
0.20
Grand Total
BLD-CSTN-1-7
BLD-CSTN-1-8
Grand Total
Cement Mortar (1 : 8)
Unit : 1cum
A. MATERIALS:
Cement
Sand (including 5% wastage)
Seigniorage charges for sand
B. MACHINERY
- Nil C. LABOUR:
Man mazdoor for mixing mortar
Grand Total
kg.
240.00
cum
1.05
cum
1.05
day
0.20
kg.
180.00
cum
1.05
cum
1.05
day
0.20
Kg
cum
cum
400.00
0.90
0.45
cum
0.90
cum
0.45
day
0.10
day
2.36
kl
1.20
BLD-CSTN-2
BLD-CSTN-2-1
Cement Mortar (1 : 6)
Unit : 1cum
A. MATERIALS:
Cement
Sand (including 5% wastage)
Seigniorage charges for sand
B. MACHINERY
- Nil C. LABOUR:
Man mazdoor for mixing mortar
: 2000,
Hence
660
BLD-CSTN
Index-code
BLD-CSTN-2-2
S No
Description
Unit
Quantity
10
BLD-CSTN-2-3
BLD-CSTN-2-4
11
12
13
BLD-CSTN-2-5
Kg
220.00
cum
cum
cum
0.90
0.45
0.90
cum
kl
0.45
1.20
hour
1.00
day
0.10
day
1.39
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
kg
275.00
cum
0.48
cum
0.54
cum
0.27
cum
0.09
kl
1.20
day
0.10
day
2.36
kg
162.00
cum
0.90
cum
0.45
cum
0.90
cum
0.45
kl
1.20
day
0.10
day
2.36
kg
162.00
cum
0.90
cum
0.45
cum
0.90
cum
0.45
kl
1.20
hour
1.00
661
BLD-CSTN
Index-code
S No
1
Description
Unit
Quantity
day
0.10
day
1.39
-
C. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Water Charges 1%
Grand Total
BLD-CSTN-2-6
14
15
BLD-CSTN-2-7
BLD-CSTN-2-8
BLD-CSTN-2-9
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
kg
129.60
cum
0.90
cum
0.45
cum
0.90
cum
0.45
kl
1.20
day
0.10
day
2.36
plinth level.
16
17
Unit = 1cum
A. MATERIALS:
Cement
Coarse aggregate 40 mm
Fine aggregate (Sand)
Seigniorage charges for C.A
Seigniorage charges for F.A
Water (including for curing)
B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity
C. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Grand Total
Plain Cement concrete (1:6:10) using 40 mm
metal with hand mixing upto Plinth level
Unit = 1cum
A. MATERIALS:
Cement
Coarse aggregate 40 mm
Fine aggregate (Sand)
Seigniorage charges for C.A
Seigniorage charges for F.A
Water (including for curing)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Grand Total
Plain Cement concrete (1:6:10) using 40 mm
metal with Concrete mixture upto Plinth level
Unit = 1cum
A. MATERIALS:
Cement
Coarse aggregate 40 mm
Fine aggregate (Sand)
Seigniorage charges for C.A
Seigniorage charges for F.A
Water (including for curing)
kg
129.60
cum
0.90
cum
0.45
cum
0.90
cum
0.45
kl
1.20
hour
1.00
day
0.10
day
1.39
kg
129.60
cum
0.90
cum
0.54
cum
0.90
cum
0.54
kl
1.20
day
0.10
day
2.36
kg
129.60
cum
0.90
cum
0.54
cum
0.90
cum
0.54
kl
1.20
662
BLD-CSTN
Index-code
S No
1
BLD-CSTN-2-10
BLD-CSTN-2-11
BLD-CSTN-2-12
18
19
20
Description
Unit
Quantity
hour
1.00
day
0.10
day
1.39
B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity
C. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Grand Total
Plain Cement concrete - Nominal Mix (1:3:6)
using 40mm metal with hand mixing
Unit : 1cum
A. MATERIALS:
Cement
Coarse aggregate 40mm
Fine aggregate (Sand)
Seigniorage charges for C.A
Seigniorage charges for F.A
Water (including for curing)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Grand Total
Plain Cement concrete (M 20) Nominal Mix using
40mm metal using concrete mixer
Unit : 1cum
A. MATERIALS:
Cement
Coarse aggregate 40mm graded
Fine aggregate (Sand)
Seigniorage charges for C.A
Seigniorage charges for F.A
Water (including for curing)
B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity
C. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Grand Total
Plain Cement concrete (M 15) Nominal Mix
1:2.5:5
Kg
220.00
cum
0.90
cum
0.45
cum
0.90
cum
0.45
kl
1.20
day
0.10
day
2.36
Kg
330.00
cum
0.90
cum
0.45
cum
0.90
cum
0.45
kl
1.20
hour
1.00
day
0.10
day
1.39
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
Kg
275.000
cum
0.540
cum
0.270
cum
0.090
cum
0.480
cum
0.900
cum
0.480
kl
1.20
hour
1.000
day
0.100
day
1.390
663
BLD-CSTN
Index-code
BLD-CSTN-2-13
S No
Description
Unit
Quantity
cum
cum
Kgs
0.900
0.450
400.000
day
day
day
0.133
0.267
3.600
hour
Liters
Liters
kl
1.000
0.133
0.667
1.200
cum
cum
Kgs
0.900
0.450
400.000
day
day
day
0.167
0.167
4.700
hour
kl
1.000
1.200
cum
cum
Kgs
0.900
0.450
400.000
day
day
day
0.067
0.133
2.500
hour
kl
0.267
1.200
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
A. MATERIALS:
20mm HBG graded metal
Sand
Cement
B. LABOUR:
1st Class Mason
2nd Class Mason
Mazdoor (Both Men and Women)
B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity
Cost of Diesel for Miller
Cost of Petrol for Vibrator
Water (including for curing)
BASIC COST per 1 cum
B
A. MATERIALS:
20mm HBG graded metal
Sand
Cement
B. LABOUR:
1st Class Mason
2nd Class Mason
Mazdoor (Both Men and Women)
B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity
Water (including for curing)
BASIC COST per 1 cum
C
A. MATERIALS:
20mm HBG graded metal
Sand
Cement
B. LABOUR:
1st Class Mason
2nd Class Mason
Mazdoor (Both Men and Women)
B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity
Water (including for curing)
BASIC COST per 1 cum
664
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
22
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
BLD-CSTN-2-14
cum
cum
day
day
day
h
0.80
0.40
0.133
0.267
4.600
1.333
kl
1.200
cum
cum
day
day
day
H
kl
0.80
0.40
0.167
0.167
5.600
1.333
1.200
cum
cum
day
day
day
h
kl
0.80
0.40
0.067
0.133
3.077
0.308
1.200
Grade
Kgs
M 20
350
M 25
M 30
M 35
M 40
380
400
420
430
665
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
23
BLD-CSTN-2-15
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
Unit : 1cum
A. MATERIALS:
Coarse aggregate 20mm graded
cum
0.80
cum
0.40
cum
0.80
cum
0.40
kl
1.20
hour
0.222
hour
0.222
Concrete Pump
C. LABOUR:
Mason 1st class
day
0.222
day
0.056
day
0.056
day
0.917
cum
0.80
cum
0.40
cum
0.80
cum
0.40
Unit : 1cum
A. MATERIALS:
Coarse aggregate 20mm graded
Fine aggregate (Sand)
Seigniorage charges for C.A
Seigniorage charges for F.A
Water (including for curing)
B. MACHINERY
Batching plant at 20 cum per hour
kl
1.20
hour
0.444
hour
0.444
Concrete Pump
C. LABOUR:
Mason 1st class
day
0.444
day
0.111
Mason 2 class
Mazdoor (unskilled)
Grand Total
RCC SLABS, BEAMS
Unit : 1cum
day
0.222
day
1.556
cum
0.80
cum
0.40
cum
0.80
cum
0.40
kl
1.20
nd
A. MATERIALS:
Coarse aggregate 20mm graded
Fine aggregate (Sand)
Seigniorage charges for C.A
Seigniorage charges for F.A
Water (including for curing)
666
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
hour
0.133
hour
day
0.133
0.133
day
0.033
Mason 2 class
Mazdoor (unskilled)
Grand Total
day
0.067
day
0.433
B. MACHINERY
Batching plant at 20 cum per hour
nd
Rate
Rs.
5
Grade
Kgs
M 20
M 25
M 30
M 35
M 40
350
Amount
Rs.
6
Remarks
7
380
400
420
430
24
BLD-CSTN-2-16
Description of Structure
Nil
for each
additional floor
(3.05 M) over
and above 2nd
floor (6.1 M)
Nil
1.333
Hrs
10%
0.267
Hrs
10%
kgs
cum
320.00
0.90
cum
cum
cum
L.S.
0.45
0.90
0.45
hour
1.00
Unit = 25 sqm
A. MATERIALS:
Cement
Coarse aggregate 12mm
Fine aggregate (sand)
Seigniorage charges of coarse aggregate
day
0.1
day
1.98
667
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
25
kgs
cum
cum
320.00
0.90
0.45
cum
cum
L.S.
0.90
0.45
hour
1.00
day
day
0.1
1.98
1.05
kg
6.00
day
day
2.00
BLD-CSTN-2-17
Unit = 20 sqm
A. MATERIALS:
Cement
Coarse aggregate 12mm
Fine aggregate (sand)
Seigniorage charges of coarse aggregate
1000 Unit = t
&
(a) Material
1200
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
6.40
1.025
each
70.000
Hr
10.00
kg
6.00
668
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
day
2.50
day
2.00
day
6.40
1.05
Binding wire
(b) Labour for cutting, bending, shifting to site,
tying and placing in position
kg
6.00
day
day
2.00
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
Unit = t
(a) Material
TMT bars including 2.5 per cent for wastage
Welding Electrodes @ 5 per joint (14 joints / ton)
Welding Charges (Hire charges of Welding Machine)
6.40
1.025
each
70.000
Hr
10.00
Binding wire
(b) Labour for cutting, bending, shifting to site,
tying and placing in position
kg
6.00
Welder
Blacksmith
Mazdoor (Unskilled)
(c) Overheads on (a+b)
(d) Contractors profit on (a+b+c)
Rate per t = a+b+c+d
28 Supplying,
fitting and placing MS bar
11.9 reinforcement in foundation complete as per
drawings and technical specifications for Bars
BLD-CSTN-2-20
below 36 mm dia including over laps and
wastage, where they are not welded
day
2.50
day
2.00
day
6.40
1.05
kg
6.00
day
day
2.00
1000 Unit = t
&
(a) Material
1200
6.40
669
BLD-CSTN
Index-code
S No
1
Description
Unit
Quantity
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
BLD-CSTN-3
BLD-CSTN-3-1
Unit = 1cum
A. MATERIALS:
Cement
Bricks traditional size 23 x 11 x 7 cms 2nd class
Fine aggregate (Sand)
Seigniorage charges for F.A
B. LABOUR:
Mason 1st class
Mason 2 class
Mazdoor (unskilled)
Grand Total
Note : For Bricks 2.4 % wastage taken.
nd
ii
96.00
512.00
0.20
cum
0.20
day
0.24
day
0.56
day
1.89
iii
kg
Nos
cum
kg
72.00
Nos
512.00
cum
0.20
cum
0.20
day
0.24
day
0.56
day
1.89
kg
57.60
Nos
cum
512.00
0.20
cum
0.20
day
0.24
day
0.56
day
1.89
670
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
iv
Unit = 1cum
A. MATERIALS:
Cement
Bricks traditional size 23 x 11 x 7 cms 2nd class
Fine aggregate (Sand)
Seigniorage charges for F.A
B. LABOUR:
Mason 1st class
Mason 2 class
Mazdoor (unskilled)
Grand Total
Brick Masonry in CM (1:3) with Bricks traditional
size 23 x 11 x 7 cms 1st Class
nd
Unit = 1cum
A. MATERIALS:
Cement
Bricks1st Class traditional size 23 x 11 x 7 cms
Fine aggregate (Sand)
Seigniorage charges for F.A
B. LABOUR:
Mason 1st class
kg
48.00
Nos
512.00
cum
0.20
cum
0.20
day
0.24
day
0.56
day
1.89
kg
36.00
Nos
512.00
cum
0.20
cum
0.20
day
0.24
day
0.56
day
1.89
kg
96.00
Nos
512.00
cum
0.20
cum
0.20
day
0.24
day
Mason 2nd class
day
Mazdoor (unskilled)
Grand Total
Note : 1. When Mortar mix is changed as CM 1:4, 1:5, 1:6
and 1:8, proportionate quantity of cement has to be
substituted. No change in other data.
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
0.56
1.89
2. When First class Modular Bricks are used provide 570 nos
bricks of size 19 x 9 x 9 cms.
671
BLD-CSTN
Index-code
BLD-CSTN-3-2
S No
Description
Unit
Quantity
30
kg
100.60
Amount
Rs.
6
Remarks
7
Unit = 1cum
A. MATERIALS:
Cement
Bricks modular size 19 x 9 x 9 cms 2nd class
Fine aggregate (Sand)
Seigniorage charges for F.A
B. LABOUR:
Mason 1st class
Mason 2 class
Mazdoor (unskilled)
Grand Total
Brick Masonry in CM (1:4) with Modular Bricks
19 x 9 x 9 cms 2nd class
nd
ii
Rate
Rs.
5
Nos
520.00
cum
0.21
cum
0.21
day
0.24
day
0.56
day
1.89
Unit = 1cum
A. MATERIALS:
Cement
Bricks modular size 19 x 9 x 9 cms 2nd class
Fine aggregate (Sand)
Seigniorage charges for F.A
B. LABOUR:
Mason 1st class
Mason 2 class
Mazdoor (unskilled)
Grand Total
Brick Masonry in CM (1:5) with Modular Bricks
19 x 9 x 9 cms 2nd class
nd
iii
kg
75.60
Nos
cum
520.00
0.21
cum
0.21
day
0.24
day
0.56
day
1.89
Unit = 1cum
A. MATERIALS:
Cement
Bricks modular size 19 x 9 x 9 cms 2nd class
Fine aggregate (Sand)
Seigniorage charges for F.A
B. LABOUR:
Mason 1st class
iv
kg
60.48
Nos
cum
520.00
0.21
cum
0.21
day
0.24
day
0.56
day
1.89
Unit = 1cum
A. MATERIALS:
Cement
Bricks modular size 19 x 9 x 9 cms 2nd class
Fine aggregate (Sand)
Seigniorage charges for F.A
B. LABOUR:
Mason 1st class
Mason 2 class
Mazdoor (unskilled)
Grand Total
Brick Masonry in CM (1:8) with Modular Bricks
19 x 9 x 9 cms 2nd class
nd
iv
kg
50.40
Nos
cum
520.00
0.21
cum
0.21
day
0.24
day
0.56
day
1.89
Unit = 1cum
A. MATERIALS:
Cement
Bricks modular size 19 x 9 x 9 cms 2nd class
kg
37.80
Nos
520.00
672
BLD-CSTN
Index-code
S No
Description
Unit
cum
0.21
cum
0.21
day
0.24
Mason 2 class
day
0.56
Mazdoor (unskilled)
Grand Total
11.5 cm wide Brick masonry for super-structure
on ground floor in cm (1:3) using second class
traditional size bricks including cost of all
materials, seigniorage charges, labour and all
operations for constructing half brick masonry,
mixing cement mortar, curing etc., complete for
finished item of work, but excluding conveyance
charges of materials.
day
1.89
nos
565.000
nd
31
BLD-CSTN-3-3
Quantity
unit:10sqm
A. MATERIALS:
Country bricks,
23x11x7cm
second
class
traditional
size
Cement
Sand
Seigniorage charges for sand
B. LABOUR:
Mason 1st class
Mason 2 class
Mazdoor (unskilled)
Add water charges 1%
nd
kg.
106.000
cum
0.220
cum
0.220
day
0.600
day
0.600
day
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
2.750
1.00%
Grand Total
32
BLD-CSTN-3-4
Ground Floor :
A. MATERIALS:
II Class Bricks
cum
512.000
C.M.(1:6)
cum
0.200
day
0.600
day
0.600
day
2.750
B. LABOUR:
Grand Total
33
BLD-CSTN-3-5
unit:1cum
A. MATERIALS:
673
BLD-CSTN
Index-code
S No
1
Description
2
Unit
Quantity
nos
kg.
520.000
48.00
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
674
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
Sand
Seigniorage charges for sand
B. LABOUR:
Mason 1st class
Mason 2nd class
cum
0.20
cum
0.20
day
0.57
day
0.57
Mazdoor (unskilled)
Add water charges 1%
day
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
2.54
1.00%
Grand Total
Note : Compressive strength of individual Brick shall
not be less than 70 kg / cm 2
34
BLD-CSTN-3-6
Nos.
525.00
cum
0.24
day
1.88
day
2.00
Grand Total
Note : 1 ) In case cement mortar 1:3 is used, proportionate rate is to be adopted.
2) Quantity of bricks for arches will be about 10 per cent more than that for ordinary
brickwork .
3) In case special arch bricks are used, the quantity of bricks per cum shall be taken as
580 Nos.
4) Rates for spandrel walls shall be taken same as for brickwork in substructure.
5) Rate for spandrel filling will depend on the filling material adopted
6) Compressive strength of individual Brick shall not be less than 70 kg / cm2
35
BLD-CSTN-3-7
36
BLD-CSTN-3-8
Nos.
750.00
cum
0.67
day
day
day
LS
6.60
2.41
6.21
LS
Nos.
790.00
cum
0.67
Mazdoor (Unskilled)
day
6.60
day
2.41
day
6.21
LS
LS
b) Labour
Mazdoor (Unskilled)
Mason (1st Class)
Mason (2nd Class)
White Washing 2 Coats
Grand Total
Honey Comb work with Bricks of Modular Size
and Plastered One Coat 10 mm. thick Cement
Mortar 1:5 including White Washing 2 Coats
Unit = cum
a) Material
b) Labour
Grand Total
675
BLD-CSTN
Index-code
S No
1
Unit
Quantity
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
BLD-CSTN-4
BLD-CSTN-4-1
Description
37
kg
115.20
cum
0.89
cum
0.16
cum
0.16
cum
0.16
day
day
1.05
2.45
day
3.50
day
2.80
BLD-CSTN-4-2
38
i
ii
iii
Unit = 1cum
A. MATERIALS:
Cement
Coursed Rubble Stone
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum
Fine aggregate (Sand)
Seigniorage charges for F.A
Seigniorage charges for Stone
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Grand Total
CRS Masonry in CM (1:3) 1st Sort
Unit = 1cum
A. MATERIALS:
Cement
Coursed Rubble Stone
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum
Fine aggregate (Sand)
Seigniorage charges for F.A
Seigniorage charges for Stone
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Grand Total
CRS Masonry in CM (1:4) 1st Sort
Unit = 1cum
A. MATERIALS:
Cement
Coursed Rubble Stone
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum
Fine aggregate (Sand)
Seigniorage charges for F.A
Seigniorage charges for Stone
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Grand Total
kg
201.60
cum
0.94
7Nos.
0.16
cum
0.28
cum
cum
0.28
1.10
day
day
2.50
2.32
kg
134.40
cum
0.94
7Nos.
0.16
cum
0.28
cum
cum
0.28
1.10
day
day
2.50
2.32
kg
100.80
cum
0.94
7Nos.
cum
0.16
0.28
cum
cum
0.28
1.10
day
day
2.50
2.32
676
BLD-CSTN
Index-code
S No
1
iv
Description
Unit
Quantity
39
kg
67.20
cum
0.94
7Nos.
cum
0.16
0.28
cum
cum
0.28
1.10
day
day
2.50
2.32
kg
76.80
cum
0.94
cum
0.16
cum
Fine aggregate (Sand)
cum
Seigniorage charges for F.A
cum
Seigniorage charges for Stone
B. LABOUR:
day
Mason 1st class
day
Mazdoor (unskilled)
Grand Total
Note : When Mortar mix is changed proportionate quantity of
cement has to be substituted. No change in other data.
BLD-CSTN-4-4
Remarks
7
Unit = 1cum
A. MATERIALS:
Cement
Coursed Rubble Stone
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum
40
Amount
Rs.
6
BLD-CSTN-4-3
Rate
Rs.
5
0.32
0.32
1.10
1.50
2.32
cum
0.94
Nos.
0.16
cum
0.30
day
3.00
day
2.43
BLD-CSTN-4-5
41
Unit = 1cum
A. MATERIALS:
Cement
kg
57.60
cum
0.89
cum
0.16
0.16
cum
0.16
677
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
day
5.05
Mason 2 class
Mazdoor (unskilled)
day
2.45
day
6.30
Centering Charges
LS
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
B. LABOUR:
nd
BLD-CSTN-4-6
42
Grand Total
Rubble Arch Work in Cement Mortar (1:4)
Unit = 1cum
A. MATERIALS:
Cement
Seleted Stone of sizes
(including Bond Stones)
Fine aggregate (Sand)
Seigniorage charges for F.A
as
per
specification
B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)
Centering Charges
43
BLD-CSTN-4-7
kg
cum
100.80
1.15
cum
cum
0.28
0.28
day
0.90
day
2.10
day
2.43
LS
Grand Total
Providing & Laying reinforced cement concrete
arch
complete
including
centering
and
shuttering excluding reinforcement as per
drawings and technical specifications Clauses
800, 900 and 1205.1
Unit = cum
RCC grade M20 nominal mix
a) Material
Cement
Coarse sand
20 mm aggregate
10 mm aggregate
b) Labour
Mason (1st Class)
Mazdoor (Unskilled)
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
0.40
cum
0.45
cum
0.54
cum
0.36
day
0.20
day
2.15
hour
0.40
II
Grand Total
RCC Grade M 25 (Design mix)
a) Material
Cement
Coarse sand
20 mm aggregate
10 mm aggregate
b) Labour
Mason (1st Class)
Mazdoor (Unskilled)
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
0.38
cum
0.45
cum
0.54
cum
0.36
day
0.20
day
2.15
hour
0.40
Grand Total
Note : The additional cost of centering and shuttering @ 50 per cent
of cost of material and labour shall hold good for arch spans of 6 m
and above. For lesser length of spans, the corresponding additional
cost can be taken as 40 per cent for spans above 4 m length and 30
per cent for spans less than 4 m.
678
BLD-CSTN
Index-code
S No
BLD-CSTN-4-8
44
BLD-CSTN-4-9
BLD-CSTN-4-10
45
46
Description
Unit
Quantity
RR Masonry in CM (1:6)
Unit = 1cum
A. MATERIALS:
kg
Cement
cum
CR Stone
cum
Rough Stone
cum
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum
cum
Fine aggregate (Sand)
cum
Seigniorage charges for F.A
cum
Seigniorage charges for Stone
B. LABOUR:
day
Mason 1st class
day
Mazdoor (unskilled)
Grand Total
RR Masonry in CM (1:8)
Unit = 1cum
A. MATERIALS:
kg
Cement
cum
CR Stone
cum
Rough Stone
cum
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum
cum
Fine aggregate (Sand)
cum
Seigniorage charges for F.A
cum
Seigniorage charges for Stone
B. LABOUR:
day
Mason 1st class
day
Mazdoor (unskilled)
Grand Total
Note : When Mortar mix is changed proportionate quantity of
cement has to be substituted. No change in other data
Dry Stone Masonry for Retaining Walls
Unit = 1cum
A. MATERIALS:
Rough Stone
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum
Seigniorage charges for Stone
B. LABOUR:
Mason 1st class
BLD-CSTN-4-11
47
0.50
0.16
0.33
0.33
1.10
1.20
2.00
59.40
0.44
0.50
0.16
0.33
0.33
1.10
1.20
2.00
cum
1.20
day
0.33
day
0.77
day
1.10
cum
cum
1.04
0.16
cum
1.20
day
0.45
Mason 2 class
Mazdoor (unskilled)
Grand Total
day
1.05
day
1.10
nd
Remarks
0.44
1.04
0.16
Mason 2 class
Mazdoor (unskilled)
Grand Total
Dry Stone Masonry for Well steining
Unit = 1cum
A. MATERIALS:
Rough Stone
Bond Stones
Amount
Rs.
6
79.20
cum
cum
nd
Rate
Rs.
5
679
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
48
10.50
cum
0.15
day
0.90
day
2.10
day
2.00
BLD-CSTN-4-12
A. MATERIALS:
Cuddapah / Shabad slabs 50 mm. thick
Cement Mortar 1:3
Seigniorage charges for Stone
B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)
Grand Total
Amount
Rs.
6
Remarks
7
POINTING
BLD-CSTN-5
BLD-CSTN-5-1
Rate
Rs.
5
49
BLD-CSTN-5-2
50
Mazdoor (unskilled)
Grand Total
Flush Pointing with CM (1:3) to RR Masonry
kg
14.40
cum
0.03
cum
0.03
day
0.50
day
0.74
Unit = 10 sqm
A. MATERIALS:
Cement
Fine aggregate (Sand)
Seigniorage charges for F.A
B. LABOUR:
Mason 2nd class
BLD-CSTN-5-3
BLD-CSTN-5-4
51
52
Mazdoor (unskilled)
Grand Total
Raised Pointing with CM (1:3) to RR Masonry
Unit = 10 sqm
A. MATERIALS:
Cement
Fine aggregate (Sand)
Seigniorage charges for F.A
B. LABOUR:
Mason 2nd class
Mazdoor (unskilled)
Grand Total
kg
14.40
cum
0.03
cum
0.03
day
0.50
day
0.74
kg
28.80
cum
0.06
cum
0.06
day
0.50
day
0.74
cum
0.038
day
day
1.460
2.260
680
BLD-CSTN
Index-code
S No
1
BLD-CSTN-6
BLD-CSTN-6-1
BLD-CSTN-6-2
BLD-CSTN-6-3
BLD-CSTN-6-4
BLD-CSTN-6-5
Description
Unit
Quantity
cum
0.15
cum
0.15
day
0.60
day
0.96
cum
0.15
cum
0.15
day
0.60
day
0.96
cum
0.150
cum
0.150
day
0.60
day
0.96
cum
0.15
cum
0.15
day
0.60
day
0.96
cum
0.15
cum
0.15
day
0.60
day
0.96
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
PLASTERING
53
54
55
56
57
681
BLD-CSTN
Index-code
S No
BLD-CSTN-6-6
58
BLD-CSTN-6-7
BLD-CSTN-6-8
59
60
61
BLD-CSTN-6-9
Description
Unit
Quantity
Unit = 10 sqm
A. MATERIALS:
cum
Cement Mortar (1:4)
cum
Seigniorage charges for F.A
B. LABOUR:
day
Mason 2nd class
day
Mazdoor (unskilled)
Grand Total
Plastering with CM (1:4), 20 mm thick
Unit = 10 sqm
A. MATERIALS:
cum
Cement Mortar (1:4)
cum
Seigniorage charges for F.A
B. LABOUR:
day
Mason 2nd class
day
Mazdoor (unskilled)
Grand Total
Plastering with CM (1:3), 20 mm thick
Unit = 10 sqm
A. MATERIALS:
cum
Cement Mortar (1:3)
cum
Seigniorage charges for F.A
B. LABOUR:
day
Mason 2nd class
day
Mazdoor (unskilled)
Grand Total
Note : When Mortar mix is changed proportionate quantity of
cement has to be substituted
Remarks
7
0.19
0.19
0.60
0.96
0.210
0.21
0.94
1.60
0.210
0.21
0.94
1.60
kg
43.00
cum
0.18
kg
14.50
cum
0.04
cum
0.22
day
0.63
day
Mason 2nd class
day
Mazdoor (unskilled)
Grand Total
Note : When Mortar mix is changed proportionate quantity of
cement has to be substituted
BLD-CSTN-6-10
Amount
Rs.
6
Unit = 10 sqm
A. MATERIALS:
Base Coat in CM(1:6), 16 mm thick
Cement
Fine aggregate (Sand)
Top Coat in CM(1:4), 4 mm thick
Cement
Fine aggregate (Sand)
Seigniorage charges for F.A
B. LABOUR:
Mason 1st class
62
Rate
Rs.
5
1.47
3.90
kg
31.70
cum
0.11
kg
19.20
cum
0.04
682
BLD-CSTN
Index-code
S No
Description
Unit
3
cum
0.15
day
0.63
day
Mason 2 class
day
Mazdoor (unskilled)
Grand Total
Note : When Mortar mix is changed proportionate quantity of
cement has to be substituted
nd
63
BLD-CSTN-6-11
Quantity
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
1.47
3.90
Unit - 10 sqm
A) MATERIALS
Rabbit wire mesh (1.0 M panna for 0.6 M drop)
Cement Mortar 1:3 for 25 mm thick
Dry Cement for making Lumps
12 mm Plastering 2 coats in 1:4 & 1:2 cm both sides
Excluding HYSD Steel/ Mild steel & Binding wire
B) LABOUR CHARGES
1st Class Mason
Miller Operator
Mazdoor (unskilled)
c) Machinery
Machine Mixing Mortar with Miller - Hire charges
sqm
13.30
cum
0.25
kg
50.00
sqm
21.80
day
8.00
day
1.00
day
10.00
32.00
Hrs
2.00
cum
0.110
BLD-CSTN-6-12
kg
52.800
cum
0.110
day
0.020
day
day
1.710
3.270
day
day
0.250
0.250
683
BLD-CSTN
Index-code
S No
1
Description
Unit
Quantity
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
684
BLD-CSTN
Index-code
BLD-CSTN-6-13
S No
Description
Unit
Quantity
65
cum
0.224
cum
0.100
kg
9.280
day
day
1.710
3.270
day
day
0.500
1.000
kg
6.000
kg
6.000
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
Carriage
Grounded hydrated lime
Carriage
Labour for backing coat and finishing coat
-Plaster work :
Mason, llnd class
Mazdoo (unskilled)
Add labour for dashing crushed stone
Mason 1st class
Mazdoo (unskilled)
Add for water charges @ 1 %
Cost for 10 sq.m.
Cost per sq.m
(b) Dark coloured finish using ordinary cement
and pigment
Details of cost for 10 sq.m.
Same rate as per (a) above item ()
Add cost of colour
Add for water charges @ 1 %
Add for contractor's profit and overheads
Cost for 10 sq.m.
Cost per sq.m
(c) Light coloured finish using white cement and
pigment
Details of cost for 10 sq.m.
Same rate as per (a) above item ()
Add cost of light colour
Add for water charges on cost of colour @ 1 %
Add for contractor's profit and overheads on cost of
colour and water charges
Cost for 10 sq.m.
Cost per sq.m
685
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
66
cum
kg
0.224
9.280
cum
0.100
day
day
1.710
3.270
day
day
0.500
0.610
cum
0.023
day
day
0.300
0.350
cum
0.023
day
day
0.300
0.350
cum
0.023
day
day
0.380
0.430
BLD-CSTN-6-14
Labour for backing coat and finishing coat :Mason llnd class
Mazdoor (unskilled)
Labour for pebble dashing
Mason llnd class
Mazdoor (unskilled)
Add for water charges @ 1 %
Cost for 10 sq.m.
Cost per sq.m
Plain Cement Mortar Bands :
67
BLD-CSTN-6-15
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
686
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
cum
0.224
day
day
2.200
2.700
cum
0.224
day
day
2.500
3.000
cum
0.224
day
day
3.000
3.500
cum
0.023
day
day
0.870
0.920
day
110.000
68
(A)
BLD-CSTN-6-16
(B)
(C)
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
BLD-CSTN-6-17
69
70
BLD-CSTN-6-18
687
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
cum
0.100
day
day
0.420
0.920
day
0.700
day
2.100
sqm
11.00
kg.
21.60
kg.
33.00
kg.
20.00
cum
0.12
cum
0.12
day
3.10
day
1.10
day
0.86
sqm
10.50
kg.
21.60
kg.
9.60
cum
0.12
cum
0.02
cum
0.14
day
0.960
day
2.240
day
3.30
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
B. LABOUR
Mason 1st class
Mason 2nd class
Man Mazdoor
Woman Mazdoor
Total
BLD-CSTN-7
FLOORING
71
BLD-CSTN-7-1
Mazdoor (unskilled)
Add water charges 1%
72
BLD-CSTN-7-2
Grand Total
Flooring
with
40
mm
thick
Rough
Cuddapah/Shabad stones, set over base coat of
cement mortar (1 : 8) 12 mm thick over CC bed
already laid or RCC roof slab, including pointing
with cement mortar 1:3 duly filling joints nearly,
including cost of all materials like flooring stone,
cement, sand, and water etc., complete,
including seigniorage charges, labour charges
for dressing of flooring stones etc., complete for
finished item of work, but excluding the cost of
conveyance of all materials.
Unit = 10 sqm
A. MATERIALS:
Rough Cuddapah/Shabad stones (40 mm thick)
(0.457 x 0.457 m)
688
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
689
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
73
sqm
10.10
kg.
48.00
kg.
33.00
kg.
cum
5.00
0.20
cum
0.20
day
1.00
day
2.10
day
3.00
day
5.00
sqm
10.05
kg.
28.80
kg.
33.00
kg.
6.00
BLD-CSTN-7-3
Unit = 10 sqm
A. MATERIALS:
Marble slab of size 0.305 M x 0.305 M
Cement for CM (1:6) proportion for base coat
Cement for slurry for bedding
White Cement for pointing
Sand for CM (1:6)
Seigniorage charges of sand
B. Machinery
Machine for rubbing of floor
C. LABOUR:
Mason 1st class
Mason 2 class
Mazdoor (unskilled)
nd
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
BLD-CSTN-7-4
Unit = 10 sqm
A. MATERIALS:
Chequerred terrazzo tiles of 22 mm thick (medium
shade)
kg.
cum
0.12
cum
0.12
day
0.960
day
2.240
day
3.30
Grand Total
690
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
75
sqm
10.10
kg.
21.60
kg.
33.00
kg.
6.000
BLD-CSTN-7-5
Unit = 10 sqm
A. MATERIALS:
Vitrified tiles of 1st quality of size
Cement for CM (1:8) for base coat
Cement for slurry
Cement for Pointing with CM (1:3)
Sand for CM (1:8)
Sand for pointing
Seigniorage charges of sand
B. LABOUR
Mason 1st class
Mason 2 class
Mazdoor (unskiled)
Add water charges 1%
nd
76
BLD-CSTN-7-6
cum
0.12
cum
0.020
cum
0.140
day
0.96
day
2.24
day
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
3.30
1.00%
Grand Total
Flooring with ceramic tiles, set over base coat of
cement mortar (1:8), 12 mm thick over CC bed
already laid or RCC roof slab, including neat
cement slurry of honey like consistency spread
@ 3.3.kgs per sqm & jointed neatly with white
cement paste to full depth mixed with pigment of
matching shade, including cost of all materials
like cement, sand water and tiles etc., complete,
including seigniorage charges, etc., complete for
finished item of work, but excluding the cost of
conveyance of all materials.
Unit = 10 sqm
A. MATERIALS:
Ceramic tiles
Cement for CM (1:8) for base coat
Cement for slurry
White cement
Sand for CM (1:8)
Seigniorage charges of sand
B. LABOUR
Mason 1st class
Mason 2nd class
Mazdoor (unskiled)
Add water charges 1%
Grand Total
sqm
10.10
kg.
21.60
kg.
33.00
kg.
2.00
cum
0.12
cum
0.12
day
0.96
day
2.24
day
3.30
1.00%
691
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
77
sqm
10.10
kg.
36.00
kg.
33.00
kg.
6.00
BLD-CSTN-7-7
Unit = 10 sqm
A. MATERIALS:
High polished granite 16 to 18 mm thick slab other
than black
Cement for CM (1:8) for base coat
Cement for slurry
White cement for jointing & pointing
Cement for jointing
Sand for CM (1:8)
Seigniorage charges of sand
B. LABOUR
Mason 1st class
Mason 2 class
Mazdoor (unskiled)
Add water charges 1%
nd
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
kg.
cum
0.20
cum
0.20
day
3.00
day
1.00
day
8.00
1.00%
Grand Total
78
BLD-CSTN-7-8
Unit = 10 sqm
A. MATERIALS:
Marble tiles polished 8 mm thick
Cement for CM (1:8) for base coat
Cement for slurry
White cement for jointing & pointing
Sand for CM (1:8)
Seigniorage charges of sand
B. LABOUR (including for polishing & rubbing)
Mason 1st class
Mazdoor (unskiled)
Add water charges 1%
sqm
10.10
kg.
36.00
kg.
33.00
kg.
5.00
cum
0.20
cum
0.20
day
4.00
day
8.00
1.00%
Grand Total
692
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
79
sqm
10.10
kg.
48.00
cum
0.20
cum
0.20
day
4.00
BLD-CSTN-7-9
Unit = 10 sqm
A. MATERIALS:
Granite stone tiles 8 mm thick (mirror polished of all
shades)
Cement for CM (1:6) for base coat
Sand for CM (1:6)
Seigniorage charges of sand
B. LABOUR
Mason 1st class
Mazdoor (unskiled)
Add water charges 1%
80
BLD-CSTN-7-10
day
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
8.00
1.00%
Grand Total
Flooring with decorated white back ground
glazed tiles, set over base coat of cement mortar
(1:6), 12 mm thick over CC bed already laid or
RCC roof slab, including neat cement slurry of
honey like consistency spread @ 3.3.kgs per
sqm & jointed neatly with white cement paste
mixed with pigment of matching shade to full
depth, including cost of all materials like cement,
sand water and tiles etc., complete, including
seigniorage charges, etc., complete for finished
item of work, but excluding the cost of
conveyance of all materials
Unit = 10 sqm
A. MATERIALS:
Decorated white back ground glazed tiles
sqm
kg.
10.10
28.80
kg.
33.00
kg.
6.00
cum
0.12
cum
0.12
day
0.96
day
2.24
day
3.30
1.00%
Grand Total
693
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
81
1000
Nos
0.255
kg.
21.600
kg.
6.000
10sqm
1.000
Deduct CM (1:3)
cum
0.040
cum
0.120
cum
0.120
day
0.960
day
2.240
BLD-CSTN-7-11
Unit = 10 sqm
A. MATERIALS:
20 X 20 cm pressed clay flooring tiles
Cement for CM (1:8) for base coat
Cement for jointing & pointing
Pointing with CM (1:3)
82
BLD-CSTN-7-12
day
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
4.30
1.00%
Unit = 10 sqm
A. MATERIALS:
Plain cement Tiles 20 x 20 cms
1000
Nos
0.255
kg.
21.600
kg.
6.000
10sqm
1.000
Deduct CM (1:3)
cum
0.040
cum
0.120
cum
0.120
day
0.960
day
2.240
day
3.30
1.00%
Grand Total
694
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
BLD-CSTN-7-13
Unit = 10 sqm
A. MATERIALS:
6mm to 12 mm H.G. Metal (Machine crushed)
Cement
Sand
Seigniorage charges of sand
B. LABOUR
Mason 1st class
Mason 2nd class
Mazdoor (unskiled)
Add water charges 1%
cum
0.17
kg
120.00
cum
0.085
cum
0.085
day
1.25
day
0.06
day
3.00
1.00%
Grand Total
84
BLD-CSTN-7-14
Unit = 10 sqm
A. MATERIALS:
Cement Concrete 1:6:10 using concrete mixer
Stone Chippings 3.34 mm - 10 mm
Cement
B. LABOUR
Mason 1st class
Mason 2 class
Mazdoor (unskiled)
Add water charges 1%
nd
85
BLD-CSTN-7-15
86
BLD-CSTN-7-16
cum
1.000
cum
0.250
kg
120.000
day
0.150
day
0.350
day
5.40
1.00%
Grand Total
Flooring with Cement Concrete 1:6:10, using
40mm metal, 100mm thick and plastered over
with 12 mm thick in CM(1:3)
Unit = 10 sqm
A. MATERIALS:
cum
Cement Concrete 1:6:10 using concrete mixer
10 sqm
Plastering with CM (1:3), 12 mm thick
Grand Total
Flooring with Cement Concrete 1:6:10, using
40mm metal, 100mm thick and plastered over
with 12 mm thick in CM(1:3) using Red oxid, with
polished surface
Unit = 10 sqm
A. MATERIALS:
Cement Concrete 1:6:10 using concrete mixer
Plastering with CM (1:3), 12 mm thick
1.00
1.00
cum
1.00
10 sqm
1.00
695
BLD-CSTN
Index-code
S No
Description
Red oxid
Unit
Quantity
kg
10.00
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
696
BLD-CSTN
Index-code
S No
1
87
BLD-CSTN-7-17
88
BLD-CSTN-7-18
Description
Unit
Quantity
Nos
1.10
kg
17.000
B. LABOUR
Masons for polishing
Grand Total
6 mm thick terrazzo flooring in situ with white,
black, chocolate, gray, yellow or green superior
marble chips, over 20 mm thick base coat of CM
(1:3) laid over CC bed already laid or RCC roof
slab, including cost of all materials like cement
marble powder, marble chips, sand & water etc.,
complete including polishing to get high smooth
finishing, seigniorage charges, etc., complete for
finished item of work, but excluding the cost of
conveyance of all materials
Unit = 10 sqm
A. MATERIALS:
Marble Powder
Marble Chips
Cement for top layer
Cement for base coat in CM (1:3)
Sand for base coat
Seigniorage charges of sand
B. MACHINERY
Polishing Charges
C. LABOUR
Mason 1st class
Mason 2nd class
Mazdoor (unskiled)
Grand Total
Providing skirting to internal walls to 15 cm
height/risers of steps with ceramic tiles 7.30 mm
thick length equal to flooring stones, set over
base coat of CM (1:3) 12 mm thick with cement
slurry of honey like consistency spread at the
rate of 3.30 kgs per sqm and jointed with white
cement paste mixed with pigment of matching
shade to full depth, including cost of all
materials like tiles, cement, sand and water etc.,
complete including seigniorage charges, etc.,
complete for finished item of work, but
excluding the cost of conveyance of all materials
Unit = 10 sqm
A. MATERIALS:
Ceramic tiles 7.30 mm thick
Sand for cm 1:3 base coat
Cement for cm 1:3 base coat
Cement for slurry
White cement for jointing & pointing
Seigniorage charges of sand
B. LABOUR
Mason 1st class
Mazdoor (unskiled)
Grand Total
cum
0.060
kg.
50.000
kg.
96.000
cum
0.200
cum
0.200
sqm
10.000
day
0.960
day
2.240
day
3.30
sqm
10.00
cum
0.12
kgs
57.60
kgs
33.00
kgs
6.00
cum
0.12
day
0.77
day
0.80
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
697
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
89
sqm
10.10
BLD-CSTN-7-19
Unit = 10 sqm
A. MATERIALS:
Marble slabmm thickness
Sand for base coat
Cement for base coat
Cement for slurry
White cement for jointing & pointing
Flate nosing charges
Machine cutting charges
Seigniorage charges of sand
B. LABOUR
Mason Ist class
Man mazdoor (Beldar)
Man mazdoor (Beldar) for polishing & rubbing
Woman mazdoor
Grand Total
90
BLD-CSTN-7-20
cum
0.12
kg
57.60
kg
33.00
kg
5.00
RM
66.67
RM
67.67
cum
0.12
day
2.10
day
4.90
day
4.00
day
4.00
sqm
cum
kgs
kgs
kgs
cum
10.10
0.12
34.56
33.00
2.00
0.12
day
day
day
0.96
2.24
3.30
1.00%
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
Unit = 10 sqm
A. MATERIALS:
Vitrified tiles polished 1st quality
Sand for cm 1:5 base coat
Cement for cm 1:5 base coat
Cement for slurry
White cement for jointing & pointing
Seigniorage charges of sand
B. LABOUR
Mason Ist class
Mason 2nd class
Mazdoor (unskilled)
Add water charges 1%
Grand Total
698
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
91
sqm
10.10
cum
kgs
0.12
57.60
kgs
kgs
cum
33.00
5.00
0.12
day
day
2.10
0.80
4.90
1.00%
sqm
10.10
cum
kgs
kgs
cum
0.12
57.60
33.00
0.12
day
day
day
0.96
2.24
3.10
1.00%
BLD-CSTN-7-21
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
BLD-CSTN-7-22
Grand Total
Providing skirting to internal walls to 15 cm
height/risers of steps with 25 mm thick polished
Cuddapah stone length equal to flooring stones,
set over base coat of CM (1:3) 12 mm thick with
cement slurry of honey like consistency spread
at the rate of 3.30 kgs per sqm and jointed with
white cement paste mixed with pigment of
matching shade to full depth, including cost of
all materials like Cuddapah stone, cement, sand
and water etc., complete including seigniorage
charges, etc., complete for finished item of work,
Grand Total
699
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
93
sqm
10.10
cum
kgs
kgs
0.12
57.60
33.00
cum
0.12
day
0.96
2.24
3.10
1.00%
BLD-CSTN-7-23
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
Unit = 10 sqm
A. MATERIALS:
25 mm thick polished Shahabad stone (White)
Sand for cm 1:3 base coat
Cement for cm 1:3 base coat
Cement for slurry
Seigniorage charges of sand
B. LABOUR
Mason Ist class
Mason 2nd class
Mazdoor (unskiled)
Add water charges 1%
day
Grand Total
Note : When Mortar mix is changed proportionate quantity of
cement has to be substituted for all Skirting Items.
94
BLD-CSTN-7-24
cum
0.44
100 Nos
3.00
B. LABOUR
day
Carpenters 1st Class
day
Carpenters 2nd Class
day
Man mazdoor
Note : Deduct 4.3 Nos Carpenters if plank rate is for tongued
and grooved ready planned.
1.95
4.55
5.40
Grand Total
700
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
95
cum
1.53
day
1.10
day
0.50
kgs
103.09
nos
47.91
BLD-CSTN-7-25
Unit = 10 sqm
A. MATERIALS:
Gravel (including 2% wastage)
B. LABOUR
Man mazdoor
Woman mazdoor
Grand Total
BLD-CSTN-8
Amount
Rs.
6
Remarks
7
BLD-CSTN-8-1
Rate
Rs.
5
nos
nos
43.90
nos
91.82
Bitumen washers
Zinc cromate yellow paint
Ready mixed paint
B. LABOUR
For roofing
Carpenter II class
Man mazdoor (beldar)
For premier painting one coat
Painter
Mazdoor (coolie)
For two coats of painting to over laps
Painter
Mazdor (coolie)
nos
91.82
litre
0.14
litre
0.20
day
0.84
day
0.91
day
0.06
day
0.06
day
0.14
day
0.14
LS
LS
Grand Total
Rate per 10 sqm = Grand Total/10
701
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
97
BLD-CSTN-8-2
884 +
Bitumen washers
Zinc cromate yellow paint
Ready mixed paint
B. LABOUR
For roofing
Carpenter II class
Man mazdoor (beldar)
For premier painting one coat
Painter
Mazdoor (coolie)
For two coats of painting to over laps
Painter
Mazdor (coolie)
Grand Total
98
BLD-CSTN-8-3
kgs
126.07
nos
47.91
nos
43.90
nos
91.82
nos
91.82
litre
0.14
litre
0.20
day
0.84
day
0.91
day
0.06
day
0.06
day
0.14
day
0.14
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
884 + 810
kgs
154.80
nos
47.91
nos
43.90
nos
91.82
nos
91.82
litre
0.14
litre
0.20
day
0.84
day
0.91
day
0.06
day
0.06
702
BLD-CSTN
Index-code
BLD-CSTN-8-4
S No
Description
Unit
Quantity
day
0.14
day
0.14
99
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
0.15
22.03
22.03
22.03
0.43
0.54
LS
Grand Total
Rate per 10 sqm = Grand Total/10
BLD-CSTN-8-5
100 Best Tiled Roofing with Pan tiles over Flat Tiles
196 and Lime mortar Borders including Teak
Reapers.
Unit = 10 sqm
A. MATERIALS:
Pan Tiles 230 x (140 + 130)/2, 12 mm thick
1000 No
1560
1000 No
470
10RM
kgs
cum
cum
75.000
0.500
0.008
0.300
day
day
day
day
LS
0.800
2.200
1.100
5.400
LS
cum
cum
cum
0.500
1.000
1.000
Teak Reepers 50 x 12 mm
Wire Nails 40 mm long
Lime
Lime Mortar
B. LABOUR
Carpenter
Bricklayers
Man mazdoor
Woman mazdoor
Sundries including tarring reepers, extra labour / for
pointing the underside of flat tiles and white washing
the same.
Grand Total
Sub Analysis :
Lime Moratar 1:2
lime
Sand
Grinding Lime Mortar
Total
703
BLD-CSTN
Index-code
BLD-CSTN-8-6
S No
Description
Unit
Quantity
1000 No
1560
10RM
kgs
cum
107.000
0.700
0.120
day
day
day
day
1.100
1.400
1.100
3.200
Unit = 10 sqm
A. MATERIALS:
Pan Tiles 230 x (140 + 130)/2, 12 mm thick
1000 No
1560
RM
25
100 No
150
Bamboo mats
10 sqm
10.500
cum
0.120
day
day
day
day
1.100
1.400
1.100
3.200
1000 No
160
1000 No
470
10RM
kgs
cum
cum
75.000
0.500
0.008
0.380
day
day
day
day
LS
0.800
1.600
1.100
4.300
LS
Remarks
7
mm. centres
Teak Reepers 50 x 12 mm
Wire Nails 40 mm long
Lime Moratar
B. LABOUR
Carpenter
Bricklayers
Man mazdoor
Woman mazdoor
Grand Total
102 Best Tiled Roofing with Pan tiles laid on Bamboo
198 Rafters, Bamboo Reepers and Bamboo Mats,
BLD-CSTN-8-8
Amount
Rs.
6
Unit = 10 sqm
A. MATERIALS:
Pan Tiles 230 x (140 + 130)/2, 12 mm thick
BLD-CSTN-8-7
Rate
Rs.
5
Reepers
Unit = 10 sqm
A. MATERIALS:
Teak Reepers 50 x 12 mm
Wire Nails 40 mm long
Lime
Lime Moratar
B. LABOUR
Carpenter
Bricklayers
Man mazdoor
Woman mazdoor
Sundries including tarring reepers iron wind ties 30 x
3 mm, G.I. Screw, washers etc., and extra labour for
pointing the underside of flat tiles and white washing
the same.
Grand Total
704
BLD-CSTN
Index-code
BLD-CSTN-8-9
S No
Description
Mangalore
Unit
Quantity
1000 No
160
10RM
36.000
kgs
cum
0.500
0.090
day
day
day
day
0.500
0.500
1.100
2.200
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
tiles
Unit = 10 sqm
A. MATERIALS:
Mangalore tiles (vide Stadard Specification)
BLD-CSTN-8-10
Teak Reepers 50 x 12 mm
Wire Nails 50 mm long
Lime Moratar
B. LABOUR
Carpenter
Bricklayers
Man mazdoor
Woman mazdoor
Grand Total
105 Best Tiled Roofing with Mangalore tiles over
201 Ceiling Tiles with Air Spaces and including Teak
Reepers
Unit = 10 sqm
A. MATERIALS:
Rate for "Best Mangalore tiled roofing
Mangalore tiles including teak reeper".
with 10 sqm
Add
Terracing tiles
B. LABOUR
Bricklayers
Woman mazdoor
Grand Total
10.000
100 No
156
day
day
0.500
1.100
cum
cum
cum
LS
0.670
1.000
1.000
cum
cum
cum
0.180
0.080
0.023
day
day
LS
3.200
6.500
LS
Sub Analysis :
Lime Mortar (1: 1.5) :
Unit = 1 cum
BLD-CSTN-8-11
Lime
Fine Sand
Grinding Mortar (Spl Grinding)
Sundries
Total
106 Plastering with Lime Mortar 3 Coats, 25 mm
thick (Sebara Rendering)
Unit = 10 sqm
Lime Mortar (1:2)
Lime Mortar (1:1.5)
Lime
LABOUR
Bricklayers
Mazdoor (unskilled)
Sundries
Total
705
BLD-CSTN
Index-code
BLD-CSTN-8-12
S No
Description
Unit
Quantity
Unit = 10 sqm
A. MATERIALS:
Terracing Bricks 150 x 75 x 25mm
1000 No
2000
100 No
900
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
cum
Broken brick 20 mm cube
cum
Lime
cum
Lime Moratar
Pointing with cement mortar 1:3 (for rate - vide 10 sqm
relevant schedule item)
0.980
cum
0.240
B. LABOUR
Bricklayers
Mazdoor (unskilled)
Grand Total
day
day
4.300
6.500
0.380
0.210
1.000
Note : The quantity proposed for broken brick allows for the
brick powder formed, replacing sand for concrete layers.
BLD-CSTN-8-13
100 No
10.000
900
cum
Cement Mortar 1:3
Pointing with cement mortar 1:3 (for rate - vide 10 sqm
relevant schedule item)
B. LABOUR
day
Bricklayers
day
Woman mazdoor
LS
Sundries including crude oil
Grand Total
Sub Analysis :
RCC (M 20) using 20 mm HG graded metal using
Concrete mixturefor Roofing 125 mm thick
0.260
1.000
cum
1.250
10 sqm
1.000
A. MATERIALS:
Rate of "Reinforced cement Concrete Roofing 125 mm 10 sqm
thick and 2 courses of Flat Tiles at Top including pointing
with Cement Mortar (1:3)"
1.000
Add :
For extra thickness of roofing slab
Grand Total
0.150
2.200
2.200
Form Work
Total
BLD-CSTN-8-14
cum
706
BLD-CSTN
Index-code
BLD-CSTN-8-15
S No
Description
Unit
Quantity
Remarks
7
Add :
For extra thickness of roofing slab
Grand Total
cum
1.000
0.250
BLD-CSTN-8-17
Amount
Rs.
6
BLD-CSTN-8-16
Rate
Rs.
5
Deduct :
For Less thickness of roofing slab
Grand Total
112 Reinforced cement Concrete Roofing 100 mm
207 thick with CC (M 20) using 20 mm graded metal
with Imprevious Coat with 12 mm thick
Plastering in CM (1:3) with 1 kg. of Impermo
Compound or ACCO Proof per Bag of Cement
and laid when slab is Green.
cum
1.000
0.250
Unit = 10 sqm
Reinforced Concrete Roofing slab 100 mm thick (for 10 sqm
rate - vide relevant schedule item)
1.000
Centering Charges
10 sqm
1.000
10 sqm
1.000
kgs
1.500
Impermo Compound
Grand Total
Note for Items 204 - 207 :
1. No extra rate will be paid for finishing the bottom
surface of the roofing slab as described in SS No.
"For estimating purpose the extra allowance for
camber concrete, when such is required may be
given under sundries."
707
BLD-CSTN
Index-code
BLD-CSTN-8-18
S No
Description
Unit
Quantity
1000 No
450
Amount
Rs.
6
Remarks
7
Unit = 10 sqm
A. MATERIALS:
Flat Tiles 150 x 150 x 15 mm
cum
Cement Mortar 1:3
Pointing with cement mortar 1:3 (for rate - vide 10 sqm
relevant schedule item)
B. LABOUR
Bricklayers
Man Mazdoor
day
day
BLD-CSTN-8-19
Rate
Rs.
5
Sub Analysis :
Mazdoor (unskilled)
Mate
Sundries including crude oil
Grand Total
114 Best Sloping Bengal Terrace with 3 courses of
209 Flat Tiles at Top including Teak Wood Reepers
0.110
1.000
1.100
1.100
1.000
Day
Day
LS
Unit = 10 sqm
A. MATERIALS:
Flat Tiles 150 x 150 x 15 mm
1000 No
1350
cum
cum
10 RM
0.008
0.150
75.000
kgs
Wire Nails 40 mm long
Plastering with lime mortar 3 coats (for rate - vide 10 sqm
relevant schedule item)
0.500
1.000
Lime
Lime Moratar (1:1.5)
Teak Reepers 52 x 12 mm
B. LABOUR
Carpenter
Bricklayers
Woman mazdoor
Sundries including tarring reepers
Grand Total
day
day
day
LS
0.800
2.200
2.200
708
BLD-CSTN
Index-code
BLD-CSTN-8-20
S No
Description
Unit
Quantity
1000 No
1560
cum
0.120
day
day
day
LS
1.400
1.100
4.300
day
day
1.100
0.800
10 sqm
1.000
Amount
Rs.
6
Remarks
7
BLD-CSTN-8-21 116
213
117
BLD-CSTN-8-22 214
Lime Moratar
B. LABOUR
Bricklayers
Man Mazdoor
Woman mazdoor
Sundries
Grand Total
Shifting Pan Tiles (Labour Only)
Unit = 10 sqm
Bricklayers
Man Mazdoor
Grand Total
Shifting Pan Tilesand forming new White
Washed Lime Mortar Boarders, 230 x 50 mm at 2
Metres Intervals
Unit = 10 sqm
Rate of "Shifting Pan Tiles"
BLD-CSTN-8-23
Rate
Rs.
5
LS
cum
0.132
100 No
300
day
day
LS
6.500
5.400
Unit = 10 sqm
Rate for "12 mm. Teak Wood Plank Ceiling Tongued 10 sqm
and Grooved Planking"
10.000
10 RM
66.000
100 No
240
day
LS
1.100
Deduct :
Carpenter
Sundries
Grand Total
709
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
cum
0.210
kg
2.000
day
0.660
day
1.540
day
3.70
sqm
11.00
day
2.50
day
2.00
sqm
11.00
day
2.50
day
2.00
sqm
11.00
day
2.50
day
2.00
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
BLD-CSTN-8-25
BLD-CSTN-8-26
BLD-CSTN-8-27
BLD-CSTN-8-28
B. LABOUR
Carpenter Ist class
Man mazdoor
Grand Total
123 Providing & fixing flat pressed 3 layer medium
density particle board sheet with necessary nails
etc., complete, excluding the cost of frame work
for base and cost of conveyance of all materials
Unit = 10 sqm
A. MATERIALS:
Standard quality of flat pressed 3 layer medium density
board sheet 4.50 mm thick
B. LABOUR
Carpenter Ist class
Man mazdoor
Grand Total
710
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
sqm
11.00
day
2.50
day
2.00
cum
0.05
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
BLD-CSTN-8-29
BLD-CSTN-8-30
Unit = 10 sqm
A. MATERIALS:
Wooden strips 1st class BT wood 25 x 6 mm size
Nails
Rabbit wire mesh
Plaster of paris
B. LABOUR
for Jointing the wooden strips including fixing
the rabbit mesh
Carpenter Ist class
Man mazdoor (beldar)
For doing plaster of paris over wooden strips
Mason Ist class
Mason IInd class
Mazdoor (unskilled)
Grand Total
Gypboard Suspended false ceiling
BLD-CSTN-8-31
kg
0.75
sqm
10.20
kg
219.76
day
2.60
day
1.60
day
2.62
day
1.62
day
377.00
sqm
1.03
UNIT -1 sqm
A) Material requirement as per India Gypsum
12.5 mm Gypboard
1219 mm x 1829 mm size Boards
711
BLD-CSTN
Index-code
S No
1
Description
Unit
Quantity
RM
Nos
0.64
1.84
RM
2.30
RM
0.84
RM
Nos
0.40
0.64
Nos
Nos
Kgs
0.64
18.00
0.55
RM
Lits
1.46
0.15
day
day
day
day
day
day
day
0.40
0.40
0.08
0.08
0.04
0.08
0.24
Hrs
Hrs
0.32
0.64
1%
sqm
1.00
RM
0.40
RM
1.60
RM
1.60
RM
Nos
Nos
1.28
1.28
1.28
Ceiling Angle
25 mm x 10 mm x 0.55 mm
Connecting Clips
Ceiling Section
51.5 mm x 26 mm x 10.5 mm x 0.55 mm thick
Intermediate Channel
45 mmx 15 mm x 15 mm x 0.9 mm
Perimeter Channel
20 mm x 27 mm x 30 mm(web) of 0.55 mm thick
Rawl Plug
Soffit Cleats
Drywall Screws - 25 mm
Jointing Compound
Jointing Paper Tape
Drywall Top Coat
B) LABOUR CHARGES
1st Class Carpenter
2nd Class Carpenter
1st Class Painter
2nd Class Painter
Power Saw Cutter - Hand Operated - Operator
Power Drill - Hand Operated - Operator
Unskilled Mazdoor
C) Machinery
Power Saw Cutter - Hand Operated - Hire charges
Power Drill - Hand Operated - Hire Charges
Scaffolding charges
BASIC COST per 1 sqm
Gyp Board Fine Line Grid false ceiling
BLD-CSTN-8-32
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
127 Supplying and fixing Gyp Board Fine Line Grid false ceiling
(GS-FLC-4.6 as per India Gypsum) in size 600 mm x 600
mm using 12.5 mm thick/ 9.5 mm thick Gyp Board sheet
tiles of size 595 mm x 595 mm or 595 mm x 1195 mm
conforming to IS 2095 - 1982 fixing to Gyp steel precoated
GI wall angle of size 25 mm x 25 mm x of 0.70 mm thick
along the perimeter of ceiling screw fixed to brick work/
partition at 610 mm c/c and suspending the frame work
using precoated GI Tee section (24 mm x 38 mm x 0.7
mm) from soffit at 1220 mm c/c fixed with GI Soffit Cleat,
rawl plugs and steel expansion fasteners & connecting clip
to the GI T section with 4 mm dia GI Rod with galvanised
spring steel level clip of PVC unversal holding clips system
at 1200 mm c/c and fixing the 12.5 mm / 9.5 mm
Gypboard Sheet tiles of size 595 mm x 595 mm or 595 mm
x 1195 mm and finishing two coats of drywall topcoat
complete for finished item of work as per Idia Gypsum Ltd
specification.
UNIT -1 sqm
A) Material requirement as per India Gypsum
12.5 mm / 9.5 mm - Gypboard Tiles
Either - 595 mm x 595 mm Or - 595 mm x 1195 mm GI Angle - Precoated
25 mm x 25 mm x 0.7 mm
GI - Precoated - T Section - 3600 mm long
24 mm x 38 mm x 0.7 mm thick
GI - Precoated - T Section - 600 mm long
24 mm x 38 mm x 0.7 mm thick
GI Rod - 4 mm Dia
Connecting Rod
Rawl Plug
Soffit Cleats
712
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
Nos
5.36
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
713
BLD-CSTN
Index-code
S No
Description
BLD-CSTN-8-33
Unit
Quantity
Lits
0.15
day
day
day
day
day
0.40
0.40
0.08
0.08
0.04
day
day
0.04
0.24
Hrs
0.32
Hrs
0.32
1%
sqm
1.00
RM
0.40
RM
1.60
RM
1.60
RM
Nos
1.28
1.28
day
day
day
day
day
day
day
0.40
0.40
0.08
0.08
0.04
0.04
0.24
Hrs
Hrs
0.32
0.32
1%
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
UNIT 1 sqm
A) Material requirement
15 mm - Armstrong Mineral Fiber sheet 600 x 600
Hotdipped GI Angle - Precoated - Grid
19 mm x 19 mm
Polyster painted GI - T Section - 1200 mm
(1) 24 x 32 mm and (2) 24 x 25 mm (sub-cross Tee)
Polyster painted GI - T Section - 300 mm
24 mm x 27 mm
GI Rod - prestraightened - 2.0 mm dia
Connecting Rod
6 mm Nylon Rawl Plug
B) LABOUR CHARGES
PER UNIT 1 sqm
1st Class Carpenter
2nd Class Carpenter
1st Class Painter
2nd Class Painter
Power Saw Cutter - Hand Operated - Operator
Power Drill - Hand Operated - Operator
Unskilled Mazdoor
C) Machinery
Power Saw Cutter - Hand Operated - Hire charges
Power Drill - Hand Operated - Hire Charges
Scaffolding charges
BASIC COST per 1 sqm
714
BLD-CSTN
Index-code
S No
1
Description
Unit
Quantity
sqm
1.00
RM
0.40
RM
3.20
Nos
1.28
Nos
1.28
day
day
day
day
day
day
day
0.36
0.36
0.00
0.00
0.02
0.04
0.20
Hrs
Hrs
0.16
0.32
1%
cum
0.005
L.S
day
day
LS
0.11
0.22
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
BLD-CSTN-8-34
UNIT 1 sqm
A) Material requirement
15 mm/ 19 mm Thermocole sheet 600 x 600
Alumninium Angle
24 mm x 24 mm
Anodised Aluminium T Section
(1) 24 x 24.5 x 2.4 mm mm
GI Rod - prestraightened - 2.0 mm dia
Connecting Rod
Rawl Plugs
B) LABOUR CHARGES
1st Class Carpenter
2nd Class Carpenter
1st Class Painter
2nd Class Painter
Power Saw Cutter - Hand Operated - Operator
Power Drill - Hand Operated - Operator
Unskilled Mazdoor
C) Machinery
Power Saw Cutter - Hand Operated - Hire charges
Power Drill - Hand Operated - Hire Charges
Scaffolding charges
BASIC COST per 1 sqm
BLD-CSTN-9
BLD-CSTN-9-1
715
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
cum
0.007
L.S
day
day
0.160
0.32
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
BLD-CSTN-9-2
LS
BLD-CSTN-9-3
cum
0.009
L.S
day
day
day
day
day
LS
0.220
0.43
133 White
BLD-CSTN-9-4
cum / kg
1.20
day
day
0.11
0.22
0.50%
716
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
cum / kg
2.00
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
134 White
BLD-CSTN-9-5
Unit: 10 sqm
A. MATERIALS :
Whiting / White Cement
L.S
day
0.210
day
0.320
1.00%
cum / kg
2.800
BLD-CSTN-9-6
Unit: 10 sqm
A. MATERIALS :
Whiting / White Cement
BLD-CSTN-9-7
0.300
0.430
1.000
BLD-CSTN-9-8 137
BLD-CSTN-9-9
10 sqm
1.000
kg
1.340
day
day
0.500
1.300
1.000%
717
BLD-CSTN
Index-code
BLD-CSTN-9-10
S No
Description
Unit
Quantity
kg
1.700
day
1.200
1.000%
Lts
Nos
Nos
Lts
Nos
Nos
0.50
0.08
0.19
1.70
0.36
0.84
kg
1.00
day
0.700
0.500%
kg
2.000
day
day
0.300
1.500
1.000%
kg
3.500
day
day
0.500
1.500
1.000%
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
Unit: 10 sqm
A. MATERIALS :
Distemper
B. LABOUR
Painter
Sundries including brushes, ladders, etc.,
Total cost for 10 sqm
PAINTING & VARNISHING
BLD-CSTN-10
BLD-CSTN-10-1
PRIMARY COAT:
Cost of Primer
Painter I st class
Pianter Iind class
Cost of washable Oil Bound Distemper
1st class painter
II class painter
Total cost
141 Painting, Priming Coat on New Plastered Surface
BLD-CSTN-10-2 270
Unit: 10 sqm
A. MATERIALS :
Cement Primer
B. LABOUR
Painter
Sundries including brushes, soaps, putty etc.,
Total cost for 10 sqm
142 Painting Walls with Snowcem or other equal and
BLD-CSTN-10-4
Unit: 10 sqm
A. MATERIALS :
Cement Paint at 5 sqm., per kg
B. LABOUR
Painter
Mazdoor (unskilled)
Sundries including brushes, etc.,
Total cost for 10 sqm
143 Painting Walls with Snowcem or other equal and
285 approved Water Proof Cement Paint over
Priming Coat, 2 Coats (All Colours)
Unit: 10 sqm
A. MATERIALS :
Cement Paint at 3 sqm., per kg
B. LABOUR
Painter
Mazdoor (unskilled)
Sundries including brushes, etc.,
Total cost for 10 sqm
718
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
kg
day
1.00
0.21
day
kg
0.49
3.50
day
day
day
0.15
0.35
1.50
0.700
day
0.700
1.000%
0.70
day
0.70
L
L
0.800
0.600
day
day
0.700
0.700
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
BLD-CSTN-10-5
BLD-CSTN-10-6 268
Unit: 10 sqm
A. MATERIALS :
Wood Primer
B. LABOUR
Painter
Sundries including brushes, soap, putty etc.,
Total cost for 10 sqm
146 Painting, Priming Coat on New Iron Work
BLD-CSTN-10-7 269
Unit: 10 sqm
A. MATERIALS :
Red Oxide Primer
B. LABOUR
Painter
Sundries including brushes, soap, putty etc.,
Total cost for 10 sqm
A. MATERIALS :
Varnish
Linseed Oil - boiled
B. LABOUR
Painter
Man Mazdoor
Sundries including brushes,fuel, size etc.,
Total cost for 10 sqm
719
BLD-CSTN
Index-code
BLD-CSTN-10-9
S No
Description
Unit
Quantity
L
L
1.200
1.100
day
day
1.100
1.100
kg
1.600
day
0.700
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
Unit: 10 sqm
A. MATERIALS :
Varnish
Linseed Oil - boiled
B. LABOUR
Painter
Man Mazdoor
Sundries including brushes,fuel, size etc.,
Total cost for 10 sqm
149 Painting with Ready mixed oil paint (all colours)
BLD-CSTN-10-10 256
to
265 i. One Coat - New Wood Work :
ii
iii
iv
Unit: 10 sqm
A. MATERIALS :
Ready mixed paint
B. LABOUR
Painter
Sundries including brushes, soap, putty etc.,
Total cost for 10 sqm
Two Coats - New Wood Work :
Unit: 10 sqm
A. MATERIALS :
Ready mixed paint
B. LABOUR
Painter
Sundries including brushes, soap, putty etc.,
Total cost for 10 sqm
One Coat - Old Wood Work & New Iron Work :
Unit: 10 sqm
A. MATERIALS :
Ready mixed paint
B. LABOUR
Painter
Sundries including brushes, soap, putty etc.,
Total cost for 10 sqm
Two Coats - Old Wood Work & New Iron Work:
Unit: 10 sqm
A. MATERIALS :
Ready mixed paint
B. LABOUR
Painter
Sundries including brushes, soap, putty etc.,
Total cost for 10 sqm
One Coat - Old Iron Work :
Unit: 10 sqm
A. MATERIALS :
Ready mixed paint
B. LABOUR
Painter
Sundries including brushes, soap, putty etc.,
Total cost for 10 sqm
LS
kg
2.800
day
LS
1.200
kg
1.500
day
0.700
LS
kg
2.4.
day
LS
1.200
kg
1.200
day
LS
0.700
720
BLD-CSTN
Index-code
S No
1
vi
vii
viii
Description
Unit
Quantity
kg
2.100
day
LS
1.100
kg
3.400
day
1.500
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
LS
kg
3.900
day
LS
1.600
0.500
day
0.700
0.400
day
0.700
0.900
day
1.200
ii
iii
721
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
iv
0.800
day
1.200
0.800
day
1.100
0.700
day
1.100
1.200
day
1.600
1.100
day
1.500
0.700
day
0.700
A. MATERIALS :
Plastic Emulsion paint (at 20 sqm / litre as per
British Paints (I) Ltd.
B. LABOUR
Painter
B. LABOUR
Painter
B. LABOUR
Painter
B. LABOUR
Painter
Sundries including brushes, soap, putty etc.,
Total cost for 10 sqm
Plastic Emulsion paints - Three Coats for Old
Iron Work :
A. MATERIALS :
Plastic Emulsion paint (at 20 sqm / litre as per
British Paints (I) Ltd.
B. LABOUR
Painter
BLD-CSTN-10-12
151
i
viii
Remarks
vii
Amount
Rs.
6
New
A. MATERIALS :
Plastic Emulsion paint (at 20 sqm / litre as per
British Paints (I) Ltd.
vi
Rate
Rs.
5
722
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
ii
0.500
day
0.700
1.200
day
1.200
1.100
day
1.200
1.100
day
1.100
0.900
day
1.100
1.700
day
1.600
A. MATERIALS :
Synthetic Enamel paint (at 20 sqm / litre as per
British Paints (I) Ltd.
iii
iv
B. LABOUR
Painter
Sundries including brushes, soap, putty etc.,
Total cost for 10 sqm
Painting with Synthetic Enamel paints - Two
Coats - for New Wood Work
A. MATERIALS :
Synthetic Enamel paint (at 20 sqm / litre as per
British Paints (I) Ltd.
B. LABOUR
Painter
Sundries including brushes, soap, putty etc.,
Total cost for 10 sqm
Painting with Synthetic Enamel paints - Two
Coats - For Old Wood Work
A. MATERIALS :
Synthetic Enamel paint (at 20 sqm / litre as per
British Paints (I) Ltd.
B. LABOUR
Painter
Sundries including brushes, soap, putty etc.,
Total cost for 10 sqm
Painting with Synthetic Enamel paints - Two
Coats - For New Iron Work
A. MATERIALS :
Synthetic Enamel paint (at 20 sqm / litre as per
British Paints (I) Ltd.
B. LABOUR
Painter
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
vii
B. LABOUR
Painter
Sundries including brushes, soap, putty etc.,
Total cost for 10 sqm
Painting with Synthetic Enamel paints - Three
Coats - for New Wood Work
A. MATERIALS :
Synthetic Enamel paint (at 20 sqm / litre as per
British Paints (I) Ltd.
B. LABOUR
Painter
Sundries including brushes, soap, putty etc.,
Total cost for 10 sqm
723
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
viii
1.600
day
1.500
kg
0.500
day
0.800
day
LS
0.800
0.650
day
day
LS
0.800
0.800
kg
L
0.228
1.630
day
LS
3.200
cum
1.000
day
day
17.700
8.800
LS
A. MATERIALS :
Synthetic Enamel paint (at 20 sqm / litre as per
British Paints (I) Ltd.
B. LABOUR
Painter
Sundries including brushes, soap, putty etc.,
Total cost for 10 sqm
152 Polishing on wood work with readymade wax
BLD-CSTN-10-13
polish of approved brand and manufacture
New Work :
A. MATERIALS :
Readymade wax polish
B. LABOUR
Painter
Healper
Sundries including brushes, soap, cloth etc.,
Total cost for 10 sqm
BLD-CSTN-10-14
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
coat)
New Work :
A. MATERIALS :
Melamine polish
B. LABOUR
Painter
Healper
Sundries for Spraying Machine etc.,
Total cost for 10 sqm
154 French Spirit polishing Two or more coats on
BLD-CSTN-10-15
new works including a coat of wood filler.
A. MATERIALS :
Shellac
Spirit
B. LABOUR
Painter
Sundries such as pigment, terpentaine, sand paper, putty,
wood filler, white woolen cloth, linseed oil, cotton etc.,
BLD-CSTN-11
BLD-CSTN-11-1
WOOD
WORK,
ALUMINUM
WINDOWS, VENTILATORS Etc.,
DOORS,
724
BLD-CSTN
Index-code
BLD-CSTN-11-2
S No
Description
Unit
Quantity
cum
1.000
day
day
17.700
8.800
LS
cum
1.000
day
17.700
day
8.800
Unit = 1 cum
Materials :
Teak wood large scantlings over 2 m and below 3 m
in length
BLD-CSTN-11-5
Remarks
Labour :
Carpenter
Man Mazdoor
Sundries including nails, screws etc.,
Cost per cum
BLD-CSTN-11-4
Amount
Rs.
6
Unit = 1 cum
Materials :
Teak wood large scantlings over 2 m and below 3 m
in length
BLD-CSTN-11-3
Rate
Rs.
5
Labour :
Carpenter
Man Mazdoor
Sundries including nails, screws etc.,
Cost per cum
158 Best Teak Wood wrought and put up for trusses
including straps and all iron work (Schedule
Item No 289)
Unit = 1 cum
Materials :
Teak wood large scantlings
Iron Work (average)
Labour :
Carpenter
Man Mazdoor
Sundries including nails, screws etc.,
Cost per cum
159 Fully Panelled doors - External or Internal Moulded panels (Schedule Item No 290)
A
i
Single Shutter
800 x 2000 mm
*Teak wood
Labour, wrought and putup in position frame &
shutters
LS
cum
1.000
kg
112.000
day
26.500
day
8.800
LS
cum
0.083
sqm
1.600
ii
LS
cum
0.088
sqm
1.800
725
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
iii
1100 x 2000 mm
*Teak wood
Labour, wrought and putup in position frame &
shutters
cum
0.109
sqm
2.200
iv
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
LS
cum
0.123
sqm
2.520
cum
0.094
sqm
1.890
vi
LS
cum
0.159
sqm
3.600
LS
cum
0.096
sqm
1.800
cum
0.104
sqm
2.000
cum
0.134
sqm
2.860
iii
726
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
iv
1400 x 2300 mm
*Teak wood
Labour, wrought and putup in position frame &
shutters
cum
0.147
sqm
3.220
cum
0.068
sqm
0.720
sqm
1.600
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
BLD-CSTN-11-6
Single Shutter
800 x 2000 mm
*Teak wood
Five - Ply - Ply - Wood brich
Labour, wrought and putup in position frame &
shutters
Sundries inclusive of holdfasts and all wind
appliances (Vide relevant standard specification)
ii
LS
cum
0.071
sqm
0.870
sqm
1.800
cum
0.100
sqm
1.160
sqm
2.520
iii
LS
1300 x 2200 mm
*Teak wood
Five - Ply - Ply - Wood brich
Labour, wrought and putup in position frame &
shutters
Sundries inclusive of holdfasts and all wind
appliances (Vide relevant standard specification)
cum
0.106
sqm
1.390
sqm
2.860
cum
0.077
sqm
0.880
sqm
1.890
LS
727
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
vi
1000 x 2100 mm
*Teak wood
Five - Ply - Ply - Wood brich
Labour, wrought and putup in position frame &
shutters
cum
0.091
sqm
0.880
sqm
2.100
cum
0.082
sqm
0.710
sqm
1.800
*Teak wood
cum
0.088
sqm
0.820
sqm
2.000
*Teak wood
cum
0.090
sqm
sqm
0.940
2.200
*Teak wood
cum
0.123
sqm
sqm
1.900
3.600
cum
sqm
sqm
0.130
1.280
3.600
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
B
i
1000 x 2000 mm
1100 x 2000 mm
1400 x 2300 mm
1500 x 2400 mm
*Teak wood
Five - Ply - Ply - Wood brich
Labour, wrought and putup in position frame &
shutters
Sundries inclusive of holdfasts and all wind appliances
(Vide relevant standard specification)
728
BLD-CSTN
Index-code
BLD-CSTN-11-7
S No
Description
Unit
Quantity
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
cum
0.072
sqm
0.470
sqm
1.600
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
Item 292)
BLD-CSTN-11-8
293)
BLD-CSTN-11-9
294)
A
Single Shutter
800 x 2000 mm
*Teak wood
Glass
Labour, wrought and putup in position frame &
shutters
Sundries inclusive of putty, brads, hold fasts and all
wind
appliances
(Vide
relevant
standard
specification)
ii
LS
cum
0.076
sqm
0.560
sqm
1.800
LS
1200 x 2100 mm
*Teak wood
Glass
Labour, wrought and putup in position frame &
shutters
Sundries inclusive of putty, brads, hold fasts and all
wind
appliances
(Vide
relevant
standard
specification)
iv
cum
0.106
sqm
0.760
sqm
2.520
LS
cum
0.115
sqm
0.870
sqm
2.860
LS
729
BLD-CSTN
Index-code
S No
1
Description
Unit
Quantity
cum
0.087
sqm
0.420
sqm
1.800
Double Shutter
900 x 2000 mm
*Teak wood
Glass
Labour, wrought and putup in position frame &
shutters
Sundries inclusive of putty, brads, hold fasts and all
wind
appliances
(Vide
relevant
standard
specification)
ii
iii
iv
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
LS
cum
0.092
sqm
0.510
sqm
2.000
LS
cum
0.096
sqm
0.600
sqm
2.200
LS
cum
0.123
sqm
1.060
sqm
3.220
LS
cum
0.130
sqm
1.280
sqm
3.600
LS
730
BLD-CSTN
Index-code
BLD-CSTN-11-10
S No
Description
Unit
Quantity
*Teak wood
Labour, wrought and putup in position frame &
shutters
cum
0.107
sqm
2.000
LS
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
BLD-CSTN-11-11
296)
i
ii
1000 x 2000 mm
cum
0.127
sqm
2.520
LS
BLD-CSTN-11-12
166 Country
1000 x 2000 mm
Country wood
Labour, wrought and putup in position frame &
shutters
Sundries inclusive of putty, brads, hold fasts and
wind appliances and screws for planks (Vide
standard specification)
ii
cum
sqm
0.107
2.000
LS
cum
0.127
sqm
2.520
LS
BLD-CSTN-11-13
Each Door
BLD-CSTN-11-14
Single Shutter :
800 x 2000 mm
*Teak wood
Labour, wrought and putup in position frame &
shutters
cum
0.083
sqm
1.600
LS
LS
731
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
ii
1000 x 2100 mm
*Teak wood
Labour, wrought and putup in position frame &
shutters
cum
0.100
sqm
2.100
LS
LS
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
BLD-CSTN-11-15
ii
800 x 2000 mm
Country wood
Labour, wrought and putup in position frame &
shutters
cum
0.083
sqm
1.600
LS
LS
cum
0.100
sqm
2.100
LS
LS
BLD-CSTN-11-16
Single Shutter :
i
900 x 2000 mm
*Teak wood
Flush Shutter 35mm thick (Vide relevant standard
specification)
Labour, wrought and putup in position frame &
shutters
cum
0.035
sqm
1.530
sqm
1.800
732
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
ii
1000 x 2100 mm
*Teak wood
Flush Shutter 35mm thick (Vide relevant standard
specification)
cum
0.037
sqm
1.820
sqm
2.100
cum
0.028
sqm
0.390
sqm
0.720
cum
0.037
sqm
0.500
sqm
0.960
cum
0.041
sqm
0.700
sqm
1.200
cum
0.061
sqm
0.710
sqm
1.440
cum
0.072
sqm
0.920
sqm
1.800
cum
0.059
sqm
0.970
sqm
1.700
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
Single Shutter :
600 x 1200 mm
*Teak wood
Glass
Labour, wrought and putup in position frame &
shutters
Sundries inclusive of putty, brads, hold fasts and wind
appliances (Vide standard specification)
ii
ii
iii
iv
733
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
each
each
each
each
each
each
each
each
each
each
cum
0.039
sqm
0.720
cum
0.043
sqm
0.840
cum
0.051
sqm
0.960
cum
0.059
sqm
1.200
cum
0.081
sqm
1.440
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
A
i
Single Shutter
600 x 1200 mm
*Teak wood
Labour, wrought and putup in position frame &
shutters
LS
LS
B
i
ii
iii
734
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
iv
900 x 1200 mm
**Teak wood
Labour, wrought and putup in position frame &
shutters
cum
0.056
sqm
1.080
cum
0.036
sqm
0.070
sqm
0.720
cum
0.052
sqm
0.100
sqm
1.080
cum
0.077
sqm
0.120
sqm
1.440
cum
0.094
sqm
0.150
sqm
1.800
each
each
each
each
each
each
each
each
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
BLD-CSTN-11-22
307)
A
Single Shutter
600 x 1200 mm
**Teak wood
Glass
Labour, wrought and putup in position frame &
shutters
Sundries inclusive of putty, brads, hold fasts and
wind appliances (Vide standard specification)
B
i
ii
735
BLD-CSTN
Index-code
BLD-CSTN-11-24
S No
Description
Unit
Quantity
cum
0.034
sqm
0.720
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
iii
iv
LS
cum
0.048
sqm
0.960
LS
cum
0.052
sqm
1.080
LS
cum
0.052
sqm
1.200
LS
BLD-CSTN-11-25
800 x 500 mm
*Teak wood
Glass
Wire netting
Labour, wrought and putup in position
Sundries inclusive of putty brads and iron hold fasts where
such are necessary say in 30 cm wall.
ii
iii
cum
0.012
sqm
0.240
sqm
0.190
sqm
0.400
LS
cum
0.014
sqm
0.310
sqm
0.240
sqm
0.500
LS
cum
0.018
sqm
0.480
sqm
0.290
sqm
0.720
LS
736
BLD-CSTN
Index-code
BLD-CSTN-11-26
S No
Description
Unit
Quantity
cum
0.021
sqm
0.190
sqm
0.400
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
313)
i
800 x 500 mm
*Teak wood
Glass
Labour, wrought and putup in position frame &
shutters
Sundries inclusive of putty brads sash centres brass
ring iron cleats and window card - vide relevant
standard specifications.
ii
iii
LS
cum
0.025
sqm
0.024
sqm
0.500
LS
cum
0.030
sqm
0.390
sqm
0.720
LS
BLD-CSTN-11-27
Unit - 1 sqm
A) MATERIAL REQUIREMENT
ALUMINIUM SECTION
GLAZING with GLASS
SILICON SEALANT
RUBBER BEADING
B) LABOUR CHARGES
1st Class Carpenter
2nd Class Carpenter
Power Saw Cutter - Hand Operated - Operator
Power Drill - Hand Operated - Operator
Unskilled Mazdoor
C) Machinery
Power Saw Cutter - Hand Operated - Hire charges
Power Drill - Hand Operated - Hire Charges
Supervision Charges
Power charges for Motors
BASIC COST per 1 sqm
day
0.947
day
1.158
day
0.105
day
0.211
day
0.632
Hrs
0.842
Hrs
1.684
Nos
0.211
1%
737
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
BLD-CSTN-11-28
Unit - 1 sqm
A) MATERIAL REQUIREMENT
ALUMINIUM SECTION
PARTICLE BOARD - Prelaminated
GLAZING with GLASS
SILICON SEALANT
RUBBER BEADING
as per design
as per design
as per design
B) LABOUR CHARGES
day
1.042
day
1.042
day
0.104
day
0.139
day
0.347
Hrs
0.833
Hrs
1.111
Nos
0.174
1%
Unit - 1 sqm
A) MATERIAL REQUIREMENT
ALUMINIUM SECTION
GLAZING with GLASS
SILICON SEALANT
RUBBER BEADING
as per design
as per design
Alum.Anodised.PC Handles
B) LABOUR CHARGES
1st Class Carpenter
2nd Class Carpenter
as per design
as per design
as per design
as per design
day
0.360
day
1.081
738
BLD-CSTN
Index-code
S No
Description
BLD-CSTN-11-30
Unit
Quantity
day
0.360
day
0.360
day
1.081
Hrs
2.883
Hrs
2.883
Nos
0.360
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
1%
UNIT 1 sqm
A) MATERIAL REQUIREMENT
ALUMINIUM SECTION
GLAZING with GLASS
SILICON SEALANT
RUBBER BEADING
Alum.Anodised.PC Handles
as per design
as per design
as per design
as per design
as per design
B) LABOUR CHARGES
day
0.347
day
1.042
day
0.347
day
0.347
day
1.042
Hrs
2.778
Hrs
2.778
Nos
0.347
1%
739
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
BLD-CSTN-11-31
UNIT 1 sqm
A) MATERIAL REQUIREMENT
ALUMINIUM SECTION
GLAZING with GLASS
SILICON SEALANT
RUBBER BEADING
Alum.Anodised.PC Handles
Hydraulic Floor Spring/ Door Closure
B) LABOUR CHARGES
1st Class Carpenter
2nd Class Carpenter
Power Saw Cutter - Hand Operated - Operator
Power Drill - Hand Operated - Operator
Unskilled Mazdoor
C) Machinery
Power Saw Cutter - Hand Operated - Hire charges
Power Drill - Hand Operated - Hire Charges
Supervision Charges
Power charges for Motors
BASIC COST per 1 sqm
187 Removing white wash or colour wash by steel wire
brushing and/or scraping; sand papering and
preparing the wall surface smooth including
BLD-CSTN-11-32
necessary repairs to scratches complete
Details of cost for 10 sq.m
Labour :
White washer / Mason 2nd Class
Mazdoor (unskilled)
Sundries such as sand paper and scraper etc.
Scaffolding
Add for water charges @ 1 %
Add for contractor's profit and overheads
Cost for 10 sq.m.
Cost per sq.m
188 Removing white wash or colour wash by steel wire
brushing and/or scraping; sand papering and
preparing the ceiling and/or sloping roofs surface
BLD-CSTN-11-33
smooth including necessary repairs to scratches
complete
Deatailed cost for 10 sqm
Rate as per above item
as per design
as per design
as per design
as per design
as per design
as per design
day
0.417
day
0.833
day
0.417
day
0.417
day
1.250
Hrs
3.333
Hrs
3.333
Nos
0.417
1%
day
day
0.010
0.170
10 sqm
740
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
10 sqm
day
0.080
BLD-CSTN-11-35
10 sqm
BLD-CSTN-11-36
day
day
0.010
0.170
day
day
0.010
0.170
BLD-CSTN-11-37
BLD-CSTN-11-38
741
BLD-CSTN
Index-code
S No
1
BLD-CSTN-12
BLD-CSTN-12-1
Unit
Quantity
day
1.220
day
2.440
day
4.880
day
4.320
day
4.090
day
day
0.500
0.500
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
and
disposal
materials within 100 metres lead
ii
iii
BLD-CSTN-12-2
Description
of unserviceable
Lime concrete.
Details of cost for 1 cu.m.
Labour :Mazdoor (unskilled)
Sundries
Add for water charges @ 1 %
Cost per cu m
Unreinforced cement concrete upto 15 cm
thicknes
Details of cost for 1 cu.m.
Labour :Mazdoor (unskilled)
Sundries
Add for water charges @ 1 %
Cost per cu m
Unreinforced cement concrete more than 15 cm
thickness
BLD-CSTN-12-3
Reinforced
area considering
cuttings 0.01 Sq.m. reinforcement
Blacksmith 2nd class
Mazdoor (Male)
Sundries
Add for water charges @ 1 %
Cost per sq m
1% Labour for
742
BLD-CSTN
Index-code
S No
1
Description
Unit
Quantity
day
day
0.100
0.200
day
0.050
day
day
0.130
0.270
day
0.070
day
day
0.060
0.120
day
day
0.080
0.160
3.150
day
day
day
0.090
0.250
0.250
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
197 Dismantling
BLD-CSTN-12-4
BLD-CSTN-12-5
ii
ii
BLD-CSTN-13
BLD-CSTN-13-1
743
BLD-CSTN
Index-code
BLD-CSTN-13-2
S No
Description
Unit
Quantity
3.150
day
day
day
0.090
0.250
0.250
day
day
1.000
0.100
1.310
day
day
day
0.100
0.400
0.400
1.310
day
day
0.100
0.400
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
BLD-CSTN-13-3
BLD-CSTN-13-4
Cement Mortar
Labour :Mason, II Class
Mazdoor (male)
Add for water charges @ 1 %
Cost for 3 m
Cost per m
202 Providing and fixing 25 mm bore galvanised M.S.
tube (light grade) outlet in cement mortar 1:3(1
cement: 3 fine sand) including cutting and making
good the wall
Details of cost for 10 pipes 12.5 cm long day i.e.,
1.25 metres
Materials:
Galvanised mild steel tube (light grade) 25 mm
nominal bore 10 x 12.5 cm = 1.25 metre with
wastage of 5%
Labour :For cutting and fixing in position
Assistant fitter
Mason.
Mazdoor (male).
Sundries
Add for water charges @ 1 %
Cost for 1.25 m
Cost per m
203 Providing and fixing 1.80 metre long RCC fencing
BLD-CSTN-13-5
744
BLD-CSTN
Index-code
BLD-CSTN-13-6
S No
Description
Unit
Quantity
day
0.400
cum
0.336
kg
26.440
cum
0.336
sqm
9.880
day
day
day
0.120
0.120
0.250
10 sqm
1.000
Mazdoor (male).
Sundries
Add for water charges @ 1 %
Cost for 1.25 m
Cost per m
204 Providing and fixing 1.80 metre long RCC fencing
posts with 6 mm bar bibs as per design in plate No.
22/2/2. (earth work & concrete to be paid for
separately)
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
cum
0.025
cum
30.000
745
BLD-CSTN
Index-code
S No
1
Description
Unit
Quantity
kg
9.380
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
0.2770*
3x0.165x0.75=0.3712
0.165x0.165=0.0272
0.10 x 0.10=0.0100/0.6992 Sq.m..
For ten posts=10 x 0.6992 = 6.992 Sq.m.
Quantity
of
surface
plaster
12.50+7.60+7.60=27.70 Cm.
xr=3.1416x5=15.71Cm./43.41Cm
1.05=0.4560 Sq.m.
4x0.165x0.75=0.4950
0.165x0.165=0.0272
0.10 x 0.10=0.0100/0.9882 Sq.m.
posts = 10 x 0.9882=9.88 Sq.m.
area
0.434
For 10
BLD-CSTN-13-7
BLD-CSTN-13-8
LS
day
day
day
0.150
0.150
0.300
kg
cum
19.500
0.040
day
day
0.080
0.160
746
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
Lit
4.100
Liters
0.41
BLD-CSTN-14
BLD-CSTN-14-1
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
ANTE-TERMITE TREATMENT
207 Providing Antitermite treatment as per IS 6315 (Part - 2)
2001 (Pre-constructional chemical treatment measures)
along the internal & external vertical faces of the columns,
plinth beams, basement and top surface of the basement
filling below flooring bed as per the specified procedure
conforming to IS 6315 (Part-2) 2001 and other relevant
approved specification duly using Chlorpyriphos/ Lindane
emulsifiable concentrate 20% with 1% concentration @ 7.5
Liters/ sqm of the vertical surface & @ 5.0 Liters/ sqm of
the horizontal surface of the substructure to a depth of 500
mm around columns & 300 mm deep around plinth beams,
basements & floor filling area including excavation channel
along the wall & rodding etc & cost & conveyance of all
materials to the site, cost of labour for spraying, rodding
etc complete for finished item of work as per the approval
of the Engineer-in-Charge
Unit = 10 sqm
A) Chlorpyriphos/ Lindane emulsifiable concentrate of
20%
Man Mazdoor
Sprayer
D) Hire charges
4.51
1%
day
day
3.0
0.22
10%
3%
1.50%
Add OH & CP
BASIC COST per 1 sqm
Note: CPWD - Rate Analysis per 9 Sqm
BLD-CSTN-15
BLD-CSTN-15-1
Vertical
Chloropyriphos
Earthwork excavation
Beldar
Horizontal
Chloropyriphos
Vertical
Beldar
Hire charges
Sprayer, drilling machine etc
sundries & contingencies
Water charges & electricity
Add OH & CP
CENTERING, FORM WORK etc.
208 Providing traditional centering, shuttering and
scaffolding using Cashewrina balli props and
bracings supporting wooden brackets, wooden wall
plates, wooden runners and steel plate form work as
per the approved plan and other accessories as per
the standard trade practice including hire charges
for ballies, runners, wooden members and cost and
conveyance of all other consumable accessories,
taxes etc complete for finished item of work
(I)
Lit
cum
Nos
Lit
Nos
Nos
UNIT 1 sqm
Unsupported Roof Height up to - 3.66 M (12'0")
A) MATERIAL REQUIREMENT
747
BLD-CSTN
Index-code
S No
1
Description
2
Unit
Quantity
Nos
2.40
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
748
BLD-CSTN
Index-code
S No
1
(II)
Description
2
Nos
1.44
Nos
1.44
RM
sqm
16.00
1.86
B) LABOUR CHARGES
1st Class Carpenter
2nd Class Carpenter
Unskilled Mazdoor
Supervision Charges
Consumables like Rope, Nails, de-shuttering oil
Tape, cover plates
Tools like Hammers etc.,
BASIC COST per 1 sqm
Unsupported Roof Height up to - 4.60 M (15'0")
A) MATERIAL REQUIREMENT
Supervision Charges
Consumables like Rope, Nails, de-shuttering oil
Tape, cover plates
Tools like Hammers etc.,
BASIC COST per 1 sqm
(III) Unsupported Roof Height up to - 7.30 M (24'0")
A) MATERIAL REQUIREMENT
Cashewrina Balli Props - 3" to 4" dia - 12'-0" Height
Wall Plate Brackets / beam bottom supports
Wedge Plate fixture
Runner beams of approximately 4" x 4" size
Steel Plate - form work plates B) LABOUR CHARGES
1st Class Carpenter
2nd Class Carpenter
Unskilled Mazdoor
Supervision Charges
Consumables like Rope, Nails, de-shuttering oil
Tape, cover plates
Tools like Hammers etc.,
BASIC COST per 1 sqm
209 Providing rigid Steel centering, shuttering and
scaffolding using steel pipes, adjustable Jack screw
props, acro spans, couplers, tie rods, bracings
members, supporting brackets, acro span beams
and steel plate/ ply-wood form work as per the
approved shuttering designs & plan and other
accessories as per the IS Norms and stability
calculations including hire charges for jack pipes,
acro spans, runners, wooden members and cost and
conveyance of all other consumable accessories,
taxes etc complete for finished item of work
(I)
Quantity
BLD-CSTN-15-2
Unit
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
0.00
day
day
day
day
0.16
0.28
0.48
0.04
1%
1%
1%
Nos
4.32
Nos
1.44
Nos
1.44
RM
sqm
16.00
1.86
Nos
0.20
Nos
Nos
0.36
0.68
Nos
0.06
1%
1%
1%
Nos
Nos
Nos
RM
sqm
5.76
1.44
1.44
16.00
1.86
Nos
Nos
Nos
Nos
0.28
0.52
1.08
0.08
1%
1%
1%
UNIT 1 sqm
Unsupported Roof Height up to - 3.66 M (12'0")
A) MATERIAL REQUIREMENT
Jack Screw Adjsutable Props - 50 mm dia B Class
Pipes
749
BLD-CSTN
Index-code
S No
1
Description
Unit
Quantity
Kgs
62.51
day
day
0.22
0.38
day
day
0.72
0.04
1%
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
(II)
B) LABOUR CHARGES
1st Class Carpenter
2nd Class Carpenter
Unskilled Mazdoor
Supervision Charges
Consumables like Rope, Nails, de-shuttering oil
Tape, cover plates
Tools like Hammers etc.,
BASIC COST per 1 sqm
Unsupported Roof Height up to - 7.32 M (24'0")
A) MATERIAL REQUIREMENT
Heavy Frames - 50 mm dia B Class Pipes (HD
Towers)
Span Beams - 2.4 M Long (Acro Spans) Approximtely
1%
1%
Kgs
112.635
day
0.32
day
0.52
day
1.28
day
0.06
1%
1%
1%
750
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
Note : Cost of Centering charges with different centering & scaffolding materials for
different structures may be calculated as per the guidelines given Below
TYPE OF STRUCTURE
UNIT
COS
CENTERING AREA T OF
CEN
TERI
NG
A
B
RCC
STRUCT
URE UNIT
MEASUR
EMENT
C
FOOTINGS
3.88 sqm
per 1 cum
PEDESTALS
6.17 sqm
per 1 cum
PLINTH BEAMS
9.35 sqm
per 1 cum
LINTELS
7.94 sqm
per 1 cum
CHAJJAS - SUNSHADES
1.22 sqm
per 1 sqm
COLUMNS
11.15 sqm
per 1 cum
BEAMS
9.35 sqm
per 1 cum
1.05 sqm
per 1 sqm
1.09 sqm
per 1 sqm
1.14 sqm
per 1 sqm
3.85 sqm
per 1 sqm
2.70 sqm
per 1 sqm
10.63 sqm
per 1 cum
10.78 sqm
per 1 cum
DOME SLABS
17.19 sqm
per 1 cum
HELICAL STAIRCASES
1.31 sqm
per 1 sqm
For calculating centering charges of RCC Structures, using either cashewrina balli
scaffolding or steel pipe scaffolding, the respective cost may be arrived by taking the
above
values.
Therefore,
Centering charges for any structure:C= A x B
210 Providing STAGE SCAFFOLD with staging using
BLD-CSTN-15-3
(I)
UNIT 1 sqm
Unsupported Roof Height up to - 3.66 M (12'0")
A) MATERIAL REQUIREMENT
Cashewrina Balli Props - 3" to 4" dia - 12'-0" Height
Scaffold Boards - Bamboo scaffolds - Bamboos 8'0" long
B) LABOUR CHARGES
1st Class Carpenter
2nd Class Carpenter
Unskilled Mazdoor
Supervision Charges
Consumables like Rope, Nails, de-shuttering oil
Nos
2.40
Nos
2.70
day
0.04
day
0.30
day
0.48
day
0.04
1%
751
BLD-CSTN
Index-code
S No
Description
Unit
(II)
B) LABOUR CHARGES
1st Class Carpenter
2nd Class Carpenter
Unskilled Mazdoor
Supervision Charges
Consumables like Rope, Nails, de-shuttering oil
Tape, cover plates
Tools like Hammers etc.,
BASIC COST per 1 sqm - PLAN AREA
(III) Unsupported Roof Height up to - 7.30 M (24'0")
A) MATERIAL REQUIREMENT
Cashewrina Balli Props - 3" to 4" dia - 12'-0" Height
Scaffold Boards - Bamboo scaffolds - Bamboos 8'0" long
BLD-CSTN-15-4
B) LABOUR CHARGES
1st Class Carpenter
2nd Class Carpenter
Unskilled Mazdoor
Supervision Charges
Consumables like Rope, Nails, de-shuttering oil
Tape, cover plates
Tools like Hammers etc.,
BASIC COST per 1 sqm - PLAN AREA
211 Providing ACCESS SCAFFOLD using Cashewrina
balli props and bracings supporting wooden
brackets, wooden stage scaffold boards including
hire charges for cashewrina ballies, wooden baords,
scaffolds etc., and cost and conveyance of all other
consumable accessories, taxes etc complete for
finished item of work for ELEVATION AREA
(I)
UNIT 1 sqm
Up to - 3.66 M (12'0")
A) MATERIAL REQUIREMENT
Cashewrina Balli Props - 3" to 4" dia - 12'-0" Height
Scaffold Boards - Bamboo scaffolds - Bamboos 8'0" long
B) LABOUR CHARGES
1st Class Carpenter
2nd Class Carpenter
Unskilled Mazdoor
Supervision Charges
Consumables like Rope, Nails, de-shuttering oil
Tape, cover plates
Tools like Hammers etc.,
Quantity
4
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
1%
1%
Nos
4.32
Nos
2.70
day
0.08
day
0.38
day
0.68
day
0.06
1%
1%
1%
Nos
5.76
Nos
2.70
day
0.12
day
0.54
day
1.08
day
0.08
1%
1%
1%
Nos
1.74
Nos
0.72
day
0.07
day
0.11
day
0.2
day
0.04
1%
1%
1%
Up to - 7.32 M (24'0")
A) MATERIAL REQUIREMENT
752
BLD-CSTN
Index-code
S No
Description
Unit
Quantity
Nos
1.74
Nos
0.38
day
0.12
day
0.22
day
0.36
day
0.04
B) LABOUR CHARGES
1st Class Carpenter
2nd Class Carpenter
Unskilled Mazdoor
Supervision Charges
Consumables like Rope, Nails,de-shuttering oil
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
1%
1%
1%
BLD-CSTN-15-5
(I)
UNIT 1 sqm
Unsupported Roof Height up to - 3.66 M (12'0")
A) MATERIAL REQUIREMENT
Jack Screw Adjsutable Props - 50 mm dia B Class
Pipes
(II)
Kgs
39.26
day
0.04
day
0.34
day
0.60
day
0.04
1%
1%
1%
A) MATERIAL REQUIREMENT
Heavy Frames - 50 mm dia B Class Pipes (HD
Towers)
Lock Pins
LD Foot Plates
LD Couplers
Total Scaffolding Pipes - Appx B) LABOUR CHARGES
1st Class Carpenter
2nd Class Carpenter
Unskilled Mazdoor
Supervision Charges
Consumables like Rope, Nails, de-shuttering oil
Tape, cover plates
Tools like Hammers etc.,
BASIC COST per 1 sqm - PLAN AREA
Kgs
112.635
day
0.12
day
0.58
day
1.20
day
0.08
1%
1%
1%
753
BLD-CSTN
Index-code
BLD-CSTN-15-6
S No
Description
Unit
Quantity
Kgs
19.7496
day
0.07
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
(I)
UNIT 1 sqm
Up to - 3.66 M (12'0")
A) MATERIAL REQUIREMENT
MS Pipe Scaffold Frames - 1.20 x 1.50 M
Approximately 27.3 M Long x 3.66 M High
day
0.11
day
0.24
day
0.04
1%
1%
1%
Up to - 7.32 M (24'0")
A) MATERIAL REQUIREMENT
MS Pipe Scaffold Frames - 1.20 x 1.50 M
Approximately 27.3 M Long x 3.66 M High
Kgs
19.14
day
0.12
day
0.22
day
0.44
day
0.04
1%
1%
1%
Rs. A
(Rs. A - Rs. B)
C
754
BLD-CSTN
Index-code
S No
1
Description
Unit
Quantity
Rate
Rs.
5
Amount
Rs.
6
Remarks
7
Let :
Cost of Scaffolding materials = Rs. A
Scrap value of Scaffolding materials = Rs. B
(Usually B = A * 10%)
Period of Hire of Scaffolding materials, in years =
Life of Scaffolding materials, in years =
Therefore, Hire Charges of scaffolding Materials:
C
D
[(Rs. A - Rs. B)*C]
D
Note: While calculating the Capital Cost of the materials, deprication shall be allowed
based on the service life of the materials.
Number of uses of Scaffolding materials (C )
Wooden Materials - No of Uses - 10 Times (C)
Period of Hire of Steel Scaffolding materials, in years = 1.64 (200 days per Annum)
(C
Life) of Steel Forms & Scafholding Material - 3 Years (D)
Period of Requirement of Centering Material
Slabs : 14 + 4 = 18 days
Columns : 1.50 days
Foundations : 2 days
755