PRE-COMMISSIONING CHECK LIST FOR SPLIT UNIT


(BIN BN KIM TRA TRC KHI VN HNH MY LNH HAI CC)
Project:
Tn d n:
Contractor:
Nh Thu:
Client :
Ch u t

Ref No.:
S tham chiu:
Contract package:
Gi thu:
Project Management:
T vn QLDA:

QA-F-VN-PCM-PreCommissioning_Checklist_for_Split_
Unit-Rev A

ARCHETYPE

Description of item(s):
(M t hng mc)
According to Drawing No.:
(Da theo bng v s):
Owners Inspection Report
(Bin bn kim tra ca Ch u t)

Date:

(Ngy)

Check list (Danh muc cn kim tra)

Time:

(Gi)

Result (Kt qua)

1. Anti-vibration mounts? (Gia chng rung?)


2. Fans freely rotate? (S quay t do cua quat dan lanh?)
3. Drive belts aligned? (S thng hang gia cac buly dn hng va ai?)
4. Bearings clear & lubricated? (V sinh va bi trn cac truc?)
5. Filter banks clear? (V sinh li loc?)
6. Heating/Cooling coil clear & undamaged? (Dan nong/lanh v sinh tt
khng h hong?)
7. Fan compartment clear & free of debris? (V sinh khoang cha quat?)
8. Inspect unit location for proper required service clearances? (Khoang cach
ky thu
t?)
9. Inspect unit location for proper free air clearances? (Khoang cach thoang
gio?)
10. Insulated the entire refrigerant pipe line? (Cach nhit ng ng hut?)
11. Evacuated each refrigerant circuit to 350 micron? (Hut chn khng n
350 mircon?)
12. Charge each circuit with proper amount of R-22? (Khi lng gas u?)
13. All pipe/duct conns to AC complete? (Cac ng nc/gas va ng gio ni ti
AC a hoan chinh?)
14. Installed system indoor thermostat? (a lp thermostat cho h thng?)
15. Installed system low voltage interconnecting wiring to proper terminal of
outdoor unit, indoor unit and system thermostat? (Kim tra u ni dy tai
hp u ni cua indoor unit va outdoor unit?)
16. Check the unit power phasing to be sure that it has been installed in an
ABC sequence. Refer to Unit voltage phasing? (Kim tra th t pha?)
Owners Supervisor comment ( kin ai din Chu u t):

Note (Ghi ch):

QA-F-VN-PCM-Pre-Commissioning_Checklist_for_Split_Unit-Rev A

Page 1/2

Your submission for approval is subject to following conditions: (n trnh ph duyt co kt


qua nh sau):
Approved
(Chp thun)
Not approved as noted
(Khng chp thun vi ghi chu sau)

Approved on condition as noted


(Chp thun vi iu kin ghi chu sau)
Amend and resubmit
(Sa va trnh lai)

Note (Ghi ch): Accepting the T & C works in this inspection SHALL not relieve the contractors responsibilities from his
contract agreements. /Vic chp nhn kit qua kim tra vn hanh va th nghim trong bin ban nghim thu nay s
khng lam giam trach nhim cua nha thu theo nhng iu khoan rang buc trong hp ng.

Contractor
(Nh thu):

Project Management
Consultant
(T vn Qun L D
n):

Client's
Representatives
(i din Ch u t):

Signature (Ch k):

Signature (Ch k):

Signature (Ch k):

Name (Tn):_______________

Name (Tn):_______________

Name (Tn):_______________

Position (Chc vu):__________

Position (Chc vu):__________

Position (Chc vu):__________

Date (Ngay):_______________

Date (Ngay):_______________

Date (Ngay):_______________

QA-F-VN-PCM-Pre-Commissioning_Checklist_for_Split_Unit-Rev A

Page 2/2