Академический Документы
Профессиональный Документы
Культура Документы
Z:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-013 METAL DOORS AND FRAMES\C-CS-20-013 METAL DOORS AND FRAMES REV 0.DOC
Client Name:
Project Name:
Project Number:
Specification C-CS-20-013
Page 1 of 13
Rev. 0
FLUOR
Mining & Minerals
Originator
(name/initials)
Hernan Alvarez
Rev
Date
14Jul05
Revision Description
Issued for Construction
; New Issue
ORIGINAL SIGNED BY
APPROVALS
FLUOR
DATE
CLIENT
DATE
Project Manager:
Engineering Manager:
Brad Matthews
14Jul05
Reza Sherkat
14Jul05
Hernan Alvarez
14Jul05
William Craft
15Jul05
Gary Christie
15Jul05
Process Approval:
Z:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-013 METAL DOORS AND FRAMES\C-CS-20-013 METAL DOORS AND FRAMES REV 0.DOC
ARCHITECTURAL
Client Name:
Project Name:
Project Number:
Specification C-CS-20-013
Page 2 of 13
Rev. 0
FLUOR
Mining & Minerals
GENERAL....................................................................................................................................................... 3
1.1
Summary ......................................................................................................................................................3
1.2
References...................................................................................................................................................3
1.3
Submittals.....................................................................................................................................................3
2.
PRODUCTS.................................................................................................................................................... 4
2.1
Manufacturers ..............................................................................................................................................4
2.2
Materials.......................................................................................................................................................4
2.3
Fabrication ...................................................................................................................................................4
3.
EXECUTION ................................................................................................................................................... 6
3.1
Installation ....................................................................................................................................................6
3.2
Cleaning .......................................................................................................................................................7
4.
ATTACHMENTS ............................................................................................................................................ 7
1.
GENERALIDADES......................................................................................................................................... 9
1.1
Resumen ......................................................................................................................................................9
1.2
Referencias ..................................................................................................................................................9
1.3
Remisiones ................................................................................................................................................10
2.
PRODUCTOS ............................................................................................................................................... 10
2.1
Fabricantes ................................................................................................................................................10
2.2
Materiales...................................................................................................................................................10
2.3
Fabricacin.................................................................................................................................................11
3.
EJECUCIN ................................................................................................................................................. 13
3.1
Instalacin ..................................................................................................................................................13
4.
ANEXOS ....................................................................................................................................................... 14
Z:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-013 METAL DOORS AND FRAMES\C-CS-20-013 METAL DOORS AND FRAMES REV 0.DOC
ARCHITECTURAL
Client Name:
Project Name:
Project Number:
Specification C-CS-20-013
Page 3 of 13
Rev. 0
FLUOR
Mining & Minerals
GENERAL
1.1
Summary
A.
Scope of Specification
This specification includes but does not necessarily limit materials and labor to furnish, unload,
store, and install metal doors and frames for a complete, operational system.
B.
Related Specifications
The following specifications prescribe items of related Work:
1.
C-CS-20-010
Metal Panel
2.
C-CS-20-005
3.
C-CS-20-011
Galvanized Flashing
4.
C-CS-20-012
Joint Sealing
5.
C-CS-20-016
Finished Hardware
6.
C-CS-20-017
7.
C-CS-20-022
Field Painting
Coordinate Work prescribed by this specification with Work prescribed by the above listed
specifications.
1.2
References
Referenced publications within this specification shall be the latest revision, unless otherwise
specified; and applicable parts of the referenced publications shall become a part of this specification
as if fully included.
1.3
A.
B.
C.
D.
E.
F.
G.
UL (Underwriters Laboratories)
Submittals
A.
Shop Drawings
Submit shop drawings to Fluor for review. Show glazing and construction details, hardware
mounting locations, elevations, door and frame type, profile for each frame type, wall anchors for
each type of wall, and joiners for split frames.
Z:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-013 METAL DOORS AND FRAMES\C-CS-20-013 METAL DOORS AND FRAMES REV 0.DOC
ARCHITECTURAL
Client Name:
Project Name:
Project Number:
Specification C-CS-20-013
Page 4 of 13
Rev. 0
FLUOR
Mining & Minerals
PRODUCTS
2.1
2.2
Manufacturers
A.
Ceco
B.
Curries / Essex
C.
D.
E.
Steelcraft
F.
Other Approved
Materials
A.
Doors
Heavy Duty
44.4mm thick, full flush, and seamless
B.
C.
Integral Seals
Doors with factory installed integral seals shall be similar and equal to Series WF Uni-Seal by
Pioneer Industries. Provide where scheduled on the drawings.
D.
Louvers
DL-138 as manufactured by Construction Specialties, Inc., or an approved substitute.
2.3
Fabrication
A.
Doors
1.
Fabricate doors from cold-rolled, stretcher-leveled steel sheets with clean, smooth
surfaces. Welded joints on exposed surfaces shall be dressed smooth so they are invisible
after finishing.
2.
Fabricate exterior doors from prime quality galvanized steel (A-60) sheets complying with
ASTM A568, A653 and A924. Steel shall be degreased, primed, and ready for field
painting according to Specification C-CS-20-022.
3.
Door Construction
Construct by using 2 prime quality, cold-rolled steel sheets, 18 gage for interior doors and
16 gage for exterior doors. Interior doors shall have a 1-piece resin-impregnated
honeycomb core securely bonded to both face sheets. Exterior doors shall be filled with
the Manufacturer's standard foam insulation. Top and bottom channels shall be 16-gage
Z:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-013 METAL DOORS AND FRAMES\C-CS-20-013 METAL DOORS AND FRAMES REV 0.DOC
ARCHITECTURAL
Client Name:
Project Name:
Project Number:
Specification C-CS-20-013
Page 5 of 13
Rev. 0
FLUOR
Mining & Minerals
5.
Clearances
Allow proper clearance for hanging and operation without binding. Lock edges of door
stiles shall be beveled 3.2mm in 50 mm. Close top and bottom edges of all exterior metal
doors to provide a weather seal.
6.
Reinforcing
The door Manufacturer shall obtain the necessary hardware templates to facilitate the
correct location and size of mortising, reinforcing, drilling, and tapping of doors at the
factory. Provide 7 gage plate or continuous 12 gage channel reinforcing for hinges, 14
gage reinforcing for closers and Manufacturer's standard heavy duty reinforcing for other
hardware. In no case shall reinforcing be less than minimum standard gages
recommended in SDI-100.
7.
Glass Moldings and Stops shall be metal same material and gage as Frames
8.
Wired glass
Glass shall be diamond pattern, 6mm thick, Form 1, Quality Q(5), Mesh M(1). UL Listed
and in accordance with applicable building codes. Comply with ASTM C1036 and Z97.1.
9.
Tempered Glass
Glass shall be tempered in all doors, except where required by code to be wire glass.
Glass shall be as specified in Specification C-CS-20-017.
10.
B.
Labeled Doors
a.
b.
Fire doors shall have a label or other identification showing the name of the
Manufacturer, the fire resistance rating, and the maximum transmitted temperature
end point (for stairway fire doors only). Such label shall be approved and shall be
permanently affixed. The label shall be applied at the door factory where fabrication
and assembly are carried out.
Gages
Metal for frames shall be cold-rolled steel with clean, smooth surfaces. Except where
other gages are indicated or specified, fabricate from no lighter than U.S. Standard 16gage.
Z:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-013 METAL DOORS AND FRAMES\C-CS-20-013 METAL DOORS AND FRAMES REV 0.DOC
ARCHITECTURAL
Client Name:
Project Name:
Project Number:
Specification C-CS-20-013
Page 6 of 13
Rev. 0
FLUOR
Mining & Minerals
Reinforcing
Mortise, reinforce, drill, and tap from templates to receive hardware. Provide steel
reinforcements for hardware cutouts and spot weld to frames. Provide cover boxes in
back of hardware cutouts. Punch frames to receive rubber silencers [:: 3 on single ::] [:: 2
for double-door frames ::]. Set lock strikes and adjust to provide clearance for silencers.
Obtain the necessary hardware templates from the hardware Manufacturer to properly size
and locate mortising and reinforcing.
3.
Frame Anchors
Provide metal anchors of shapes, types, and sizes required for the adjoining type of wall
construction. Fabricate anchors of steel no lighter than gage used for frames. Anchors
shall be corrugated or deformed. Provide floor anchors, spot welded.
4.
Labeled Frames
Fabricate according to UL requirements with scheduled labels. Factory-attach appropriate
UL label. Provide approved anchors for type wall frame in which frame is to be installed.
5.
C.
Astragals
Provide an overlapping metal astragal on pairs of labeled doors except when the doors are
equipped with an approved, rim-type exit hardware and provided with a removable mullion.
Where astragals are prohibited by code, provide fire rated units tested without astragals in
accordance with NFPA 80.
D.
E.
Finish Painting
Doors shall be finish-painted as scheduled on the drawings and specified in Specification C-CS20-022.
3.
EXECUTION
3.1
Installation
A.
Frames
1.
Set frames in position, plumb, align, and brace securely until permanent anchors are set.
Anchor bottom of frames to floor with power fasteners. Build in wall anchors with walls.
Where frames require ceiling struts or other structural overhead bracing, they shall be
securely anchored to ceilings or structural framing as required. Anchor labeled frames
according to UL requirements. Provide no fewer than 3 anchors per jamb, and spot weld
floor anchors flush with frame and drilled for anchoring frame to floor. Where floor fills
occur, terminate the bottom of the frame at the indicated finish floor level and support by
the adjustable extension slip angles resting on and anchored to the structural slab.
Z:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-013 METAL DOORS AND FRAMES\C-CS-20-013 METAL DOORS AND FRAMES REV 0.DOC
ARCHITECTURAL
Client Name:
Project Name:
Project Number:
Specification C-CS-20-013
Page 7 of 13
Rev. 0
FLUOR
Mining & Minerals
3.2
In drywall construction, double steel studs shall be installed on each side of opening and
secured to structure above. Coordinate with Specification C-CS-20-005.
Doors
1.
Install for smooth, easy operation with no sag, drag, bow, or wrap. Hang true, plumb, and
square. Coordinate with Specification C-CS-20-016.
2.
Cleaning
Upon completion of the installation, clean exposed surfaces of door frames thoroughly, and touch-up
as recommended by the Manufacturer, ready to receive finish painting.
4.
ATTACHMENTS
Not applicable.
End of Specification
Z:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-013 METAL DOORS AND FRAMES\C-CS-20-013 METAL DOORS AND FRAMES REV 0.DOC
ARCHITECTURAL
Client Name:
Project Name:
Project Number:
Specification C-CS-20-013
Page 8 of 14
Rev. 0
FLUOR
Mining & Minerals
Origen
(nombre/iniciales)
Hernan Alvarez
Fecha
Rev.
14Jul05
Descripcin de la Revisin
Emitido para Construcin
; Nueva Edicin
APROBACIONES
FECHA
CLIENTE
FECHA
Gerente de Proyecto:
Gerente de Ingeniera:
Brad Matthews
14Jul05
Reza Sherkat
14Jul05
Hernan Alvarez
14Jul05
William Craft
15Jul05
Gary Christie
15Jul05
Z:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-013 METAL DOORS AND FRAMES\C-CS-20-013 METAL DOORS AND FRAMES REV 0.DOC
ARCHITECTURAL
Client Name:
Project Name:
Project Number:
Specification C-CS-20-013
Page 9 of 14
Rev. 0
FLUOR
Mining & Minerals
GENERALIDADES
1.1
Resumen
A.
Alcance de la Especificacin
Esta especificacin incluye, pero no necesariamente se limita, a los materiales y mano de obra
para suministrar, descargar, almacenar, e instalar las puertas y marcos metlicos para un
sistema operacional completo.
B.
Especificaciones Relacionadas
Las siguientes especificaciones prescriben los tems de Trabajo relacionado:
1.
C-CS-20-010
Panel Metlico
2.
C-CS-20-005
3.
C-CS-20-011
4.
C-CS-20-012
Sellado de Juntas
5.
C-CS-20-016
Cerrajera
6.
C-CS-20-017
Vidrio y Vidriado
7.
C-CS-20-022
Pintura en Campo
Coordinar el Trabajo prescrito por esta especificacin con el Trabajo indicado por las
especificaciones arriba listadas.
1.2
Referencias
Las publicaciones referenciadas dentro de esta especificacin, debern ser la ltima revisin, salvo
que se especifique de otra manera; y las partes aplicables de las publicaciones referenciadas,
debern convertirse como parte de esta especificacin como si estuviera incluida totalmente.
A.
B.
C.
D.
E.
F.
G.
UL (Laboratorios de Certificacin)
Z:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-013 METAL DOORS AND FRAMES\C-CS-20-013 METAL DOORS AND FRAMES REV 0.DOC
ARCHITECTURAL
Client Name:
Project Name:
Project Number:
Specification C-CS-20-013
Page 10 of 14
Rev. 0
FLUOR
Mining & Minerals
Remisiones
A.
Planos de Fbrica
Remitir los planos de fbrica a Fluor para su revisin. Mostrar los detalles de construccin y
trabajos en vidrios, ubicaciones de accesorios de montaje, elevaciones, tipo de puerta y marco,
perfil de cada tipo de marco, anclajes de muro para cada tipo de muro, y piezas de ensamble
para marcos despiezados.
2.
PRODUCTOS
2.1
2.2
Fabricantes
A.
Ceco
B.
Curries / Essex
C.
D.
E.
Steelcraft
F.
Otros Aprobados
Materiales
A.
Puertas
Servicio Pesado
Espesor de 44.4mm, totalmente lisa, y sin costuras.
B.
C.
Sellos Integrales
Las puertas con sellos integrales instalados en fbrica debern ser similares e iguales a las
Series WF Uni-Seal de Pioneer Industries. Proveer donde se especifique en los planos.
D.
Persianas
Modelo DL-138 segn lo fabricado por Construction Specialties, Inc., o un sustituto aprobado.
Z:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-013 METAL DOORS AND FRAMES\C-CS-20-013 METAL DOORS AND FRAMES REV 0.DOC
ARCHITECTURAL
Client Name:
Project Name:
Project Number:
Specification C-CS-20-013
Page 11 of 14
Rev. 0
FLUOR
Mining & Minerals
Fabricacin
A.
Puertas
1.
2.
3.
Construccin de Puertas
Construir utilizando 2 plancha de acero laminado en fro, de primera calidad, calibre 18
para puertas interiores y calibre 16 para puertas exteriores. Las puertas de interiores
debern tener ncleo de panal impregnado en resina de 1-pieza, pegada fijamente en
ambas caras de las planchas. Las puertas exteriores debern ser rellenadas con espuma
aislante estndar del fabricante. Los canales superiores e inferiores debern ser de acero
calibre 16, fijados con soldadura a puntos en la cara de la puerta. Las uniones de los
bordes de las planchas de cara debern ser interconectadas mecnicamente. Doblar las
alas de los canales superiores e inferiores hacia el interior de la puerta.
4.
5.
Holguras
Dejar una holgura apropiada para la suspensin y operacin de la puerta sin trabarse. Los
bordes de la cerradura de los montantes de puertas deben ser biselados. 3.2mm en
5.1mm. Hermetizar los bordes superiores e inferiores de todas las puertas metlicas
exteriores para proveer un sellado contra daos climticos.
6.
Reforzado
El Fabricante de puertas deber obtener plantillas necesarias de accesorios para facilitar
la ubicacin y dimensionado correcto de mortajas, refuerzos, taladrados y horadado de
puertas en la fbrica. Proveer placas de refuerzo de calibre 7 o canales continuos de
calibre 12 para las bisagras, refuerzo de calibre 14 para las piezas de cierre y refuerzos
de servicio pesado estndar del fabricante para otro accesorio. En ningn caso el refuerzo
deber ser menos que los calibres estandarizados mnimos recomendados en SDI-100.
7.
8.
Vidrios
Los vidrios debern ser de modelo diamante (vidrio catedral), espesor de 6mm, Formato
1, Calidad Q(5), cocada M(1). Segn UL mencionada y de acuerdo con los cdigos de
construccin aplicable. En acuerdo con ASTM C1036 y Z97.1.
Z:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-013 METAL DOORS AND FRAMES\C-CS-20-013 METAL DOORS AND FRAMES REV 0.DOC
ARCHITECTURAL
Client Name:
Project Name:
Project Number:
Specification C-CS-20-013
Page 12 of 14
Rev. 0
FLUOR
Mining & Minerals
Vidrios
Los vidrios debern ser templados en todas las puertas, excepto donde el cdigo exige
que sea vidrio armado con alambre. Los vidrios debern ser tal como se especifica en la
especificacin C-CS-20-017.
10.
B.
Puertas Rotuladas
a.
b.
Las puertas contra incendios debern tener una etiqueta u otra identificacin que
muestre el nombre del Fabricante, y la calificacin de resistencia contra incendio, y
la temperatura mxima transmitida en los puntos extremos (solamente para puertas
contra incendios en escaleras). Tal etiqueta deber ser aprobada y deber
mantenerse permanentemente fija. La etiqueta deber ser aplicada en la fbrica de
puertas donde se ha llevado a cabo la fabricacin y ensamblado.
Calibres
El metal para los marcos deber ser de acero laminado en fro con superficies limpias y
lisas. Excepto donde se indique o especifique otros calibres, fabricar de un calibre no
menor al calibre 16 del estndar U.S.
2.
Reforzado
Hacer las mortajas, reforzar, taladrar y horadar a partir de plantillas para colocar los
accesorios. Proporcionar refuerzos de acero donde se realizaron cortes para instalar
accesorios y aplicar soldadura de punto a los marcos. Proveer cajas protectoras en la
parte trasera donde se realizaron los cortes para instalar accesorios. Punzonar los marcos
para poner silenciadores de goma [:: 3 en puerta de una hoja ::] [:: 2 para marcos de
puerta doble ::]. Instalar el agujero del pestillo de la cerradura y ajustar para proporcionar
holgura a los silenciadores. Obtener las plantillas necesarias de accesorios del fabricante
de accesorios para dimensionar y posicionar la mortaja y el reforzamiento en forma
apropiada.
3.
4.
Clasificacin de Marcos
Fabricar de acuerdo a los requerimientos de UL con las etiquetas predeterminadas.
Adosar en fbrica la etiqueta UL apropiada. Proveer los anclajes aprobados para el tipo de
marco de pared en el cual el marco ser instalado.
5.
Z:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-013 METAL DOORS AND FRAMES\C-CS-20-013 METAL DOORS AND FRAMES REV 0.DOC
ARCHITECTURAL
Client Name:
Project Name:
Project Number:
Specification C-CS-20-013
Page 13 of 14
Rev. 0
FLUOR
Mining & Minerals
C.
Astrgalos
Proveer un astrgalo metlico de traslape en pares de puertas que hayan sido clasificadas,
excepto cuando las puertas estn equipadas con un accesorio de escape tipo rim
(sobresaliente) aprobado, provisto con un parteluz desmontable. Donde estn prohibidos los
astrgalos por el cdigo, proveer unidades resistentes al fuego probadas sin astrgalos de
acuerdo con NFPA 80.
D.
E.
Pintado Final
Las puertas debern tener un pintado de acabado como se indica en los planos y en la
Especificacin C-C-CS-20-022.
3.
EJECUCIN
3.1
Instalacin
A.
B.
Marcos
1.
Fijar los marcos en la posicin, aplomar, alinear, y sujetar firmemente hasta que los
anclajes permanentes se instalen. Anclar las partes inferiores de marcos con sujeciones
de fuerza. Ensamblar los anclajes de pared en las paredes. Cuando los marcos requieran
arriostres de techo u otro elemento estructural en altura, debern ser anclados firmemente
a techos o armaduras estructurales segn se requiera. Anclar los marcos rotulados segn
los requerimientos de UL. Proveer no menos de 3 anclajes por cada jamba, y los anclajes
de piso unidos con soldadura a punto sean enrasados con el marco y taladrado para
anclar la estructura al piso. Donde aparezcan rellenos en el piso; terminar la parte inferior
del marco al nivel indicado de piso terminado; y dar soporte mediante los ngulos de
deslizamiento de extensin ajustable, descansando encima y anclados a la losa
estructural.
2.
En la construccin con paneles recubiertos de yeso (drywall), debern ser instalados dos
esprragos de acero en cada lado de la abertura y; asegurados a la estructura anterior.
Coordinar con la especificacin C-CS-20-005.
Puertas
1.
Instalar para lograr una operacin fcil y uniforme sin pandeos, rozamientos,
inclinaciones, o abolladuras. Suspender correctamente, aplomar, y cuadrar. Coordinar con
la Especificacin C-CS-20-016.
2.
Z:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-013 METAL DOORS AND FRAMES\C-CS-20-013 METAL DOORS AND FRAMES REV 0.DOC
ARCHITECTURAL
Client Name:
Project Name:
Project Number:
Specification C-CS-20-013
Page 14 of 14
Rev. 0
FLUOR
Mining & Minerals
Limpieza
Al finalizar la instalacin, limpiar exhaustivamente las superficies expuestas de los marcos de
las puertas, y retocar segn lo recomendado por el Fabricante; preparar para dar el pintado
final.
4.
ANEXOS
No aplicable.
Fin de la Especificacin
Z:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-013 METAL DOORS AND FRAMES\C-CS-20-013 METAL DOORS AND FRAMES REV 0.DOC
ARCHITECTURAL